Loading...
E&B Paving/Eng/CO8/1,523.63/Main Street ImprovementsCITY OF CARMEL TO: Tiffany Boone CONTRACT CHANGE ORDER NO.: 8 Project Manager DATE: April 21, 2016 City of Carmel Indiana PROJECT NAME: Main Street Improvements One Civic Square CITY REQ. NO.: Carmel, IN 46032 CITY PO NO.: 14-06 CITY PO DATE: I. You are directed to make the following changes in this Contract: x Change Order #8 will add a pay item for concrete curb work that had to be performed out tact . of sequence due to a utility conflict by Vectren Energy. The concrete curb could not be installed with the concrete curb machine and additional labor was realized for handwork. SCHEDULED ADJUSTMENT ITEM AMOUNT (+) OR (-) DAYS II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. NO.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 4,499,818.04 Contract Price will be increased/decreased by this Change Order $ 1,523.63 New Contract Price including this Change Order $ 4,501,341.67 Contract Time prior to this Change Order 258 Days 6/1/2015 Completion Date Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order 258 Days '6/1/2015 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Recommended Accepted American Structureaoint, Inc. E&B Paving Company, Inc. ENGINEER CONTRACTOR 7260 Shadeland Station 17042 Middletown Avenue Address Address Indianapolis, IN 46256 City/state/Zip By: �A L -d Phone: 311- 28 - S63 Date: 4 --II - 1 (-I Noblesville, IN 46060 City/State/Zip By: Phone: S117 -771-Z717 Date: Approved mes Brainard, Mayor Contract Modification City of Carmel 4/21/2016 5:23 PM FieldManager 4.5a . Contract: _2014.00444, Main Street Improvements Cont. Mod. Revision Cont. Mod. Net Change Awarded Contract Amount Number Number Date 8 4/21/2016 $1,523.63 $4,398,095.94 Route Contract Location Carmel, Indiana Short Description Change Order #8 Description of Changes Change Order #8 will be adding a pay item for concrete curb that was installed by handwork instead of by curb machine. The work was delayed and could not have been installed during curb machine operation due to a utility conflict by Vectren. New Items Project: IN2014.00444, Main Street Improvements Category: 2, East of U.S. 31 Interchange Item Description Item Code Prop.Ln. ItemType Unit Proposed Qty, Unit Price Dollar Value Curb, Concrete, Handwork 01519 0348 CHANGE LS 1.000 1,523.63000 $1,523.63 Reason: Change Order #8 Subtotal for Category 2: $1,523.63 Subtotal for Project IN2014.00444: $1,523.63 Contract: _2014.00444 Cont. Mod.: 8 Page 1 of 1 E&B PAVINIG.Inc World -Class Solutions at a Local Levels" ADDITIONAL WORK AUTHORIZATION To: City of Carmel Phone: One Civic Square Fax: 317-571-2678 Cannel IN 46032 Project: Carmel - Main St 14-06 Attn: Dave Machala DESCRIPTION: Location: Carmel - Main St, a and w of US 31 City: Carmel Date: 10/5/2015 Job No: 02143299 The following quoted prices are for additional work that is not a part of our original contract scope of work: The attached pricing is for installation of the curb (Item #167) in the entrance off of Old Meridian St. This work was delayed because of utility conflicts. If you need any additoinal information, please let me know. Item #1: Description Quantity EWA Additional cost for curb work 1 ADDITIONAL CHARGE FOR THE ABOVE WORK IS: Unit Price Extension LS $ 1,523.63 $ 1,523.63 Subtotal $ 1,523.63 10% of first $3,000.00 $ - 7% of remainder $ - TOTAL $ 1,523.63 REVISED UNIT PRICE $ 1,523.63 $ 1,523.63 Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. Date: Owner or Contractor Signature (Authorized Representative) We hereby agree to fumish labor and materials - complete in accord an it e a ove specifications, at the above stated price. E & B Paving, Inc., Authorized Signature 4, Date: 10/05/15 THIS IS ADDITIONAL WORK AUTHORIZATION NO. 21 AN EQUAL OPPORTUNITY EMPLOYER ....................................... 17042 Middletown Ave. • Noblesville, IN 46060 PHONE: 317.773.4132 • FAx: 317.773.4137 www.ebpaving.com 002 E & B PAVING, INC. - NOBLESVIL Job Cost Page 1 05 OCT 2015 Task Summar 09:43:23 Reporting Perio 09/30/15 Thru 09/30/15 Project: 02143325 MAIN STREET - CARMEL Supervisor: Task : 60506121AI P2 -CURB, CONC, B HAND Comments Pay Item Unit of Measure LFT Budget Quantity 20.00 Todate Amount Billed Budget Labor Hours Todate Units Complete: 103.00 Period Units Complete: 78.00 Todate Units Billed . Percent Complete 515.00% Todate Labor Hours 45.00 Period Todate Actual Units Cost Budgeted Actual Actual Actual Actual X Budgeted Dollar Percent Type Description Unit Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Variance Complete 02 LABOR DOLLARS 26.2 16.87 1,315.57'32.. 2,539.34 2,7 .87 68.53 483. % 03 BURDEN 15. 5 9.78 763.05 1,314.82 1,570.75 25 93 1.23% 04 EQUIPMENT X1450 5.91 461.00 6.82 70 4 1,493.50 791.0 242.21% 06 OTHER DIRECT MATERIAL 6 6.19 483.00 6.33 .00 469.68 182.3 715.230 07 EXPENSES 00 0.00 0.00 3.70 319. 0.00 -3 .13 0.00% 10 OVERHEAD 78 0.78 61.01 -"1.10 113.74 183.34 69.60 319. 9% 62.3V 39.53 3,083.63 54.77 5,641.47 6,425.14 783.67 I �j^ f OR of=%/ All) 161 =�eclj.t%ItF, x 21)G = �fS�a, °° pay -- J*3v�3: A3 ��s�