HomeMy WebLinkAbout01 77 00 Closeout Procedures.docSECTION 01 77 00 - CLOSEOUT PROCEDURES PART 1 – GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. SUMMARY This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following: Substantial Completion procedures. Final completion procedures. Project Record Documents Warranties. Final cleaning. SUBSTANTIAL COMPLETION Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete. Advise Owner of pending insurance changeover requirements. Submit specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents. Obtain and submit releases permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, and similar releases. Prepare and submit Project Record Documents, Final Completion construction photographs and photographic negatives, damage or settlement surveys, property surveys, and similar final record information. Deliver tools, extra materials, and similar items to location designated by Owner. Label with manufacturer's name and model number where applicable. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's personnel of changeover in security provisions. Termina te and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements. Advise Owner of changeover in heat and other utilities. Submit changeover information related to Owner's occupancy, use, operation, and maintenance. Complete final cleaning requirements, including touchup painting. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects. FINAL COMPLETION Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following: Submit a final Application for Payment according to Division 0 Section 00 70 00 “Standard General Conditions for Construction Contracts-Payments to Contractor and Completion.” Submit certified copy of Architect's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Architect. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance. Submit evidence of final, continuing insurance coverage complying with insurance requirements. Submit pest-control final inspection report and warranty. Instruct Owner's personnel in adjustment, and maintenance of products, equipment, and systems. LIST OF INCOMPLETE ITEMS (PUNCH LIST) Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction. PROJECT RECORD DOCUMENTS Refer to Specification Section 01 78 39 “Project Record Documents” for additional information. MAINTENANCE DATA Assemble a complete set of maintenance data indicating all maintenance requirements associated with this bid package. WARRANTIES Submittal Time: Submit written warranties on request of Architect for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated. Partial Occupancy: Submit properly executed warranties within 15 days of completion of designated portions of the Work that are completed and occupied or used by Owner during construction period by separate agreement with Contractor. PRODUCTS (Not Used) EXECUTION FINAL CLEANING General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations. REPAIR OF THE WORK Complete repair and restoration operations before requesting inspection for determination of Substantial Completion. Repair or remove and replace defective construction END OF SECTION 01 77 00