HomeMy WebLinkAboutdrainage report3939 Priority Way South Drive, Suite 200 Indianapolis, Indiana 46240 Telephone 317 844 6777 Facsimile 317 706 6451 www.cripe.biz PIC: 060384-20311 Drainage Design Report for Meridian & Main, Phase I Lot 1 Carmel, Indiana Prepared for: Meridian 131, LLC 6100 West 96th Street Indianapolis, IN 46278 May 16, 2014 Revised October 3, 2014 Revised February 11, 2015 Revised February 23, 2015 Certified by: David A. Lach, PE INDIANA PE 10000126 DRAINAGE DESIGN REPORT FORLOT 1, MERIDIAN & MAIN PHASE 1TABLE OF CONTENTS1.0 Introduction......................................................................................................... 2 1.1 Project Description .................................................................................................2 1.2 Scope of Report .....................................................................................................2 1.3 Existing Conditions and Detention Summary .........................................................2 2.0 Pre-developed Conditions ................................................................................. 3 2.1 Pre-developed Site Conditions Allowable Release Rates ......................................3 3.0 Storm Sewer Analysis ........................................................................................ 3 3.1 Storm Sewer Network ............................................................................................3 4.0 Water Quality Analysis ....................................................................................... 4 4.1 Post-Construction Stormwater Quality Measures ...................................................4 5.0 Conclusions ............................................................................................................. 4 APPENDICIES Appendix A – Storm Sewer Analysis, Calculations and Exhibits Appendix B – Water Quality Analysis, Calculations and Exhibits Appendix C – Additional Detention Calculations Appendix D – Drainage Design Report for Meridian and Main Phase 1, Lot 2 Revisions 2 O:\2006\060384\20311\Docs\Engr\Reports\Drainage Report\Report_Drainage_2014-10-03.doc 1.0 IntroductionThis drainage report outlines the storm water management system to serve Lot1, Meridian & Main Phase 1 development. The site is located in Phase I of theMeridian & Main Office Park located east of US 31 and north of Main Street. Thepurpose of this report is to identify the impacts of the storm water runoff from theproposed commercial development on the surrounding properties and existingstorm sewer systems. The detention design for this site was developed as part of the master plan and was governed by the Hamilton County Stormwater Ordinance. The City of Carmel Stormwater Technical Standards Manual was used for the storm sewer hydraulic calculations and the water quality design. 1.1 Project Description The proposed project will consist of the development of lot 1 which shall consist of 2 proposed multi-tenant retail building, asphalt parking, concrete sidewalk and associated utilities. 1.2 Scope of Report This report summarizes the storm water management system for the proposed development and the impacts to the proposed master plan. 1.3 Existing Conditions and Detention Summary The proposed site is located within the Meridian & Main Office Park Development and is Lot 1. The site is located just west of the new St. Christopher’s Episcopal Church on the previous St. Christopher’s Episcopal Church site. The site is part of the Meridian & Main master plan and drains to the existing storm water infiltration/detention basins located to the northwest. These existing detention ponds account for the runoff for the development (Refer to the Supplemental Drainage Report). The adjoining properties zoning consist of the following: North/West: Pennsylvania Way (Private Drive) and US31 Corridor Overlay/B6 South: US31 Corridor Overlay/B6 East: Church and Residential (Single Family) (OM/SU) The soils maps from the US Department of Agriculture, Soil Conservation Service identifies the proposed Lot 1, Building 1 site to consist of Crosby Silt loam (CrA). 3 O:\2006\060384\20311\Docs\Engr\Reports\Drainage Report\Report_Drainage_2014-10-03.doc The Firm map panel number 18057C0207F dated February 19, 2003, indicate that the site lies in Flood Zone “X”. These areas are considered to be outside of the 500 year floodplain. 2.0 Pre-developed Conditions 2.1 Pre-developed Site Conditions Allowable Release Rates The allowable release rates have been determined as part of the master plan for the Meridian & Main development (Refer to the attached Supplemental Drainage Report). Pond Pack was previously used to analyze the multiple detention/infiltration basins on this site. The master planned network consists of three basins. These ponds were modeled as an inter-connected pond network model that accounted for the head and tail water conditions. The watershed areas for each of the basins can be found in the attached supplemental drainage report. The proposed construction at Building 1, Lot 1 is part of Onsite Pond1 basin. The original master planned onsite pond1 basin is approximately 10.86 acres with a curve number of 90.1. Cripe has revised the master plan in Appendix C so that the curve number is now 90.8. 3.0 Storm Sewer Analysis The storm sewer analysis for the proposed construction consists of an enclosed storm sewer network. 3.1 Storm Sewer Network Hydraflow Storm Sewers Extension for AutoCAD Civil 3D, v.8 is used to size all storm drainage pipes for the 10-year storm event peak flows. Hydraflow utilizes a graphical pipe network containing pipe data, inlet characteristics, watershed areas, and rainfall information. These flow calculations are valid for both pressure and varied flow situations including hydraulic jumps, backwater elevations, and draw down curves. These calculations are based on the rational method. Factors involved include runoff coefficient (C), time of concentration (Tc) and Area (A). (See calculations and the inlet basin exhibit in Appendix A). 3 O:\2006\060384\20311\Docs\Engr\Reports\Drainage Report\Report_Drainage_2014-10-03.doc The Firm map panel number 18057C0207F dated February 19, 2003, indicatethat the site lies in Flood Zone “X”. These areas are considered to be outside ofthe 500 year floodplain.2.0 Pre-developed Conditions2.1 Pre-developed Site Conditions Allowable Release Rates The allowable release rates have been determined as part of the master plan for the Meridian & Main development (Refer to the attached Supplemental Drainage Report). Pond Pack was previously used to analyze the multiple detention/infiltration basins on this site. The master planned network consists of three basins. These ponds were modeled as an inter-connected pond network model that accounted for the head and tail water conditions. The watershed areas for each of the basins can be found in the attached supplemental drainage report. The proposed construction at Building 1, Lot 1 is part of Onsite Pond1 basin. The master planned onsite pond1 basin is approximately 10.86 acres with a curve number of 90.1. 3.0 Storm Sewer Analysis The storm sewer analysis for the proposed construction consists of an enclosed storm sewer network. 3.1 Storm Sewer Network Hydraflow Storm Sewers Extension for AutoCAD Civil 3D, v.8 is used to size all storm drainage pipes for the 10-year storm event peak flows. Hydraflow utilizes a graphical pipe network containing pipe data, inlet characteristics, watershed areas, and rainfall information. These flow calculations are valid for both pressure and varied flow situations including hydraulic jumps, backwater elevations, and draw down curves. These calculations are based on the rational method. Factors involved include runoff coefficient (C), time of concentration (Tc) and Area (A). (See calculations and the inlet basin exhibit in Appendix A). 4 O:\2006\060384\20311\Docs\Engr\Reports\Drainage Report\Report_Drainage_2014-10-03.doc 4.0 Water Quality Analysis4.1 Post-Construction Stormwater Quality Measures The Stormwater quality treatment system for this project consists of a treatment train of a proposed mechanical BMP sized solely for the Lot 1 site and the existing detention/infiltration basins which have been sized for the entire development. The detention/infiltration basins shall provide both water quality treatment and quantity performance (detention) based on the entire developments contributing watershed. This system complies with the design criteria presented in the City of Carmel Stormwater Technical Standards Manual and the Hamilton County Drainage Ordinance. See Appendix B for additional information. 5.0 Conclusions The proposed storm drainage system complies with the criteria stated in the City of Carmel Stormwater Technical Standards Manual and the Hamilton County Drainage Ordinance for detention, water quality and storm water sewer sizing. 5 O:\2006\060384\20311\Docs\Engr\Reports\Drainage Report\Report_Drainage_2014-10-03.doc Appendix A Storm Sewer Analysis, Calculations and Exhibits 6 O:\2006\060384\20311\Docs\Engr\Reports\Drainage Report\Report_Drainage_2014-10-03.doc FEMA MAP 7 O:\2006\060384\20311\Docs\Engr\Reports\Drainage Report\Report_Drainage_2014-10-03.doc SOILS INFORMATION 1 OF 3 8 O:\2006\060384\20311\Docs\Engr\Reports\Drainage Report\Report_Drainage_2014-10-03.doc SOILS INFORMATION 2 OF 3 9 O:\2006\060384\20311\Docs\Engr\Reports\Drainage Report\Report_Drainage_2014-10-03.doc SOILS INFORMATION 3 OF 3 10 O:\2006\060384\20311\Docs\Engr\Reports\Drainage Report\Report_Drainage_2014-10-03.doc ZONING Revisions DescriptionDateMark C E R T I F I E D B Y : D r a w n B y : C h e c k e d B y : Q u a l i t y A s s u r a n c e : S c a l e : S h e e t D a t e P r o j e c t N u m b e r GIS LAND SURVEYING INTERIOR DESIGN CIVIL / TRANSPORTATION ENGINEERS LAND PLANNING(317) 844-6777 FAX (317) 706-6464 INDIANAPOLIS, INDIANA 46240 3939 PRIORITY WAY SOUTH DRIVE, SUITE 400 E-Mail cripe@cripe.biz S c a l e : 1 " = 0 OWNER'S REPRESENTATION R C Paul I. Cripe, Inc. D a t e EQUIPMENT PLANNING ARCHITECTUREARCHITECTURE F O R C A L L S I N I N D I A N A C A L L T O L L F R E E O:\2006\060384\20311\Cad\Engr\Xrefs\060384-20311_basins.dwg , January 26, 2015 2:05 PM, BOB GAFFER‹3DXO,&ULSH,QF LOT 1 MERIDIAN 131, LLC. 6100 W. 96TH STREET INDIANAPOLIS, IN 46219 1 0 - 0 3 - 2 0 1 4 0 6 0 3 8 4 - 2 0 3 1 1 0 6 - 2 6 - 2 0 1 4 06-26-2014 City Comments 08-05-2014 OWNER REVISIONS C O V E R I N G S T O R M W A T E R P O L L U T I O N P R E V E N T I O N P L A N D E S I G N S T - 1 2 0 ' STORM SEWER BASINS EXHIBIT 11 O:\2006\060384\20311\Docs\Engr\Reports\Drainage Report\Report_Drainage_2014-10-03.doc Appendix B Water Quality Analysis, Calculations and Exhibits RevisionsDescriptionDateMark CERTIFIED BY:Drawn By:Checked By:Quality Assurance:Scale:Sheet Date Project NumberGISLAND SURVEYING INTERIOR DESIGN CIVIL / TRANSPORTATION ENGINEERS LAND PLANNING (317) 844-6777 FAX (317) 706-6464 INDIANAPOLIS, INDIANA 46240 3939 PRIORITY WAY SOUTH DRIVE, SUITE 400 E-Mail cripe@cripe.biz Scale: 1" =0OWNER'S REPRESENTATION R CPaul I. Cripe, Inc.DateEQUIPMENT PLANNING ARCHITECTUREARCHITECTURE FOR CALLS IN INDIANACALL TOLL FREE O : \ 2 0 0 6 \ 0 6 0 3 8 4 \ 2 0 3 1 1 \ C a l c s \ E n g r \ W a t e r Q u a l i t y \ P r e l i m \ W Q _ E x h i b i t _ 2 0 1 4 - 1 0 - 0 3 . d w g , J a n u a r y 2 6 , 2 0 1 5 2 : 2 1 P M , B O B G A F F E R , © P a u l I . C r i p e , I n c . LOT 1, BUILDING 1 MERIDIAN 131, LLC.6100 W. 96TH STREET INDIANAPOLIS, IN 46219 05-16-2014 060384-20311-STATE OF R E E N I G N E L A N OISSEFORPDAVIDA.L A C H R EGISTERE D A N A I D NI COVERING EXISTING DESIGN WQ30'WATER QUALITY BASIN EXHIBIT WA T E R Q U A L I T Y B A S I N AQ U A S W I R L A S - 5 B M P PO I N T O F D I S C H A R G E 06/28/07 Exhibit 701-1: Curve Number Calculation for Water Quality Storm Event Wa t e r Q u a l i t y C u r v e N u m b e r 707274767880828486889092949698 10 0 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 1 0 0 Pe r c e n t I m p e r v i o u s n e s s W a t e r Q u a l i t y C u r v e N u m b e r ( C N w q ) Meridian & Main Phase 1, Lot 1Project Summary Meridian & Main Phase 1, Lot 1TitleS Pierre revised J OlashukEngineerCompany10/3/2014Date Water Quality Meridian & Main Phase 1, Lot 1Notes Page 1 of 727 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/3/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterWQ Calc 2014-10-03.ppc Table of Contents 6Runoff CN-AreaWaterQuality 4Time of Concentration CalculationsWaterQuality 3Time-Depth CurveHamilton County 2Master Network Summary Meridian & Main Phase 1, Lot 1Subsection: Master Network SummaryCatchments Summary Peak Flow(ft³/s)Time to Peak(hours)Hydrograph Volume(ac-ft)Return Event(years)ScenarioLabel 1.0612.0000.213100Hamilton County - Synthetic Curve, 100 yrsWaterQuality Node Summary Peak Flow (ft³/s) Time to Peak (hours) Hydrograph Volume (ac-ft) Return Event (years) ScenarioLabel 1.0612.0000.213100 Hamilton County - Synthetic Curve, 100 yrs Out10 Page 2 of 727 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/3/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterWQ Calc 2014-10-03.ppc Meridian & Main Phase 1, Lot 1Storm Event: Hamilton County - NRCS Type II (1.0 in)Label: Hamilton County Return Event: 100 yearsSubsection: Time-Depth CurveTime-Depth Curve: Hamilton County - NRCS Type II (1.0 in) Hamilton County - NRCS Type II (1.0 in) Label hours0.000Start Time hours1.200Increment hours24.000End Time years100Return Event CUMULATIVE RAINFALL (in) Output Time Increment = 1.200 hours Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (hours) 0.10.00.00.00.00.000 0.20.20.10.10.16.000 0.90.90.80.80.612.000 1.01.01.00.90.918.000 (N/A)(N/A)(N/A)(N/A)1.024.000 Page 3 of 727 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/3/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterWQ Calc 2014-10-03.ppc Meridian & Main Phase 1, Lot 1Storm Event: Hamilton County - NRCS Type II (1.0 in)Label: WaterQuality Return Event: 100 yearsSubsection: Time of Concentration CalculationsTime of Concentration ResultsSegment #1: User Defined Tc hours0.117Time of Concentration Time of Concentration (Composite) hours0.117Time of Concentration (Composite) Page 4 of 727 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/3/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterWQ Calc 2014-10-03.ppc Meridian & Main Phase 1, Lot 1Storm Event: Hamilton County - NRCS Type II (1.0 in)Label: WaterQuality Return Event: 100 yearsSubsection: Time of Concentration Calculations==== User DefinedValue entered by userTc =Tc= Time of concentration, hoursWhere: Page 5 of 727 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/3/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterWQ Calc 2014-10-03.ppc Meridian & Main Phase 1, Lot 1Storm Event: Hamilton County - NRCS Type II (1.0 in)Label: WaterQuality Return Event: 100 yearsSubsection: Runoff CN-AreaRunoff Curve Number Data Adjusted CNUC(%)C(%)Area(acres)CNSoil/Surface Description 97.8000.00.03.23097.800WaterQualityCN 97.800(N/A)(N/A)3.230(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 6 of 727 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/3/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterWQ Calc 2014-10-03.ppc Meridian & Main Phase 1, Lot 1Index WaterQuality (Time of Concentration Calculations, 100 years)...4, 5 WaterQuality (Runoff CN-Area, 100 years)...6 W Master Network Summary...2MHamilton County (Time-Depth Curve, 100 years)...3H Page 7 of 727 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/3/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterWQ Calc 2014-10-03.ppc 12 O:\2006\060384\20311\Docs\Engr\Reports\Drainage Report\Report_Drainage_2014-10-03.doc Appendix C Additional Detention Calculations Meridian and Main INDOT RevisionsProject Summary Meridian and Main INDOT RevisionsTitleS. Farny Updated J. Lasch Updated J. OlashukEngineerCripeCompany9/25/2014Date 06038420320 Masterplan Revised for INDOT Revision (and Lot 1) Impacts if no additional storage provided Notes Page 1 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Table of Contents 19Detention Time Hamilton County - NRCS Type II (6.5 in)RevPOND_NO.1 (IN) 18Interconnected Pond Routing Summary Hamilton County - NRCS Type II (6.5 in)RevPOND_NO.1 17Detention Time Hamilton County - NRCS Type II (3.8 in)RevPOND_NO.1 (IN) 16Interconnected Pond Routing Summary Hamilton County - NRCS Type II (3.8 in)RevPOND_NO.1 15Volume Equations 14Elevation-Area Volume Curve 13Volume Equations 12Elevation-Area Volume Curve Hamilton County - NRCS Type II (3.8 in)RevPOND_NO.1 9Time vs. Volume 6Time vs. VolumeHamilton County - NRCS Type II (3.8 in)RevPOND_NO.1 5Runoff CN-AreaOnsite_Pond_1 2Master Network Summary Meridian and Main INDOT RevisionsSubsection: Master Network SummaryCatchments Summary Peak Flow(ft³/s)Time to Peak(hours)Hydrograph Volume(ac-ft)Return Event(years)ScenarioLabel 13.1412.0002.58410Hamilton County - Synthetic Curve, 10 yrsOnsite_Pond_1 23.6112.0004.895100 Hamilton County - Synthetic Curve, 100 yrs Onsite_Pond_1 0.4212.2500.10010 Hamilton County - Synthetic Curve, 10 yrs Offsite Church 0.8512.2000.202100 Hamilton County - Synthetic Curve, 100 yrs Offsite Church 8.4412.0001.68410 Hamilton County - Synthetic Curve, 10 yrs onsite_Pond3 15.0112.0003.148100 Hamilton County - Synthetic Curve, 100 yrs onsite_Pond3 1.6512.0000.34010 Hamilton County - Synthetic Curve, 10 yrs Offsite R/W 2.8812.0000.618100Hamilton County - Synthetic Curve, 100 yrs Offsite R/W 3.5312.0000.70410 Hamilton County - Synthetic Curve, 10 yrs ONSITE_Pond2 6.2712.0001.316100 Hamilton County - Synthetic Curve, 100 yrs ONSITE_Pond2 Node Summary Peak Flow (ft³/s) Time to Peak (hours) Hydrograph Volume (ac-ft) Return Event (years) ScenarioLabel 1.6114.5501.48610Hamilton County - Synthetic Curve, 10 yrs HAMILTON XING 4.7614.4504.344100 Hamilton County - Synthetic Curve, 100 yrs HAMILTON XING Pond Summary Page 2 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsSubsection: Master Network SummaryPond Summary Maximum Pond Storage(ac-ft)Maximum Water Surface Elevation(ft)Peak Flow(ft³/s)Time to Peak(hours)Hydrograph Volume(ac-ft)Return Event(years)ScenarioLabel (N/A)(N/A)16.5412.0003.47210 Hamilton County - Synthetic Curve, 10 yrs RevPOND_N O.1 (IN) 1.903869.831.6114.5501.48610 Hamilton County - Synthetic Curve, 10 yrs RevPOND_NO.1 (OUT) (N/A)(N/A)27.7911.4507.203100 Hamilton County - Synthetic Curve, 100 yrs RevPOND_N O.1 (IN) 3.324871.554.7614.4504.343100 Hamilton County - Synthetic Curve, 100 yrs RevPOND_N O.1 (OUT) (N/A)(N/A)8.4412.0001.68410 Hamilton County - Synthetic Curve, 10 yrs POND_NO.3 (IN) 0.957875.020.8213.4000.41210 Hamilton County - Synthetic Curve, 10 yrs POND_NO.3 (OUT) (N/A)(N/A)15.0112.0003.148100 Hamilton County - Synthetic Curve, 100 yrs POND_NO.3 (IN) 1.845876.631.4613.4501.307100 Hamilton County - Synthetic Curve, 100 yrs POND_NO.3 (OUT) (N/A)(N/A)3.8912.0001.11610 Hamilton County - Synthetic Curve, 10 yrs POND_NO. 2 (IN) 0.427869.861.5212.1000.44910 Hamilton County - Synthetic Curve, 10 yrs POND_NO. 2 (OUT) (N/A)(N/A)7.5112.0002.624100 Hamilton County - Synthetic Curve, 100 yrs POND_NO. 2 (IN) Page 3 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsSubsection: Master Network SummaryPond Summary Maximum Pond Storage(ac-ft)Maximum Water Surface Elevation(ft)Peak Flow(ft³/s)Time to Peak(hours)Hydrograph Volume(ac-ft)Return Event(years)ScenarioLabel 0.976871.581.9511.4001.546100 Hamilton County - Synthetic Curve, 100 yrs POND_NO. 2 (OUT) (N/A)(N/A)-1.6112.000-0.059100 Hamilton County - Synthetic Curve, 100 yrs POND_NO. 2 (Reverse) Page 4 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (3.8 in)Label: Onsite_Pond_1 Return Event: 10 yearsSubsection: Runoff CN-AreaRunoff Curve Number Data Adjusted CNUC(%)C(%)Area(acres)CNSoil/Surface Description 80.0000.00.01.52080.000additional lot 98.0000.00.06.54098.000impervious 80.0000.00.02.80080.000grass 90.840(N/A)(N/A)10.860(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 5 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (3.8 in)Label: RevPOND_NO.1 Return Event: 10 yearsSubsection: Time vs. VolumeTime vs. Volume (ac-ft)Output Time increment = 0.050 hoursTime on left represents time for first value in each row. Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Time(hours) 0.0000.0000.0000.0000.0000.000 0.0000.0000.0000.0000.0000.250 0.0000.0000.0000.0000.0000.500 0.0000.0000.0000.0000.0000.750 0.0000.0000.0000.0000.0001.000 0.0000.0000.0000.0000.0001.250 0.0000.0000.0000.0000.0001.500 0.0000.0000.0000.0000.0001.750 0.0000.0000.0000.0000.0002.000 0.0000.0000.0000.0000.0002.250 0.0000.0000.0000.0000.0002.500 0.0000.0000.0000.0000.0002.750 0.0000.0000.0000.0000.0003.000 0.0000.0000.0000.0000.0003.250 0.0000.0000.0000.0000.0003.500 0.0000.0000.0000.0000.0003.750 0.0000.0000.0000.0000.0004.000 0.0000.0000.0000.0000.0004.250 0.0000.0000.0000.0000.0004.500 0.0000.0000.0000.0000.0004.750 0.0000.0000.0000.0000.0005.000 0.0000.0000.0000.0000.0005.250 0.0000.0000.0000.0000.0005.500 0.0000.0000.0000.0000.0005.750 0.0000.0000.0000.0000.0006.000 0.0000.0000.0000.0000.0006.250 0.0000.0000.0000.0000.0006.500 0.0000.0000.0000.0000.0006.750 0.0000.0000.0000.0000.0007.000 0.0000.0000.0000.0000.0007.250 0.0000.0000.0000.0000.0007.500 0.0000.0000.0000.0000.0007.750 0.0000.0000.0000.0000.0008.000 0.0000.0000.0000.0000.0008.250 0.0030.0020.0010.0010.0008.500 0.0080.0070.0060.0050.0048.750 0.0130.0120.0110.0100.0099.000 0.0200.0180.0170.0160.0149.250 0.0270.0260.0240.0230.0219.500 0.0390.0360.0340.0310.0299.750 Page 6 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (3.8 in)Label: RevPOND_NO.1 Return Event: 10 yearsSubsection: Time vs. VolumeTime vs. Volume (ac-ft)Output Time increment = 0.050 hoursTime on left represents time for first value in each row. Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Time(hours) 0.0520.0500.0470.0440.04210.000 0.0670.0640.0610.0580.05510.250 0.0820.0790.0760.0730.07010.500 0.1310.1060.0940.0890.08510.750 0.3480.2990.2510.2070.16511.000 0.6100.5560.5020.4500.39811.250 0.8950.8360.7780.7210.66511.500 1.1971.1361.0751.0140.95411.750 1.4431.4131.3731.3191.25912.000 1.5381.5211.5041.4851.46612.250 1.6191.6031.5871.5711.55412.500 1.7001.6831.6671.6511.63512.750 1.7791.7641.7481.7321.71613.000 1.8261.8211.8151.8071.79413.250 1.8451.8411.8381.8341.83013.500 1.8641.8611.8571.8531.84913.750 1.8831.8791.8751.8721.86814.000 1.9001.8961.8931.8901.88614.250 1.9011.9021.9031.9031.90214.500 1.8971.8971.8981.8991.90014.750 1.8921.8931.8941.8951.89615.000 1.8871.8881.8891.8901.89115.250 1.8821.8831.8841.8851.88615.500 1.8771.8781.8791.8801.88115.750 1.8711.8721.8731.8741.87616.000 1.8651.8661.8671.8691.87016.250 1.8591.8601.8611.8631.86416.500 1.8511.8531.8551.8561.85816.750 1.8381.8411.8431.8461.84917.000 1.8241.8271.8301.8321.83517.250 1.8101.8131.8161.8191.82117.500 1.7961.7991.8021.8051.80817.750 1.7831.7851.7881.7911.79418.000 1.7691.7711.7741.7771.78018.250 1.7551.7581.7601.7631.76618.500 1.7411.7441.7471.7491.75218.750 1.7271.7301.7331.7361.73819.000 1.7131.7161.7191.7211.72419.250 1.6991.7011.7041.7071.71019.500 1.6841.6871.6901.6931.69619.750 Page 7 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (3.8 in)Label: RevPOND_NO.1 Return Event: 10 yearsSubsection: Time vs. VolumeTime vs. Volume (ac-ft)Output Time increment = 0.050 hoursTime on left represents time for first value in each row. Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Time(hours) 1.6691.6721.6751.6781.68120.000 1.6531.6571.6601.6631.66620.250 1.6381.6411.6441.6471.65020.500 1.6231.6261.6291.6321.63520.750 1.6081.6111.6141.6171.62021.000 1.5931.5961.5991.6021.60521.250 1.5781.5811.5841.5871.59021.500 1.5571.5611.5651.5701.57421.750 1.5351.5391.5431.5481.55222.000 1.5131.5171.5221.5261.53022.250 1.4911.4951.5001.5041.50822.500 1.4691.4741.4781.4821.48722.750 1.4471.4521.4561.4601.46523.000 1.4261.4301.4341.4391.44323.250 1.4041.4081.4131.4171.42123.500 1.3831.3871.3911.3961.40023.750 1.3591.3641.3691.3741.37824.000 1.3301.3361.3421.3471.35324.250 1.3011.3071.3131.3191.32424.500 1.2711.2771.2831.2891.29524.750 1.2431.2481.2541.2601.26625.000 1.2151.2201.2261.2311.23725.250 (N/A)(N/A)1.1981.2041.20925.500 Page 8 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (6.5 in)Label: RevPOND_NO.1 Return Event: 100 yearsSubsection: Time vs. VolumeTime vs. Volume (ac-ft)Output Time increment = 0.050 hoursTime on left represents time for first value in each row. Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Time(hours) 0.0000.0000.0000.0000.0000.000 0.0000.0000.0000.0000.0000.250 0.0000.0000.0000.0000.0000.500 0.0000.0000.0000.0000.0000.750 0.0000.0000.0000.0000.0001.000 0.0000.0000.0000.0000.0001.250 0.0000.0000.0000.0000.0001.500 0.0000.0000.0000.0000.0001.750 0.0000.0000.0000.0000.0002.000 0.0000.0000.0000.0000.0002.250 0.0000.0000.0000.0000.0002.500 0.0000.0000.0000.0000.0002.750 0.0000.0000.0000.0000.0003.000 0.0000.0000.0000.0000.0003.250 0.0000.0000.0000.0000.0003.500 0.0000.0000.0000.0000.0003.750 0.0000.0000.0000.0000.0004.000 0.0000.0000.0000.0000.0004.250 0.0000.0000.0000.0000.0004.500 0.0000.0000.0000.0000.0004.750 0.0000.0000.0000.0000.0005.000 0.0000.0000.0000.0000.0005.250 0.0000.0000.0000.0000.0005.500 0.0020.0010.0010.0010.0015.750 0.0030.0030.0030.0020.0026.000 0.0060.0050.0050.0040.0046.250 0.0090.0080.0080.0070.0076.500 0.0130.0120.0110.0110.0106.750 0.0170.0160.0150.0140.0147.000 0.0260.0230.0210.0190.0187.250 0.0390.0360.0330.0310.0287.500 0.0530.0500.0470.0440.0417.750 0.0680.0650.0620.0590.0568.000 0.0840.0810.0780.0740.0718.250 0.1070.1020.0970.0920.0888.500 0.1340.1290.1230.1180.1128.750 0.1620.1570.1510.1450.1409.000 0.1920.1860.1800.1740.1689.250 0.2230.2160.2100.2040.1989.500 0.2630.2540.2460.2380.2309.750 Page 9 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (6.5 in)Label: RevPOND_NO.1 Return Event: 100 yearsSubsection: Time vs. VolumeTime vs. Volume (ac-ft)Output Time increment = 0.050 hoursTime on left represents time for first value in each row. Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Time(hours) 0.3050.2970.2880.2790.27110.000 0.3490.3400.3320.3230.31410.250 0.3940.3850.3760.3670.35810.500 0.5070.4540.4260.4130.40410.750 0.9500.8510.7560.6650.58011.000 1.4721.3651.2581.1531.05111.250 1.9881.8891.7871.6841.57911.500 2.4542.3642.2722.1792.08511.750 2.7882.7552.7042.6302.54412.000 2.9022.8792.8572.8352.81312.250 3.0162.9942.9712.9482.92512.500 3.1273.1053.0833.0613.03912.750 3.2323.2113.1913.1703.14813.000 3.2853.2823.2773.2683.25213.250 3.2953.2933.2913.2893.28713.500 3.3063.3043.3023.3003.29813.750 3.3163.3143.3123.3103.30814.000 3.3243.3233.3213.3193.31714.250 3.3063.3123.3173.3213.32414.500 3.2783.2843.2893.2953.30114.750 3.2513.2563.2623.2673.27315.000 3.2243.2293.2353.2403.24615.250 3.1983.2033.2093.2143.21915.500 3.1723.1783.1833.1883.19315.750 3.1473.1523.1573.1623.16716.000 3.1233.1283.1333.1373.14216.250 3.0983.1033.1083.1133.11816.500 3.0723.0783.0843.0893.09416.750 3.0373.0443.0513.0583.06517.000 3.0023.0093.0163.0233.03017.250 2.9672.9742.9812.9882.99517.500 2.9332.9402.9472.9532.96017.750 2.8992.9062.9122.9192.92618.000 2.8652.8722.8782.8852.89218.250 2.8322.8382.8452.8522.85818.500 2.7992.8052.8122.8182.82518.750 2.7682.7742.7802.7872.79319.000 2.7382.7442.7502.7562.76219.250 2.7082.7142.7202.7262.73219.500 2.6792.6852.6912.6972.70219.750 Page 10 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (6.5 in)Label: RevPOND_NO.1 Return Event: 100 yearsSubsection: Time vs. VolumeTime vs. Volume (ac-ft)Output Time increment = 0.050 hoursTime on left represents time for first value in each row. Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Volume(ac-ft)Time(hours) 2.6502.6562.6622.6672.67320.000 2.6212.6272.6332.6392.64420.250 2.5932.5992.6052.6102.61620.500 2.5662.5712.5772.5822.58820.750 2.5382.5442.5492.5552.56021.000 2.5122.5172.5222.5282.53321.250 2.4842.4902.4962.5012.50621.500 2.4482.4552.4632.4712.47821.750 2.4102.4182.4252.4332.44022.000 2.3742.3812.3882.3952.40322.250 2.3412.3472.3542.3602.36722.500 2.3092.3152.3222.3282.33422.750 2.2792.2852.2912.2972.30323.000 2.2502.2562.2612.2672.27323.250 2.2222.2272.2332.2382.24423.500 2.1942.2002.2052.2102.21623.750 2.1642.1712.1782.1832.18924.000 2.1272.1342.1412.1492.15624.250 2.0902.0982.1052.1122.11924.500 2.0552.0622.0692.0762.08324.750 2.0202.0272.0342.0412.04825.000 1.9851.9921.9992.0072.01325.250 (N/A)(N/A)1.9641.9711.97825.500 Page 11 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (3.8 in)Label: RevPOND_NO.1 Return Event: 10 yearsSubsection: Elevation-Area Volume Curve Volume (Total)(ac-ft)Volume(ac-ft)A1+A2+sqr(A1*A2)(acres)Area(acres)Planimeter(ft²)Elevation(ft)0.0000.0000.0000.0000.0866.00 0.0630.0630.3800.3800.0866.50 0.2630.2001.1980.4190.0867.00 0.5000.2371.3660.4930.0867.52 0.7460.2461.5370.5330.0868.00 1.3260.5811.7420.6300.0869.00 2.0190.6922.0760.7560.0870.00 2.8260.8072.4210.8600.0871.00 3.1790.3532.6500.9080.0871.40 3.7600.5812.9041.0300.0872.00 4.8241.0653.1941.1000.0873.00 Page 12 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (3.8 in)Label: RevPOND_NO.1 Return Event: 10 yearsSubsection: Volume Equations Pond Volume Equations* Incremental volume computed by the Conic Method for Reservoir Volumes.Volume = (1/3) * (EL2 - El1) * (Area1 + Area2 + sqr(Area1 * Area2)) Lower and upper elevations of the incrementwhere: EL1, EL2 Areas computed for EL1, EL2, respectivelyArea1, Area2 Incremental volume between EL1 and EL2Volume Page 13 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (3.8 in)Label: RevPOND_NO.1 Return Event: 100 yearsSubsection: Elevation-Area Volume Curve Volume (Total)(ac-ft)Volume(ac-ft)A1+A2+sqr(A1*A2)(acres)Area(acres)Planimeter(ft²)Elevation(ft)0.0000.0000.0000.0000.0866.00 0.0630.0630.3800.3800.0866.50 0.2630.2001.1980.4190.0867.00 0.5000.2371.3660.4930.0867.52 0.7460.2461.5370.5330.0868.00 1.3260.5811.7420.6300.0869.00 2.0190.6922.0760.7560.0870.00 2.8260.8072.4210.8600.0871.00 3.1790.3532.6500.9080.0871.40 3.7600.5812.9041.0300.0872.00 4.8241.0653.1941.1000.0873.00 Page 14 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (3.8 in)Label: RevPOND_NO.1 Return Event: 100 yearsSubsection: Volume Equations Pond Volume Equations* Incremental volume computed by the Conic Method for Reservoir Volumes.Volume = (1/3) * (EL2 - El1) * (Area1 + Area2 + sqr(Area1 * Area2)) Lower and upper elevations of the incrementwhere: EL1, EL2 Areas computed for EL1, EL2, respectivelyArea1, Area2 Incremental volume between EL1 and EL2Volume Page 15 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (3.8 in)Label: RevPOND_NO.1 Return Event: 10 yearsSubsection: Interconnected Pond Routing SummaryInfiltrationConstantInfiltration Method (Computed) ft³/s0.50Infiltration Rate (Constant) Initial Conditions Calculation Tolerances ft866.00Elevation (Starting Water Surface Computed) ft³/s0.000Flow Tolerance (Minimum) ac-ft0.000Volume (Starting)35Maximum Iterations ft³/s0.50Infiltration (Starting ICPM)hours0.050ICPM Time Step ft³/s0.00Outflow (Starting)hours0.050Output Increment 1.903869.8314.550 Volume (ac-ft) Elevation (ft) Time to Peak (hours) Maximum Storage 0.000.000 0.000.000 0.000.000 Flow (Peak) (ft³/s) Time to Peak (hours) Reverse Flow Peaks 1.6114.550Pond Outflow... 0.000.000Infiltration... 16.5412.000Pond Inflow.... Flow (Peak) (ft³/s) Time to Peak (hours) Forward Flow Peaks Forward1.486 Forward0.942 Reverse0.000 DirectionVolume(ac-ft) Total Volume Out Reverse0.000Pond Outflow... Reverse0.000Infiltration... Forward3.472Pond Inflow.... DirectionVolume(ac-ft) Total Volume In Mass Balance (ac-ft) ac-ft0.000Volume (Initial ICPM) ac-ft3.472Volume (Total In ICPM) ac-ft2.428Volume (Total Out ICPM) ac-ft1.198Volume (Ending) ft868.78Elevation (Ending) ac-ft-0.155Difference %4.5Percent of Inflow Volume (Interconnected Pond Mass Balance) Page 16 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (3.8 in)Label: RevPOND_NO.1 (IN)Return Event: 10 yearsSubsection: Detention TimeInfiltration ConstantInfiltration Method (Computed) ft³/s0.50Infiltration Rate (Constant) Approximate Detention Times hours14.550 Time to Peak (Outflow + Infiltration, Peak to Peak Detention Time) hours12.000Time to Peak (Inflow, Peak to Peak Detention Time) hours2.550Detention Time (Peak to Peak) hours16.677Time to Centroid (Outflow) hours13.570Time to Centroid (Inflow) hours3.107Detention Time (Centroid to Centroid) hours6.354Weighted Average Plug Time hours6.892Maximum Plug Volume Plug Time ac-ft0.068Maximum Inflow Plug Volume hours11.950Time (Maximum Plug Volume, Start) hours12.000Time (Maximum Plug Volume, End) Page 17 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (6.5 in)Label: RevPOND_NO.1 Return Event: 100 yearsSubsection: Interconnected Pond Routing SummaryInfiltrationConstantInfiltration Method (Computed) ft³/s0.50Infiltration Rate (Constant) Initial Conditions Calculation Tolerances ft866.00Elevation (Starting Water Surface Computed) ft³/s0.000Flow Tolerance (Minimum) ac-ft0.000Volume (Starting)35Maximum Iterations ft³/s0.50Infiltration (Starting ICPM)hours0.050ICPM Time Step ft³/s0.00Outflow (Starting)hours0.050Output Increment 3.324871.5514.450 Volume (ac-ft) Elevation (ft) Time to Peak (hours) Maximum Storage 0.000.000 0.000.000 0.000.000 Flow (Peak) (ft³/s) Time to Peak (hours) Reverse Flow Peaks 4.7614.450Pond Outflow... 0.000.000Infiltration... 27.7911.450Pond Inflow.... Flow (Peak) (ft³/s) Time to Peak (hours) Forward Flow Peaks Forward4.343 Forward0.986 Reverse0.000 DirectionVolume(ac-ft) Total Volume Out Reverse0.000Pond Outflow... Reverse0.000Infiltration... Forward7.203Pond Inflow.... DirectionVolume(ac-ft) Total Volume In Mass Balance (ac-ft) ac-ft0.000Volume (Initial ICPM) ac-ft7.203Volume (Total In ICPM) ac-ft5.329Volume (Total Out ICPM) ac-ft1.964Volume (Ending) ft869.92Elevation (Ending) ac-ft-0.090Difference %1.3Percent of Inflow Volume (Interconnected Pond Mass Balance) Page 18 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsStorm Event: Hamilton County - NRCS Type II (6.5 in)Label: RevPOND_NO.1 (IN)Return Event: 100 yearsSubsection: Detention TimeInfiltration ConstantInfiltration Method (Computed) ft³/s0.50Infiltration Rate (Constant) Approximate Detention Times hours14.450 Time to Peak (Outflow + Infiltration, Peak to Peak Detention Time) hours11.450Time to Peak (Inflow, Peak to Peak Detention Time) hours3.000Detention Time (Peak to Peak) hours17.025Time to Centroid (Outflow) hours14.014Time to Centroid (Inflow) hours3.010Detention Time (Centroid to Centroid) hours5.405Weighted Average Plug Time hours3.578Maximum Plug Volume Plug Time ac-ft0.114Maximum Inflow Plug Volume hours11.400Time (Maximum Plug Volume, Start) hours11.450Time (Maximum Plug Volume, End) Page 19 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc Meridian and Main INDOT RevisionsIndex RevPOND_NO.1 (Volume Equations, 100 years)...15 RevPOND_NO.1 (Volume Equations, 10 years)...13 RevPOND_NO.1 (Time vs. Volume, 100 years)...9, 10, 11 RevPOND_NO.1 (Time vs. Volume, 10 years)...6, 7, 8 RevPOND_NO.1 (Interconnected Pond Routing Summary, 100 years)...18 RevPOND_NO.1 (Interconnected Pond Routing Summary, 10 years)...16 RevPOND_NO.1 (IN) (Detention Time, 100 years)...19 RevPOND_NO.1 (IN) (Detention Time, 10 years)...17 RevPOND_NO.1 (Elevation-Area Volume Curve, 100 years)...14 RevPOND_NO.1 (Elevation-Area Volume Curve, 10 years)...12 R Onsite_Pond_1 (Runoff CN-Area, 10 years)...5OMaster Network Summary...2, 3, 4M Page 20 of 2027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/4/2014 Bentley PondPack V8i [08.11.01.51] Bentley Systems, Inc. Haestad Methods Solution CenterMaster Plan Analysis 2014-09-25.ppc 13 O:\2006\060384\20311\Docs\Engr\Reports\Drainage Report\Report_Drainage_2014-10-03.doc Appendix D Drainage Design Report for Meridian and Main Phase 1, Lot 2 Revisions