HomeMy WebLinkAbout05 52 13 Pipe and Tube Railings-Steel.docPEDCOR SQUARE; BUILDING 5 05 52 13 - PEDCOR SQUARE Issue Date 12.18.15 PIPE AND TUBE RAILINGS PEDCOR SQUARE; BUILDING 5 SECTION 05 52 13 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Steel pipe and tube railings. 1.3 PERFORMANCE REQUIREMENTS A. General: In engineering railings to withstand structural loads indicated, determine allowable design working stresses of railing materials based on the following: 1. Steel: 72 percent of minimum yield strength. B. Structural Performance: Provide railings capable of withstanding the effects of gravity loads and the following loads and stresses within limits and under conditions indicated: 1. Handrails: a. Uniform load of 50 lbf/ ft. applied in any direction. b. Concentrated load of 200 lbf applied in any direction. c. Uniform and concentrated loads need not be assumed to act concurrently. C. Thermal Movements: Provide exterior railings that allow for thermal movements resulting from the following maximum change (range) in ambient and surface temperatures by preventing buckling, opening of joints, overstressing of components, failure of connections, and other detrimental effects. Base engineering calculation on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss. 1. Temperature Change (Range): 120 deg F, ambient; 180 deg F, material surfaces. D. Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metals and other materials from direct contact with incompatible materials. 1.4 SUBMITTALS A. Product Data: For the following: 1. Manufacturer's product lines of mechanically connected railings. 2. Grout, anchoring cement, and paint products. PEDCOR SQUARE; BUILDING 5 05 52 13 - PEDCOR SQUARE Issue Date 12.18.15 PIPE AND TUBE RAILINGS PEDCOR SQUARE; BUILDING 5 B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work. 1. For installed products indicated to comply with design loads, include structural analysis data signed and sealed by the qualified professional engineer responsible for their preparation. C. Samples for Initial Selection: For products involving selection of color, texture, or design. D. Samples for Verification: For each type of exposed finish required. 1. Sections of each distinctly different linear railing member, including handrails, top rails, posts, and balusters. 2. Fittings and brackets. 3. Assembled Sample of railing system, made from full-size components, including top rail, post, handrail, and infill. Sample need not be full height. a. Show method of finishing members at intersections. E. Welding certificates. F. Qualification Data: For professional engineer. G. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, according to ASTM E 894 and ASTM E 935. 1.5 QUALITY ASSURANCE A. Source Limitations: Obtain each type of railing through one source from a single manufacturer. B. Welding: Qualify procedures and personnel according to the following: 1. AWS D1.1, "Structural Welding Code-Steel." 1.6 PROJECT CONDITIONS A. Field Measurements: Verify actual locations of walls and other construction contiguous with railings by field measurements before fabrication and indicate measurements on Shop Drawings. 1. Established Dimensions: Where field measurements cannot be made without delaying the Work, establish dimensions and proceed with fabricating railings without field measurements. Coordinate wall and other contiguous construction to ensure that actual dimensions correspond to established dimensions. 2. Provide allowance for trimming and fitting at site. 1.7 COORDINATION AND SCHEDULING A. Coordinate installation of anchorages for railings. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation. PEDCOR SQUARE; BUILDING 5 05 52 13 - PEDCOR SQUARE Issue Date 12.18.15 PIPE AND TUBE RAILINGS PEDCOR SQUARE; BUILDING 5 B. Schedule installation so wall attachments are made only to completed walls. Do not support railings temporarily by any means that do not satisfy structural performance requirements. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: 1. Steel Pipe and Tube Railings: a. Pisor Industries, Inc. b. Sharpe Products. c. Wagner, R & B, Inc.; a division of the Wagner Companies. 2.2 METALS, GENERAL A. Metal Surfaces, General: Provide materials with smooth surfaces, without seam marks, roller marks, rolled trade names, stains, discolorations, or blemishes. B. Brackets, Flanges, and Anchors: Cast or formed metal of same type of material and finish as supported rails, unless otherwise indicated. 2.3 STEEL AND IRON A. Tubing: ASTM A 500 (cold formed). B. Pipe: ASTM A 53, Type F or Type S, Grade A, Standard Weight (Schedule 40), unless another grade and weight are required by structural loads. 1. Provide galvanized finish for exterior installations and where indicated. C. Plates, Shapes, and Bars: ASTM A 36. D. Castings: Either gray or malleable iron, unless otherwise indicated. 1. Gray Iron: ASTM A 48, Class 30, unless another class is indicated or required by structural loads. 2. Malleable Iron: ASTM A 47. 2.4 FASTENERS A. General: Provide the following: 1. Steel Railings: Plated steel fasteners complying with ASTM B 633, Class Fe/Zn 25 for electrodeposited zinc coating. PEDCOR SQUARE; BUILDING 5 05 52 13 - PEDCOR SQUARE Issue Date 12.18.15 PIPE AND TUBE RAILINGS PEDCOR SQUARE; BUILDING 5 B. Fasteners for Anchoring Railings to Other Construction: Select fasteners of type, grade, and class required to produce connections suitable for anchoring railings to other types of construction indicated and capable of withstanding design loads. C. Fasteners for Interconnecting Railing Components: 1. Provide concealed fasteners for interconnecting railing components and for attaching them to other work, unless exposed fasteners are unavoidable or are the standard fastening method for railings indicated. D. Anchors: Provide cast-in-place anchors, fabricated from corrosion-resistant materials with capability to sustain, without failure, a load equal to six times the load imposed when installed in unit masonry and equal to four times the load imposed when installed in concrete, as determined by testing per ASTM E 488 conducted by a qualified independent testing agency. 2.5 MISCELLANEOUS MATERIALS A. Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy welded. B. Shop Primers: Provide primers that comply with Division 09 Section “Painting.” C. Universal Shop Primer: Fast-curing, lead- and chromate-free, universal modified-alkyd primer complying with MPI#79. 1. Use primer with a VOC content of 420 g/L (3.5 lb/gal.) or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24). 2. Use primer containing pigments that make it easily distinguishable from zinc-rich primer. D. Zinc-Rich Primer: Complying with SSPC-Paint 20 or SSPC-Paint 29 and compatible with topcoat. 1. Use primer with a VOC content of 420 g/L (3.5 lb/gal.) or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24). 2. Products: Subject to compliance with requirements, provide one of the following: a. Benjamin Moore & Co.; Epoxy Zinc-Rich Primer CM18/19. b. PPG Architectural Finishes, Inc.; Aquapon Zinc-Rich Primer 97-670. c. Sherwin-Williams Company (The); Corothane I GalvaPac Zinc Primer. E. Shop Primer for Galvanized Steel: Zinc-dust, zinc-oxide primer formulated for priming zinc-coated steel and for compatibility with finish paint systems indicated, and complying with SSPC-Paint 5. F. Galvanizing Repair Paint: High-zinc-dust-content paint for re-galvanizing welds in steel, complying with SSPC-Paint 20. G. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D 1187. H. Non-shrink, Nonmetallic Grout: Factory-packaged, non-staining, non-corrosive, nongaseous grout complying with ASTM C 1107. Provide grout specifically recommended by manufacturer for interior and exterior applications. PEDCOR SQUARE; BUILDING 5 05 52 13 - PEDCOR SQUARE Issue Date 12.18.15 PIPE AND TUBE RAILINGS PEDCOR SQUARE; BUILDING 5 I. Anchoring Cement: Factory-packaged, non-shrink, non-staining, hydraulic-controlled expansion cement formulation for mixing with water at Project site to create pourable anchoring, patching, and grouting compound. 1. Water-Resistant Product: At exterior locations and where indicated provide formulation that is resistant to erosion from water exposure without needing protection by a sealer or waterproof coating and that is recommended by manufacturer for exterior use. 2.6 FABRICATION A. General: Fabricate railings to comply with requirements indicated for design, dimensions, member sizes and spacing, details, finish, and anchorage, but not less than that required to support structural loads. B. Assemble railings in the shop to greatest extent possible to minimize field splicing and assembly. Disassemble units only as necessary for shipping and handling limitations. Clearly mark units for reassembly and coordinated installation. Use connections that maintain structural value of joined pieces. C. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch, unless otherwise indicated. Remove sharp or rough areas on exposed surfaces. D. Form work true to line and level with accurate angles and surfaces. E. Fabricate connections that will be exposed to weather in a manner to exclude water. Provide weep holes where water may accumulate. F. Cut, reinforce, drill, and tap as indicated to receive finish hardware, screws, and similar items. G. Connections: Fabricate railings with welded connections, unless otherwise indicated. H. Welded Connections: Cope components at connections to provide close fit, or use fittings designed for this purpose. Weld all around at connections, including at fittings. 1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals. 2. Obtain fusion without undercut or overlap. 3. Remove flux immediately. 4. At exposed connections, finish exposed surfaces smooth and blended so no roughness shows after finishing and welded surface matches contours of adjoining surfaces. I. Non-welded Connections: Connect members with concealed mechanical fasteners and fittings. Fabricate members and fittings to produce flush, smooth, rigid, hairline joints. 1. Fabricate splice joints for field connection using an epoxy structural adhesive if this is manufacturer's standard splicing method. J. Form changes in direction as follows: 1. As detailed. PEDCOR SQUARE; BUILDING 5 05 52 13 - PEDCOR SQUARE Issue Date 12.18.15 PIPE AND TUBE RAILINGS PEDCOR SQUARE; BUILDING 5 K. Form simple and compound curves by bending members in jigs to produce uniform curvature for each repetitive configuration required; maintain cross section of member throughout entire bend without buckling, twisting, cracking, or otherwise deforming exposed surfaces of components. L. Close exposed ends of railing members with prefabricated end fittings. M. Provide wall returns at ends of wall-mounted handrails, unless otherwise indicated. Close ends of returns unless clearance between end of rail and wall is 1/4 inch or less. N. Brackets, Flanges, Fittings, and Anchors: Provide wall brackets, flanges, miscellaneous fittings, and anchors to interconnect railing members to other work, unless otherwise indicated. O. Provide inserts and other anchorage devices for connecting railings to concrete or masonry work. Fabricate anchorage devices capable of withstanding loads imposed by railings. Coordinate anchorage devices with supporting structure. P. Toe Boards: Where indicated, provide toe boards at railings around openings and at edge of open-sided floors and platforms. Fabricate to dimensions and details indicated. 2.7 FINISHES, GENERAL A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping. C. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples. Noticeable variations in the same piece are not acceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast. D. Provide exposed fasteners with finish matching appearance, including color and texture, of railings. 2.8 STEEL AND IRON FINISHES A. Galvanized Railings: 1. Hot-dip galvanize indicated steel and iron railings, including hardware, after fabrication. 2. Comply with ASTM A 123 for hot-dip galvanized railings. 3. Comply with ASTM A 153 for hot-dip galvanized hardware. B. Fill vent and drain holes that will be exposed in the finished Work, unless indicated to remain as weep holes, by plugging with zinc solder and filing off smooth. PEDCOR SQUARE; BUILDING 5 05 52 13 - PEDCOR SQUARE Issue Date 12.18.15 PIPE AND TUBE RAILINGS PEDCOR SQUARE; BUILDING 5 C. For galvanized railings, provide hot-dip galvanized fittings, brackets, fasteners, sleeves, and other ferrous components. D. Preparation for Shop Priming: Prepare uncoated ferrous-metal surfaces to comply with minimum requirements indicated below for SSPC surface preparation specifications and environmental exposure conditions of installed railings: 1. Exterior Railings (SSPC Zone 1B): SSPC-SP 6/NACE No. 3, "Commercial Blast Cleaning." 2. Interior Railings (SSPC Zone 1A): SSPC-SP 7/NACE No. 4, "Brush-off Blast Cleaning." 3. Interior Railings Indicated to Receive Zinc-Rich Primer (SSPC Zone 1A): SSPC- SP 6/NACE No. 3, "Commercial Blast Cleaning." E. Apply shop primer to prepared surfaces of railings, unless otherwise indicated. Comply with requirements in SSPC-PA 1, "Paint Application Specification No. 1: Shop, Field, and Maintenance Painting of Steel," for shop painting. Primer need not be applied to surfaces to be embedded in concrete or masonry. 1. Do not apply primer to galvanized surfaces. 2. Stripe paint corners, crevices, bolts, welds, and sharp edges. F. For painting refer to Specification Section 09 97 01 “High Performance Coatings- Aliphatic Polyurethane.” PART 3 - EXECUTION 3.1 INSTALLATION, GENERAL A. Fit exposed connections together to form tight, hairline joints. B. Perform cutting, drilling, and fitting required for installing railings. Set railings accurately in location, alignment, and elevation; measured from established lines and levels and free of rack. 1. Do not weld, cut, or abrade surfaces of railing components that have been coated or finished after fabrication and that are intended for field connection by mechanical or other means without further cutting or fitting. 2. Set posts plumb within a tolerance of 1/16 inch in 3 feet. 3. Align rails so variations from level for horizontal members and variations from parallel with rake of steps and ramps for sloping members do not exceed 1/4 inch in 12 feet. C. Adjust railings before anchoring to ensure matching alignment at abutting joints. D. Fastening to In-Place Construction: Use anchorage devices and fasteners where necessary for securing railings and for properly transferring loads to in-place construction. PEDCOR SQUARE; BUILDING 5 05 52 13 - PEDCOR SQUARE Issue Date 12.18.15 PIPE AND TUBE RAILINGS PEDCOR SQUARE; BUILDING 5 3.2 RAILING CONNECTIONS A. Non-welded Connections: Use mechanical or adhesive joints for permanently connecting railing components. Use wood blocks and padding to prevent damage to railing members and fittings. Seal recessed holes of exposed locking screws using plastic cement filler colored to match finish of railings. B. Welded Connections: Use fully welded joints for permanently connecting railing components. Comply with requirements for welded connections in Part 2 "Fabrication" Article whether welding is performed in the shop or in the field. C. Expansion Joints: Install expansion joints at locations indicated but not farther apart than required to accommodate thermal movement. Provide slip-joint internal sleeve extending 2 inches beyond joint on either side, fasten internal sleeve securely to 1 side, and locate joint within 6 inches of post. 3.3 ANCHORING POSTS A. Anchor posts to metal surfaces with oval flanges, angle type, or floor type as required by conditions, connected to posts and to metal supporting members as follows: 1. For steel pipe railings, weld flanges to post and bolt to supporting surfaces. 3.4 ANCHORING RAILING ENDS A. Anchor railing ends to concrete and masonry with round flanges connected to railing ends and anchored to wall construction with anchors and bolts. 3.5 ATTACHING HANDRAILS TO WALLS A. Attach handrails to wall with wall brackets. Provide brackets with 1-1/2-inch clearance from inside face of handrail and finished wall surface. 1. Use type of bracket with flange tapped for concealed anchorage to threaded hanger bolt. B. Locate brackets as indicated or, if not indicated, at spacing required to support structural loads. C. Secure wall brackets to building construction as follows: 1. For concrete and solid masonry anchorage, use drilled-in expansion shields and hanger or lag bolts. 2. For hollow masonry anchorage, use toggle bolts. 3.6 ADJUSTING AND CLEANING A. Touchup Painting: Cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint are specified in Division 09 painting Sections. PEDCOR SQUARE; BUILDING 5 05 52 13 - PEDCOR SQUARE Issue Date 12.18.15 PIPE AND TUBE RAILINGS PEDCOR SQUARE; BUILDING 5 B. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair galvanizing to comply with ASTM A 780. 3.7 PROTECTION A. Protect finishes of railings from damage during construction period with temporary protective coverings approved by railing manufacturer. Remove protective coverings at time of Substantial Completion. B. Restore finishes damaged during installation and construction period so no evidence remains of correction work. Return items that cannot be refinished in the field to the shop; make required alterations and refinish entire unit, or provide new units. END OF SECTION 05 52 13