HomeMy WebLinkAbout257347 04/08/16 i y,_C�q�
�/ \�. CITY OF CARMEL, INDIANA VENDOR: 254004
'. ONE CIVIC SQUARE DUKE ENERGY CHECK AMOUNT: $****35,383.13*
r' ,?Q; CARMEL, INDIANA 46032 PO BOX 1326 CHECK NUMBER: 257347
'M,«oN�: CHARLOTTE NC 28201-1326 CHECK DATE: 04/08/16
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
1125 4348000 42603287015 672.25 42603287015
1091 4348000 50103608012 27,944.35 50103608012
1125 4348000 52603287010 121.49 52603287010
1207 4348000 55803643015 37.33 55803643015
2201 4348000 56403842015 194.10 56403842015
651 5023990 57303050010 39.45 57303050010
1091 4348000 60103608018 3,071.00 60103608018
2201. 4348000 62903721010 43.59 62903721010
2201 4348000 70303728013 22.68 70303728013
2201 4348000 71603731012 13.44 71603731012
2201 4348000 75003846016 20.71 75003846016
2201 4348000 79203824012 9.40 79203824012
2201 4348000 85503714014 104.76 85503714014
110 4348000 87403794021 513.08 87403794021
651 5023990 89303276018 101.88 89303276018
2201 4348000 90503834013 120.94 90503834013
2201 4348000 95503714010 86.00 955037140.10
2201 4348000 95703663010 13.80 95703663010
2201 4348000 98803769010 30.53 98803769010
Voucher No. Warrant No.
254004 Duke Energy Allowed 20
PO Box 1326
Charlotte, NC 28201-1326
In Sum of$
$ 32,430.02
ON ACCOUNT OF APPROPRIATION FOR
101 -General Fund/109 -Monon Center
PO#or INVOICE NO. ACCT#/TITLE AMOUNT Board Members
Dept#
1125 0600-3660-01-8 4348000 $ 98.74 1 hereby certify that the attached invoice(s), or
1125 7470-3295-01-4 4348000 $ - bill(s) is(are)true and correct and that the
1125 1650-3050-01-7 4348000 $ - materials or services itemized thereon for
1125 0990-3736-01-9 4348000 $ 376.89 which charge is made were ordered and
1125 5260-3287-01-0 4348000 $ 121.49 received except
1125 3890-3290-02-9 4348000 $ 10.49
1125 4260-3287-01-5 4348000 $ 672.25 li
1125 1660-3622-01-8 4348000 $ 134.81
2 .=1091' 6010-3608-01-8 4348000 $ 3,071.00
1091 5010-3608-01-2 4348000 $ 27,944.35 April 1, 2016
1 'P I
Signature
$ 32,430.02 Accounts Payable Coordinator
Cost distribution ledger classification if Title
claim paid motor vehicle highway fund
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice of bill to be properly itemized must show; kind of service,where performed,dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
Purchase Order No.
254004 Duke Energy Terms
PO Box 1326 Date Due
Charlotte, NC 28201-1326
Invoice Description
Number (or note attached invoice(s) or bill(s)) Amount
3/31/16 0600-3660-01-8 Monon Greenway Tunnel lights 2-Mar $ 98.74
7470-3295-01-4 Meadow Lark Park Outdoor lights 3-Mar
1650-3050-01-7 Monon Trail Crossing Flashers- NA for online staterr
3/31/16 0990-3736-01-9 Founders Park- 11675 Hazel Dell Pkwy 2-Mar $ 376.89
3/29/16 5260-3287-01-0 Maintenance- 1427 116th St. E 29-Feb $ 121.49
3/31/16 3890-3290-02-9 River Heritage Park- 11813 River Ave. 2-Mar $ 10.49
3/29/16 4260-3287-01-5 Administration - 1411 116th St E 29-Feb $ 672.25
3/31/16 1660-3622-01-8 Central Park Lagoon Aeration pumps 2-Mar $ 134.81
3/31/16 6010-3608-01-8 MCC - East side 3-Mar $ 3,071.00
3/31/16 5010-3608-01-2 MCC-West side 2-Mar $ 27,944.35
TOTAL $ 32,430.02
, 20
Clerk-Treasurer
Page 1 of 2
Carmel Clay Parks&Recreation Duke Energy 1-800-774-1202 90 003#660
City Of Carmel
Dir 116Th St E
Monon Trail
PO Box 1326 Payments after Mar 31 not included Bill prepare on�'M r 31. 2016.,,.:O
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter reading Apr 28,201`6
di Aetd
Elec 106950892 Feb 27 Mar 30 32 27308 28079 1 771 0.00
00191041_ , rtt .elitttt
Usage- 771 kWh Amt Due-Previous Bill $82.06
Duke Energy-Rate CSNO $98.74 Payment(s) Received 82.06c
Current Electric Charges $-9M Balance Forward ��
Current Electric Charges 9874
Current Amount Due $fid
"Important:For your safety,stay away from power lines.Do not work near overhead lines.Always
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
RECEIVED
APR -.1 2016
BY:
Average Cost: $0.1281 per kWh Apr 22,2016 $98.74
��IDUKE�
ENERGY• Visit us at www.duke-energy.com
(S DUKE To view information printed on the back of your bill pplease click or
ENERGY go to www.duke-energV.com/indiana/billing/back-of-bill.aso Page 2 of 2
a
,
Carmel Clay Parks&Recreation Dir 116Th St E 0600-3660-01-8
City Of Carmel Monon Trail
Electric Duke Energy
Meter- 106950892 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge $9.40
kWh Usage- 771 Energy Charge
300 kWh @ $0.08240900 24.72
Feb 27-Mar 30 471 kWh @ $0.07287300 34.32
32 Days Rider 60- Fuel Adjustment
771 kWh @ $0.01042500 8.04
Rider 61 -Coal Gasification Adj
771 kWh @ $0.01348900 10.40
Rider 62- Pollution Cntl Adj
771 kWh @ $0.00437700 3.37
Rider 63- Emission Allowance
771 kWh @ $0.00003600cr 0.03cr
Rider 66-A-Energy Eff Adj
771 kWh @ $0.00166400 1.29
Rider 67-Cinergy Merger Credit
771 kWh @ $0.00060300cr 0.46cr
Rider 68-Midwest Ind Sys Oper Adj
771 kWh @ $0.00184000 1.42
Rider 70-Reliability Adjustment
771 kWh @ $0.00081300 0.63
Rider 71 -Clean Coal Adjustment
771 kWh @ $0.00724200 5.58
Rider 72- Federally Mand Cost Adj
.771 kWh @ $0.00007600 0.06 $98.74
t $98.74
kWh Eleotrlc Usage
1,000-
800-
600-
400-
200-
0—
Calculations
,0008006004002000Calculations based on most recent 12 month history
Total Usage 8,125
Average Usage 677
MA APR MA JUN JU AUG SEP OCTNOV DEC JAN FEB MAR
FJectric 68 694 611 53 51 51 73 74 92 892 631 771
DUKE
ENERGY, Visit us at www.duke-energy.com
gY•
Page 1 of 2
Carmel Clay Parks&Recreation Duke Energy 1-800-521-2232 0990-3736-01.-9 --�
City Of Carmel
11675 Hazel Dell Pkwy
Carmel IN 46033
2 S. 1;
PO Box 1326 Payments after Mar 31 not included Bill pre dare ornMa�31;`2DT6'" ��_
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter'�eading=Apr'28 2016 <<
Elec 093535442 Feb 29 Mar 30 30 11557 15312 1 3,755 0.00
t O.tlt :N� t t:
Usage- 3,755 kWh Amt Due-Previous Bill $308.07
Duke Energy-Rate CSNO $376.89 Payment(s) Received 308.07c
Current Electric Charges $ S Balance Forward --Fo
Current Electric Charges 376.89
Current Amount Due "'$i rmlm:
"Important:For your safety,stay away from power lines.Do not work near overhead lines.Always
assume that downed lines are energized and dangerous.Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
RECEI'V'ED
APR - 1 2016
BY:
o>I a ..
Average Cost: $0.1004 per kWh Apr 22,2016 $376.89 $388.20
J
D.�'Kffi
,8- Visit us at www.duke-energy.com
4feas DUKE To view information printed on the back of your bill please click or
ENERGY., go to w,w.duke-energv.com/indiana/billiniz/back-of-bill.asii Pa e 2 of 2
V
Carmel Clay Parks&Recreation 11675 Hazel Dell Pkwy 0990-3736-01-9
City Of Carmel Carmel IN 46033
�lliE
Electric Duke Energy
Meter- 093535442 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge $9.40
kWh Usage- 3,755 Energy Charge
300 kWh @ $0.08240900 24.72
Feb 29-Mar 30 700 kWh @ $0.07287300 51.01
30 Days 1,500 kWh 9 $0.06169600 92.54
1,255 kWh @ $0.04117900 51.68
Rider 60- Fuel Adjustment
3,755 kWh @ $0.01042500 39.15
Rider 61 -Coal Gasification Adj
3,755 kWh 9 $0.01348900 50.65
Rider 62- Pollution Cntl Adj
3,755 kWh @ $0.00437700 16.44
Rider 63-Emission Allowance
3,755 kWh @ $0.00003600cr 0.14cr
Rider 66-A-Energy Eff Adj
3,755 kWh 9 $0.00166400 6.26
Rider 67-Cinergy Merger Credit
3,755 kWh @ $0.00060300cr 2.26cr
Rider 68-Midwest Ind Sys Oper Adj
3,755 kWh 9 $0.00184000 6.91
Rider 70-Reliability Adjustment
3,755 kWh @ $0.00081300 3.05
Rider 71 -Clean Coal Adjustment
3,755 kWh @ $0.00724200 27.19
Rider 72-Federally Mand Cost Adj
3,755 kWh @ $0.00007600 0.29 $376.89
o al�rf $376.89
kWh Electric Usage
4,000-
3,200-
2,400-
8
,0003,2002,4008
0
M 4
J M
Calculations based on most recent 12 month history
Total Usage 22,179
Average Usage 1,848
MA AP MAY JUN JU AUGSEP OC NOV DEC JAN FEB MAR
FJectric 3,57 2,05 821 551 2951 61 1,20 1,968 2,2 2,382 3,237 2,95 3,755
�ENERGY. Visit us at www.duke-energy.com
rage i of z
Carmel Clay Parks&Recreation Duke Energy 1-500-774-1202 526Us28 01-0
1427 116Th St E
Carmel IN 46032
PO Boz 1326 Payments after Mar 29 not included Bill prepared c n Mar 29,201'6
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter reading Ap 6, 016
a 9 D IRS ON
.x
.. . u
Elec 063601950 Feb 25 Mar 25 29 17907 19007 1 1,100 0.00
�b ° a � art t
Usage- 1,100 kWh Amt Due-Previous Bill $114.44
Duke Energy-Rate RSNO $121.49 Payment(s)Received 114.44cr
Current Electric Charges $�9 Balance Forward
Current Electric Charges 121.49
Current Amount Due MEMNON
"important:For your safety,stay away from power lines.Do not work near overhead lines.Always
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. " RECEIVED
MAR 3 0 2m
BY:
Average Cost: $0.1104 per kWh Apr 20,2016 $121.49
f� DUKE
€NERDY& Visit us at www.duke-energy.com
C:JKE To view information printed on the back of your bill please click or
ENERGY., go to www.duke-eneray.com/indiana/billing/back-of-bill.aso Pa e 2 of 2
t
an
ti
Carmel Clay Parks&Recreation 1427 116Th St E 5260-3287-01-0
Carmel IN 46032
ani' sWHIM
Electric Duke Energy
Meter- 063601950 Rate RSNO -Residential Service
Multipliers- 1 Connection Charge $9.40
kWh Usage- 1,100 Energy Charge
300 kWh @ $0.09294500 27.88
Feb 25-Mar 25 700 kWh @ $0.05417800 37.92
29 Days 100 kWh @ $0.04446400 4.45
Rider 60- Fuel Adjustment
1,100 kWh @ $0.01042500 11.47
Rider 61 -Coal Gasification Adj
1,100 kWh @ $0.01267300 13.94
Rider 62-Pollution Cntl Adj
1,100 kWh @ $0.00374100 4.12
Rider 63-Emission Allowance
1,100 kWh @ $0.00003600cr 0.04cr
Rider 66-A-Energy Eff Adj
1,100 kWh @ $0.00388000 4.27
Rider 67-Cinergy Merger Credit
1,100 kWh @ $0.00052600cr 0.58cr
Rider 68-Midwest Ind Sys Oper Adj
1,100 kWh @ $0.00126200 1.39
Rider 70-Reliability Adjustment
1,100 kWh @ $0.00068500 0.75
Rider 71 -Clean Coal Adjustment
1,100 kWh @ $0.00586200 6.45
Rider 72- Federally Mand Cost Adj
1,100 kWh @ $0.00006400 0.07 $121.49
o: ttx � $121.49
KWh Electric Usage
2,500
2,000
1,500
1,000
5004, M
0 6 wil �
Calculations based on most recent 12 month history
Total Usage 16,679
Average Usage 1,390
MA AP MA JUN JU AUG SEP OCTNOV DEC JAN FEB MAR
Electric 1,03 1,04 1,10 1,80 1,79 2,04 1,675 1,129 1,40 1,3941,158 1,024 1,100
(D DUKE ENERGY, Visit us at www.duke-energy.com
Page 1 of 2
Carmel Clay Parks&Recreation Duke Energy 1-800-774-12023890'
City Of Carmel
11813 River Ave
Carmel IN 46033
_ a tl
PO Box 1326 ,.,...%,..,<,..,.,...., Payments after Mar 31 not included Bill prepareonYMarr�201;6s�';
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter eading Apr 282016
s 80 317 tdf
a r.,
Elec 106957100 Feb 29 Mar 30 30 1125 1134 1 9 0.00
Usage- 9 kWh Amt Due-Previous Bill $10.48
Duke Energy-Rate CSNO $10.49 Payment(s)Received 10.48c
Current Electric Charges $TOM Balance Forward �b
Current Electric Charges 10.49
Current Amount Due � - � A
"Important:For your safety,stay away from power lines.Do not work near overhead lines.Always
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
RECEIVED
APR - 1 2016
BY:
Average Cost: $1.1656 per kWh Apr 22,2016 $10.49
44 DUKE
ENERGY Visit us at www.duke-energy.com
fDUKE To view information printed on the back of your bill please click or
ENERGY go to www.duke-energv.com/indiana/billine/back-of-bill.aso Pa e 2 of 2
Carmel Clay Parks&Recreation 11813 River Ave 3890-3290-02-9
City Of Carmel : Carmel IN 46033
i5 tt
Electric Duke Energy
Meter- 106957100 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge $9.40
kWh Usage- 9 Energy Charge
9 kWh 9 $0.08240900 0.74
Feb 29-Mar 30 Rider 60-Fuel Adjustment
30 Days 9 kWh @ $0.01042500 0.09
Rider 61 -Coal Gasification Adj
9 kWh @ $0.01348900 0.12
Rider 62-Pollution Cntl Adj
9 kWh @ $0.00437700 0.04
Rider 63-Emission Allowance
9 kWh @ $0.00003600cr 0.00
Rider 66-A-Energy Eff Adj
9 kWh @ $0.00166400 0.01
Rider 67-Cinergy Merger Credit
9 kWh @ $0.00060300cr 0.01cr
Rider 68-Midwest Ind Sys Oper Adj
9 kWh @ $0.00184000 0.02
Rider 70- Reliability Adjustment
- 9 kWh @ $0.00081300 0.01
Rider 71 -Clean Coal Adjustment
9 kWh @ $0.00724200 0.07
Rider 72- Federally Mand Cost Adj
9 kWh @ $0.00007600 0.00 $10.49
atCisle %sem $10.49
kWh Electric Usage
15
1
9
6
3
0
M M
Calculations based on most recent 12 month history
Total Usage 112
Average Usage 9
MA APR MA JUN JULAUG SEP OCTNOV DEC JAN FEB MAR
Bectric 9 119 10 9 10 9 9
f�DUKE
Visit us at www.duke-energy.com ENERGY, gy.com
Page 1 of 3
Carmel Clay Parks&Recreation Duke Energy 1-800-774-1202E42601132-8,_ -01-5
1411 116Th St E
Carmel IN 46032
tf r.
PO Box 1326 Payments after Mar 29 not included Bill prepared n Mar 29,2016
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter rea ing Apr 26,2016
--------------
N----------N? -- ft .
Elec 108036629 Feb 25 Mar 25 29 13064 13250 40 7,440 0.00
CometSIM
Usage- 7,440 kWh Amt Due-Previous Bill $1,137.04
Duke Energy- Rate RSNO $644.50 Payment(s)Received 1,137.04c
Current Electric Charges $-6-4TO Balance Forward �0. 0
Current Electric Charges 644.50
Current OL Charges 27.75
Qo [n Q Current Amount Due 212
Qty 2 Usage- 184 kWh
Duke Energy
1 @ Rate SOLU $18.43
1 @ Rate SUOL 9.32
Current OL Charges
"Important:For your safety,stay away from power lines.Do not work near overhead lines.Always
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
RECETVED
MAR 30 2016
BY:
Average Cost: $0.0866 per kWh Apr 20,2016 $672.25
f ��UKE
-MERG Visit us at www.duke-energy.com
( DUKE To view information printed on the back of your bill please click or
ENERGY go to www.duke-en,-ray.com/indiana/billinR/back-of-bil[.asp Pa e 2 of 3
Carmel Clay Parks&Recreation 1411 116Th St E 4260 3287-01-5
Carmel IN 46032
„ ars
Electric Duke Energy
Meter- 108036629 Rate RSNO -Residential Service
Multipliers- 40 Connection Charge $9.40
kWh Usage- 7,440 Energy Charge
300 kWh @ $0.09294500 27.88
Feb 25-Mar 25 700 kWh @ $0.05417800 37.92
29 Days 6,440 kWh @ $0.04446400 286.35
Rider 60-Fuel Adjustment
7,440 kWh 0 $0.01042500 77.56
Rider 61 -Coal Gasification Adj
7,440 kWh @ $0.01267300 94.29
Rider 62- Pollution Cntl Adj
7,440 kWh @ $0.00374100 27.83
Rider 63- Emission Allowance
7,440 kWh @ $0.00003600cr 0.27cr
Rider 66-A-Energy Eff Adj
7,440 kWh @ $0.00388000 28.87
Rider 67-Cinergy Merger Credit
7,440 kWh @ $0.00052600cr 3.91cr
Rider 68-Midwest Ind Sys Oper Adj
7,440 kWh @ $0.00126200 9.39
Rider 70-Reliability Adjustment
7,440 kWh @ $0.00068500 5.10
Rider 71 -Clean Coal Adjustment
7,440 kWh @ $0.00586200 43.61
Rider 72-Federally Mand Cost Adj
7,440 kWh @ $0.00006400 0.48 $644.50
e $644.50
Outdoor Lighting(OL) Duke Energy
Quantity- 1 Rate SOLU -Outdoor Lighting Sry
Lumens- 30,000
Type- High Press Sodium Energy Charge
kWh Usage- 104 Lighting Maint Charge $3.21
Feb 25-Mar 28 Lighting Equip Charge 8.95
32 Days Energy Charge 4.72
Rider 60-Fuel Adjustment 1.08
Rider 61 -Coal Gasification Adj 0.02
Rider 62- Pollution Cntl Adj 0.11
Rider 63-Emission Allowance
Rider 66-A-Energy Eff Adj 0.17
Rider 67-Cinergy Merger Credit 0.10cr
Rider 68-Midwest Ind Sys Oper Adj 0.05
Rider 70- Reliability Adjustment 0.04
Rider 71 -Clean Coal Adjustment 0.18
Rider 72- Federally Mand Cost Adj 18.43
Outdoor Lighting(OL) Duke Energy
Quantity- 1 Rate SUOL -Unmetered Outdoor Ltg Sry
Lumens- 8,000
Type- Mercury Vapor Energy Charge
kWh Usage- 80 Energy Charge $3.63
Feb 25-Mar 28 Lighting Maint Charge 4.50
32 Days Rider 60- Fuel Adjustment 0.83
Rider 61 -Coal Gasification Adj 0.02
Rider 62-Pollution Cntl Adj 0.08
Rider 63-Emission Allowance
Rider 66-A- Energy Eff Adj 0.14
Rider 67-Cinergy Merger Credit 0.08cr
Rider 68-Midwest Ind Sys Oper Adj 0.04
Rider 70-Reliability Adjustment 0.03
Rider 71 -Clean Coal Adjustment 0.13
Rider 72- Federally Mand Cost Adj 9.32
o a [tr�Q $27.75
( O .
DUKE
ENERGY Visit us at www.duke-energy.com
DUKE To view information printed on the back of your bill please click or
ENERGY., go to www.duke-energy.com/indiana/billing/back-of-bill.asp Pa e 3 of 3
Carmel Clay Parks&Recreation 1411 116Th St E 4260-3287-01-5
Carmel IN 46032
kWh Electric Usage
20,000
16,000
12,000
x,000
a,000
0
1 A M j S AM
Calculations based on most recent 12 month history
Total Usage 99,008
Average Usage 8,251
MA AP MAY JUN JU AUG SEP OCTI NOV DEC JAN FEB MAR
Electric 10, 6,5 5,02 6,22 6,0941 6,66415,5 4,224 8,864 11,5441 17,264 13,384 7,624
fugENERGY,DUKE Visit us at www.duke-energy.com
Page 1 of 2
FINOMM ME,
3
City Of Carmel Duke Energy 1-877-499-7859 1'6603_622='Oy1 8`
Carmel Clay Parks For Account Services,please contact
1235 Central Park Dr E Jessica Jackman
Misc:Lagoon Pum
Carmel IN 46032
PO Box 1326 Payments after Mar 31 not included Bill prepared oW K 31,20116-._
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter reading pr 28,20 6
i
Elec 106906084 Feb 29 Mar 29 29 95753 96856 1 1,103 0.00
Usage- 1,103 kWh Amt Due-Previous Bill $121.00
Duke Energy-Rate CSNO $134.81 Payment(s)Received 121.00c
Current Electric Charges $-TN. ' Balance Forward 0.00
Current Electric Charges 134.81
Current Amount Due --
"Important:For your safety,stay away from power lines.Do not work near overhead lines.Always
assume that downed lines are energized and dangerous.Report downed power lines to Duke Energy
immediately by calling 800.343.3525. C4 �*�-•
APR —"VE
:1 2016
BY:
Average Cost: $0.1222 per kWh Apr 22,2016 $134.81
�fauxE
ENERGY Visit us at www.duke-energy.com
tab DUKE To view information printed on the back of your bill please click or
ENERGY go to www.duke-eneray.com/indiana/billing/back-of-bill.asr) Pa e 2 of 2
City Of Carmel 1235 Central Park Dr E 1660-3622-01-8
Carmel Clay Parks Misc:Lagoon Pum
Carmel IN 46032
Electric Duke Energy
Meter- 106906084 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge $9.40
kWh Usage- 1,103 Energy Charge
300 kWh @ $0.08240900 24.72
Feb 29-Mar 29 700 kWh @ $0.07287300 51.01
29 Days 103 kWh @ $0.06169600 6.35
Rider 60-Fuel Adjustment
1,103 kWh @ $0.01042500 11.50
Rider 61 -Coal Gasification Adj
1,103 kWh 9 $0.01348900 14.88
Rider 62-Pollution Cntl Adj
1,103 kWh 9 $0.00437700 4.83
Rider 63-Emission Allowance
1,103 kWh @ $0.00003600cr 0.04cr
Rider 66-A-Energy Eff Adj
1,103 kWh @ $0.00166400 1.83
Rider 67-Cinergy Merger Credit
1,103 kWh @ $0.00060300cr 0.67cr
Rider 68-Midwest Ind Sys Oper Adj
1,103 kWh @ $0.00184000 2.03
Rider 70-Reliability Adjustment
1,103 kWh @ $0.00081300 0.90
Rider 71 -Clean Coal Adjustment
1,103 kWh @ $0.00724200 7.99
Rider 72-Federally Mand Cost Adj
1,103 kWh @ $0.00007600 0.08 $134.81
$134.81
KWh Electric Usage
2,000
1,600— b
1,200
800
400
0
4MM
Calculations based on most recent 12 month history
Total Usage 12,008
Average Usage 1,001
MA AP MA JUN JULAUGSEP OCTNOV DEC JAN FEB MAR
Electric 1,25 1,15 1,19 1,03 ---
xfm,,DUKE Visit us at www.duke-energy.com
ENERGY gY•
Page 1 of 2
NS^xr �,'�r
City Of Carmel Duke Energy 1-800-774-1202.• 60*1:0 3.60tL41-8
Carmel Clay Parks
1235 Central Park Dr E
Misc:Main Bldg
Carmel IN 46032
. .
PO Box 1326 Payments after Mar 31 not included Bill repaFtl on=Mar&t.2_0:fx:6 �Y'
Charlotte NC 28201-1326 Last payment received Mar 16 Next meter reading Apr 28,2016
i
Elec 106940254 Feb 29 Mar 30 30 34,844
On Peak 79.70
�'�,.�r'��•sz eta.�K - ---- - �y _ t;t'�Siih __ _ . .
Usage- 34,844 kWh 16.80 War Amt Due-Previous Bill $4,261.08
Duke Energy-Rate LSNO $3,071.00 Payment(s)Received 4,261.08c
Current Electric Charges Balance Forward
Current Electric Charges 3_,071.00
Current Amount Duei
"Important:For your safety,stay away from power lines.Do not work near overhead lines.Always
assume that downed lines are energized and dangerous.Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
RECEIVED
APR - 1 2016
BY:
...........................
Average Cost: $0.0881 per kWh Apr 22,2016 $3,071.00
f IDUKEipar.- Visit us at www.duke-energy.com gy.com
DUKE To view information printed on the back of your bill please click or
ENERGY go to www.duke-energy.com/indiana/billing/back-of-bill.asr) Pa e 2 of 2
City Of Carmel 1235 Central Park Dr E 6010-3608-01-8
Carmel Clay Parks Misc:Main Bldg
Carmel IN 46032
Electric Duke Energy
Meter- 106940254 Rate LSNO -Low Load Factor Sec Sry
kWh Usage- 34,844
Connection Charge $15.00
Actual kW- 79.70 Energy Charge
Actual kVa- 81.40 300 kWh @ $0.10788900 32.37
Billed Kvar- 16.80 700 kWh @ $0.08688900 60.82
Power Factor- 97.8% 1,500 kWh @ $0.07798900 116.98.
12,643 kWh @ $0.05818900 735.68
Date of Peak 03/02/2016 Load Factor-Next 110 Hrs Use
Time of peak 00.00.00 8,767 kWh @ $0.05158800 452.27
Load Factor-Over 300 Hrs Use
Feb 29-Mar 30 10,934 kWh @ $0.04678900 511.59
30 Days KVAR Charge
16.80 Kvar @ $0.24000000 4.03
Rider 60-Fuel Adjustment
34,844 kWh 9 $0.01042500 363.25
Rider 61 -Coal Gasification Adj
34,844 kWh @ $0.01000200 348.51
Rider 62-Pollution Cntl Adj
34,844 kWh @ $0.00332500 115.86
Rider 63- Emission Allowance
34,844 kWh @ $0.00003600cr 1.25cr
Rider 66-A-Energy Eff Adj
34,844 kWh 9 $0.00166400 57.98
Rider 67-Cinergy Merger Credit
34,844 kWh @ $0.00029500cr 10.28cr
Rider 68-Midwest Ind Sys Oper Adj
34,844 kWh @ $0.00148100 51.60
Rider 70- Reliability Adjustment
34,844 kWh @ $0.00056500 19.69
Rider 71 -Clean Coal Adjustment
34,844 kWh @ $0.00559900 195.09
Rider 72- Federally Mand Cost Adj
34,844 kWh 9 $0.00005200 1.81 $3,071.00
ffl- k4 $3,071.00
kWh Electric Usage
150,000-
120,000-
90,000
50,000120,00090,000
60,000
30,000
0
M M M
Calculations based on most recent 12 month history
Total Usage 776,372
Average Usage 64,698
MA APR MA JUN JULAUGSEP OC NOV DEC JAN FEB MAR
Electric 43,60 28,374 62,55 121,830 71,071 37,235 33,09 44,981 53,79 .50,194 34,844
16,DUKE
ENERGY Visit us at www.duke-energy.com
Page 1 of 2
5 R9
Q
City Of Carmel F Duke Energy 1-877-499-7859
Carmel Clay Parks For Account Services,please contact
1235 Central Park Dr E Jessica Jackman
Carmel 1N 46032
PO Box 1326 Payments after Mar 31 not included Bill prepar d onwMar„31 2Q,16
Charlotte NC 28201-1326 YNx % Last payment received Mar 16 Next mete readingApr�2820.L6a-;i
Elec 108068377 Feb 29 Mar 30 30 329,530
On Peak 728.80
Usage- 329,530 kWh 728.80 kW Amt Due-Previous Bill $26,549.95
397.60 kVar Payment{s}Received 26,549.95c
Duke Energy-Rate HSNO $27,944.35 Balance Forward �0.05
Current Electric Charges $-27,944.35 Current Electric Charges 27,944 35
Current Amount Due
"Important:For your safety,stay away from power lines.Do not work near overhead lines.Always
assume that downed lines are energized and dangerous.Report downed power lines to Duke Energy
immediately by calling 800.343.3525. ”
R.ECEIVED
APS - 1 2016
BY:
e. mM
00
Average Cost: $0.0848 per kWh Apr 22,2016q $27,944.35
,F CiUKE 1
�NEltGY> Visit us at www.duke-energy.com
DUKE To view information printed on the back of your bill please click or
ENERGY., go to www.duke-enerev.com/indiana/billing/back-of-bill.asi3 Pa e 2 of 2
City Of Carmel 1235 Central Park Dr E 5010-3608-01-2
Carmel Clay Parks Carmel IN 46032
........ . ........... .. .... .. _ E
Electric Duke Energy
Meter- 108068377 Rate HSNO -High Load Factor Sec Sry
kWh Usage- 329,530 Connection Charge $15.00
Actual kW- 728.80 Demand Charge
Actual kVa- 830.20 728.80 kW @$14.06000000 10,246.93 .
Billed Kvar- 397.60 Energy Charge
Power Factor- 87.8% 329,530 kWh @ $0.01683000 5,545.99
KVAR Charge
397.60 Kvar @ $0.24000000 95.42
Date of Peak 03/15/2016 Rider 60-Fuel Adjustment
Time of peak 16.30.00 329,530 kWh @ $0.01042500 3,435.35
Feb 29-Mar 30 Rider 61 -Coal Gasification Adj
30 Days 728.80 kW 9 $5.51965200 4,022.72
Rider 62- Pollution Cntl Adj
728.80 kW 9 $1.72535800 1,257.44
Rider 63-Emission Allowance
329,530 kWh @ $0.00003600cr 11.86cr
Rider 66-A-Energ Eff Adj
329,530 kWh 9a $0.00166400 548.33
Rider 67-Cinergy Merger Credit
329,530 kWh 9 $0.00033300cr 109.73cr
Rider 68-Midwest Ind Sys Oper Adj
329,530 kWh Co) $0.00159700 526.26
Rider 70- Reliability Adjustment
329,530 kWh 9 $0.00060100 198.05
Rider 71 -Clean Coal Adjustment
728.80 kW @ $2.95187500 2,151.33
Rider 72- Federally Mand Cost Adj
728.80 kW @ $0.03172600 23.12 $27,944.35
x
l $27,944.35
kWh Electric Usage
500,000-
400,000
300,000
200,000
100,000
0
M M mmam
Calculations based on most recent 12 month history
Total Usage 4,681,978
Average Usage 390,165
MA AP MA JUN JULAUG SEP OCTNOV DEC JAN FEBMAR
Electric 369,37 365,33 416,01 491,599 491,32 463,40 452,79 353, 316,3 358,92 326,801 316,5 329,530
tDDUKE Visit us at www.duke-energy.com
ENERGY gy.com
VOUCHER # 165031 WARRANT# ALLOWED
254004 IN SUNT OF $
DUKE/PSI ENERGY
PO BOX 9001076
Louisville, KY 40290-1076
Carmel Wastewater Utility
ON ACCOUNT OF APPROPRIATION FOR
Board members
PO# INV# ACCT# AMOUNT Audit Trail Code
39303276010 01-736H-08 $95.59
�93b3276o« o1.7150.01
Voucher Total $�
Cost distribution ledger classification if
claim paid under vehicle highway fund
Prescribed by State Board of Accounts City Form No.201 (Rev 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show, kind of service, where
performed, dates of service rendered, by whom, rates per day, number of units,
price per unit, etc.
Payee
254004
DUKE/PSI ENERGY Purchase Order No.
PO BOX 9001076 Terms
Louisville, KY 40290-1076 Due Date 3/29/2016
Invoice Invoice Description
Date Number (or note attached invoice(s) or bill(s)) Amount
3/29/2016 3930327601( $95.59
hereby certify that the attached invoice(s), or bill(s) is (are) true and
;orrect and I have audited same in accordance with IC 5-11-10-1.6
s 12C I L 6-4.✓n'
Date Officer
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT
Page 1oY1
City[fCarmel Duke Energy 1'877'499'7859 8930-3276'81'8
Carmel Utilities For Account Services,please contact
801 Range Line Rd Jessica Jackman
Carmel|N40032
POBox 1320 Payments after Mar 21 nmindudad 8i||preparedonMar e1.uo1e
Charlotte NC282O1 1328 Last payment received Mar u1 Next meter reading Apr 1a.uo10
Bau 106153880 Feb 17 K8mr 17 29 853 1852 1 798 0.00
X.
Usage- 799 kWh Amt Due- Previous Bill $128.86
Duke Energy- Rate CSNO $101.88 Payment(s) Received 128.86cr
Current Electric Charges $101.88 Balance Forward 0.00
Current Electric Charges 101.88
Current Amount Due $_f_01.88
- --�- --- "hnportar»:'For your safety,
' ineg. Do-66t\wi near overhead Unes.--Akwuya -
assume that downed lines areenergized unddangamuu. Roportdownedpower|inoa0oDukeEnergy
immediately bycalling 8OO.343.3525. ^
01275 perkWh Apr 12,2016 $101.88
��
ENERGY. uuxo*nurg^ovm
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT
Page 1 of 1
............... ......
.........................
.........................
........................
............... ....
................:-
........................
...............
...........................
City Of Carmel Duke Energy 1-800-774-1202 3930-3276-01-0
901 Range Line Rd IN
Carmel IN 46032
PO Box 1326 Payments after Mar 21 not included Bill prepared on Mar 21,2016
Charlotte NC 28201-1326 Last payment received Mar 01 Next meter reading Apr 15,2016
............................... a- r
............ ....... I , �� . . ...............
::::::<:::>::>::::>:::::<:::>:::<:>-.-.-<:::::>::>::::>::::>::
... . ..
. .. . ........
Elec 098340182 Feb 17 Mar 17 29 38091 38834 1 743 0.00
....... .. ... .......X'. ......
.................................................................... ................. ......
....... .....
0 `jOMMOV X............. ...... UIT.M. j tnd ....................................................... ..
.......... ......................
i I .
Usage- 743 kWh Amt Due- Previous Bill $ 123.80
Duke Energy- Rate CSNO $95.59- Payment(s) Received 123.80cr
Current Electric Charges f-9-5.59 Balance Forward 0.00
Current Electric Charges 95.59
Current Amount Due $-96.59
"Important:For your safety,stay away from power lines-Do noLwork--near-overhead lines-Always.-
assum&tffi.Wdo1Wned-Ii6es dr6e nergized and dangeilous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525.
...........................................................- ----- ...... ...................
.........................................
.......................................... .........................................
.......................................... .........................................
..........................................
ia- Lin :`A=
..........
.............................. .........
.......................................... .........
Average Cost: $0.1287 per kWh Apr 12,2016 $95.59
f DUKE
ENERGY. www.duke-energy.com
BM-BwDEMW DUKE.INREG.20160321 0101011.CSV-33333-000011604 *printed on recyclable paper.
VOUCHER # 165025 WARRANT# ALLOWED
254004 IN SUM OF $
DUKE/PSI ENERGY
PO BOX 9001076
Louisville, KY 40290-1076
Carmel Wastewater Utility
ON ACCOUNT OF APPROPRIATION FOR
Board members
t
PO# INV# ACCT# AMOUNT Audit Trail Code
I
21103050020 01-7151-05 $291.94
0j9503a-75o 13 01 _-7150_0_3
a01io30S009G 0e -7is®-03 , y2 :y0
S73o3aSozjla o1 --715o -i)3 , 39.` 5
I
Voucher Total29a-94�
Cost distribution ledger classification if
claim paid under vehicle highway fund
Prescribed by State Board of Accounts City Form No.201 (Rev 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must shove, kind of service, where
performed, dates of service rendered, by whom, rates per day, number of units,
price per unit, etc.
Payee
254004
DUKE/PSI ENERGY Purchase Order No.
PO BOX 9001076 Terms
Louisville, KY 40290-1076 Due Date 3/28/2016
Invoice Invoice Description
Date Number (or note attached invoice(s) or bill(s)) Amount
3/28/2016 2110305002( $291.94
I hereby certify that the attached invoice(s), or bill(s) is (are)true and
correct and I have audited same in accordance with IC 5-11-10-1.6
Date Officer
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT
Page 1of1
City OfCarmel Duke Energy 1'077'499'7859 2110'3060'82-0
Carmel Utilities For Account Services,please contact
815 Range Line Rd Jessica Jackman
Carmel |N48O32
X.
POBox 132O Payments after Mar 21not included Bill prepared unMar 21.uu16
Charlotte NC 28201-1326 Last payment received Mar uo Next meter reading Apr 1a.un1V
Bou 108023896 Feb 17 yWur 17 28 867 880 100 2.800 11.00
Usage- 2,900 kWh Amt Due- Previous Bill $372.36
Duke Energy- Rate SWP $291.94 Payment(s) Received 372.36cr
Current Electric Charges $-2-91.94 Balance Forward 0.00
Current Electric Charges 291.94
Current Amount Due $i9-1.94al
"Important: For your Safety,stay awayfrom power lines. Do not work near overhead lines.Always
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525.
Average Cost: $
0U007 per kWh Apr 12,2016 $291.94
ri-i—oc—I—v 1 wr rwn 1 1— In Twun rM I IVIGV I Page 1 of 1
:...d...: ,s..::::::.::::::::::::::..::::::::: For ttxqutnes:G €I:.. �Arrcu»! Itn �r .
City Of Carmel Duke Energy 1-877-499-7859 2950-3275-01-3
Carmel Utilities For Account Services,please contact
13698 Spring Mill Blvd Jessica Jackman
Carmel IN 46032
t:;: ... .....:.:nts. A : :: ::.:.::::::::::::::.::Accaun#:In
PO Box 1326 Payments after Mar 18 not included Bill prepared on Mar 18,2016
Charlotte NC 28201-1326 Last payment received Mar 08 Next meter reading Apr 14,2016
> ::> ;:::;;::>::»:::: t ate................................
t�:s> revt�s;:;�resen�:>::::::::>::I�f�(�;;;:;.:.;:.;::.>a3sa �:::>::>::>::»::>«:>::> ►:»:<><:::>::
Elec 108026101 Feb 15 Mar 16 30 41546 42179 1 633 2.54
to rtc .Cv rns. ial '>` > < <:.<': ><<<' <
�i� .eri�Bitlit�'`>�=�=�><< << > >< =>�`��<= `� >= >> =
Usage- 633 kWh Amt Due- Previous Bill $67.85
Duke Energy- Rate SWP $82.58 Payment(s) Received 67.85cr
Current Electric Charges 82.58 Balance Forward 0.00
Current Electric Charges 82.58
O} -i 'So.o Current Amount Due 82.58
"important: For your safety stay avvay from poweriines.Do—not work near overn-ead-tines.Al'wsem—
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
Moun be.
Average Cost: $0.1305 per kWh Apr 11,2016 $82.58
�� DUKE
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160318010101_1.CSV-41497-000008173 0 Printed on recyclable paper.
rage i or r
City Of Carmel Duke Energy 1-877-499-7859 2210-3050-02-6
Carmel Utilities For Account Services,please contact
4879 Woodfield Dr Jessica Jackman
Carmel IN 46033
> ` ' ..Aces`::<::>::...;;;:::<
uttt.lnlc�rma#ict >'> = < `
:::.:.::.:::.::.:::::::::::::::::::.:.:::::....::::::::.::.:::::,::.::::::::::::::::::::::::._::.:::.::::::::::::::::::::::::::::::::.:.:.:._:._
PO Box 1326 Payments after Mar 18 not included Bill prepared on Mar 18,2016
Charlotte NC 28201-1326 Last payment received Mar 08 Next meter reading Apr 14,2016
IlU[ :.<....:_.:.:.:.::?, ............
... ......e > a ............
rv>....
Elec 108036934 Feb 16 Mar 16 29 21166 21474 1 308 2.39
>''>< > ......«
Usage- 308 kWh Amt Due- Previous Bill $45.25
Duke Energy- Rate SWP $48.40 Payment(s) Received 45.25cr
Current Electric Charges 48.40 Balance Forward 0.00
Current Electric.Charges 48.40
3 Current Amount Due 48.40
"Important:For your-safety;stay awaytrorii po-,wer-lines Do-nbl ticrik;i ui�o5e„iead`4i
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
....................:..
...............
.......................................... ..........................................
..........................................
.........................................
.......................................... ..........................................
>Ctueaa3 »aEincut>De> >'>
Average Cost: $0.1571 per kWh Apr 11,2016 $48.40
4� DUKE
N RGY® www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160318010101_1.CSVA1495-000006173 0 Printed on recyclable paper.
VLt=AtftHt:IUhN I Ht:I Ut'VUH I IVN W1 IN TUUH IrAYMI:--N I Page 1 of 2
........................... .........
... ....................................................... ........... ...........
.. .............................. ............. ...................................
...........%....%........................
. ...................
..........
.. . ............ .......
. . ... . .................... .....
.. .... ........................
.. ..... . ............ .. Qu
. ..... ..... .....
.................................. ..... .... ................. .......
.................................. . ........... ......... ......
............
City Of Carmel Duke Energy 1-877-499-7859 5730-3050-01-0
Carmel Utilities For Account Services,please contact
889 Bridle Cir Jessica Jackman
Carmel IN 46032
..............
............
... .. .. ....
.. ................ ............X M. A.
... . .............................
M i.R.—MEM ME=
................. ....
..... .. . .... .................. .......................%.:.... ..... ..
.. .................... .................................. ............
. ... . .......�-- ..............
.............. ....................... '"--------I I*............:- ---------------
PO Box 1326 Payments after Mar 22 not included Bill prepared on Mar 22,2016
Charlotte NC 28201-1326 Last payment received Mar 08 Next meter reading Apr 18,2016
.............. ............ ...........
U U V
N' b
M ::.....>::..
.......... ......
......................... .............................
................:', I I . .'' , - 111
Elec 108080123 Feb 18 Mar 18 29 8902 9125 1 223 0.96
....................................................... ..........
.................................
...................
...............................................
Usage- 223 kWh Amt Due- Previous Bill $32.58
Duke Energy- Rate SWP $39.45 Payment(s) Received 32.58cr
Current Electric Charges 39.45 Balance Forward 0.00
Current Electric Charges 39.45
Current Amount Due 39.45
z� ay
ISO, 03
- "In,.Ij-ortani:=FGrVOLir-.c;aic-lty-,—bt.-ty-away-froin-power-lines-Do-1-10t-WOTk2n6EiroV&iWEiadViffe-sAlvgy-s—.-----m-.
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525.
.........
........................................... ............... . ........
.......................................... .......... ...............
..........................................
..... ........
..............CI ............ ..............
............ .............. ...... ............
.............
............ .... ..... ..........
... .......
...........
... ........
............
............ .....
Average Cost: $0.1769 per kWh Apr 13,2016 $39.45
DUKE
ENERGY. ww'w.duke-energy.corn
BM-BW.DEMW.D UKE.INREG.2016032201 01 01l.CSVA9137-000006919 Printed on recyclable paper.
VOUCHER NO. WARRANT NO.
ALLOWED 20
DUKE ENERGY
PO BOX 1326 IN SUM OF$
CHARLOTTE, NC 28201-1326
$477.11
ON ACCOUNT OF APPROPRIATION FOR
Street Department
PO#/Dept. INVOICE NO. I ACCT#/Fund AMOUNT Board Member:
0 43-480.00 $477.11 1 hereby certify that the attached invoice(s), or
2201 I 201
bill(s) is (are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Tuesda March,29l, 20y.
Q
Street Commissioner
Cost distribution ledger classification if
claim paid motor vehicle highway fund
i
I
Prescribed by State Board of Accounts City Form No.201 (Rev.1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service,where performed,dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
Purchase Order No.
Terms
Date Due
Invoice Date Invoice# Description Amount
Dept. Fund# (or note attached invoice(s) or bill(s))
03/28/16 0 $477.11
2201 201
I hereby certify that the attached invoice(s),or bill(s), is(are)true and correct and I have audited same in accordance
with IC 5-11-10-1.6
20
Clerk-Treasurer
YLf-AtiL HL UHN IHC IVF YUHI IUN WI I H YUUH NAYMEN I Page 1 of 1
€Qr In utrl�s:Cain:::::.::::::::::::::. ►cccut f�lumhetr
City Of Carmel Duke Energy 1-800-521-2232 3920-3822-01-8
Street Department
746 136Th St W
Misc:Strt Light
Carmel IN 46032
>> <»><:` < > <> :>::::>:::::_»:::>:::>::;:::::>: :::::>:::;:;> "'<> > »>>>> '
A1�caurrt I>3trat€ani.;:.:;.;:.;:.:_:.:.;:.;:.;:::.;;;:<.;;:.::
PO Box 1326 Payments after Mar 22 not included Bill prepared on.Mar 22,2016
Charlotte NC 28201-1326 Last payment received Mar 08 Next meter reading Apr 18,2016
11Reter'Retd `
:::<:>
>>< » `>'>> >'> >
Ysn
................ ::>:llsa <::::;>::::::::»:::<:>:<:: 1:::><:::>::::>::..:::::::::
Elec 093881957 Feb 18 Mar 18 29 12295 15293 1 2,998 0.00
:IEllectrtc::-:: amtmerc�al::::::::::::::;::::::::::::::::>::::>::::::::> ::»<>::::::::>:<::<:::>:<:><:. rtrreni f3
.....................
.. ......................................................................
Usage- 2,998 kWh Amt Due- Previous Bill $ 153.43
Duke Energy- Rate CSNO $315.97 Payment(s) Received 153.43ci
Current Electric Charges $-T1-5.9 7 Balance Forward 0.00
Current Electric Charges 315.97
Current Amount Due $Y15.97
"Important: For your safety,stay away from power lines. Do not work near overhead lines.Always
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
......................................... .............:............R..............
.......................................... ..........................................
.......................................... ..........................................
..........................................
........... .............
.......................................... ..........................................
.......................................... ..........................................
%
.......................................... ..........................................
.......................................... .............................
Hy
Average Cost: $0.1054 per kWh Apr 13,2016 $315.97
ENERGY.Ywww.duke-energy.com
�y
BM_MDEMw.DUKE.INREG.20160322010101_1.CSV-3725-000025751 @ Printed on recyclable paper.
YLhAbh HE[UHN I HE I VY YUH I IUN VVI I H YUUH YHYMtN 1 Page 1 of 1
�. : s :»:::::r<::»:>:;:::>:<::::::::>;>:::::: ar>tt:
�t�>� ,err,►.�;.;�; . .r.. ; ;;;:. :.:. ::::.:.......
City Of Carmel Duke Energy 1-800-521-2232 9880-3769-01-0
14099 Clay Terrace Blvd
Suite:A Mlsc:Hwy Lights
Carmel IN 46032
»>>><< > ` >:>:: ; Acout lrxt .rte. . .n.......
ita
PO Box 1326 Payments after Mar 21 not included Bill prepared on Mar 21,2016
Charlotte NC 28201-1326 Last payment received Mar 08 Next meter reading Apr 15,2016
;;;;:.;:. :>»::>T «<»<>:»:«:f .:sP..:r..evcou <::priit: :<::>Mrafti: :>>::>::>Las ::::>::>::>::>::>::>:: fil/ : :::
I of rN rr rer >s ..::.;......:::::.Y :: .....: .: : g.::.:::::.:.:::::::::::::::::::::::.:::
Elec 104806928 Feb 17 Mar 17 29 14628 15075 1 447 0.00
:.>`'
Usage- 447 kWh Amt Due- Previous Bill $30.80
Duke Energy- Rate SMLC $30.53 Payment(s) Received 30.80cr
Current Electric Charges 30.53 Balance Forward 0.00
Current Electric Charges 30.53
Current Amount Due 30.53
"Important: For your safety,stay away from power lines. Do not work near—overrhea—dimes.Always - _.
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
:....`:Due> ltnoi€ t.11 t .........
Average Cost: $0.0683 per kWh Apr 12,2016 $30.53
ENERGY. www.duke-energy.com
BM BW.DEMW.DUKE.INREG.20160321010101_1.CSV-3717-000023692 0 Printed on recyclable paper.
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT Page 1 of.1
.. .' '> .>< r r u
City Of Carmel Duke Energy 1-800-521-2232 9570-3663-01-0
Round About Light
13654 Oakridge Rd
Carmel IN 46032
>:::::<:::>::>< ................:::::: ::> :
::
::,..:.
PO Box 1326 Payments after Mar 21 not included Bill prepared on Mar 21,2016
Charlotte NC 28201-1326 Last payment received Mar 01 Next meter reading Apr 15,2016
«::
Et i€iE ``. at > <>< >' > <......i r ..�di( ' `` < < << -<``<` '`"'< >>
...:A.....,.�•...: :.::..::.:.. :.........
lliiecr ��Nt�rr3i;seiy« pre .iit <>Nts�(lii < >>� l�s�;>:.;'»:
Elec 106974131 Feb 18 Mar 17 28 47941 48034 1 93 0.00
EMU
Usage- 93 kWh Amt Due- Previous Bill $ 1.54
Duke Energy- Rate SMLC $13.80 Payment(s) Received 1.54cr
Current Electric Charges 3.80 Balance Forward 0.00
Current Electric Charges 13.80
Current Amount Due 13.80
"Important: For your safety,stay away from power lines. Do not work near overhead lines.Always -
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
Average Cost: $0.1484 per kWh Apr 12,2016 $13.80
ENERGY. www.duke-energy.60m
BM_BW.DEMW.DUKE.INREG.20160321010101_1.CSV-3715-000023693 0 Printed on recyclable paper.
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT Page 1 of 1
�**
kti:�I $:igtf :;E:':'<:::':':`•%•': `'':<i2%?<% .�'.fiiAM£ #iht11.
City Of Carmel Duke Energy 1-800-521-2232 3010-3704-01-0
Street Department
2525 136Th St E
Misc: Roundabout
Carmel IN 46032
PO Box 1326 Payments after Mar 21 not included Bill prepared on Mar 21,2016
Charlotte NC 28201-1326 Last payment received Mar 01 Next meter reading Apr 15,2016
...................read r ><<> '> >'><.......s< « .
:€:::>:::`.:
n .:s..:::?.r..evscs....:.r.......e ...:.............................:::::::g.:::::::.:: :::::.::.
Elec 106978964 Feb 17 Mar 17 29 69807 70683 1 876 0.00
it :><`Blkin>;« > <` << » <<< ' >>' ' >< < <<<:
Usage- 876 kWh Amt Due- Previous Bill $55.34
Duke Energy- Rate SMLC $50.82 Payment(s) Received 55.34cr
Current Electric Charges 50.82 Balance Forward 0.00
Current Electric Charges 50.82
Current Amount Due V60.82
"Important: For your safety,stay away from power lines. Do not work near overhead lines.Always
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
Average Cost: $0.0580 per kWh Apr 12,2016 $50.82
4nDUKE
ENERGY. www.duke-energy.com
BM BwDEMW.DUKE.INREG.20160321010101_1.CSV-3713-000023694 0 Printed on recyclable paper.
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT page 1 of 1
>:; >::»::> ` > >>`< >farts:<>:u1a < <<< sltter=`'
..
City Of Carmel Duke Energy 1-800-521-2232 1590-3701-01-0
Street Department
Flasher Signal
920 Range Line Rd N
Carmel IN 46032
> ``<>>` »>>r> >> ':< JC €it ltifrt:
PO Box 1326 Payments after Mar 21 not included Bill prepared on Mar 21,2016
Charlotte INC 28201-1326 Last payment received Mar 01 Next meter reading Apr 15,2016
.........................................
..........:..............................
..........:..............................
'�1EEl'�>`:�:.itirilfyet'�:::::'::�":�'I�l<Is: �f`L71 '•': i sdYl:�:s :l�l'EVi� :::::�`r��:;:..� �!!�€�': '<' :��::�'�`''•`:� ::::::>':`::: ��. .::€::`::
Elec 106940151 Feb 17 Mar 17 29 3024 3065 1 41 0.00
Usage- 41 kWh Amt Due- Previous Bill $13.23
Duke Energy- Rate SMS $13.39 Payment(s) Received 13.23cr
Current Electric Charges 3.39 Balance Forward 0.00
Current Electric Charges 13.39
Current Amount Due 13.39
"Important: For your safety,stay away from power lines. Do not work near overhead lines.Always
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
Average Cost: $0.3266 per kWh Apr 12,2016 $13.39
DUKE
ENERGY® www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160321010101_1.CSV-3711-000023695 @ Printed on recyclable paper.
PLEASE HE URN IHE IOP POHT ION WITH YOUR PAYMENT
Page 1 of 1
::.:: ► .Add r ..: :: .: ::;:;:;:: .; :
City Of Carmel Duke Energy 1-800-521-2232 4190-3744-01-2
Street Dept
Dir Shelborne Rd
131 St St
lf>a I P x►xte>at % A cau to larnra .:::.:.:..:::::..:.::.:..:::.:.::::::..;.:......::::
PO Box 1326 Payments after Mar 23 not included Bill prepared on Mar 23,2016
Charlotte NC 28201-1326 Last payment received Mar 08 Next meter reading Apr 19,2016
<` >€ ad '' at » « <` >>Metreairr > >:> <>>><' <> < ><
.............................................. ..... ....:.:... ... . .. .::...:: .. :...: :::.::::::.:...:.:::::::::.
.um er::::::::>:>1 a> t::::>::::>:: : ::>::::»::>:::::> .:s>::>:::r:.eu s :::resen.:>><:::: .......
::.:..Y ......::::::.:.:
Elec 108041230 Feb 20 Mar 19 28 8173 8295 1 122 0.00
c.... I ::>:>::.
Usage- 122 kWh Amt Due- Previous Bill $26.82
Duke Energy- Rate CSNO $24.25 Payment(s) Received 26.82cr
Current Electric Charges 24.25 Balance Forward 0.00
Current Electric Charges 24.25
Current Amount Due 24.25
"Important: For your safety,stay awaylrom wlines. Do not work ne-o e�ead lines 1lways
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
...........
D e l]airT > ><'
Average Cost: $0.1988 per kWh Apr 14,2016 $24.25
4�
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160323010101_1.CSV-2309-000026973 @ Printed on recyclable paper.
Page 1 of 1
t+la ,...::.:.:.: c >::> :: >:
l ru. e.�►.ddress> ' < >»> ::::>:::>::>:>:::::>:<>:::::> <€
City Of Carmel Duke Energy 1-800-521-2232 7160-3731-01-2
Street Department
Dir Shelborne Rd
121 St St
............::::::::..::.::.:.:::.:::.:;.;::: A cotfni tni�mfa ort
PO Box 1326 Payments after Mar 23 not included Bill prepared on Mar 23,2016
Charlotte NC 28201-1326 Last payment received Mar 08 Next meter reading Apr 19,2016
::..:.::r:e:::v:::f:...: EKE:; :
Elec 086760630 Feb 20 Mar 19 28 657 742 1 85 0.00
Usage- 85 kWh Amt Due- Previous Bill $13.76
Duke Energy- Rate SMLC $ 13.44 Payment(s) Received 13.76cr
Current Electric Charges 13.44 Balance Forward 0.00
Current Electric Charges 13.44
Current Amount Due 13.44
''Important- For your safety,stay awayromf`povuer Imes. Do nofwork near overh`eaalm'es—Always – - -
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
..........
........................:.....
.........
Moun
Average Cost: $0.1581 per kWh Apr 14,2016 $13.44
ENERGY., www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160323010101_1.CSV-2185-000027034 Printed on recyclable paper.
PLEASE RETURN THE TOP PORTION WITH roonpxn^swr ---'----'- -- -
Page of
City Of Carmel Duke Energy 1'800'521'2232 3610'3734'01'6
Street Department
Dir She|bomnand
126Th St
ja
9O Box 1328 Payments after Mar uu not included Bill prepared on Mar un.2016
Charlotte NC 28201-1326 Last payment received Mar on Next meter reading Apr 1m`cu10
Q91 a ..........
Beu 104875053 Feb 20 Mar 19 28 10083 10188 1 110 080
MI
Usage- 116 kWh Amt Due- Previous Bill $ 15.43
Duke Energy- Rate SMLC $14.91 Payment(s) Received 15.43cr
Current Electric Charges 1-4.91 Balance Forward 0.00
Current Electric Charges 14.91
Current Amount Due $71-4.91
�ssume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525.
ia
Average Cost:
�~
`
'
$0.1285 per kWh Apr 14,2016 $14.91
DUKE
ENERGY. www.duke-energy.com
owI-13WocmKooxE./wncs.20160323010101I.00v-2183-000027034 @Printed onrecyclable paper.
✓oucher No. Warrant No.
254004 Duke Energy Allowed 20
PO Box 1326
Charlotte, NC 28201-1326
In Sum of$
$ 588.67
ON ACCOUNT OF APPROPRIATION FOR
101 General Fund /I 10 Facilities
I
PO#or INVOICE NO. ACCT#/TITLE AMOUNT Board Members
Dept#
1125 5710-3301-01-9 4348000 $ - I hereby certify that the attached invoice(s), or
1125 2810-3743-01-1 4348000 $ 56.44 bill(s) is(are)true and correct and that the
1125 1810-3743-01-6 4348000 $ 19.15materials or services itemized thereon for
1125 1310-3278-01-0 4348000 $ - which charge is made were ordered and
1125 3190-3277-01-0 4348000 $ - deceived except
1125 7280-3771-01-5 4348000 $ -
<':'' 8740-3794-02-1 4348000 $ 513.08
1125 1550-3287-02-9 4348000 $ -
April 1, 2016.
Signature
$ 588.67 Accounts Payable Coordinator
Cost distribution ledger classification if Title
claim paid motor vehicle highway fund
I
I
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice of bill to be properly itemized must show; kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
Purchase Order No.
254004 Duke Energy Terms
PO Box 1326 Date Due
Charlotte, NC 28201-1326
Invoice Invoice Description
Date Number (or note attached invoice(s) or bill(s)) Amount
5710-3301-01-9 Inlow Park-6310 131st St E 9-Mar
3/29/16 2810-3743-01-1 Central Park Shelter 2-Mar $ 56.44
3/29/16 1810-3743-01-6 Central Park Street lighting 29-Febl $ 19.15
1310-3278-01-0 North Trailhead - 1251 Rohrer Rd 22-Mar
3190-3277-01-0 Carey Grove Pk- 14001 N Carey Rd 18-Mar
7280-3771-01-5 Pedestrian bridge- 500 146th St W 22-Mar
3/31/16 8740-3794-02-1 Wilfong Pavilion Founders Park 2-Mar $ 513.08
1550-3287-02-9 Central Park- Dog Park- 1507 116th St E 3-Mar
TOTAL $ 588.67
, 20
Clerk-Treasurer
rage i of z
..
City Of Carmel Duke Energy 1-877-499-7859 2810 3743-01 1'
Carmel Clay Parks For Account Services,please contact
1235 Central Park Dr E Jessica Jackman
Misc:Shelter
Carmel IN 46032
PO Box 1326 Payments after Mar 28 nat included Bill prepared n M✓ ..ar.'� Oti6
Chariotte NC 28201-1326 Last payment received Mar 15 Next meter reading Apr 26,2016
a 1
` u s.NO I I ftl �1-:1 .
Elec 039451247 Feb 25 Mar 04 8 30926 E 30926 1 0 0.00
Elec 106826790* Mar 04 Mar 25 21 00000 394 1 394 0.00
*New Meter
Usage- 394 kWh Amt Due-Previous Bill $85.41
Duke Energy-Rate CSNO $56.44 Payment(s) Received 85.41c
Current Electric Charges $-5-6--.47 Balance Forward 0.0
Current Electric Charges 56.44
Current Amount Due
"Important:For your safety,stay away from power lines.Do not work near overhead lines.Always
assume that downed lines are energized and dangerous.Report downed power lines to Duke Energy
immediately by calling 800.343:3525. "
RECF,jVED
MAR 3.0 2016
BY: APR 1201
Average Cost: $0.1432 per kWh Apr 20,2016 $56.44 $58.13
LIN
E Visit us at www.duke-energy.com
g-' RGY;
DUKE To view information printed on the back of your bill please click or
ENERGY go to www.duke-enerRv.com/indiana/billing/back-of-bill.asp Pa e 2 of 2
City Of Carmel 1235 Central Park Dr E 2810-3743-01-1
Carmel Clay Parks Misc:Shelter
Carmel IN 46032
Electric Duke Energy
Meter- 039451247 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge $9.40
kWh Usage- 0 Energy Charge
Feb 25-Mar 04 300 kWh @ $0.08240900 24.72
8 Days 94 kWh @ $0.07287300 6.85
Rider 60- Fuel Adjustment
Meter: 106826790 394 kWh @ $0.01042500 4.11
Multipliers- 1 Rider 61 -Coal Gasification Adj
kWh Usage- 394 394 kWh @ $0.01348900 5.31
Rider 62- Pollution Cntl Adj
394 kWh @ $0.00437700 1.72
Mar 04-Mar 25 Rider 63-Emission Allowance
21 Days 394 kWh @ $0.00003600cr 0.01cr
Rider 66-A-Energy Eff Adj
Meter Change 394 kWh @ $0.00166400 0.66
Rider 67-Cinergy Merger Credit
394-kWh @ $0.00060300cr 0.24cr --
Rider 68-Midwest Ind Sys Oper Adj
394 kWh @ $0.00184000 0.72
Rider 70- Reliability Adjustment
394 kWh @ $0.00081300 0.32
Rider 71 -Clean Coal Adjustment
394 kWh @ $0.00724200 2.85
Rider 72- Federally Mand Cost Adj
394 kWh @ $0.00007600 0.03 $56.44
kWh Electric Usage
1,000-
800
600 03
400
200
0
M M M
Calculations based on most recent 12 month history
Total Usage 6,792
Average Usage 566
MAR AP MAY JUN JU AUG SEP OC NOV DEC JAN FEB MAR
Electric 59 551 501 46 46 4 58 45 67 77 772 661 394
j DUKE
ENERGY Visit us at www.duke-energy.com
Nage 1 of 2
City Of Carmel Duke Energy 1-800-521-22321810 743-U:1.6
Carmel Clay Parks "`
1235 Central Park Dr E
Misc:Lighting
Carmel IN 46032
PO Box 1326 Payments after Mar 29 not included Bill prepared o Mar 29. 20:16
Charlotte NC 28201-1326 Last payment received Mar 16 Next meter rea ing Apr 26,2016
Elec 038130351 Feb 25 Mar 25 29 4688 4768 1 80 0.00
Usage- 80 kWh Amt Due-Previous Bill $19.63
Duke Energy-Rate CSNO $19.15 Payment(s) Received 19.63c
Current Electric Charges Balance Forward Abu
Current Electric Charges 1915
Current Amount Due
"Important:For your safety,stay away from power lines.Do not work near overhead lines.Always
assume that downed lines are energized and dangerous.Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
RECEIVED
MAR 3`0 2016
APR I 1 X0,6
lum
Average Cost: $0.2394 per kWh Apr 20,2016 $19.15 $19.72
VEINIEN,01
Visit us at www.duke-energy.com
DUKE To view information printed on the back of your bill please click or
ENERGY go to www.duke-energy.com/indiana/billing/back-of-bill.asp Page 2 of 2
0
City Of Carmel 1235 Central Park Dr E 1810-3743-01-6
Carmel Clay Parks Misc:Lighting
Carmel IN 46032
:. . �
Electric Duke Energy
Meter- 038130351 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge $9.40
kWh Usage- 80 Energy Charge
80 kWh @ $0.08240900 6.59
Feb 25-Mar 25 Rider 60- Fuel Adjustment
29 Days 80 kWh @ $0.01042500 0.83
Rider 61 -Coal Gasification Adj
80 kWh @ $0.01348900 1.08
Rider 62- Pollution Cntl Adj
80 kWh @ $0.00437700 0.35
Rider 63- Emission Allowance
80 kWh @ $0.00003600cr 0.00
Rider 66-A-Energy Eff Adj
80 kWh @ $0.00166400 0.14
Rider 67-Cinergy Merger Credit
80 kWh @ $0.00060300cr 0.05cr
Rider-68-.Midwest Ind Sys Oper Adj
80 kWh Co) $0.00184000 0.15
Rider 70-Reliability Adjustment
80 kWh @ $0.00081300 0.07
Rider 71 -Clean Coal Adjustment
80 kWh @ $0.00724200 0.58
Rider 72-Federally Mand Cost Adj
80 kWh @ $0.00007600 0.01 $19.15
$19.15
kWh Electric Usage
150-
120-
6
501206
°
30-
0—
Calculations
0 0 Calculations based on most recent 12 month history
Total Usage 1,011
Average Usage 84
MAR APR MA JUN JU AUGSEP OCTNOV DEC JAN FEB MAR
Electric 95 77 66 1.4
7 8 83 10 117 80
j DUKE
ENERGY Visit us at www.duke-energy.com
Page 1 of 2
Carmel Clay Parks&Recreation Duke Energy 1-800-521-2232 874'0-3794:02_1
11675 Hazel Dell Pkwy
Misc:Pavilion
Carmel IN 46033
PO Box 1326 Payments after Mar 31 not included Bill prepare�d'onMaar 31. 2016 ��"
Charlotte NC 28201-1326 Last payment received Mar 15 Next mete rFea5n' Apr 28,2018
Elec 106959482 Feb 29 Mar 30 30 2760 2881 40 4,840 19.60
r
Usage- 4,840 kWh 1.90 kVar Amt+Due-Previous Bill $779.53
Duke Energy-Rate LSNO $513.08 Payment(s)Received 779.53c
Current Electric Charges Balance Forward �b
Current Electric Charges 513.08
Current Amount Due
"Important:For your safety,stay away from power lines.Do not work near overhead lines.Always
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
RECEIVED
APR q-.1 2016
BY: APR PR R Z 2016
a
Average Cost: $0.1060 per kWh Apr 22,2016 $513.08
It
DUKE..
ENERGI(( Visit us at www.duke-energy.com
(�DUKE To view information printed on the back of your bill please click or
ENERGY go to www.dul<e-eneray.com/indianalbilline/back-of-bill.aso Pa e 2 of 2
Carmel Clay Parks&Recreation 11675 Hazel Dell Pkwy 8740-3794-02-1
Misc:Pavilion
Carmel IN 46033
Electric Duke Energy
Meter- 106959482 Rate LSNO -Low Load Factor Sec Sry
Multipliers- 40
kWh Usage- 41840 Connection Charge $15.00
Demand Read- 00.49 Energy Charge
Actual kW- 19.60 300 kWh Co) $0.10788900 32.37
Billed Kvar- 1.90 700 kWh @ $0.08688900 60.82
Power Factor- 99.5% 1,500 kWh @ $0.07798900 116.98
1,224 kWh 0 $0.05818900 71.22
Load Factor-Next 110 Hrs Use
Feb 29-Mar 30 1,116 kWh @ $0.05158800 57.57
30 Days KVAR Charge
1.90 Kvar @ $0.24000000 0.46
Rider 60- Fuel Adjustment
4,840 kWh @ $0.01042500 50.46
Rider 61 -Coal Gasification Adj
4,840 kWh @ $0.01000200 48.41
Rider 62-Pollution Cntl Adj
4,840 kWh 0 $0.00332500 16.09
Rider 63-Emission Allowance
4,840 kWh @ $0.00003600cr 0.17cr
Rider 66-A-Energy Eff Adj
4,840 kWh @' $0.00166400 8.05
Rider 67-Cinergy Merger Credit
4,840 kWh Co) $0.00029500cr 1.43cr
Rider 68-Midwest Ind Sys Oper Adj
4,840 kWh 9 $0.00148100 7.17
Rider 70- Reliability Adjustment
4,840 kWh @ $0.00056500 2.73
Rider 71 -Clean Coal Adjustment
4,840 kWh @ $0.00559900 27.10
Rider 72- Federally Mand Cost Adj
4,840 kWh 0 $0.00005200 0.25 $513.08
3kC s $513.08
kWh Electric Usage
10,000-
8,000-
6,000-
4,000-
2,000-
0-
0,0008,0006,0004,0002,0000
WMM M
Calculations based on most recent 12 month history
Total Usage_ 60,520
Average Usage 5,043
MA AP
MAY JUN JULAU SEP OCTNOV DEC JAN FEB MAR
FJaclric 5,20 2,66
2,400 4,16 4,280 4,52 4,320 4,200 5,040 6,72 9,280 6,080 4,840
f DUKE
ENERGY, Visit us at www.duke-energy.com
VOUCHER NO. WARRANT NO.
ALLOWED 20
DUKE ENERGY
100 SOUTH MILL CREEK ROAD IN SUM OF$
NOBLESVILLE, IN 46060
$131.60
ON ACCOUNT OF APPROPRIATION FOR
Carmel Fire
PO#/Dept. INVOICE NO. I ACCT#/Fund AMOUNT Board Members
3960-3050-01-4 I 43-480.00 I $131.60 1 hereby certify that the attached invoice(s), or
1120 101
bill(s) is (are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Tuesday, April 05, 2016
ve-�D 'S_
David Haboush
Fire Chief
Cost distribution ledger classification if
claim paid motor vehicle highway fund
'rescribed by State Board of Accounts City Form No.201(Rev.1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
\n invoice or bill to be properly itemized must show: kind of service,where performed, dates service rendered, by
vhom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
Purchase Order No.
Terms
Date Due
nvoice Date invoice# Description Amount
Dept. Fund# (or note attached invoice(s)or bill(s))
04/05/16396050-01-4 I Sirens I $131.60
1120 101
I hereby certify that the attached invoice(s), or bill(s), is(are)true and correct and I have audited same in accordance
with IC 5-11-10-1.6
, 20
Clerk-Treasurer
I cl..l-I�c ncIVnIV Inc IVB �VnIIVIV YYlln IVVn rf1IIVICIVI
Page 1 of 1
Nate <'':... '>::::„,:::>::>:::::> > >:::>::»<:>::< >>'> >': > > = >:.,:>::=>:::>::::>_:>:<:;:. ;;:::::::<
. . . ..........
Asidr�ss>`::>;::;:>...... > >:> »:<:>>::>............�k.tii utrlQs.�a1l.......:.:.......... ........ . �#s ....
::::::::::: ::::: u>E3l: lut�:::
City Of Carmel Duke Energy 1-800-521-2232 3960-3050-01-4
>:::.:: :>:;<;:.::.;::.:.....:.:...............::...;:.;:;;.;: A cauat I �rrxna to .> :.:
PO Box 1326 Payments after Mar 31 not included Bill prepared on Mar 31,2016
Charlotte NC 28201-1326 Last payment received Mar 22
MEN...............
Qty 14 Usage-0 Amt Due- Previous Bill $ 131.60
Duke Energy- Rate CSN9 Payment(s) Received 131.60cr
Comm Sry-Fire Siren 131.60 Balance Forward 0.00
Current Unmetered Charges $131.60 Current Unmetered Charges 131.60
Current Amount Due $131.00
... .........................................
... .........................................
............ .........................................
.........................................
><>te>€aie >=> > >Atnt iuii' >> >
Apr 22,2016 $131.60
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160331010101_1.CSV-29329-000013031 @ Printed on recyclable paper.
VOUCHER NO. WARRANT NO.
ALLOWED 20
DUKE ENERGY
PO BOX 1326 IN SUM OF$
CHARLOTTE, NC 28201-1326
$37.33
ON ACCOUNT OF APPROPRIATION FOR
Brookshire Golf Course
PO#/Dept. INVOICE NO. I ACCT#/Fund AMOUNT Board Members
5580-3643-01-5 43-480.00 $37.33 1 hereby certify that the attached invoice(s), or
1207 I 101
bill(s) is (are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Tuesday,April 05, 2016
Cost distribution ledger classification if
claim paid motor vehicle highway fund
rescribed by State Board of Accounts City Form No.201(Rev.1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
m invoice or bill to be properly itemized must show: kind of service,where performed,dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit,etc.
Payee
Purchase Order No.
Terms
Date Due
nvoice Date Invoice# Description Amount
Dept. Fund# (or note attached invoice(s)or bill(s))
03/31/16 I 5580-3643-01-5 I ElectricI $37.33
1207 101
I hereby certify that the attached invoice(s),or bill(s), is(are)true and correct and I have audited same in accordance
with IC 5-11-10-1.6
, 20
Clerk-Treasurer
................. .................
Page 1 of 3
%»::< « : . .:> >
: > «' : ....
City Of Carmel Duke Energy 1-800-521-2232 5580-3643-01-5
Brookshire Golf Club
>A►:��oun..IE31i .rrn �
Iia
PO Box 1326 Payments after Mar 31 not included Bill prepared on Mar 31,2016
Charlotte NC 28201-1326 Last payment received Mar 15
Qty 4 Usage-321 kWh Amt Due- Previous Bill $36.85
Duke Energy Payment(s) Received 36.85cr
4 C& Rate SUAL $37.33 Balance Forward 0.00
Current Street Light Charges 37.33 Current Street Light Charges 37.33
Current Amount Due $37.33
Apr 22,2016 $37.33
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160331010101_1.CSV-3731-000023458 @ Printed on recyclable paper.
DUKE ENERGY
Pa e2of3
: ::::::::::.:::::::::::::::::.. :..:;:.>::>:.;;:.:.;:.;:.;:.;:.;:.;:.:.;"�+ tvt g Ar d s..:.;:.;:.;;:.;::.;;::.::;.:.: . .::::::::::::::..Accvurt! luM Jo.:::
City Of Carmel 5580-3643-01-5
Brookshire Golf Club
:. ::::::::::::::.:::::..:.:..::....................... ..
::>::>::>::>::::>:::<:>::>: ........: : ::»»»::>::»>::>::>:::»::>:>::>:;:>:<:::>:::.:.:: ...........................f3......::::::::::.;::::.;;:.;:.;:.;:.;:.:.;:.;:.;:.;:.::.; ::::.;::.::::.::::::::::..
Street Lights Duke Energy
Quantity- 1 Rate SUAL -Unmetered Outdoor Ltg Sry
Lumens - 30,000
Type- High Press Sodium Energy Charge
kWh Usage- 102 102 kWh @ $0.04538700 $4.63
F�4F Unit kW- 0.305 Lighting Maint Charge
2 Burn Hours- 333.33 1 Units @ 4.50000000 4.50
Feb 29-Mar 30 Rider 60- Fuel Adjustment
30 days 102 kWh @ $0.01042500 1.06
Rider 61 -Coal Gasification Adj
102 kWh @ $0.00023400 0.02
Rider 62- Pollution Cntl Adj
102 kWh @ $0.00101200 0.10
-�- -_----Rider6o=Ernissioti-Allowance---
102 kWh @ $0.00003600cr 0.00
Rider 66-A- Energy Eff Adj
102 kWh @ $0.00166400 0.17
Rider 67-Cinergy Merger Credit
102 kWh @ $0.00098200cr 0.10cr
Rider 68-Midwest Ind Sys Oper Adj
102 kWh @ $0.00048500 0.05
Rider 70- Reliability Adjustment
102 kWh @ $0.00034200 0.03
Rider 71 -Clean Coal Adjustment
102 kWh @ $0.00168500 0.17
Rider 72- Federally Mand Cost Adj
102 kWh @ $0.00001800 0.00 $ 10.63
Duke Energy
Quantity- 2 Rate SUAL -Unmetered Outdoor Ltg Sry
Lumens - 16,000
Type- High Press Sodium Energy Charge
kWh Usage- 117 117 kWh @ $0.04538700 $5.31
Unit kW- 0.176 Lighting Maint Charge
Burn Hours- 333.33 2 Units @ 4.50000000 9.00
Feb 29-Mar 30 Rider 60- Fuel Adjustment
30 days 117 kWh @ $0.01042500 1.22
Rider 61 -Coal Gasification Adj
117 kWh 0 $0.00023400 0.03
Rider 62- Pollution Cntl Adj
117 kWh @ $0.00101200 0.12
Rider 63- Emission Allowance
117 kWh @ $0.00003600cr 0.00
-- ----Ride. 6&-A=Energy-Eff=Adj - -- - - -
117 kWh @ $0.00166400 0.20
Rider 67-Cinergy Merger Credit
117 kWh @ $0.00098200cr 0.11 cr
Rider 68-Midwest Ind Sys Oper Adj
117 kWh @ $0.00048500 0.06
Rider 70- Reliability Adjustment
117 kWh @ $0.00034200 0.04
Rider 71 -Clean Coal Adjustment
117 kWh @ $0.00168500 0.20
Rider 72- Federally Mand Cost Adj
117 kWh @ $0.00001800 0.00 16.07
ENERGY. www.duke-energy.com
BM -3733-000023458 0 Printed on recyclable paper.
DUKE ENERGY
Pa e3of 3
f3
............................................
:'::i:::i::i: :ii':iii:iii>:i:i:::jI:•:•: j :: :::::::: :: ::::i' ::::::::::
... .....:: : ::::::::::::::: :::
City Of Carmel 5580-3643-01-5
Brookshire Golf Club
Street Lights Duke Energy
Quantity- 1 Rate SUAL -Unmetered Outdoor Ltg Sry
Lumens - 30,000
Type- High Press Sodium Energy Charge
kWh Usage- 102 102 kWh @ $0.04538700 $4.63
Unit kW- 0.305 Lighting Maint Charge
Burn Hours- 333.33 1 Units @ 4.50000000 4.50
Feb 29-Mar 30 Rider 60- Fuel Adjustment
30 days 102 kWh @ $0.01042500 1.06
Rider 61 -Coal Gasification Adj
102 kWh @ $0.00023400 0.02
Rider 62- Pollution Cntl Adj
102 kWh 0 $0.00101200 0.10
Rider 63- Emission Allowance
102 kWh @ $0.00003600cr 0.00
Rider 66-A- Energy Eff Adj
102 kWh @ $0.00166400 0.17
Rider 67-Cinergy Merger Credit
102;kWh @ $0.00098200cr 0.10cr
Rider 68-Midwest Ind Sys Oper Adj
102 kWh @ $0.00048500 0.05
Rider 70- Reliability Adjustment
102 kWh @ $0.00034200 0.03
Rider 71 -Clean Coal Adjustment
102 kWh @ $0.00168500 0.17
Rider 72- Federally Mand Cost Adj
102 kWh @ $0.00001800 0.00 10.63
«"` fvrfatejalt `
37.33
.:<otaE< trrez� <iuf�iar
kWh Electric Usage
350
280-
210-
140-
70-
0
8210140700
M M J M
Calculations based on most recent 12 month history
Total Usage 3,852
Average Usage_ _ 321,__ --
MAR AP MAY JUN JU AUr' SEP OCTI NOV DEC JAR FEE ROAR
Electric 321 321 321 321 321 , 321 321 321 321 321 321 321 321
ENERGY. www.duke-energy.com
13M-13W.DEMW.DUKE.INREG.2016033i 010101 1.CSV-3734-000023458 30827-P-0007
VOUCHER NO. WARRANT NO.
ALLOWED 20
DUKE ENERGY
PO BOX 1326
IN SUM OF$
CHARLOTTE, NC 28201-1326
$1,058.56
ON ACCOUNT OF APPROPRIATION FOR
Street Department
PO#/Dept. INVOICE NO. ACCT#/Fund AMOUNT Board Member
0 43-480.00 $15.80 1 hereby certify that the attached invoice(s), or
2201 201
0 43-480.00 $707.01 bill(s) is (are) true and correct and that the
2201 201 materials or services itemized thereon for
0 I 43-480.00 I $335.75
2201 201 which charge is made were ordered and
received except
/ ill A �A-
TAtV* mioner
,Api 0552016
Cost distribution ledger classification if
claim paid motor vehicle highway fund
Prescribed by State Board of Accounts City Form No.201 (Rev.1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service,where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
Purchase Order No.
Terms
Date Due
Invoice Date Invoice# Description Amount
Dept. Fund# (or note attached invoice(s) or bill(s))
04/01/16 0 $15.80
2201 201
04/04/16 0 $707.01
2201 201
04/05/16 I 0 I I $335.75
2201 201
I hereby certify that the attached invoice(s), or bill(s), is(are)true and correct and I have audited same in accordance
with IC 5-11-10-1.6
20
Clerk-Treasurer
Page of
City Of Carmel Duke Energy 1'800'521'2232 1120'3687-01'1
2301 131 StSuvx
�y ^10Jo�W1isu: Rab Lights
-
Carmel IN 46032
POBox 132O Payments after Mar eonot included Bill prepared on Mar 28,2o1n
Charlotte NC282O1 1320 Last payment received Mar ou Next meter reading Apr 21,2016
Beo 104882398 Feb 20 Mar 23 32 22777 22812 1 135 0.00
Usage- 135 kWh Amt Due- Previous Bill $16.43
Duke Energy- Rate SMLC $15.80 Payment(s) Received 15.43cr
Current Electric Charges 1—5.80 Balance Forward (TO-0
Current Electric Charges 15.80
Current Amount Due
"Important: For stay away from power lines. Donot work near overhead lines.Always
assume that downed lines areenergized unddan0emuu. Rnportdmmnmdpowar|inwmtoDukmEnerDy
immediately bycalling 8OO.343.3525. ^
66 Due=
Average Cost: $O.117D per kWh Apr 19,2016 $15.80
DUKE
ENERGY www.uke-enoogyoom
am-eW.osMmDUKE./wnso.a,1o03'ov1v`v,-,.00v~m,u000uom,o @ Printed onrecyclable paper.
-
rl_ NOMMMIUnry me ivr rvniivryVVI in TVVnrATIVICNi page 1 of 1
far Tnqumew:.;:.; sru ! uaer;:::
City Of Carmel Duke Energy 1-800-521-2232 9550-3714-01-0
Street Department
11599 Keystone
Carmel IN 46032
�.:
a. : . � �._ �
: :.: �:>:::::::: >::>:> ::::::»:>:lfcra :>: : :: » >:PaantT : . .... . ... . _ >< < »: :
POBox 1326Payments after Mar 29 not includedBillreprepared on Mar 29206
�.
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter reading Apr 26,2016
.............................................................An:t�taT......
:......:::::::::>:::1#sa :::::>::;MUM
Elec 035185747 Feb 25 Mar 26 30 68749 69722 1 973 0.00
............................: ial':%.,..".",.,-".."..,"."-""-"."* ' >::>:.>:_>::>::>:# :,.'i>kii '''' ................. ... >`:
Usage- 973 kWh Amt Due- Previous Bill $91.88
Duke Energy- Rate SMHL $86.00 Payment(s) Received 91.88cr
Current Electric Charges 86.00 Balance Forward 0.00
Current Electric Charges 86.00
Current Amount Due 86.00
_- -----"irrrp'urt�Qiif:�F�ryou�sa�ieiy;stdy-awa➢from�puWertii�es.�uu otvvork il�ar oviri�eac�iir��e�:i-�iway�-1-�-�_
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
.......................................... ..........................................
..........................................
............. AinoitDHe > >
Average Cost: $0.0884 per kWh Apr 20,2016 $86.00
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160329010101_1.CSV-9635-000029657 0 Printed on recyclable paper.
Page 1 of 1
NalSrV� ldd mss.;;;::.;:.; :.. r�r tqtfm�sI:.;;;;:.;;;;::;.;;:.;;:.;;;,;;,;;;;;;::< icu> t
City Of Carmel Duke Energy 1-800-621-2232 0280-3816-01-0
1480 Main St W
Carmel IN 46032
: :< < ` <` .. >......................................................... t :n . ..'aeTr>
PO Box 1326 Payments after Mar 31 not included Bill prepared on Mar 31,2016
Charlotte NC 28201-1326 Last payment received Mar 16 Next meter reading Apr 28,2016
»>::<:>::>::...................... .................................................................... .:.........:..:.::.....:::.....:::::::..::.......::.::::.::/cat::.::
Elec 106931911 Feb 27 Mar 29 31 16604 18123 1 1,519 0.00
.........................................................
<> > >� >> . ` > > >> > > >'[>
Usage- 1,519 kWh Amt Due- Previous Bill $ 183.67
Duke Energy- Rate CSNO $176.83 Payment(s) Received 183.67cr
Current Electric Charges $176.83 Balance Forward 0.00
Current Electric Charges 176.83
Transfer From 57803839-01 2.73cr
Current Amount Due $174.10
------For-your--convenience,-we-have-included-yourfinal-charges-for.ervice-at-411Ti-1-ST-E.-Ity-urprc-vicus-- -
account was gas and electric,and your current account does not have both services-only the charges
for like services have been transferred. The charges not transferred will remain on your previous
account. If your final bill has been paid,please disregard the final charges included above.
"Important: For your safety,stay away from power lines. Do not work near overhead lines.Always
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
................................... ................................ ...................................
Average Cost: $0.1164 per kWh Apr 22,2016 $174.10 $ 179.32
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160331010101_1.CSV-42711-000007409 0 Printed on recyclable paper.
rt_c'vac nu unry nc yr rvn i wry vvi i n Tvun rrTTrvicry i page 1 of 1 J
::.:am:.::: gr:. :.:..:..:.:.::...::.:.:.........:::.....:...:.. .... ....... �4':c�ruan# lum#e...:.:
City Of Carmel Duke Energy 1-800-521-2232 1280-3816-01-6
1482 Main St W
Carmel IN 46032
v > ' > > > >' >> >>>'> > >'Ac0.uat'l + a3ta >> ' => <`:'>
- - -
PO Box 1326 Payments after Mar 31 not included Bill prepared on Mar 31, 2016
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter reading Apr 28,2016
:>>> > >'�:> ` < >:>:<:<>.::>:.`Read .�3a ....... .... .......Mete..:..air ..........................................Act-ual`>`:
::::>::>::f�4�:::::>::::::>::::
Elec 106961329 Feb 27 Mar 29 31 13285 14468 1 1,183 0.00
Eectra8riial >` > ' ar#< tlin`'`'
........ <` > >`' > >< `' `
Usage- 1,183 kWh Amt Due- Previous Bill $ 145.74
Duke Energy- Rate CSNO $142.91 Payment(s) Received 145.74cr
Current Electric Charges $142.91 Balance Forward 0.00
Current Electric Charges 142.91
Current Amount Due $T422.91
"Important: For your safety,stay away from power lines. Do not work near overhead lines.Always
--assume-teat-dowrred-lines-ar"nergizeu and-dangerous--iieportcdown-Ed-pawei titres to-Duk. Energy---- -
immediately by calling 800.343.3525. "
>' ?
Average Cost: $0.1208 per kWh Apr 22,2016 $142.91 $ 147.20
4'DUKE
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160331010101_1.CSV-42713-000007409 0 Printed on recyclable paper.
Page 1 of 1 -
purr
... �s aflElmoAcGniirtt f�luml et..:.
City Of Carmel Duke Energy 1-800-521-2232 2370-3824-01-3
Street Department
51 111Th E
Carmel IN 46032
>'>'> .. / c c t`I a i'a o i > <'< <'> >>'>>>>>`
:::.::::.::......:::::::::.:.::::::.
PO Box 1326 Payments after Mar 31 not included Bill prepared on Mar 31,2016
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter reading Apr 28,2016
> Ftad
`
iri ' >: < '` > ` >< > >` ctf#a `>'
reuiou..... setit:::> lir::::>
Elec 108228208 Feb 29 Mar 30 30 7714 8198 1 484 0.00
Usage- 484 kWh Amt Due- Previous Bill $202.85
Duke Energy- Rate CSNO $66.56 Payment(s) Received 202.85cr
Current Electric Charges 66.56 Balance Forward 0.00
Current Electric Charges 66.56
Current Amount Due 66.56
"Important.For-your safety,-stay-away-from power-lines.:Do-not-%arork nearoverhead lines. Always
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
.... ................:..................
AifT`` >
Average Cost: $0.1375 per kWh Apr 22,2016 $66.56 $68.56
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160331010101_1.CSV-42675-000007423 0 Printed on recyclable paper.
Page 1 of 1
rsss >::>:::::::>:>:::::>:>:::;::>::;::<:::: 1*Qr ltrgr irr� �tll ;:.;:.;:.;;;;:.;:.;:.:;.;:.;:.;:.;... 1XcCilstturtrhet
City Of Carmel Duke Energy 1-800-521-2232 6920-3824-01-7
Street Department
10600 Meridian St N
Indianapolis IN 46290
Maarm:n s> ......: : ::.. A�cot�t� Info�xna#ron . ....:::::::::::::::::::::::::::.::.::.::. ..:.
PO Box 1326 Payments after Mar 31 not included Bill prepared on Mar 31, 2016
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter reading Apr 28,20!6
M t�r.;l�eadin:: ' >':>::>:::«:::::>::»::>::=::»:<:<:>::>:>:::`::::::::::»:>A+ ba I'>:::<:::
IVe3ers::>::>I5litirier:>:::fink:>:::>': a:<:»:>::<:>I3 :s> :PKeviiciis:':arsetit:'<:>::>: ...t-:<
Elec 104871789 Feb 29 Mar 30 30 00000 00000 1 0 0.00
scf mmerial. 0 `;.. 13rttrn .._........... . ::>::::>::::::>:::::::>::>:>::::»::.:.>:.>:::.>::>:::
Usage- 0 kWh Amt Due- Previous Bill $ 18.80
Duke Energy- Rate CSNO $9.40 Payment(s) Received 28.20cr
Current Electric Charges 9.40 Balance Forward 9.40c
Current Electric Charges 9.40
Current Amount DueU.00
"Important:-Foryoursatety,siay-away from power-lines-Do-not-work-near-overhead-lines.-Always - -~
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
:.........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
> kii3au�i€Ckue > >
$0.00
ENERGY. www.duke-ene'rgy.com
BM_BW.DEM DUKE.INREG.20160331010101_1.CSV-42677-000007423 0 Printed on recyclable paper.
Page 1o11
40
City Of Carmel Duke Energy 1-800'621'2232 7920'3824'01'2
Street Department
95 106Th St E
Indianapolis|N4828O
POBox 1320 Payments after Mar n1 not included Bill prepared onMar u1.2o)n
Charlotte NC 28201'1320 Last payment received Mar 15 Next meter reading Apr oo`oo)s
-�Mtl ISO
Boo 108220719 Feb 28 Mar 30 30 090 690 1 0 080
Usage- 0 kWh Amt Due- Previous Bill $9.40
Duke Energy- Rate CSNO $9.40 Payment(s) Received 9.40cr
Current Electric Charges —9.4 0 Balance Forward 0.00
Current Electric Charges 9.40
Current Amount Due —$--9.40
--------^/mpotliam'Pn -ynnrsafetyrs'tay-ae fm/i. r|ines.--Dn-not'wndrneurnverhe�ud'Xnea7-Alw -------
aauumo1ha1dmwnod|inea are energized and dangerous. Report downed power lineu to Duke Energy
immediately bycalling 800343.3525. ^
Apr 22,2016 $9.40
����
�="~�
ENERGY www.duke-energy.com
nwuxmocmvxuoxs./woca.zu,suxx1v,v,o/-,.oav-4e67aovu00nzu 0Printed unrecyclable paper.
Page 1 of 1
t ai <l�e�rv� ':<.:; :::>::__>:::.........'<»>< .........................<<> ::::>::;::::::>::::>::> <:::>.;_::::::::>: ..............
>> <> >;.>::::::::::::>::<::;:;:::.:.:.....;..........
:.:::: ::::::::::::.::::::::::.dd ass:.;:.;:.;:.;;;;:.;:.;:.;:.;:.;;;;:.:.;.::.................: �taqu{rae; Cast...::.;:::.;::.;;;:.;: #c urt! lu #ger .
City Of Carmel Duke Energy 1-800-521-2232 8550-3714-01-4
Street Department
2380 116Th St E
Carmel IN 46032
:.:::.::...:. :.;:..:.;:.;;:.;:.;:.;:.;:.;::.::.;;:.:;::;::.:;::.;•.:;.;:.;: A cru
PO Box 1326 Payments after Mar 30 not included Bill prepared on Mar 30,2016
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter reading Apr 25,2016
Reals :;:;::>:><:;
. :. ... . .. . .. . .:.:. .:::: ...::::::::::9€:::::::::.:...:.::..:...;,:::.>;.;::.:.;:.:.::-;:.;:.;:.;:.;:.;
l Ititer=:::::`:Ni�iinsre > ritiii::<:::> :>::>:>::::>ba:s::>Pr`.:.._• ::ix-.0..:.:...::>::::::::>: `<:>::>:::<::<:>:::.:::::.:..::::>::::>::>::::»::::>::>:
::::::. .::::. :::es.;;F�r�se1.;:.;:_::N( Ist:.:::..:.::::13sa ..:.::::::.:::::::::CtY:.::::..
.....:.;:;.;;;:.::.;;:.;:.;:.;:.;:.;:.;:.;:.;:.;:.;:.;: ......................:............:......:....:...............;....::::::::::..:.:::::::::::: .::-:.:....:......................
Elec 106889707 Feb 25 Mar 25 29 92959 94208 1 1,249 0.00
to al ...... ........................... . .. C ::....:#:s3s11sri` ::>::::::::::::::>::::<::::>::::>:::::::::::....>::::>::<::>::<::::;:>:::::::<:::::>::::>::::»::>:::=>::::>::>::>
Usage- 1,249 kWh Amt Due- Previous Bill $ 113.25
Duke Energy- Rate SMHL $ 104.76 Payment(s) Received 113.25cr
Current Electric Charges $TO4.76 Balance Forward 0.00
Current Electric Charges 104.76
Current Amount Due $104.76
_ ---'important.-F-ai-your-safety btayaivayfram-powe Bines.Do-not-work noar-overhead-lirrea.Always---------
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
Average Cost: $0.0839 per kWh Apr 21,2016 $104.76
4'DUKE
NERGY® www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160330010101_1.CSV-17901-000029485 @ Printed on recyclable paper.
Page 1 of 1
S .
r t .. u.. all.::..::::::::::::::::::::.:::: ►f✓ ? .u..int: l>O.m.. at._._
Q
City Of Carmel Duke Energy 1-800-521-2232 7030-3728-01-3
Dir Cherry Creek By
Hazel Dell
A c au at lE ii rfia is ri > > »=:;;::::».......... `:..:._-:,:: «:
PO Box 1326 Payments after Mar 30 not included Bill prepared on Mar 30,2016
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter reading Apr 27,2016
Acat.......
fl
::. .:..:::.:..:::: :::::::::::.:...:.:.:::::.::>l . ..i.....::...... >>: ::>:`:>::>
......... ::.::::::::::::8.::::::::.:.::,:::::::::::::::::.:::::.:
Elec 071377135 Feb 27 Mar 28 30 13956 14065 1 109 0.00
..................................................................................................... ..................................................................................................................
Usage- 109 kWh Amt Due- Previous Bill $23.83
Duke Energy- Rate CSNO $22.68 Payment(s) Received 23.83cr
Current Electric Charges 22.68 Balance Forward 0.00
Current Electric Charges 22.68
Current Amount Due 22.68
"Important:For your safety,stay away from power lines. Do not work near overhead lines.Always
- ---assume-that-downed-lines-are-energized und-dangerous-Report-downed-povrer-lines te-Duke=Energy-
immediately by calling 800.343.3525. "
..............................
...........
.......................................... ..........................................
.......................................... .........................
Average Cost: $0.2081 per kWh Apr 21,2016 $22.68
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160330010101_1.CSV-17903-000029484 0 Printed on recyclable paper.
Page 1 of 1
t i3t l Vic >`..;..:<..:.:.::.::;,»:< >' > . < < »> »»';:`<:: >;::::>::::>;: ::::::<:>:::
.;: :: ::........ .......;::.::.::.;:.:::.;::.::.::.;:.;:.;:.;::.;:.;:. .... .;;:.. fart
City Of Carmel Duke Energy 1-800-521-2232 0230-3727-01-1
Street Department
936 Main St E
Carmel IN 46032
X.. �'aSF. ........ To ... .....>::::>::::>:::.....:........:::;::::.: A cuuuf Intarirrat ;.:.;:::::::::.
PO Box 1326 Payments after Mar 30 not included Bill prepared on Mar 30,2016
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter reading Apr 27,2016
�t�.r..: ea�lfn .::::..:::::::::::::::::: .::::<;:,Ac#c;<ai.:::::.
.......::::.:;..::.;..:.;..;.:.;:;5.::.;:.:::.: ...:.;:::.;...:...:..;;;;:.;:.;;
Num...
ber::>::::>f=rain>:<:»::>Ttt::::::>::::>:> .:s> r:.es
er3t:::::::::::»l t .....>::::>:::::<:>:lf!sa e:::::::::::::>::::»:::::::> :::::>::::>::>::
::::::!:::.:::.::::::::::.:::.:::::::::.::::::.:::.::...:..:::::::::::::::::::::::.:::.8:::::::::..::::::,::::::::.::::::::::::
Elec 082820039 Feb 26 Mar 28 31 57362 58369 1 1,007 0.00
Usage- 1,007 kWh Amt Due- Previous Bill $64.26
Duke Energy- Rate SMLC $57.01 Payment(s) Received 64.26cr
Current Electric Charges 57.01 Balance Forward 0.00
Current Electric Charges 57.01
Current Amount DueI.01
- _ -"Important:Fovyour-safety;_stay a!ktay-from-power-lines.-Do-not-work near-overhead lines:-Ahnrays--— — —_
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
Average Cost: $0.0566 per kWh Apr 21,2016 $57.01
tn DUKE
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160330010101_1.CSV-17545-000029659 *printed on recyclable paper.
Page 1 of 1
City Of Carmel Duke Energy 1-800-521-2232 6290-3721-01-0
Street Department
Dir Carmel Dr E
Keystone Ave
1 (> jai t§' `<> ><> < .>'<> ........................... >.:X. :. .............................:::: :: : ::>::>:>< << >< >'> ':`
::::::::::::: ::::::..::::.:.:::;::.::.;::.;::. :.;:.;:.:.;:.;:.;:.;:.;:.;:.;:.;:.;:.;:.:::.;: A �uat ln#orfn #tq ;.;:.;:.;:.;:.;:.;:.;:.;:.;:.::;::::.
PO Box 1326 Payments after Mar 30 not included Bill prepared on Mar 30,2016
Charlotte NIC 28201-1326 Last payment received Mar 08 Next meter reading Apr 25,2016
l els.:.{ r..esent.........
Elec 106077453 Feb 24 Mar 25 30 54702 55425 1 723 0.00
Usage- 723 kWh Amt Due- Previous Bill $46.31
Duke Energy- Rate SMLC $43.59 Payment(s) Received 46.31 cr
Current Electric Charges 43.59 Balance Forward 0.00
Current Electric Charges 43.59
Current Amount Due 43.59
"Important:For-your-safety;-stay-away-from power-lines.—Do-not-work-near-overhead-lines.-Always-- __ ---
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
Moun
Average Cost: $0.0603 per kWh Apr 21,2016 $43.59
ENERGY. www.duke-energy.com
BM_BWDEMW.DUKE.INREG.20160330010101_1.CSV-17547-000029659 @ Printed on recyclable paper.
Page 1 of 1
ar,lt.. u>E : t:.....::::..::::::::::::::::::�tG��u�t::ttm3
::.::.;;;:.;:.;;:.;:.;;;:.:.;:.;:.;:.;:.;;;;:..........A.........................................................
City Of Carmel Duke Energy 1-800-521-2232 5640-3842-01-5
Carmel Street Dept
11601 Pennsylvania St N
Indianapolis IN 46280
::.:.::.:. ...: :..:...: ::. ::.;:.;: ;: .:;..::.::.:.:::.;:.;;:.;:.;:.;:.;:.;;:.;:.;:.;:.;;:.;:.:;. A0coult
PO Box 1326 Payments after Apr 01 not included Bill prepared on Apr 01,2016
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter reading Apr 29,2016
..........................................................:.p.:....:en:=<=>:::«Itftt<:>:::>::>:<><:Usa :>::»::::::::::>::::::::>::>::icfil:::>::::>::::>::
Elec 108252827 Feb 29 Mar 31 31 2712 4402 1 1,690 0.00
Usage- 1,690 kWh Amt Due- Previous Bill $209.82
Duke Energy- Rate CSNO $ 194.10 Payment(s) Received 209.82cr
Current Electric Charges $-T-94.1 0 Balance Forward 0.00
Current Electric Charges 194.10
Current Amount Due $194.10
_----''it7lportaitt:Futyoui-safeiy,stay dwa}y-frerrl-'powerifrres. Do-not-rrotkrrea-i-overl-ij�ad-iines-Alway
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
......................
......................
...................................
< ue 11 a€ lm ui l u
::::I?.::::::..
Average Cost: $0.1149 per kWh Apr 25,2016 $194.10 $199.92
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160401010101_1.CSV-45765-000008396 0 Printed on recyclable paper.
Page 1 of 1
Trrtt� Add#` r tgra
City Of Carmel Duke Energy 1-800-521-2232 0810-3666-01-6
Street Department
Dir Old Meridian
Grand Blvd
: : ::;.:. Accvut lntarnrarort
PO Box 1326 Payments after Apr 01 not included Bill prepared on Apr 01,2016
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter reading Apr 29,2016
.........................
................................ ;............................................................Actuaf::.::.:
Elec 106954344 Mar 01 Mar 31 30 23918 23979 1 61 0.00
Usage- 61 kWh Amt Due- Previous Bill $25.43
Duke Energy- Rate SMLC $ 12.27 Payment(s) Received 38.30cr
Current Electric Charges 12.27 Balance Forward 12.87c
Current Electric Charges 12.27
Current Amount Due 0.60c
- - Nothing-tu pay.-:.—the erraurit-indicated is-a-crradit,not-an-amount tc be-paid-We-will-apply-lhis-cre,:it-----
to your next bill.
"Important: For your safety,stay away from power lines. Do not work near overhead lines.Always
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
Average Cost: $0.2011 per kWh $0.00
DUKE
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG20160401010101_1.CSV 45763-000008397 @ Printed on recyclable paper.
Page 1 /f1
City Of Carmel Duke Energy 1'800'521'2232 7600'3846-01'6
Traffic Signal
697Carmel DrW
yNiuo:TraSign
Carmel |N48O32
P0Box 132O Payments after Apr 0 1 not included Bill prepared onApr o1.eo1s
Charlotte NIC 2801'1326 Last payment received Mar 15 Next meter reading Apr 29.20|V
Eleo 108238845 Feb 29 Mar 31 31 583 670 1 83 0.00
Usage- 93 kWh Amt Due- Previous Bill $20.94
Duke Energy- Rate CSNO $20.71 Payment(s) Received 20.94cr
Current Electric Charges $�-20.71 Balance Forward 0.00
Current Electric Charges 20.71
Current Amount Due $�-2-0.71
"Important: For stay away from power lines. Donot work near overhead lines.Always
uuuumethat downed lines aree izeUanUUangomuu. Roportdmwnodpowar|inoshoDukeEnergy
immediately bycalling 8OO.3433525. ^
Average Cost: $U.2O27 per kWh
���
��K
�="=
ENERGY
um_oameMwuuxs/wnca.20160401010101 l.00vA5761*00008398 @ Printed onrecyclable paper.
Page 1 of 1
;:.;:<;;::;;;:;;.;;;;;;;: c�r tt�qurril..... 1# cc�►> ! Ier...:
City Of Carmel Duke Energy 1-800-521-2232 9180-3816-01-3
699 Pro-Med Ln
Carmel IN 46032
:::::::: :::::::::::::.._:..::::.:.;:..:;;:.;;:.;:.::.;:.: %AtKeeuntin# rnra# t
PO Box 1326 Payments after Apr 01 not included Bill prepared on Apr 01,2016
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter reading Apr 29,2016
.... ..
Elec 108224922 Mar 01 Mar 31 30 8975 9855 1 880 0.00
Usage- 880 kWh Amt Due- Previous Bill $252.37
Duke Energy- Rate CSNO $ 110.97 Cancel Late Pmt Charge 7.82cr
Current Electric Charges $110.97 Payment(s) Received 376.79cr
Balance Forward 132.24c
Current Electric Charges 110.97
Current Amount Due 21.27c
ll
—Nothing—to—pay—.--the—.mount-indicated-is-a-credit-not-un-amount-to-be-paid-.-We-will-apply-this-cred;.�--
to your next bill.
"Important: For your safety,stay away from power lines. Do not work near overhead lines.Always
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
.........................:................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
> Er>3tu�tf] e'»> ;
Average Cost: $0.1261 per kWh $0.00
44� DUKE
N RGY® www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160401010101_1.CSV 45719-000008417 @ Printed on recyclable paper.
Page 1 of 1
.::::::::.::::::::::::::::::::::::::..::::::::::::::::::::::::::::.. ::;:.:.::.;:.;:.;;;:.: arcur� al;:.;;:.;;:.:.;:.;:.;;;:.;:.:::.;::.;:.:.;:.:;; � tlmer .
City Of Carmel Duke Energy 1-800-521-2232 7180-3816-01-2
699 Pro-Med Ln
Carmel IN 46032
....................................r a ...;:........
PO Box 1326 Payments after Apr 01 not included Bill prepared on Apr 01,2016
Charlotte NC 28201-1326 Last payment received Mar 15 Next meter reading Apr 29,2016
.A.4
.....................
<:>�: :>::::>::>:::>::::::::::r<:>::::::::::::>::::::::>::>::»::::>::>::>::::>::: �tuaf::>:»::::
Nuie »::frrtiiti:>:>':: 7 <:>:<::::na :s::: revitiis=:Rr.:ee :::>::>:llifiii#iE:::>:;:>:>::ls a= >: <::::::<:>':<: lllt::::>«:::
.:...........:::::.::..: �. '�:::::.:::..:::::.::::::::::::::::::.
Elec 108224923 Mar 01 Mar 31 30 7618 8376 1 758 0.00
....................................................................................................
.....................................................................................................
..................................................................................................................
1"I #r -Carifiirial > > `> ` ' >> > iieti#13iElin:.:<< :<>>s<: >; >;;: <> ; : «<<` >< < =`« >`< :
Usage- 758 kWh Amt Due- Previous Bill $222.88
Duke Energy- Rate CSNO $97.27 Cancel Late Pmt Charge 6.91 cr
Current Electric Charges 97.27 Payment(s) Received 332.81 cr
Balance Forward 116.84c
Current Electric Charges 97.27
Current Amount Due 19.57c
Nothing,to:pay._. the_amotint_indicated_is=a_credit._not_an_amount to be paid._We_will apply-this-credit-
to-Your
pply,this_credit_.
to your next bill. _ _
"Important: For your safety,stay away from power lines. Do not work near overhead lines.Always
assume that downed lines are energized and dangerous. Report downed power lines to Duke Energy
immediately by calling 800.343.3525. "
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
..........................................
Average Cost: $0.1283 per kWh
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160401010101_1.CSV 45715-000008417 Printed on recyclable paper.
Page of
City Of Carmel Duke Energy 1'800'521'2232 9060'3834-01'3
1328 Main St W
Misc:Lights
Carmel IN 46032
PDBox 1320 Payments after Apr n1not included Bill prepared onApr o/.on1V
Charlotte NC282O1 1320 Last payment received Mar 1s Next meter reading Apr uu.2o|s
UM e pi
Beo 108228207 Mar 01 Mar 31 30 11303 10871 1 5.308 0.00
Usage- 5,308 kWh Amt Due- Previous Bill $534.84
Duke Energy- Rate CSNO $501.84 Cancel Late Pmt Charge 21.96cr
Current Electric Charges
.84 Payment(s) Received 893.78cr
Balance Forward 380.90cl
Current Electric Charges 501.84
Current Amount Due $T2—0.9 4
"Important: For stay away from power lines. Donot work near overhead lines.Always
assume that downed lines are energized anddanAenouu. Roportdownedpowor|ineyuoDukoEnergy
immediately bycalling 8OO.343.3525. ^
Average Cost: $O.O945 per kWh Apr 25,2016 $120.94
��0��
��^^�
ENERGY www.duke-energy.com
BM-BW.DEMW.DUKE.INREG.20160401 0101011.Cov-4577mm r 0 Printed on recyclable paper.