HomeMy WebLinkAbout257103 04/05/16 +q CITY OF CARMEL, INDIANA VENDOR: 368938
s® i ONE CIVIC SQUARE C H A CONSULTING CHECK AMOUNT: $****27,220.00*
CARMEL, INDIANA 46032 300 SOUTH MERIDIAN CHECK NUMBER: 257103
9M«oN UNION STATION CHECK DATE: 04/05/16
INDIANAPOLIS IN 46225
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
202 R4340100 32640 30004-11 27,220.00 96TH PRIORITY WAY RAB
Prescribed by State Board of Accounts City Form No.201(Rev.1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service,where performed,dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit,etc.
Payee
Purchase Order No.
Terms
Date Due
Invoice Date Invoice# Description Amount
Dept. Fund# (or note attached invoice(s)or bill(s))
03/11/16 I 30004-11 I 96th and Priority Way RAB I $27,220.00
2200 202
1 hereby certify that the attached invoice(s),or bill(s), is(are)true and correct and I have audited same in accordance
with IC 5-11-10-1.6
, 20
Clerk-Treasurer
VOUCHER NO. WARRANT NO.
C H A CONSULTING ALLOWED 20
300 SOUTH MERIDIAN IN SUM OF$
UNION STATION
INDIANAPOLIS, IN 46225
$27,220.00
ON ACCOUNT OF APPROPRIATION FOR
En-gineering
PO#/Dept. INVOICE NO. ACCT#/Fund AMOUNT Board Member:
32640 I 30004-11 I 43-401.00 I $27,220.00 1 hereby certify that the attached invoice(s), or
2200 Encumbered 202
bill(s) is (are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
_received except
Friday, April 01, 2016
Cost distribution ledger classification if
claim paid motor vehicle highway fund
CJAA7-� Pp_ 3240
2�'L - 24'3 L-�O 1 00
Skip Tennancour March 11,2016
Land Acquisition Manager Invoice No: 30004-11
American Structurepoint
8425,Wicklow Way
Brownsburg,IN 46112
Project 30004 96th Street at,Priority Way W.Drive Roundabout Construction(City Project#15-04)
CONTACT:; DAVID.HENKEL: (317)780;7227
I
Preliminary Engineering Services per the contract dated April 1,2015
Des No:1400937; Total Contract NTE$180,085; NTP dated April 1,2615
Supplemental Agreement No.1 dated February 17,2016
NTE$116;340;Total Contract NTE$296,425; ,NTP dated February 18,2016
$203,400.00 Lump Sum
$66,900,00 Hourly/NTE
$26;125.00 Unit(NTE
$296,425.00
Professional Services: January 30,2016 Through February 26,2016
Percent Previous Current
Billing Phase/task Fee Complete Fee Billed Fee Bi.lied
LUMP SUM
Section 1 Traffic Data Collection 20,500.00 90.00% 18,450.00 0.00
Section 2 Environmental Document&Permitting 21,300.00_ 95.00% 20,235.00 0.00
Section 3 Public Involvement 13,400.00 25.00% 3,350.00 0.00
Section 4 Project Management&Roadway/Drainage Design 148,200.00 65.00% 69,110.00 27,220.00
(through Final Tracings)
Total Fee 203,400.00 111,145.00 27,220.00
Section 5: Utility Coordination (Hourly/NTE)
Billing Limits Current Billing Prior Billing Billed to Date
Total Billings 0.00 23,443:46 23,443.46
Billing Limit 49,300.00
Amount Remaining 25;856.54
Section 6: RW Engineering. (Unit/NTE)
Billing Limits Current Billing Prior Billing Billed to Date
Total Billings 0.00 0.00
Billing Limit 26,125.00
Amount Remaining 26,125.00
Section 7: Supplemental Toad Survey(Hourly/NTE)
Billing Limits Current Billing Prior Billing Billed to Date
Total Billings 0.00 5,000.00 5,000.00
Billing Limit 5,000.00
Amount Remaining 0.00
Section 8: Bidding and Construction Phase Svcs(Hourly/NTE)
Billing Limits Current Billing Prior Billing Billed to Date
Total Billings 0.00 5,000.00 5,000.00
Billing Limit 12,600.00
Amount Remaining 7,600.00
Total Project Billing Limits Current Billing Prior Billing Billed To Date
Total Billings 27,220.00 139,588.46 166,608.46
Billing Limit 296,425.00
Remaining 129,616.54
Total Due This Invoice $27,220.00
"Satisfying Our Clients-with Union Station,300'S..Merldian Street,Indianapolis,IN 46225
Dedicated People Committed to Total Quality" I T 317.786.0461 • F 317.788.0957• www.chacompantes.com
Project
C+lAr
Status
CONTACT: Jeremy Kashman,P.E.,City Engineer DATE: March 14,2016
CLIENT: City of Carmel PROJECT NO.: 30004-
PROJECT:
0004_
PROJECT: 96th Street and Priority Way Roundabout(City Project#15 04)
$Y: Christopher J.Schultz,P.E. PAGES-' 1 of 1
I
DISTRIBUTION:
NAME COMPANY �E-MAIL ADDRESS PHONE
Jeremy Kashman City of Carmel jkashman(@carmel.in.gov 317-571-2441
Chris Ogg City of Carmel ;coggpearmel.in gov 317-571-2441
Tom Karis CHA tkaris(@chacompanies.com 317=780-7255
Dawn Replogle CHA dreploWePchacompanies.com 317-780-7133
Kevin-Rearick CHA krearickna'chacompanies.com 317-780-7141
David Henkel CHA dhenkelachacomnanies.com
317-780-722
Chris Schultz CHA cschultz(@chacompanies.com 317-780-7252
Trevor Wieseke CHA twieseke0chacomnanies.com 317-780-7205
Tim Coomes United Consulting timcOucindy.com 317-895-2585
Jon Korff 'United Consulting jonkoucindy com 317-895-2585
PROGRESS SINCE LAST REPORT:
• 2/29/16—PFC Meeting(See attached minutes)
• 3/2/16—DPW-Meeting(See attached minutes)
• 3/8/16—Approved CE Document Signed(Environmental process complete)
ANTICIPATED WORK DURING NEXT MONTH:
• Initiate inter-local agreement process with DPW.
• United to begin updating the.R/W Engineering documents.
• United to begin Title/Encumbrance.Reports.
• Land.Acquisition Services by Carmel.
ENVIRONMENTAL SCHEDULE:
• 9/28/15 CE submittal#1 to INDOT
• 10/2o/15 Review Complete by INDOT
0 10/30/15 CE submittal#2 to INDOT
0 11/20/15 Review Complefe by INDOT
0 12/09/15 CE submittal n3 to INDOT
(Continued.on Next Page)
V:1ProjectsMIN621Transpo6666130004 Carmel,96th St at Priority Way100 Adr inistrationllb operations110 Status Reparis130004 Status Report 2016.03.14.dogx
"Satisfying Our Clients with Union Station,300 S.Meridian Street,Indianapolis,IN 46225
Dedicated People Committedto total Quality" T 317.786.0461 • F 317.788.0957 9 www chacompanies.com
PROJECT STATUS
96th Street and Priority Way Roundabout
March 14, 2016
Page 2
• 12/29/15 Review Complete by INDOT
• 1/07/i6 Advertise for public involvement
2/12/16 Final CE Submittal to INDOT for signatures
a 3/8/16 Final INDOT Approved CE Document
DESIGN SCHEDULE:
!' • 9/28/15 Stage 2'Submittal to Carmel '
e 10/8/15 RevietvlNleeting held with Carmel/CHA
I
• 11/12/15 Stage 2Submittal to INDOT
• 12/4/15 On-siteUtility Meeting
a 12/11/15 Stage 2 Review Complete by INDOT
• 2/29/16 PFC Meeting
• 3/2/16 DPW Meeting
• 3/8/16 INDOT NTP for land acquisition(Approved CE)
• 3/18/16 Begin R/W Engineering Updates(United Consulting)
SCOPE OR BUDGET CHANGES:
• 2/24/16 NTP received for Supplemental Agreement No.1 by Carmel for.2016 design effort.
INFORMATION NEEDED FROM CLIENT/OTHERS:
• Utilities—Need Utility R/W requirements to finalize proposed R/W.
• City of Carmel—Need Inter-local Agency Agreement between Carmel and Indianapolis for Right-of-Way
Acquisition.
Minutes
Meeting
PROJECT: ge Street and Priority Way
DATE: February 29, 2016 at 2:00 PM_
RE: Preliminary Field Check Meeting �
1, BY: Christopher J.Schultz, P.F.
j 1
j ATTENDEES:
NAME COMPANY E-MAIL ADDRESS !PHONE
Jeremy Kashman City of Carmel ikashman@carmel.in.eov 317-571-2441
Tiffany Boone City of Carmel tboone@carmel.in.kov 317-571-2441
Keith Myers INDOT kwmyers@indot.in.eov 765-744-5790
Scott Sipes INDOT ssipes@indot.in.eov 317-467-3420
Jennifer Beck INDOT ibeck@indot.in.eov 317-232-0911
Chris Schultz CHA cschultz@chacompanies.com 317-780-7252
Samantha De Sollar CHA sdesollar@chacompanies.com 317-780-7178
Melanie Stanage CHA mstanage@chacompanies.com 317-780-7248
Jon Korff United Consulting ionk@ucindy.com 317=895-2585
Scott Minnich United Consulting scottm@ucindv.com 317=895-2585
Brian Harger Vectren bharser@vectren.com 317-776-55"70
Shawn Williams Vectren sawilliams@vectren.com 317-776-5570
Jim Duvall IPL Jim.duvall@aes:eom 317=261-5203
Rich Miller Citizens Energy rmiller@citiiensenere?ygroup.com 317-927-4684
Scott Ritter Citizens Energy sritter@citizensenergvgrouD.com 317-965-2166
Ryan Hartman Clay Township ryan.hartman@ctrwd.ore 317-844-9200
Tom Spencer Comcast tspencer@telecompiacement.com 317-752-9426
This meeting was a preliminary field check meeting.
1. Sign in and Introductions.
2. Project Overview
a. Chris gave,an overview of the proposed project. It consists of a dual lane roundabout with a
10 ft.. path and a 5'grass buffer.
b. August 9,2017-is.the letting date for this project.
c. R/W and Utilities need to be clear by March,2017
V:1ProiectsUIN621Transportahon130004.Cannel 96th Stat Priority Way100 Administraff . 0 Prajectl04 MeeUngs%2018.,.29 PFC MeetinglPFC,Meeting 1400937 Minutes:docx
"5atisf ing_Our Clients with Union Station,300-S:Meridian Street,Indianapolis,IN 46225
Dedicated People Committed:to Total Quality" ( T317.786.0461 • F 317.788.0957 9 wwwchacompanies.com
MEETING MINUTES
96th Street and Priority Way
February 29,2o16
Page.2
3. Utility Discussion
a. IPL discussed their existing transmission line running along the north side of 96th street. One
of the existing poles is in conflict with the northern portion of the proposed roundabout.
They anticipate removing this existing pole and spanning this proposed roadway bump out.
'They are tentatively planning on this work for Fall 2016 and estimating 2 months of work.
Thecommented on previous conflicts with proposed 40' tall light poles. The light pole
design height has been lowered to use the City's,,standard 31.5' tall light poles to avoid the
conflict with the transmission fine. I
b. 'Fibertech (not present) — United commented that Fibertech currently attaches to IPL poles
and will.reattach to thenew poles.
c. AT&T LS (not present)—United commented that AT&T LS currently attaches to IPL poles and
will reattach to the new poles.
d. Comcast stated that they currently run primarily underground, although there may be fiber
on existing poles. They are attempting to avoid boring 96th Street-and are waiting on a
redesign plan. Ideally, they Would like to run approximately 5 ft. deep underneath the
proposed path on the north side. Comcast mentioned the possibility of doing a joint trench
underneath the path.
°e. Level 3—not present.
f. AT&T currently has a vault located on the southwest side of the proposed roundabout that
they would like to keep and adjust to grade.
g. Brighthouse (not present)—United commented that Brighthouse has an existing line running
along the east side of Priority Way.They plan to bend along with proposed roadway and stay
within R/W.
h. Zayo(not present)—United indicated that Zayo is located within the AT&T duct bank.
i. Vectren, currently has a 4" plastic main along the north side of 96th Street. They are
attempting to possibly relocate further north out of the project limits(behind the businesses)
and anticipate having a work plan by the end of March.
j. Citizens Gas has an 8" main along the south side of 96th Street and.. need to stay in this
location.They have a 4" main along the west side of Priority Way and plan to shift and stay
within proposed R/W.The building in the southwest corner of the roundabout is serviced by
the 4" line along Priority Way and they will need to keep this building in service. United is
designing the relocation, which is anticipated to be placed just inside the proposed south
R/W line.
k. Carmel Water(not present) United commented that Carmel Water has a line on the north
side of 96th Street that feeds the yellow hydrants only.The existing crossing on the east end
ofthe project is to be capped and.removed.There are no conflicts with the current proposed
project, but there may be a conflict with the relocated IPL light poles depending on their final
location.
I. Citizens Water has an existing 12"water main running along the south side of 96`h Street and
the west side of Priority Way.They commented that the line on the south side of 96th Street
conflicts with the proposed storm inlets and will need to be shifted north. The line along
Priority Way also has,a conflict with storm structure 217.Test hole results will be sent over to
further coordinate on these conflicts.The hydrant on the northwest side of 96th Street will be
removed.
MEETING MINUTES
Wh Street and Priority Way
February 29,2016
Page g
m. Clay Township Sewer has an existing 16" force main underneath the existing westbound
lanes of 9611 Street. This is not currently in conflict with any other utilities, but will need to
maintain the minimum 10 ft. horizontal separation from other relocated lines.
.n. United commented that Windstream may have a line on the existing IPL poles, and will
investigate further.
io. The Park Owners Association for the Precedent commented that there would be conflict with
existing private light poles and private irrigation systems for the buildings on the south side
of 96th Street. They also stated that there is a monument in the Southwest corner of the
' project that will be impacted by construction.1
ip. Jeremy commented! n the possibility of adding a north leg to theroundabout in the future
and the need to consider putting utilities deep enough to accommodate this roadway.
4. Maintenance of Traffic
,a. Chris gave an overview of the plan to maintain one lane of traffic in each direction for MOT
to simplify and expedite construction:
b. Chris commented on the requirement to maintain,driveway access.from Priority Way to the
building in the southwest corner of the roundabout during construction.
c. There was some discussion on the impacts of other projects in the area on the MOT traffic
flow, including Delegate's Row roundabout and the Keystone intersection. Jeremy
commented on the possibility of coordinating with the City of Indianapolis on signal timing
along River Road to help-alleviate some congestion.
d. The Park Owners Association for the Precedent expressed concern with maintaining a bank
drive through lane in the southeast bank parking lot. Jeremy assured that this would be
possible and that there was only some temporary work in the area to reconstruct curb for
the parking lot,
S. Additional Project Discussion
a. Right of Way—Chris mentioned that R/W will be acquired from 4 parcels and temporary R/W
will be acquired from S parcels.
b. The multiuse path was discussed and Jeremy commented that redevelopment along the 96th
Street corridor is now requiring a path to be constructed. The gaps will be filled in as those
projects happen.
.c. The trail on the southeast side of the roundabout is not proposed to be constructed with this
project, but there is R/W available for a path in the future.
d. INDOT asked that consideration be given to the crosswalk locations based on the volume of
traffic on 961h Street. Jeremy mentioned that they,should remain in the current location to
be consistent with-other roundabouts within the City. There is a 6' refuge island where
pedestrian can cross one direction of traffic before continuing to cross the opposing lanes.
Attachments:
• Sign-in Sheet
• Project Exhibit
These minutes represent our interpretation of all items discussed. Please provide a notice of any discrepancies to the
issuer of these minutes within seven days to amend the record.
PFC Meeting Sign-in Sheet `
96th Street at Priority Way — Carmel, IN
2:00 PM - Monday, February 29, 2016 ._ -
Initial Name Company Phone Email Address
Brian Hanger Vectren 317-776-5570 Uharger cwt vectren.com
Cassandra;Hudson INDOT Greenfield,Program Dir. 317-467-3413 chudsonlnindot.in.gov
GS Chris Schultz CHA Consulting, Inc., Project Mgr 317-780-7252 cschultz a.chacompanies.com
Dan Jones Zayo Broadband 317-508-2807 dan.jones e,zayo.com
Dave Henkel CHA Consulting, Inc.,VP 317-780-7227 dhenkel�t,ch� acompanies.com
Dewayne Hamilton Level 3 317-916-2708 reloOwlevel1com
Don Ballard INDOT Greenfield, R/W Manager 317-233-2055 doballard@-indot.in.gov
Jake Greenwald ATT 317-690-1991 jg0936@att.com
Jennifer;BeckINDOT Greenfield, Project Mgr. 317-232-0911 jbeck_r indor.in.goy
lvV, Jeremy Kas a:nj City of Carmel, City Engineer 317=571-2441 jkashman cr,carmel.in.gov
Alft Jim Duvall IPL 317-261-5203 jim.duval1 a,aes.com
Jim.Kellam Zayo Broadband 317-524-5712 jim.kellain etlzavo.com
Joe Burton Brighthouse 317-339-9075 joe.burtonQmvbrighthouse com
Jon Korff United Consulting, Utility Coord. 317-895-2585 IonK@ucindy.com
Larry Jones City of Indianapolis, Dep. Dir. Engr 317-327-8425 larrv_jone,-,Qindv gov
(N � Melanie Stanage CHA Consulting, Inc., Project Engr. 317-780-7248 mstanage a chacompanies com
Page I
Initial Name Company Phone Email Address
Michelle Loveall INDOT Greenfield, RR Coord. 317-467-3438 m I o v e a dot.in.gov
Mille Hoy INDOT Greenfield, Utilities Engr. 317-234-5605 mhoy@.indot.ja.gov
dot.in.gov
Rhonda!Williams IPL 317-261-5203 rhonda.williams@-,Les.com
& Rich Miller Citizens Energy 317-927-4684 rmiller@cidzensenergygroup.com
Ryan Hartman Clay Township 317-844-9200 aran.hartmannctitivd.org
5-5Q Samantha DeSollar CHA Consulting,Inc., Project Engr 317-780-7178 sdesollarnchacompanies.com
Gj(gvA Scott Minnich United Consulting, Utility'Coord. 317-895-2585 ScottMQucindy.com
Scott Ritter Citizens Energy 317-965-2166 Sritter@citizensenergygroup.com
Scott.Sipes INDOT Greenfield,Area Engineer 317-467-3420 ssipes@indot.in.gov
Shawn Williams Vectren 317-776-5570 sawilliams@,vectren.com
Steve Cook City of Carmel Water 317-733-2855 scookc.carmeldn.gov
Steve Garner ATT& Fibertech 317-690-1991 garnerslg a.aol.com
Susan Harrington . INDOT Greenfield,.Env. Mgr 317-232-0680 shari-ington a,indot.in.gov
Tim.Boykin Level 3 317-916-2708 tinz:bo;rkin a,level3.com
Tom Spencer Comcast 317-752-9426 tspenceratelecolnplacement com
c/r
P4 Zd r"ZgY—L79 6 �C lam' c,�s raJ'a f. i,n, v✓
u _t'';:1'e')Rj (',I h.j �i/ i.. `+.!' i i(;'.� J I (-2'��1 +bCO)"c"" C'Gll';.'i,%-i
Page
a. I
Mp
96TH STREET
'c
t
u 4 ~ I
of t for
In
40
tir., sa M
�sm,
lob
P
• :.: 4
"
OPTION IA - ROUNDABOUT OFFSET SOUTH
50 25 0 10,
-A
Minutes
CAik
Meeting
PROJECT: 96th Street Improvements by the City of Carmel
DATE: March-2,2016 at 3:00 PM
RE: Coordination Meeting with',City of Indianapolis; Department of Public Works-({DPW)
BY: Christopher J.Schultz,P.E..
I f ,
ATTENDEES: {{i
NAME COMPANY E-MAIL ADDRESS PHONE
Jeremy Kashman City of Carmel ikashman@carmel!in.eov 317=571-2441
Chris Schultz CHA cschultz@chacompanies.com 317480-7252
Dave Henkel CHA dhenkel@chacompanies.com 317-780-7227
Larry Jones City of Indianapolis larry.iones@indy.eov 317-327-8425
Melody Park City of Indianapolis melody:park@indy.gov 317-327-8425
Nathan Sheets City of Indianapolis nathan.sheets@indy.gov 317.=327-8425
This meeting was a coordination meeting held at the City of Indianapolis, Department of Public Works(DPW)to
discuss the 961h Street projects by the City of Carmel.
1. Chris and Jeremy'explained the projects programmed for 96th Street:
a. 96th St and Priority Way
b. 961h St and Keystone Pkwy
c. 96th St corridor roundabouts:
I. Delegates Row
ii. Randall Dr-(at H.H. Gregg)
iii. Gray Rd
iv. Hazel Dell Pkwy
2. 96th'St&Priority Way: CMAQ funding with Letting in.August,2017.
3, 961h 5t.&Keystone Pkwy: CMAQ/STP funding with Letting in Spring 2017,and constructioncomplete
by 2018.
4. .96 1h St&Delegates Row: Local bond with Letting in Spring 2017.
5. Randall Dr at H.H. Gregg: Local ,bond, but may not be constructed if the traffic. signal is not
warranted.
(Continued on next page)
v:lProjectsUIN621Transportati6ni90004 Carmel 96th St at PriorityWay\00 Administrationl20.Project104 Meetings\2016.03.02 DPW Meebng\DPW Meeting Minutes.docz
"Satisfying Our Clients with Union Station,300 S.MeridiamStreet,andianapolis,IN 46M
Dedicated People Committed to Total Quality" I T 317.786.0461 0 F 317:788.0957 •.www chacompanies.com
MEETING MINUTES
961h Street Improvements
March 2,2oi6
Page 2
6. An inter-local agreement between the City of Carmel and the City of Indianapolis will need to be
submitted by Carmel and approved by Indianapolis City Council members Colleen Fanning (west of
Keystone)and Christine Scales(east of Keystone).
7. For the inter-local agreement,.DPW recommends the follovqing:
i
a. An exhibit showing worst case R/W needs,with supportingdocuments to match..
I b. Number of parcels impacted in Marion Co. ! j
C. Amount of permanent R W
p / n acres required in Marion Co,
d. Percent of overall project acres required in Marion Co.
I. The south curb line along 96ch Street isi the dividing line between Marion and
Hamilton Counties.
e. Number of relocations required in Marion Co.
f. Information on planned or recent business redevelopments in the area.
8. Carmel is putting together a Communications Plan and additionally initial steps will have Carmel City
Council members meet with Indianapolis City Council members so there is a mutual understanding of
project goals. In addition to.the number of parcels and relative information to each location, Carmel
will prepare an exhibit showing the impact at each roundabout.
9. DPW mentioned that the inter-local agreement approval process would likely take 3 to 6 months.
10. Consideration will be giving to prepare the inter-local agreement in phases, but the preference is a
single agreement to cover all projects along 96th Street.
11. All communications for the inter-local agreement should be through Melody Park at DPW to present
to the Indianapolis City Council members.
12. Larry had 2 comments on the Road plans for 96th Street and Keystone Pkwy:
a. Is there a 12' or 16' travel lane along 96th Street east of Aronson (2-way left-turn)? This
needs to be defined and match the typical sections.
b. Is the eastbound by-pass lane along 96th Street separated from through traffic by a raised
concrete median, or is it flush with the adjacent pavement? Additional_callouts are required
to clearly illustrate the.pavement in.this area..
Attachments:
• Project Exhibit
These minutes.represent.our interpretation of all items discussed. Please provide a notice of any discrepancies to the
issuer of these minutes within seven days to amend the record.