Loading...
HomeMy WebLinkAboutA1.1 CONSTRUCTION_FINISH PLANS.pdfProject Number: Revisions: Drawn By Checked ByIssue Date James Robert Stutzman, AIA, NCARB Architecture / Project Management: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: Sheet Title: Project: Developer: By: PA R K I N G L E V E L SE L F S T O R A G E Ca r m e l , In d i a n a 4 6 0 3 2 Ca r m e l C i t y C e n t e r , S u i t e 7 6 A 71 2 S o u t h R a n g e l i n e R o a d COPYRIGHT & OWNERSHIP OF DOCUMENTS 19 R @ 6 2 5 / 3 2 " = 1 0 ' - 8 3 / 4 " 18 T @ 1 1 2 9 / 6 4 " = 1 7 ' - 2 3 / 6 4 " UP SCALE: 1/128"= 1'-0" KEY PLAN SUITE 76A PEDCOR DESIGN GROUP, L.L.C. A1.1 CONSTRUCTION/ FINISH PLANS BNR MC11/24/2015 STATE RELEASE SET: 11/25/2015 THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. © COPYRIGHT 2012 JAMES R. STUTZMAN, AIA, Carmel, Indiana. J 19 R @ 6 2 5 / 3 2 " = 1 0 ' - 8 3 / 4 " 18 T @ 1 1 2 9 / 6 4 " = 1 7 ' - 2 3 / 6 4 " UP FN1 FN1 FN4 FN2 FN2 FN1 FN2 FN1 FN2 FN1 FN2 FN1 FN2 FN1 FN2 FN1 FN2 FN1 FN2 FN1 FN2 FN1 FN2 FN1 FN2 FN1 FN2 FN3 S 1 . 5 A 21 ' - 6 " 6'-5" 30'-6" ALL NEW HOLLOW METAL DOORS ARE TO BE PRIMED AND PAINTED. ALL NEW HOLLOW METAL DOOR FRAMES TO BE PRIMED UNLESS NOTED OTHERWISE. CAULK INTERIOR AND EXTERIOR PERIMETERS OF ALL HOLLOW METAL DOOR FRAMES. THE SERVICE CORRIDOR SIDE OF ALL METAL DOORS AND FRAMES ARE TO BE PAINTED TO MATCH THE EXISTING SERVICE CORRIDOR WALLS. ALL EXISTING FINISHES TO REMAIN ARE TO BE CLEANED AND RESTORED TO AS CLOSE AS POSSIBLE TO THEIR ORIGINAL CONDITION. 1. 2. 3. 6. 7. 5.ALL NEW WALLS TO BE TAPED, SPACKLED, AND SANDED. SEE CONSTRUCTION PLAN FOR WALL TYPES. ALL EXPOSED METAL SURFACES ON WALLS AND IN THE CEILING (i.e.. GRILLS, HEATERS, AND FIRE EXTINGUISHER CABINETS) TO BE UNFINISHED. ALTERNATES GENERAL FLOORING IS TO BE CLEANED, MOPPED, SEALED, AND WITH NO BASE. UNLESS NOTED OTHERWISE. 4. GENERAL FINISH NOTES 1.ALTERNATES WILL NOT BE ACCEPTED WITHOUT WRITTEN APPROVAL OF DESIGNER. SAMPLES, WHEN APPLICABLE, SHALL BE SUBMITTED FOR REVIEW. CONTRACTOR TO VERIFY LEAD TIMES AS SOON AS CONTRACT IS AWARDED AND NOTIFY ARCHITECT IF SPECIFIED FINISHES WILL NOT BE AVAILABLE. DESIGN FEES MAY ACCRUE FOR TIME SPENT TO RESELECT ANY MATERIALS WHICH BECOME UNAVAILABLE DUE TO DELAYS IN ORDERING. FLOORING FINISH LEGEND VERIFY UNDERCUT REQUIREMENTS FOR DOORS WHERE FLOORING IS TO BE INSTALLED. NEW DRYWALL TO BE TAPED, SPACKLED, SANDED, AND PRIMED. FLOORS TO BE CLEANED, MOPPED, SEALED AND WITH NO BASE. FINISH PLAN NOTES: FN1 FN2 FN3 EXISTING WALLS TO BE LEFT UNFINISHED. FN4 NEW DOOR AND FRAME ARE TO BE FACTORY PRIMED AND PAINTED IN THE FIELD. PAINT PAINT MFG: SHERWIN WILLIAMS COLOR: XXX FINISH: SEMI-GLOSS LOCATION: DOORS AND DOOR FRAMES P1 SEALED CONCRETE COLOR: CLEAR LOCATION: GENERAL SC1 FLOOR SHALL BE CLEANED, SMOOTH AND LEVEL FOR INSTALLATION OF NEW FLOOR FINISHES AS SCHEDULED. 9. ALL WALLS SCHEDULED TO REMAIN (I.E. CORE WALLS, AND DEMISING WALLS) SHALL BE PATCHED, REPAIRED, AND SANDED SMOOTH IN PREPARATION FOR NEW FINISHES. 10. CONSTRUCTION PLAN NOTES: CP1 10 0 NEW DOOR AND FRAME. REFER TO DOOR SCHEDULE. DENOTES AREA NOT IN CONTRACT. GENERAL CONSTRUCTION NOTES: DIMENSIONS ARE FROM FINISHED FACE OF WALL TO FINISHED FACE OF WALL UNLESS NOTED OR SHOWN OTHERWISE. ANY DIMENSION NOT SHOWN OR DEEMED QUESTIONABLE ARE TO BE VERIFIED BY ARCHITECT. DO NOT SCALE DRAWINGS. 1. SEE CONSTRUCTION PLAN LEGEND FOR WALL CONSTRUCTION AND WALL TYPES.2. ALL WALLS SHALL BE CHALKED OFF FOR ARCHITECTS REVIEW OF NEW WALL CONSTRUCTION.3. PROVIDE CONCEALED FIRE RATED WOOD BLOCKING SUPPORTS AS REQUIRED FOR ALL SURFACE MOUNTED ITEMS. 4. SEE DOOR AND FRAME SCHEDULE. NEW DOOR AND FRAME NUMBERS CORRESPOND TO ROOM NUMBERS. WHERE MORE THAN ONE DOOR OCCURS IN A ROOM, A SUFFIX HAS BEEN ADDED (ie. 100A). 5. ALL NEW DOORS TO BE INSTALLED WITH HINGE 6" AWAY FROM WALL.6. ALL NEW DOORS SHALL ALLOW 12" CLEAR ON PUSH SIDE AND 18" CLEAR ON PULL SIDE OF DOOR, UNLESS NOTED OTHERWISE, TO MEET CURRENT ADA CODE REGULATIONS. 7. ALL NEW FIRE EXTINGUISHER CABINETS TO BE FINISHED TO MATCH ADJACENT WALL FINISH AND INSTALLED ACCORDING TO CODE. LIFE SAFETY CONTRACTOR TO VERIFY PLACEMENT AND COUNT OF FIRE EXTINGUISHERS THROUGHOUT THE SPACE. IF ADDITIONAL FIRE EXTINGUISHER LOCATIONS ARE NEEDED, A PLAN MUST BE SUBMITTED TO THE ARCHITECT FOR REVIEW OF AESTHETIC PURPOSES ONLY. 8. 6" 20 GAUGE METAL STUDS @16"O.C. 7- 1 / 4 " WITH 5/8" GYPSUM WALL BOARD EACH SIDE. WALL TO EXTEND TO DECK ABOVE. PROVIDE BATT INSULATION INSIDE WALL. W1 EXISTING WALL TO REMAIN WALL LEGEND: NOTES: CP2 CP3 CP4 PROVIDE CHAIN LINK FENCING FROM FLOOR TO DECK ABOVE. FRAME AROUND CEILING HUNG ITEMS. INCLUDE SWING DOORS WITH LOCKABLE LATCHES AND FENCESCREEN, 200 SERIES, BLACK PRIVACY SCREEN. NEW FIRE EXTINGUISHER CABINETS TO BE FINISHED TO MATCH ADJACENT WALL FINISH AND INSTALLED ACCORDING TO CODE. PROVIDE NEW ELECTRICAL PANEL FOR ELECTRICAL OUTLETS, LIGHTING, AND HVAC UNIT. PROVIDE NEW ELECTRICAL DUPLEX OUTLET. 1-HR FIRE RATED 7' - 0 " 2" 2"4'-0"2" HARDWARE L = L O C K S E T SIZE BUILDING STORAGE RO O M N A M E OP E N I N G NU M B E R XXX WID T H HE I G H T EL E V A T I O N MA T E R I A L TH I C K DOOR MA T E R I A L EL E V A T I O N FRAME REMARKS D O O R S C H E D U L E CL = C L O S E R 1. DOOR SCHEDULE NOTES: 2. 3. ALL HOLLOW METAL DOORS ARE TO BE PREPPED, PRIMED AND, PAINTED. D1 SP = S I L L P L A T E PROVIDE NEW HARDWARE TO BE: SCHLAGE, AL-SERIES, JUPITER STYLE 626 FINISH LEVER HARDWARE. COORDINATE KEYING LOCKSETS WITH THE BUILDING MANAGEMENT. HM D1 L, CL, SP7'-0"4'-0"1 3/4"HM D1 D2 J 19 R @ 6 2 5 / 3 2 " = 1 0 ' - 8 3 / 4 " 18 T @ 1 1 2 9 / 6 4 " = 1 7 ' - 2 3 / 6 4 " UP 25 ' - 1 1 3 3 / 6 4 " 6" 4' - 0 " 4'-2 7/8"2' - 1 1 7 / 8 " 6' - 5 7 / 8 " 6' - 5 7 / 8 " 6' - 5 7 / 8 " 6' - 5 7 / 8 " 5'-6" 9' - 8 1 3 / 1 6 " 9' - 8 1 3 / 1 6 " 11'-0" 4'-2 7/8"2' - 1 1 7 / 8 " 19 ' - 5 4 1 / 6 4 " 6' - 5 7 / 8 " 6' - 5 7 / 8 " 6' - 5 7 / 8 " 5'-6" 1 EL1NEW DOOR CP3 CP2 CP1 CP1 CP1 CP1 CP1 CP1 CP1 CP1 CP1 CP1 CP1 CP4 SUITE 76A 795 SQ.FT. N ELEC FECW1 1- H R F I R E RA T E D 24.1 24 25 24.1 24 25 R SR.1 R.2 R.3 R.5 R.6R SR.1 R.2 R.3 R.5 R.6 24.1 24 25 24.1 24 25 R SR.1 R.2 R.3 R.5 R.6R SR.1 R.2 R.3 R.5 R.6 SCALE: 1/4" = 1'-0" 2 FINISH PLAN A1.1SCALE: 1/4" = 1'-0" 1 CONSTRUCTION PLAN A1.1