My WebLink
About
Morphey Construction/Eng/CO1/2,126.90/Small Structure Replacement – Culvert 86
The following original items were increased/ decreased slightly and the following new items were added to the total contract. The reason for these changes were due to modifications required for permitting by the Indiana Department of Environmental Management (IDEM) due to legal parcel descriptions/ recordings with respect to living water easements. CITY OF CARMEL a TO: Mr. Steve Morphey CONTRACT CHANGE ORDER NO.: 01 Morphey Construction DATE: 3/22/2016 H OR (-) DAYS 1499 N. Sherman Dr. PROJECT NAME: Small Str. Replacement – Culvert #86 Indianapolis, IN. 46201 CITY REQ. NO.: Zero (0) Days 22 CITY PO NO.: 33414 -27.0 Sys. -$2,565.00 CITY PO DATE: 1/6/2016 23 I: You are directed to make the following changes in this Contract: -5.0 SYS. The following original items were increased/ decreased slightly and the following new items were added to the total contract. The reason for these changes were due to modifications required for permitting by the Indiana Department of Environmental Management (IDEM) due to legal parcel descriptions/ recordings with respect to living water easements. II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other:- Change order due to permitting modifications requested by IDEM. The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 485 358.00 Contract.Price will be increased/decreased by this Change Order $ —2,126.90 New Contract Price including this Change Order $ 487 484.90 Contract Time Prior to this Change Order 135 Das Completion Date Net increased/decreased resulting from this Change'Order 0 DUs Current Contract Time including this Change Order 135 Days Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. SCHEDULED ADJUSTMENT ITEM AMOUNT H OR (-) DAYS 06 Temporary Filter Sock 38.0 LFT. $247.00 Zero (0) Days 22 Revetment Riprap, Partially Grouted -27.0 Sys. -$2,565.00 Zero (0) Days 23 Geotextiles -5.0 SYS. -$25.00 Zero (0) Days 25 Mulched Seeding, U 26.0 SYS. $260.00 Zero (0) Days 27 Erosion Control Blankets 26.0 SYS. $52.00 Zero (0) Days 47 Mulched, Native Seeding 50.0 SYS. $1,205.00 Zero (0) Days 48 Revetment Riprap 17.0 TON $2118.00 Zero (0) Days 49 Permanent Turf Reinforcement Mat 23.0 SYS. $834.90 Zero (0) Days II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other:- Change order due to permitting modifications requested by IDEM. The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 485 358.00 Contract.Price will be increased/decreased by this Change Order $ —2,126.90 New Contract Price including this Change Order $ 487 484.90 Contract Time Prior to this Change Order 135 Das Completion Date Net increased/decreased resulting from this Change'Order 0 DUs Current Contract Time including this Change Order 135 Days Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended HWC Engineering ENGINEER 151 N. Delaware Ste. 800 Address Indianapolis, IN. 46204 City/State/Zip B Y• Phone: 311.1 SC •-tov (o j The Above Changes Are Accepted: Morphey Construction CONTRACTOR 1499 N. Sherman Dr. Address Indianapolis, IN. 46210 City/State/Zip By: C Phone: 3c a - 3 C,- 72-5 Approved: Mary Lori WatsoA Member Jpfm3y 4shman, City, Christina S. Pau dy, Clerk - .3 �, � N / r / � Treasurer Date: Date: _ Date: S Nlorphey Construction, Inc. 1.499 N. Sherman Dr. Indianapolis, IN 46201 May 3, 2016 Dave Lancet Project Supervisor HWC Engineering 151 N. Delaware, Suite 800 Indianapolis, IN 46204 RE: Carmel Culverts Change Order #1 Rip Rap Dear Mr. Lancet: Attached find our backup for Riprap pricing. EWA RipRap (17 TN) 1 LS $2118.Oo Let us know if you have any questions or need any additional information we can be reached at 317- 356-9250. Thanks in advance for considering our request. Sincerely, Steven P. Milbourne, Project Manager MORPHEY CONSTRUCTION JobNanae: Carmel Culverts ©ate: MORPHEY CONSTRUCTION Labor $ 533.20 Equipment s 820.00 OH&P @ 20% $ 106.64 OH&P @ 12% $ 110.40 Total Labor $ 639.84 Total Equipment $ 1,030.40 Material $ 400.00 Subs $ - OH&P @ 12% $ 48.00 10% @ 3000 $ To tat Material $ 448.00 7% @ 110.00 $ Total Subs $ - Grand Total 2,118.24 UNIT PRICE Morphey Construction, Inc. 1499 N. Sherman Dr. Indianapolis, IN 462O1 April 27, 2016 Dave Lancet Project Supervisor HWC Engineering 151 N. Delaware, Suite 800 Indianapolis, IN 46204 RE: Carmel Culverts Change Order #1 Dear Mr. Lancet: Attached find our backup for CO #1. #47 Mulched Native Seeding 5o SY $24.10/SY #49 Perm. Turf Reinforcement Mat 23 SY . $36.30/SY Let us know if you have any questions or need any additional information we can be reached at 317- 356-9250. Thanks in advance for considering our request. Sincerely, Steven P. Mil ourne, Project Manager WIudebush Grading, Inc 155 Harger Court. Noblesville, IN 46060 Phone: 317-770-9970 • Fax: 317-770-6636- Proposal 17-770-6636 Proposal Submitted To: Job Name Carmel Small Structures 86 & 102 C.O. 1 Morphey Construction Location Carmel Phone Date 4127116 Fax Revisions Attention Steve Milbourne Estimated By: GreggLecher 317-710-8777 Line Item Description Quantity Unit Unit Price Total 47 Mulched, Illative Seeding 50 SYS $ 13.00 $ 650.00 49 Permanent Turf Reinforcement Mat 23 SYS $ 33.00 $ 769.00 $ - $ - $ - IV I HL p r ,f+UtF. V V special l;onaluons 1 Seed and sad prices exclude finish grading, sod notching, debris removal, and soil preparation. 2 Topsoil and topsoil placement has been excluded from this proposal. 3 Erosion control reporting, maintenance, and removal has been excluded from proposal. 4 Proposal based on work being performed within a standard Monday through Friday work week. 5 Lawn maintenance including watering, mowing, spraying, and post fertilization has been excluded from this proposal. 6 Soil testing, organic, and inorganic soil amendments have been excluded from this proposal. 7 Proposal Includes 1 mobilization. 8 Traffic Control has been excluded from this proposal. 9 Quantities are based on the itemized proposal. Invoicing shall be based on actual installed quantities at the unit.price shown. 10 Proposal excludes all banding. 11 Proposal is bid as a complete package. Pricing is subject to change if line items are deleted from this proposal. Acceptance Of Proposal The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. This proposal may be withdrawn if not accepted within 30 days. Authorized Agent Signature and Printed Name Date JobName: Task: MORPHEY CONSTRUCTION Carmel Culverts Mutched Native Seedina $ 162.50 CODE TYPE CODE DESCRIPTION RATE HOURS REG O.T. OT Rate TOTAL Tatar Labor$ $ 650.00 10% @ 3000 $ 65.00 PC 438 Excavator 550.00 - Total subs Sln le Axle 440.00 - Laborer 35.58 2.00 53.37 2.00 71.16 Operator 45.36 2.00 72.54 2.00 96.72 Foreman 49.36 2.00 74.04 2.00 98.72 Total Equipment - 452.50 Total Labor 6 0 6.001 266.60 Carmel Culverts Mutched Native Seedina MITIr: "® • Date. MORPHEY CONSTRUCTION Labor $ 266.60 OH&P @ 20% $ 53.32 Tota/Labor $ 319.92 Material $ _ OH&P @ 12% S - TOW Material $ - Grand To tat UNIT PIRICE Equipment $ 162.50 CODE TYPE DAY RATE + DAY Hours Total S $ 170.80 Subs $ 650.00 10% @ 3000 $ 65.00 PC 438 Excavator 550.00 - Total subs Sln le Axle 440.00 - Tdaxle 680.00 - - Skid Steer 450.00 0.25 - 112.50 Pickup 160.00 025 .40.00 Total Equipment - 452.50 MITIr: "® • Date. MORPHEY CONSTRUCTION Labor $ 266.60 OH&P @ 20% $ 53.32 Tota/Labor $ 319.92 Material $ _ OH&P @ 12% S - TOW Material $ - Grand To tat UNIT PIRICE Equipment $ 162.50 OH&P @ 12% S i8.30 Total Equipment $ 170.80 Subs $ 650.00 10% @ 3000 $ 65.00 7%@110.00 $ - Total subs $ 715.00 1,205.72 - ,�t�s FORCE ACCOUNT WORK Job #: Carmel Small Structures 86 & 102 CUSTOMER NO.: Morphey Construction Markup will be added per INDOT or CONTRACT specifications for Force Account Work DATE: 04/27/16 DESCRIPTION/SCOPE OF WORK: Permanent Turf Reinforcement Mat ADDRESS/LOCATION Carmel JOB NO.: DATE EFFECTIVE: EQUIPMENT(OPERATORNOTINCLUDED) EQUIPMENT (OPERATOR NOT INCLUDED) DESCRIPTION EQUIP # RATE HOURS LABOR TOTAL ($) STRAIGHT TIME TIME +112 - -- -_ --------------------- DBL. TIME --- ---.-.-...- RATE HR RATE HR RATE HR TOTAL ($) Truck with Gooseneck Trailer $34.35 2.00 $68.70 LABORER $41.52 4 $52.83 $166.08 Tractor with Attachment $65.15 2.00 $130.30 LABORER $41.52 $52.83 $0.00 Straw Blower $125.50 $0.00 LABORER $41.52 52.83 $0.00 H droseeder $115.00 $0.00 FOREMAN $51.05 2 $64.85 $102.10 Skid Steer $70.62 $0.00 SUPERINTENDENT $55.25 $0.00 Bush Hog Rental $95.00 $0.00 $0.00 Aerator Rental $10.63 $0.00 $0.00 $o.00 LABOR COST TOTAL $268.18 $o.00 MATERIALS & SUPPLIES QUANTITY UNIT PRICE ($) TOTAL (S) $0.00 Turf Reinforcement Mat C350 1 ROLL $ 152.00 $152.00 $0.00 Geo ins 1 BOX $ 40.00 $40.00 $0.00 $0.00 $0.00 1 $0.00 $0.00 $0.00 $0.00 $0.00 $o.00 MATERIAL COST TOTAL $192.00 $0.00 TRUCKING CO. RATE Hours TOTAL ($) REGULAR HOURS $0.00 $0.00 OVERTIME HOURS $0.00 $0.00 $o.00 TRUCKING COST TOTAL $0.00 $o.00 SUBCONTRACTOR TOTAL ($) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $o.00 SUBCONTRACTOR COST TOTAL $0.00 $0.00 CATEGORY COST TOTALS MARKUP TOTALS $0.00 EQUIPMENT WITH MARKUP 12% $199.00 $23.88 $222.88 $0.00 LABOR WITH MARKUP 20% $268.18 $53.64 $321.82 $0.00 1 MATERIAL WITH MARKUP 12% $192.00 1 $23.04 $215.04 $0.00 TRUCKING WITH MARKUP (12%) $0.00 $0.00 1 $0.00 EQUIPMENT COST TOTAL $199.00 SUBCONTRACTOR WITH MARKUP (10% FIRST $3000,7% AFTER $3000) 1 $0.00 Owners Authorized Representative TOTAL $759.74 By: By: 10% Sub Printed: Printed: Title: Title: Revision C:2 (05/0412010) W t;p.p I SUGGESTED PUMP AROUND PLAN J11 UA11UN rLr�AN Scale: I _ 10 —0 - ---- SECTION A—A Scale: 1' _ 5'-0' H WC INDIANAPOLIS IAFAYERE-SCOTTSBURG e y ry .y � I+a ' 1150029 W mouucuom mfl MP—. "' 1° CITY OF CARMEL HAMILTON COUNTY N0°soMi� ° B°0 VEflT"� °f51NA10N wf n BOOK sn¢rs ENGINEERINGhWOe^�^°°^^&°°^ �' �r� dam` EROSION CONTROL ;6 �H4L� p�pRp; �E�yEp RALSTON AVENUE OVER CULVERT 86 �"� PaNEGT is-oc