SECTION 07 12 51 – SBS MODIFIED SHEET WATERPROOFING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. The general provisions of the contract, including general and supplementary
conditions and the general requirements, apply to the work specified in this
section.
1.2 DESCRIPTION OF WORK
A. The extent of SBS Modified sheet waterproofing is shown on drawings and/or
specified herein.
B. Work includes the installation of a complete SBS Waterproofing membrane
assembly including surface conditioner (Primer), an SBS heat applied
membrane, drainage and protection board as required to ensure a complete
system with all products supplied from a single-source to compatibility and
warranty requirements.
1.3 RELATED SECTIONS
A. Division 3 Concrete Surface / Substrate: This section is important to the
successful application of the SBS waterproofing membrane.
1. Strength / Density: minimum 2,500 psi compressive strength
Minimum 115 pcf density
2. Finish: Medium broom.
3. Cure Time: Water cure or approved liquid curing compound.
4. Structural Weight concrete must cure for a minimum of 14 days.
5. Deck preparation per ASTM D 5295.
1.4 SUBMITTALS
A. Manufactures data: Submit (4) copies of installation instructions, product data
and Material Safety Data Sheets (MSDS) for each material and application
specified. One copy of the MSDS must be kept on site and available for
reference.
1. Technical data sheets must include information on the following tests:
a. Accelerated aging
b. Dimensional stability
c. Elongation
B. Certification showing that the Installation Contractor is approved by the material
manufacturer.
C. Certification that all materials are warranted and supplied by a manufacturer
supplying single source responsibility for the products furnished.
PEDCOR SQUARE; BUILDING 5
07 12 51 -
PEDCOR SQUARE Issue Date 12.18.15 SBS MODIFIED SHEET
WATERPROOFING
PEDCOR SQUARE; BUILDING 5
D. Warranty: Sample copies of warranty clearly defining terms, conditions, and time
periods for the warranty.
1.5 QUALITY CONTROL
A. The Installation Contractor must be approved in writing by the membrane
manufacturer with the date of the approval prior to the project bid date. The
contractor must have a minimum of 5 years experience with Modified Asphalt
Membranes and meet the requirements of Section 01 40 00 Quality
Requirements.
B. The Installation Contractor must perform substrate moisture tests prior to
membrane installation and flood tests on completed membranes as specified
herein.
C. The membrane manufacturer must have a minimum of 10 years of experience in
the production and consistent formulation of modified asphalt membranes
specified herein and must meet the requirements of Section 01 40 00 Quality
Requirements.
D. The manufacturer must have an available technical staff to assist the contractor
in the application of the membrane (if necessary) or to answer any questions on
any component of the assembly.
E. Manufacturer shall supply proof of their ISO 9002 certification.
F. Pre-Construction conference: The manufacturer must meet with the required
parties at the site to review the project conditions that relate to the waterproofing
assembly.
1.6 DELIVERY AND STORAGE
A. Deliver all materials to the project site in original unopened containers, clearly
marked with the manufactures name and identifying numbers.
B. Materials shall be stored in a neat safe manner and in a way as not to exceed the
structural capacity of the building.
C. Store membrane rolls on end, one pallet high with the selvage edge up. Do not
store in a leaning position.
D. Store materials elevated from contact with the ground and moisture, covered with
a tarp for protection.
E. In cold weather rolls should be stored in a heated area prior to application.
F. Store all combustible materials away from heat or open flame.
1.7 WARRANTY
PEDCOR SQUARE; BUILDING 5
07 12 51 -
PEDCOR SQUARE Issue Date 12.18.15 SBS MODIFIED SHEET
WATERPROOFING
PEDCOR SQUARE; BUILDING 5
A. The waterproofing membrane shall be inspected prior to installation of concrete
mud slab above (as required) by the material manufacturer.
B. The warranty will be for a period from the date of the manufacture’s acceptance
and shall cover the waterproofing system certifying that the material as installed
shall remain free from any material defect for a period of ten (10) years. The
warranty shall cover material and water tightness of the membrane.
PART 2 - PRODUCTS
2.1 ASPHALT PRIMER: AQUADERE 09D
A. Primer shall be applied to all areas of the substrate which are to receive
membrane at an average rate of 1 gal. per 100 to 200 sq. ft. Primer may be
installed by brush roller or spray. Primer shall be applied per manufacturer’s
recommendations. Porous concrete may require additional primer.
2.2 MEMBRANE: SOPRALENE FLAM 180 BASE PLY
A. Membrane shall have a non-woven polyester reinforcement and thermo-fusible
elastomeric asphalt. Both sides shall be protected by a thermo-fusible plastic
film with an average thickness of 120 mils.
B. Components
1. Reinforcement: non-woven polyester, 180 g/m2.
2. Thermo-fusible elastomeric asphalt: mix of selected bitumen and SBS
thermo-plastic polymer.
2.3 ADHESIVE
A. HV3 adhesive supplied by membrane manufacturer.
PART 3 - EXECUTION
EXAMINATION
A. Installing Contractor shall examine substrates, areas, and conditions, with
Installer present, for compliance with requirements and other conditions affecting
performance and submit to the Construction Manager or Architect in writing, that
all substrates, areas, and conditions are in conformance with the manufacturer’s
requirements for the installation of the waterproof membrane.
1. Do not proceed with installation until after the minimum concrete curing
period recommended by waterproofing manufacturer.
2. Verify that substrate is visibly dry and free of moisture. Test for capillary
moisture by plastic sheet method according to ASTM D 4263.
a. Submit test locations, report findings and membrane installation
recommendations in writing to the Construction Manager or
Architect.
PEDCOR SQUARE; BUILDING 5
07 12 51 -
PEDCOR SQUARE Issue Date 12.18.15 SBS MODIFIED SHEET
WATERPROOFING
PEDCOR SQUARE; BUILDING 5
3. Notify Architect in writing of anticipated problems using waterproofing
over substrate.
4. Proceed with installation only after unsatisfactory conditions have been
corrected.
5. Maintain existing edge protection system around the perimeter of the
existing structural deck.
3.2 SURFACE PREPARATION
A. Refer to ASTM D 5295 Standard Guide for Preparation of Concrete Surfaces for
Bonded Membranes.
B. Clean, prepare, and treat substrates according to manufacturer's written
instructions. Provide clean, dust-free, and dry substrates for waterproofing
application.
C. Mask off adjoining surfaces not receiving waterproofing to prevent spillage and
overspray affecting other construction.
D. Remove grease, oil, bitumen, form-release agents, paints, curing compounds,
and other penetrating contaminants or film-forming coatings from concrete.
E. Remove fins, ridges, mortar, and other projections and fill honeycomb, aggregate
pockets, holes, and other voids.
F. Prepare, fill, prime, and treat joints and cracks in substrates. Remove dust and
dirt from joints and cracks according to ASTM D 4258.
G. Prepare, treat, and seal vertical and horizontal surfaces at terminations and
penetrations through waterproofing and at drains and protrusions.
3.3 EQUIPMENT
A. Torch should be of a type recommended by the membrane manufacturer.
3.4 INSTALLATION
A. Ensure the substrate is clean, dry and ready for the application. Report all
defects in substrates to Construction Manager or Architect prior to commencing
work.
B. The entire substrate to receive waterproofing is to be primed with Elastocol 500
at a average rate of 1 to 1.5 gallons per 100 sq. ft. Primer is to be installed to a
dark color and is not to be cut or thinned in any manner.
3.5 MEMBRANE APPLICATION
PEDCOR SQUARE; BUILDING 5
07 12 51 -
PEDCOR SQUARE Issue Date 12.18.15 SBS MODIFIED SHEET
WATERPROOFING
PEDCOR SQUARE; BUILDING 5
A. One-ply areas shall receive one base ply torched to the primed substrate.
B. Starter strips or reinforcement strips of Sopralene 180 Base Ply must be used at
all substrate changes of plane.
C. It is recommended to install the membrane in full rolls as much as possible.
D. The Sopralene Flam 180 for one-ply systems shall be installed (heat only) to the
prepared substrate. Starting at the low point of the deck at the drains, fuse the
membrane to the primed surface using an approved propane torch.
E. Ensure that the membrane is totally adhered to the substrate with each sheet set
vertically from the first course to the high point of the deck. The side laps shall be
3 inches.
F. Any holes or punctures in the membrane must be patched with an additional
sheet of membrane, which extends a minimum of 4 inches from all sides of the
hole or puncture.
G. The contractor shall inspect the completed work each day. Any wrinkles or voids
in the side or head laps must be cut and patched.
H. Terminate the day’s work in a manner approved by the manufacturer.
I. Prior to the application of the drainage protection layer, the contractor should
contact a representative of the manufacturer to inspect the membrane and note
any defects, which require attention.
3.9 QUALITY CONTROL
A. REPORTS
1. Installation Contractor shall submit a written daily report of work
completed that documents the location and scope of work on a drawing
along with appropriate photographs and weather report to the Construction
Manager or Architect.
a. Provide Construction Manager or Architect with a written report
documenting the test date, weather conditions, location of the test
area on a drawing along with appropriate photographs,
surveillance results, and test results including all leak remediation
recommendations.
3.9 PROTECTION AND CLEANING
A. Do not permit foot or vehicular traffic on unprotected membrane.
B. Protect waterproofing from damage and wear during remainder of construction
period.
C. Clean spillage and soiling from adjacent construction using cleaning agents and
procedures recommended by manufacturer of affected construction.
PEDCOR SQUARE; BUILDING 5
07 12 51 -
PEDCOR SQUARE Issue Date 12.18.15 SBS MODIFIED SHEET
WATERPROOFING
PEDCOR SQUARE; BUILDING 5
END OF SECTION 07 12 51