HomeMy WebLinkAbout07 12 52 SBS Modified Bituminous Foundation Waterproofing.docPEDCOR SQUARE; BUILDING 5 07 12 52 - PEDCOR SQUARE Issue Date 12.18.15 SBS MODIFIED BITUMINOUS FOUNDATION WATERPROOFING PEDCOR SQUARE; BUILDING 5 SECTION 07 12 52 – SBS MODIFIED BITUMINOUS FOUNDATION WATERPROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The general provisions of the contract, including general and supplementary conditions and the general requirements, apply to the work specified in this section. 1.2 DESCRIPTION OF WORK A. The extent of SBS Modified sheet waterproofing includes all subgrade portions of cast-in-place concrete foundation walls and subgrade portions of masonry. B. Work includes the installation of a complete SBS Waterproofing membrane assembly including surface conditioner (Primer), an SBS torch applied membrane, extruded polystyrene insulation and drainage course to ensure a complete system with all products supplied from a single-source to compatibility and warranty requirements. 1.3 RELATED SECTIONS A. Division 3 Concrete Surface / Substrate: This section is important to the successful application of the SBS waterproofing membrane. 1. Strength / Density: minimum 2,500 psi compressive strength Minimum 115 pcf density 2. Finish: Wood float or smooth form. 3. Cure Time: Water cure or approved liquid curing compound. 4. Structural Weight concrete must cure for a minimum of 14 days 1.4 SUBMITTALS A. Manufactures data: Submit (4) copies of installation instructions and product data for each material and application specified. Technical data sheets must include information on the following tests: 1. Accelerated aging 2. Dimensional stability 3. Creepage resistance B. Certification showing that the contractor is approved by the material manufacturer. C. Certification that all materials are warranted and supplied by a manufacturer supplying single source responsibility for the products furnished. 1.5 QUALITY CONTROL A. Contractor must be approved by the manufacturer with the date of the approval prior to the project bid date. The contractor must have a minimum of 5 years experience with Modified Asphalt Membranes. PEDCOR SQUARE; BUILDING 5 07 12 52 - PEDCOR SQUARE Issue Date 12.18.15 SBS MODIFIED BITUMINOUS FOUNDATION WATERPROOFING PEDCOR SQUARE; BUILDING 5 B. The membrane manufacturer must have a minimum of 10 years of experience in the production of modified asphalt membranes. C. The manufacturer must have an available technical staff to assist the contractor in the application of the membrane (if necessary) or to answer any questions on any component of the assembly. D. Manufacturer shall supply proof of their ISO 9002 certification. E. Pre-construction conference: The manufacturer must meet with the required parties at the site to review the project conditions which may relate to the waterproofing assembly. 1.6 DELIVERY AND STORAGE A. Deliver all materials to the project site in original unopened containers, clearly marked with the manufactures name and identifying numbers. B. Materials shall be stored in a neat safe manor and in a way as not to exceed the structural capacity of the building. C. Store membrane rolls on end, one pallet high with the selvage edge up. Do not store in a leaning position. D. Store materials elevated from contact with the ground and moisture, covered with a tarp for protection. E. In cold weather rolls should be stored in a heated area prior to application. F. Store all combustible materials away from heat or open flame. 1.7 WARRANTY A. The waterproofing membrane shall be inspected prior to backfilling (as required) by the material manufacturer. B. The warranty will be for a period from the date of the manufactures acceptance and shall cover the waterproofing system certifying that the material as installed shall remain free from any material defect for a period of five (5) years. The warranty shall cover material and water tightness of the membrane. PART 2 - PRODUCTS 2.1 ASPHALT PRIMER: ELASTOCOL 500 A. Primer shall be applied to all areas of the substrate which are to receive membrane at an average rate of 1 gal. per 100 to 150 sq. ft. Primer may be installed by brush roller or spray. Primer should be applied to a dark finish. Porous concrete may require additional primer. 2.2 MEMBRANE: SOPRALENE FLAM 180 PEDCOR SQUARE; BUILDING 5 07 12 52 - PEDCOR SQUARE Issue Date 12.18.15 SBS MODIFIED BITUMINOUS FOUNDATION WATERPROOFING PEDCOR SQUARE; BUILDING 5 A. Membrane shall have a non-woven polyester reinforcement and thermo-fusible elastomeric asphalt. Both sides shall be protected by a thermo-fusible plastic film with an average thickness of 120 mils. B. Components 1. Reinforcement: non-woven polyester, 180 g/m2. 2. Thermo-fusible elastomeric asphalt: mix of selected bitumen and SBS thermo-plastic polymer. 2.3 DRAINAGE COMPOSITES A. Sopradrain 200: Three dimensional high -impact resistant polymeric sheet with a bonded filter fabric. B. Description: Drainage mat composed of a polyethylene core and backing with a 5.5 oz. geotextile covering that is fusion bonded to the core. It’s smooth, solid flat back eliminates the need for a protection board. C. Physical Properties: Product Test Method Typical Value Compressive Strength ASTM D-695/1621(2) 19,000 psf Flow Rate at 1500 psf ASTM D-4716(1) 27 gpm/ft-width at 3600 psf ASTM D-4716(1) 22 gpm/ft-width at 12000 psf ASTM D-4716(1) 18 gpm/ft-width Thickness ASTM D-1777 .42 inch Geotextile (5.5 oz.) Elongation ASTM D-4632 50% Grab Tensile ASTM D-4632 160 lbs. Flow Rate ASTM D-4491 130 GPM/SF AOS (EOS) ASTM D-4751 100-120 CW-00215 Roll Dimensions Width 38” Length 82’ SF/Roll 200 coverage 246 SF/Roll Weight/Roll 66 lbs. 2.4 FASTENERS A. Hilti Powder Actuated Fastening System with DX flat head fastener. Fastener to be used the Soprema membrane fastener plate. 2.5 ADHESIVE A. Sopracolle 300 bitumen based adhesive supplied by membrane manufacturer. 2.6 INSULATION PEDCOR SQUARE; BUILDING 5 07 12 52 - PEDCOR SQUARE Issue Date 12.18.15 SBS MODIFIED BITUMINOUS FOUNDATION WATERPROOFING PEDCOR SQUARE; BUILDING 5 A. Extruded Polystyrene - Location on vertical walls as shown on drawings - Thickness 2” Thermal ASTM Test Method Value R-value (at 750ºF mean test temperature) Coefficient of linear thermal expansion, in./in. ºF C518 D696 10.0 for nominal 2” thick 3.5 x 10-5 Moisture Resistance Water absorption, % by volume Water vapor permeance, per, mac. 2” C 272 E96 0.1 0.6 Physical Recommended load (including 5-1 dynamic design factor) D1621 Modified 600 lb./ft2 PART 3 - EXECUTION 3.1 SURFACE PREPARATION A. All surfaces to receive waterproofing must be smooth dry and free from dirt, dust, ice and debris. B. Holes, joints and voids in masonry substrates should be pointed flush with the surface. The surface must be free from fins and projections. Any pipe projections must be grouted tightly. C. Release agents and concrete curing compounds must be compatible with the membrane system. A water cure or a liquid curing compound sodium silicate is preferred. Honeycombs, tie wire holes and other voids in the concrete must be cut out and re-pointed with a non-shrinking concrete patching compound. D. Refer to ASTM D 5295 Standard Guide for Preparation of Concrete Surfaces for Bonded Membranes. 3.2 EQUIPMENT A. Torch should be of a type recommended by the membrane manufacture 3.3 INSTALLATION A. Ensure the substrate is clean, dry and ready for the application. B. The entire substrate to receive waterproofing is to be primed with Elastocol 500 at a average rate of 1 to 1.5 gallons per 100 sq. ft. Primer is to be installed to a dark color and is not to be cut or thinned in any manor. 3.4 MEMBRANE APPLICATION PEDCOR SQUARE; BUILDING 5 07 12 52 - PEDCOR SQUARE Issue Date 12.18.15 SBS MODIFIED BITUMINOUS FOUNDATION WATERPROOFING PEDCOR SQUARE; BUILDING 5 A. Starter strips or reinforcement strips of Sopralene 180 must be used at all inside and outside corners as well as all 90 angles. B. It is recommended that the membrane is installed in 6 ft. sections. The membrane may be cut in the field or ordered pre cut in 6 ft. sections. C. The Sopralene Flam 180 shall be installed (torch only) to the prepared substrate. Starting at the low point of the wall of footer, fuse the membrane to the primed surface using an approved propane torch. D. The pre cast joints must be covered with two-plys of the waterproofing membrane. Cut the Sopralene flam 180 roll in half. Center the half sheet over the joint in the standing pre-cast and torch to the vertical wall. The normal application of the waterproofing membrane will follow the joint reinforcement E. Ensure that the membrane is totally adhered to the substrate with each sheet set vertically from the first course to the high point. The side laps shall be 75 mm or 3 inches. The top of each course shall be fastened 2.5 inches from the top of the sheet 6 inches o/c. with a Hilti DX Fastener and a Soprema Membrane plate. All fasteners and plates are to be corrosion resistant. F. Each of the following 6 ft. courses shall be shifted or of set from the prior course by 12 inches and shall overlap the proceeding course by 6 inches concealing the fasteners and plates from the prior course. The application shall continue until the entire surface is completed. G. Any holes or punctures in the membrane must be patched with an additional sheet of membrane which extends a minimum of 4 inches or 100 mm from all sides of the hole or puncture. H. The contractor shall inspect the completed work each day. Any wrinkles or voids in the side or head laps must be cut and patched. I. Prior to the application of the drainage or protection layer the contractor should contact a representative of the manufacturer to inspect the membrane and note any defects which will require attention. 3.5 DRAINAGE AND PROTECTION LAYER A. Install Sopradrain 300 over the completed waterproofing using spot application of Sopracolle 300 adhesive. Install the drainage composit in vertical rows ensuring that the filter fabric overlaps the fabric from each adjacent panel. The backfill must follow as soon as possible to permanently secure the drainage composite. 3.6 BACKFILLING A. Backfilling will be a continuous process from the footer and up as each course of waterproofing is installed. Soil or a specified backfill should be placed directly adjacent to the drainage layer and compacted using a vibratory compactor. The waterproofing contractor should inspect the backfill operation on a regular basis to insure that no damage is imposed by the backfill process. PEDCOR SQUARE; BUILDING 5 07 12 52 - PEDCOR SQUARE Issue Date 12.18.15 SBS MODIFIED BITUMINOUS FOUNDATION WATERPROOFING PEDCOR SQUARE; BUILDING 5 END OF SECTION 0712 52