Loading...
HomeMy WebLinkAbout2016-01-22 ADDENDUM ADD01 MEP.pdf ADDENDUM Building C.ADD.001 PROJECT PHASE II; CARMEL CITY CENTER BUILDING C – BALDWIN CHAMBERS BUILDING 800 South Rangeline Road Carmel, Indiana 46032 ADDENDUM NUMBER Building C.ADD.001 BALDWIN CHAMBERS BUILDING ISSUE DATE 04.22.16 ADDENDUM OUTLINE This Addendum lists changes resulting from the Quality Control Review from 09.15.15 to 09.29.15 and bidding questions. ITEM 001.1 Drawing Sheet EL101 - ELECTRICAL FIRST FLOOR LIGHTING PLAN •  See revised drawing included in this addendum, which includes at a minimum: 1  Reduced the quantity of lighting fixtures in the service Corridors. 2  Clarified the lighting in the Elevator Lobby. 3  Added a lighting fixture on the exterior wall of Service Corridor 137. 4  Added lighting fixtures to stairs. 5  See Attached Drawing EL101 ITEM 001.2 Drawing Sheet EL102 - ELECTRICAL SECOND FLOOR LIGHTING PLAN •  See revised drawing included in this addendum, which includes at a minimum: 1  Clarified fixture types for the lighting fixtures in the Lobby Area. 2  Clarified fixture types for the exterior lighting fixtures. See attached Drawing EL102 ITEM 001.3 Drawing Sheet EL103 - ELECTRICAL THIRD FLOOR LIGHTING PLAN •  See revised drawing included in this addendum, which includes at a minimum: 1  Clarified fixture types for the lighting fixtures in the Janitor/Mechanical Room 307. 2  Clarified junction boxes for the future exterior lighting fixtures. See Attached Drawing EL103 ITEM 001.4 Drawing Sheet EL104 - ELECTRICAL FOURTH FLOOR LIGHTING PLAN •  See revised drawing included in this addendum, which includes at a minimum: 1  Clarified fixture types for the lighting fixtures in the Janitor/Mechanical Room 307. 2  Clarified junction boxes and wiring for the future exterior lighting fixtures are to be connected to Lighitng Contactor LC- 2. See Attached Drawing EL104 ITEM 001.5 Drawing Sheet EP101 - ELECTRICAL FIRST FLOOR POWER PLAN •  See revised drawing included in this addendum, which includes at a minimum: 1  Modified the location of the Electrical Equipment in Service corridor 137, so as to not be in the stairs. See Attached Drawing EP101 ITEM 001.6 Drawing Sheet EP102 - ELECTRICAL SECOND FLOOR POWER PLAN •  See revised drawing included in this addendum, which includes at a minimum: 1  Deleted the Card Reader for the West Stair SC1-2. 2  Added receptacle at landing of Middle Stairs. 3  Added power circuit for added Exhaust Fan F-1 to be interlocked with HP-3. See Attached Drawing EP102 ITEM 001.7 Drawing Sheet EP103 - ELECTRICAL THIRD FLOOR POWER PLAN •  See revised drawing included in this addendum, which includes at a minimum: 1  Deleted the Card Reader for the West Stair SC1-3 and East Stair SC2-3. See Attached Drawing EP103 ITEM 001.8 Drawing Sheet EP104 - ELECTRICAL FOURTH FLOOR POWER PLAN •  See revised drawing included in this addendum, which includes at a minimum: 1  Deleted the Card Reader for the West Stair SC1-4 and East Stair SC2-4. See Attached Drawing EP104 ITEM 001.9 Drawing Sheet EP105 ELECTRICAL ROOF PLAN •  See revised drawing included in this addendum, which includes at a minimum: 1  Deleted the Card Reader for the Stair. 2  Added an exterior lighting fixture and light switch. See Attached Drawing EP105 ITEM 001.10 Drawing Sheet E-401 ELECTRICAL ELECTRICAL PLANS •  See drawing included in this addendum, which includes at a minimum, showing the lighting fixtures, switches and receptacles for the balconies as part of the Alternate Bid. See Attached Drawing E-401 ITEM 001.11 Drawing Sheet E-402 ELECTRICAL ELECTRICAL PLANS •  See drawing included in this addendum, which includes as a minimum, showing the lighting fixtures, switches and receptacles for the balconies as part of the Alternate Bid. See Attached Drawing E-402 ITEM 001.12 Drawing Sheet E-403 ELECTRICAL ELECTRICAL PLANS •  See drawing included in this addendum, which includes as a minimum, showing the lighting fixtures, switches and receptacles for the balconies as part of the Alternate Bid. See Attached Drawing E-403 ITEM 001.13 Drawing Sheet E-404 ELECTRICAL ELECTRICAL PLANS •  See drawing included in this addendum, which includes as a minimum, showing the lighting fixtures, switches and receptacles for the balconies as part of the Alternate Bid. See Attached Drawing E-404 ITEM 001.14 Drawing Sheet E-405 ELECTRICAL ELECTRICAL PLANS •  See drawing included in this addendum, which includes as a minimum, showing the lighting fixtures, switches and receptacles for the balconies as part of the Alternate Bid. See Attached Drawing E-405 ITEM 001.15 Drawing Sheet E-601 ELECTRICAL SCHEDULES •  See revised drawing included in this addendum, which includes at a minimum: 1  Adding new lighting fixtures. 2  Deleting the Type K-15 lighting fixture. See Attached Drawing E-601 ITEM 001.11 Drawing Sheet E-801 ELECTRICAL POWER DISTRIBUTION DIAGRAM •  See drawing included in this addendum which includes as a minimum, the New Panel “MDP5A” and feed to Relocated Panel “MDP5”. see attached Revised Drawing E-801 ITEM 001.12 Drawing Sheet EP104 ELECTRICAL ATTIC POWER PLAN •  Change the power circuits for the RTU to circuits shown on Power Distribution Diagram. ITEM 001.13 Drawing Sheet M-102 MECHANICAL SECOND FLOOR PLAN •  Added inline fan (F-1) in outdoor air ductwork, as clouded. •  Added sheet keynote #8, as clouded. ITEM 001.14 Drawing Sheet M-104 MECHANICAL FOURTH FLOOR PLAN • Modified return air ductwork, as clouded. ITEM 001.15 Drawing Sheet M-601 MECHANICAL SCHEDULES •  Modified Fan Schedule to include F-1, as clouded. •  Modified Indoor Fan Coil Unit Schedule, as clouded. •  Modified Diffusers & Grilles Schedule, as clouded. DISTRIBUTION S. Warne, J. Springer Signature Construction email J. Stutzman, S. Sturtz, Pedcor Design Group email Paul Brown Enverity Engineering