HomeMy WebLinkAbout259717 06/14/16 �,A,,�. CITY OF CARMEL, INDIANA VENDOR: 00351256
ONE CIVIC SQUARE UNITED CONSULTING CHECK AMOUNT: $'.*`16,641.31'
9� ?�; CARMEL, INDIANA 46032 1625 N POST ROAD CHECK NUMBER: 259717
M�,roN.�, INDIANAPOLIS IN 46219 CHECK DATE: 06/14/16
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
2200 R4340100 25837 11408-26A 1,800.00 ILLINOIS ST EXTENSION
2200 R4340100 25837 11408-31B 10,203.80 ILLINOIS ST EXTENSION
202 R4350900 25302 13319-22 463.75 LPA CONTRACT-111TH &
9.00 R4462864 25302 13319-22 4,173.76 LPA CONTRACT-111TH &
VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201(Rev.1995)
UNITED CONSULTING ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
1625 N POST ROAD IN SUM OF$ CITY OF CARMEL
An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
INDIANAPOLIS, IN 46219 rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
$12,003.80 Payee
ON ACCOUNT OF APPROPRIATION FOR Purchase Order#
Enaineerina
Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
25837 11408-31 b 43-401.00 $10,203.80 1 hereby certify that the attached invoice(s),or 2/12/16 11408-31 b 2011 Illinois Street-Brookshire $10,203.80
2200 Encumbered 201 2200 201
25837 11408-26a 43-401.00 $1,800.00 bill(s)is(are)true and correct and that the 4/6/16 11408-26a 2011 Illinois Street-Brookshire $1,800.00
2200 E,rcrrrabered 201 materials or services itemized thereon for 2200 1 201
which charge is made were ordered and
received except
Tuesday, May 31,2016
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
,20
Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
1625,North Post Road.
ITED Indlahapalis, IN. 46219s
Bus. 317 '85:2585. p' d 2 83�
GOTISUI mg-= Fax (317):89.5-2596
2200— R L43 Li 01
Carmel,City of Invoice number 11408-31b
Jeremy Kashman, P.E. Date 02/12/2016
One Civic Square
Carmel, IN 46032 Project 11-408 2011 Illinois Street
For Professional Services rendered after October 30,2015 through January 31,2016
Project#10-10
City Contract#060210.02
Amendment#6, PO#26550, Not to Exceed$ 89,400
Contract Percent Prior Total Current
Description Amount Complete Billed Billed Billed
Brookshire Field Survey 17,750.00 100.00 17,750.00 17,750.00 0.00
IDEM Rule 5 Permit 3,600.00 100.00 3,600.00 3,600.00 0.00
IDNR Construction in a Floodway 3,600.00 100.00 3,600.00 3,600.00 0.00
Brookshire Mitigation Site Services 17,500.00 100.00 17,500.00 17,500.00 0.00
Brookshire Mitigation Site Monitoring 18,700.00 0.00 0.00 0.00 0.00
Brookshire Mitigation Design&Plans 36,103.80 100.00 25,900.00 36,103.80 10,203.80
Brookshire Bidding Services 5,100.00 100.00 5,100.00 5,100.00 0.00
Total 102,353.80 81.73 73,450.00 83,653.80 10,203.80
Invoice total 10,203.80
Aging Summary
Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120
11408-31b 02/12/2016 10,203.80 10,203.80
Total 10,203.80 10,203.80 0.00 0.00 0.00 0.00
Approved by:
Christopher L.Hammond
Manager Transportation Department
Carmel,City of Invoice number 11408-31b
Page 1
.. �
1625 North Post Road
'"=
Indianapolis, IN 46219UNITED
Bus. (317)895-2585 ~ NIEL
-------'�
| Fax (317)895-2596
|
� o _
��o0 -������0>o��
�anne|. Cdyof Invoice number 11408'28o
Jeremy Kaohman. P.E. Date 0406/2018
One Civic Square
Conno|. IN 46032 po400t 11'408 2011 Illinois Street
For Professional Services rendered after January 31,2016 through March 31,2016
Project#1U'1O
City Cnntract#OOO21U.O2 -
Amandmon #2. PO# .Not hoExceed$13O.10O
Amendment#3. PD#25828. Not toExceed$393.85O
Amendment#4. PO#25837. Not toExceed$25O.OUU
Contract Percent Prior Total Current
Description Amount Complete Billed Billed Bi/| d
Field Survey 74.000.00 100.00 74.000.00 74.000.00 0.00
Geotechnical Investigation 12.09620 100.00 12.996.20 12.99620 0.00
US Waters Report 7.000.00 100.00 7.000.00 7.000.00 0.00
Regulatory Permits 31.280.00 100.00 31.260.00 31.280.00 0.00
Asbestos Inspection ` 0.00 0.00 0.00 0.00 0.00
Williams Creek Bridge,Wall&Rail Design and 55.000.00 100.00 55.000.00 55.000.00 0.00
Plans
Retaining Wall Design and Plans 12.000D0 100.00 12.000.00 12.000.00 0.00
Traffic Capacity and Operations Analysis 8.000.00 100.00 0.000.00 0.000.00 0.00
Lighting Design and Plans 20.000.00 100.00 20.000.00 20.000.00 0.00
Detention Pond Design and Plans 2.840.00 100.00 2.840.00 2.840.00 0.00
Utility Coordination 55.000.00 100.00 85.000.00 35.000.00 0.00
Road Design and Plans 448.200.00 100.00 449.200.00 449.200.00 0.00
Title Search 10.000.00 100.00 10.600.00 10.600.00 0.00
Right-of-Way Engineering 42.500.00 100.00 40.700.00 42.500.00 1.800D0
Bidding Services(Clearing Contract) 8.800.00 100.00 8.000.00 8.800.00 ODO
Right-of-Way Staking 900000 10000 000000 SOUOOU 000
Total 775.99620 99.09 774.196.20 775.888.20 1.800.00
Invoice total 1.800.00
Aging Summary
Invoice Number Invoice Date Outstanding Current Over3O Over 00 Over 90 Over 120
11408-20o 04002016 1.800.00 1.800.00
Total 1.800.00 1.800.00 0.00 0.00 0.00 0.00
Carmel,City m Invoice number 11*ox'ueo
Page of
VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201(Rev.1995)
UNITED CONSULTING ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
1625 N POST ROAD IN SUM OF$ CITY OF CARMEL
An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
INDIANAPOLIS, IN 46219 rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
$4,637.51 Payee
ON ACCOUNT OF APPROPRIATION FOR Purchase Order#
Engineering Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
25302 13319-22 44-628.64 $4,173.76 1 hereby certify that the attached invoice(s),or 5/3/16 13319-22 111th and Penn RAB $4,173.76
2200 Encumbered 900 2200 900
25302 13319-22 43-509.00 $463.75 bill(s)is(are)true and correct and that the 5/3/16 13319-22 111th and Penn RAB $463.75
2200 E,rc,usbered 202 materials or services itemized thereon for 2200 1 202
which charge is made were ordered and
received except
Thursday,June 09,2016
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
,20
Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
�c1, 2s3 02
4,1-4 b C) oo-a41-+V-28by-
1625 North Post Road
UNITEIndianapolis, 46219
_ Bus. (317)895-5-2585 `I co 3. �- 5 20 2 - R435O900
Consultinb Fax (317)895-2596
Carmel, City of Invoice number 13319-22
Jeremy Kashman, P.E. Date 05/03/2016
One Civic Square
Carmel, IN 46032 Project 13-319 City of Carmel - 111th and
Pennsylvania Intersecton Improvements
For Professional Services rendered after March 31,2016 through April 29, 2016
LPA
Project Name: 111th and Pennsylvania Intersection Improvements-Carmel
Contract No.:R-35550
Des No.: 1297165
Original Agreement Not to Exceed, Dated 07/31/2013=$182,000.00
Invoice Summary
Contract Total Current
Description Amount Billed Billed
Inspection 182,000.00 154,373.99 4,637.51
Total 182,000.00 154,373.99 4,637.51
Inspection
Professional Fees
Billed
Hours Rate Amount
Department Manager
Brian N. Miller
Project Time 0.50 193.42 96.71
Construction Manager 1
Christopher J. Miller
Project Time 40.00 113.52 4,540.80
Invoice total 4,637.51
Aging Summary
Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120
13319-21 04/05/2016 6,378.71 6,378.71
13319-22 05/03/2016 4,637.51 4,637.51
Total 11,016.22 11,016.22 0.00 �y-00 0.00 0.00
r
-1P
31
t a
/,
G �b
Sn ro�
—c.
Carmel,City of Invoice number 13319-22
Pagel of 2
r
Carmel,City of Invoice number 13319-22
Project 13-319 City of Carmel - 111th and Pennsylvania Intersecton Improvements Date 05/03/2016
Approved by:
Brian N. Miller
Manager Const. Engineering Dept
Carmel,City of Invoice number 13319-22
Page 2 of 2
Timesheet
United Consulting
Employee status to print:Active
er Limit report by:No limit
-FlInvoice Number: 13319-22
Consulting
Tuesday,May 03,2016
Page 1 of 14
i
Brian N.Miller Employee Status:Active i
Timesheet date:4/15/2016 Total hours:40.00
., Target per billable 0.00% Timesheet percent billable.20.0%
!
146th Street from Ditch Road to
M-
1
Springmill Road Department
114-310 Inspection Project Time - Manager _i_ 0.50! _._ _.. _ _..,. 0.501
]-C1&-'-'C-'o"-u--nt-yB"
ridg-e-2-2-1--1 n--s-p-e-c't-io-
221Inspection j Department
i ! i
15-321 {Inspection ,Project Time Manager 1.001 I 1.00
City of Carmel - 111th and
Pennsylvania Intersecton
Improvements Department )
13-319 ,Inspection Project Time )Manager j i 0.50i j j 0.50
! i River Ridge Gateway Phase 1A and + C II I { I I
11B 1 Construction Inspection
(Services i DDepartment155
` I - t-320 Phase 1 B-GatewayLake and Dam Pro',ect_Tim_eManager
_ _ __ _ _f - - _ 0.501 0.50
_ �_ __a -__ _- .y
City of Columbus Indiana Avenue from ! ( - I i t I
State Street to Marr Road ! Department I ! !
_
�14-322 Inspection )Project Time ,Manager 0.501_ 0.50;
._...__ _.______.__-_..--- ___.__..___-__._ __.____._---•
River Ridge Gateway Phase 1A and (Construction Inspection Services ! I
1B Phase 1A-(Tra_nsportation Corridor Department
Project Time Manager Segment B1 I , 0.501) (i 0.50!;_ I I
-
City of Logansport 18th and Main
Street Intersection Department i
16-301 Inspection Project Time Manager { 1 00I I i I 1.00
15-317-02 INDOT-US 31 IR-30201,
{�IR 35563,IR-35600,&IR-35602
INDOT-US 31 IR-30201,IR 35563, 1 Inspection DES 1296427 I j
IR-35600,and IR-35602 , Inspection DES 1296427 Department I�
1,5.317__.. __.. _ - ----
Grant
1ProjectTime Manager _ ` 0.50 I ; ! I 0.50
Grant County County Road 600 East Project Time ^--^ Department
-- _ . 0.50(( ! ^{ - - - -0.501
14-313 (Inspection oject g �^ _ _I I 3 1
City of Hammond Northcote Avenue
Lighting Department J
15-319 Periodic InspectionManager Project Time I j� 1.0 0
_0 j 1.0 f
i �_ _.
161st and Oakridge Roundabout Inspection Department { i
15-306 Inspection 'Project Time `— Manager ---___ 0 5.0 1 0,50
Wabash County Bridge: Department
14-221 Construction Inspection(Part-Time) Project Time }Manager 0.50
Timesheet
United Consulting
' ` Employee status to print:Active
l� NITED
7 Limit report by:No limit
COT1Sll1t117,g1
-= Invoice Number: 13319-22
Tuesday,May 03,2016
Page 2 of 14
jBrian N.Miller Employee Status:Active
Timesheet date:4/15/2016 Total hours:40,00
l_ Target percent billable 0.00% Timesheet percent billable 20.0% j
�. . .
INDOT State Road 67 Bridge
Rehabilitation Department i
J 15-314Inspection Project Time Manager 0.50 i ! I i 0.50
Direct Total 1 0.00 0.001 8001 0.001 0.00' 0 001 0.001 8.00
_- �_-__ )_. _ .
Leave L -- -- —._ __. _-_ ._ _ .. I --- ---- -- __5.00'' 9.00 9.001 5 00-j
Timesheet
fUnited Consulting
1
l Employee status to print:Active
( NITE■� '� Limit report by:No limit
Invoice Number:13319-22
Consulting==
Tuesday,
onsulting=-
Tuesday,May 03,2016
Page 3 of 14
I
Brian N.Miller Employee Status:Active i
i*Notes
Brian N.Miller,. Timesheet date:4/15/2016
16-301 City of Logansport 18th and Main Street Intersection
Inspection
Project Time/Department Manager
---------_-_.
4/11/2016 1.00 Regular Employee Note:!meeting minutes and invoice
Overhead
Pre-Contract
( 4/1 2&0.;6( 4.00 Regular Employee Note: Hancock 91 Draft CE agreement
Leave
.-_-__.._,_-___._._._____ .__......_.�._.._.__---.__.r__-_.__-_._.--______..___.________.____._-__
4/13/2016 9.00 Regular I Employee Note: FMLA
4/14/20161 9.00IRegular Employee Note: FMLA
4/15/2016 5.00.1 Regular Employee Note:fFMLA
Timesheet
United Consulting
!1 ` ^^^yyy''' TE Employee status to print:Active
j Limit report by:No limit
''UInvoice Number:13319-22
�-�—Consulting--_=
Tuesday,May 03,2016
Page 4 of 14
Christopher J.Miller. Employee Status:Active
j' Timesheet date:4/29/2016 . Total hours:40.00
6• Target percent billable 0.00% Timesheet percent billable,62.50%
*�Avon Avenue Bridge Pre-Construction Activities I j Construction 1 j
15-315 Limited Plan Review-Tracings(RD) f Project Time I Manager 1 1 j { 4.00; 3.001, 4.00, 11.00;
City of Carmel - 111th and j {
Pennsylvania Intersecton
Improvements Construction {
13-319 ----- -- - - - j Inspection -- --- - - I Project Time -- -- Manager 1 --- I--- --;— -- 1 _1.001 -- 2.00 j - 1.00!.- ` - - 4.00
Post Road from 1-70 to 46th Street { Construction
15-304 --- M{Inspection _ — {Project Time [Manager 1 { 1.001 1.00 1.001 3:00{
City of Logansport 18th and Main
Street Intersection I j Construction
16-301 Inspection I Project Time {Manager 1 3 j 1.00{ 1 00 l 1.001 4 00 i I 7.00
...._�__ 1 .._...____._ _—._..
l_..____._.__
Direct Total 1 0.00' 0.00{ 3.00 i 8.0011 6.001 8.00 0.00; 25.00
_.
�* Pre Contract _ i ----
2.00' 5.00 i 1 f 7_00,
t Leave__ _-- _�
tT _ ,
I f 8 00( 8.00 I
i.�________.._ ____.__._.�_.__.___._.____ _______ __.. ___-__.___ _____-__-.-- -_ ____ _____- 1 ___1 ____._______ _ _
Overhead Total 2.001 0.001 5.001 0.00,, 0.001 0 00 8.00 j 15.00'
Regular Total _ 2.00 0.001 8.00 j 8.00 j— 6.00 8.00 j 8.001 40.00.E
Timesheet Total 2.001 0.00 I 8.001 8.001 6.001 8.00 8.001 40.00
Employee Signature Date Name - -- _ 'I Date
Employee submitted jChristopher J.Miller i 4/28/2016
Supervisor approved JBrian N.Miller 5/2/2016
Supervisor Signature Date Accounting approved -- _
Timesheet
United Consulting
4` Employee status to print:Active
I � ED
Limit report by:No limit
f Invoice Number: 13319-22
Cons 1lting--
Tuesday,May 03,2016
Page 5 of 14
�l Christopher J.Miller Employee Status:Active
*Notes
+Christopher J..Miller Timesheet date:.4/29/2016
15-315 Avon Avenue Bridge
Pre-Construction Activities
Limited Plan Review-Tracings(RD)
Project Time/Construction Manager 1
4!26/2016 4.00 Regular Employee Note: Pian and CIB Printouts,Setup review team,Setup File Share for out of office personnel
4/27/2016 3.00,Regular Employee Note: CIB Review
4/28/2016 I 4.001 Regular Employee Note CIB and Plan Review Notes Organization
1_1---,1--l- _-- ----- T __.._-. - ---- - - ---- ------- -- ------- ._.... .,
Overhead
Pre-Contract
4/23/2016 2.00 f Regular Employee Note City of Franklin LOI and Meeting
4/25/20161 5.00 Regular Employee Note City of Franklin Meeting
Timesheet
United Consulting
i
Employee status to print:Active
J
l' UN � Limireport by:No limit
+ '"/ Invoice Number:13319-22
Consulting--
Tuesday,May 03,2016
Page 6 of 14
Christopher J.Miller Employee Status:Active?
Timesheet date:4/22/2016 Total hours:40.00_
Target percent billable 0.00% Timesheet percent billable 35.00%
. : :
4 . i
City of Carmel - 111th and
Pennsylvania Intersecton
Improvements l Construction
'13-319 j Inspection j Project Time Manager 1 2.001
; 1.00 i 1.00! 4.00
Post Road from 1-70 to 46th Street I 1 Construction 1 1 1
15-304 lP
Ins eP ( 1 3 2.001
i 1 _
i cUon Project Time ]Constr
Manager_ i_ 2.00 a..._.
1 00 _._.---- .! 5.00!
City of Logansport 18th and Main
Street Intersection ! uction i
16-301 _ Ii Inspection- -- 1 Project Time - ,Manager 1 j 2.001 1.00 1.00 i_ ! 4.00 i
{_._ 1
Construction
coon 1_ ._._ _--- !_-__-. _'_..
i Wayne County Bridge 173 j
15-301 Inspection Pro ect Time Mana er 1 1 00. 1.00!
Direct Total 0.00 l 0.001 7.00 3.001 1.001 2.00 1.00 i 14.00
*i Pre Contract i 1 ( i 4 00 4.001 5 001 7.00 20.001
*'Administration ��1 i_ 1 001 1.001 1 00 4.00i
j1.001
—_._.
! _ 2.0.0 i__ _.._._s_____ .__. 2.00
�-i Leave � .___...__ _v_.___._...._._.__..._i � .._
Overhead Total 0.00 0.00 1.001 5.00 7.001 6.00 7.00 26.00;
Regular Total 0.00 0.001 8.00, 8.001 8.00 8.00 j 8.00 40.00
Timesheet Total — 0 001 - 0_00�^8 OO I y 8 00 8 00 8.00 i —8.00! 40.00:
Employee Signature Date i I Name ; Date
Employee submitted !Christopher J.Miller f 4/22/2016 1
Supervisor approved IBnan N.Miller t 4/26/2016
Supervisor Signature Date II Accounting approved_ I 1
Timesheet
United Consulting
Employee status to print:Active
I Limit report by:No limit
Invoice Number: 13319-22
--
Consulting—
Tuesday,May 03,2016
Page 7 of 14
Christopher J.Miller Employee Status:Active;
*Notes
Christopher J.Miller Timesheet date:4/22/2016
Overhead
Pre-Contract
4/19/20161 — 4.00 Regular Employee Note: City of Franklin LOI
4/20/2016 i 4.00 I Regular Employee Note:I City of Franklin LOI
4/21/2016 5.00;Regular j Employee Note Franklin LCI i
_l— Employee Note: Franklin LOI
4/22/20161 7.001 Regular
Administration
(—_
11
4/18/2016� 1.001 Regular I Employee Note:!INDOT ITAP CR2 Evaluation�— v � J— ----^___ f i
4/19/2016 1.00 1 Regular I Employee Note:�INDOT IPTAP CR2 Evaluation
I4/20/2016 1.00�Regular T Employee Note:'INDOT[TAP CR2 Evaluation
4/21/2016 1.00�Regular Employee Note Dept.Scheduling
_._
Timesheet
United Consulting
Employee status to print:Active
�ttt **gaa , Limit report by:No limit
_VNInvoice Number:13319-22
Consulting
Tuesday,May 03,2016
Page 8 of 14
Christopher J.Miller Employee Status,Active
If Timesheet date:,4/1512016 Total hours:40.00
Target percent billable 0.00% Timesheet percent billable 75.00%
{City of Carmel - 111th and 1 j
Pennsylvania Intersecton
f Improvements f 1 Construction
j 13-319 Inspection Project Time Manager 1 I 4.001 1 2.001 2.001, 2.00 10.00
Post Road from 1-70 to 46th Street i!i 1 I Construction I
115-304 IInspection -� -- ---- ---"Project Time ^ _ �Manager1 4.0�" 1.00 1.00! 1.001-- 7.00
1 City of Logansport 18th and Main
Street Intersection Construction
1 ! "
p ._..__ g.__. --------..�----_._-1 _._. _.. I_ ._.._._.
1 16-301 Ins ection !Project Time Manager 1 8.001 1.00 1 9.00
15-315von venue Bridge Pre-Construction Construction Schedule Development Project Time__ i Manager1 Construction _ I 1 AO 1 _2.001 1^00; 4.00
-.__�--- - 1
----•----_---------___.__..._. _--.__.__..__.__._._._.-___._-._-_-___ _._-.---....--_. ________.
Direct Total _0.00 0 001 8.00 8 00 4 00! 6.001 4 00 t -30.00!
i-------
1'.'001 8.
* Administration I 2.00
* Pre Contract I f I 3.001 1 00# 4.00! 8.00!
Overhead Total I 0.00
1 0.00 0.001 0.001+ 4.00 2.001 4.001 10.00
Regular Total� 0 00 0^00
g ! 8.00 f 8.001 8.00} 8.00 8.00 j 40.00
Timesheet Total 1 0.00 8.00
; 0.00 _ 8.00 -8.00
8.00 8.00 i40.00
_.
8.00 I '
__
Employee Signature Date �.Name _._... .__.___._._-___----_-___. _._ A
Date
Employee submitted !ChristopherJ.Miller _ 14/14/2016_.
- -_ _
Supervisor approved Brian N.Miller 4/18/2016 1
Supervisor Signature Date -Accounting-approvedMichael D.Farrell _ 4/18/2016
Timesheet
United Consulting
U
Employee status to print:Active
iD Limit report by:No limit
Invoice Number: 13319-22
Consulting
Tuesday,May 03,2016
Page 9 of 14
Christopher J.Miller Employee Status:Active y
*Notes
Christopher J.Miller Timesheet date:4/15/2016 j
15-315 Avon Avenue Bridge
Pre-Construction Activities
Construction Schedule Development
Project Time/Construction Manager 1
----------
4113/20161
---___4/13/2016j 1.00 Regular Employee Note: CIB Review
4/14/2016 2.00 Regular Employee Note: CIB Testing and LD s SP's
4/15/2016 1.00 Regular Employee Note:ICE CIB Review
Overhead
Pre-Contract
4/13/2016 — 3.00 Regular j Employee Note:!Hancock 91 Agreement j
4/14/2016 1 00 Regular i Employee Note. Hancock 91 Agreement
_1_.'__.._____-..� __ _._ _._ _ _ --------4/15/20161 4.00 Regular J Employee Note.,Indy Go Redline Meeting
Administration
4/13/2016 1.00�Regular I Employee Note IINDOT ITAP CR2 Processing
_ — -------
4/14/20161
-4/14/2016 1.00 1 Regular Employee Note INDOT ITAP CR2 Trouble Shooting
Timesheet
United Consulting
f " Employee status to print:Active
Limit report by:No limit
"UNITED: Invoice Number:13319-22
--�--Consulting=
Tuesday,May 03,2016
Page 10 of 14
1 Christopher J.Miller Employee Status:Active
{ Timesheet date:4/8/2016. Total hours:40.00
I` Target percent billable 0.00'/° Timesheet percent billable 52.50%
w , f
IAvon Avenue Bridge Pre-Construction Activities Construction
Iil 15-315 ! Construction Schedule Development ±Project Time I Manager 1 ! ! ! j 2.001 2.00 S
I City of Carmel - 111 th and
Pennsylvania Intersecton j
Improvements i ; (Construction
113-319 {Inspection I Project Time Manager 1 ; { I 6.00; 3.001 5.00( 1.001 15.00
!Post Road from 1-70 to 46th Street ! I Construction j !
15-304 Inspection— _ µ w Project Time Manager 1 00 1 00 1_001 4.00 I
_I_ _ -- _-. l___ �.__._
--
Direct Total 0.001 0.001 0.001 7.00 4.001 6.001 4 00 21.00);
Administration 1 ( { I ! ! ; 2.00 i 2 00
Pre-Contract I i— LL9.001 2.00 I 1.001 1.001 13.00
e 4.00
LJLeave -_.---.-- I _ I__ _ _ ! I I 4.00---
_.
Overhead Total 1 0.001 0.001 _ 9.00( 2.00( 5 00`I 300 0.001 19.001
0.
Regular Total
0.00 001 9.001 9.001 900
Timesheet Total 1 0.001 0.00 f^9.001 9.001 9.001 9.00(y 4.00! 40.001
-- --- 3
Employee Signature Date ; _ Name Date
Employee submittedChristopher J Miller 4/11/2016 !
Supervisor approved !Brian N Miller 4/18/2016
Supervisor Signature Date LAccounting approved Michael D Farrell _ `^ ! 4/18/2016 !
Timesheet
United Consulting
1
VEmployee status to print:Active
i NIT Limit report by:No limit
Invoice Number: 13319-22
Consulting==
Tuesday,May 03,2016
Page 11 of 14
j Christopher J.Miller Employee Status:Active
*Notes . ..
i
Christopher J.Miller Timesheet date:4/8/2016
15-315 Avon Avenue Bridge
Pre-Construction Activities
Construction Schedule Development
Project Time/Construction Manager 1
_ 4!8/2016 m~—2.00 Regular �- ,Employee Note: Testing Requiremtns for CIB
_._._._.._.. ____._ _.�.. R
Overhead
Pre-Contract
4/4/2016 9.00 Regular Employee Note: Terre Haute LOI
i 4/5/2016 2.00 Regular Employee Note: Terre Haute LOI
4/6/2016
1.00 Regular R_e—g-ular _ — Employee Note:l!LTerre Haute LOI
----------
-_.._..
4/7/2016
1.00 Regular { Employee Note: Terre Haute LOI
-
Administration
4/7/2016I 2.001 Regular t Employee Note: INDOT ITAP CR-2
Timesheet
United Consulting
UNIT
Employee status to print:Active
ED Limit report by:No limit
/ Invoice Number:13319-22
Consulting—
Tuesday,May 03,2016
Page 12 of 14
� Christopher J.Miller Employee Status:Active
- Timesheet date:4/1/2016 . -Total hours:40.00
.Target percent billable 0.001/c Timesheet,percent billable.70.0% t
I i
'City of Carmel - 111th and
Pennsylvania Intersecton f I
Improvements I (Construction ! 1
13-319 Lspection i Pro'ect Time !Manager er 1 I - 8.00 3.00 7.001 18.00
i - g Activities Construction
*Avon Avenue Bride Pre-Construction Schedule Development Project Time Manager 1
i
_ _ _ � � ;_._._.._.._._._�.__-.5.00. E f 5.001
315
15-304 Ilns oection tion Sche . .
t Construction
Post Road from I-70 to 46th Street K - I Project Time Manager 1 4.00 I I 1.00, 5.00,!
p I
Direct Total0.00 0.00 4.00 8.00 I 8 00 0.00 8.0028 001
-
_.__._______ -,
�'i Pre-Contract I _ J { `; ,j 4001 j T _ '- 4.00
_11_eave � � � � ! � i I 8.00 ^ j _ 800'
Overhead Total 0.001 0.00 4.001 0.001 0.001 8.00; 0.00, 12.00
Regular Total 0.001 0.00( 8.001 8.00 8.001 8.001 8.001 40.001
Timesheet Total I 0.00 0.001 8.001 8.00 8.001 8.001 8.001 40.00
Employee Signature Date _ j Name i Date I
Employee submitted _ Christopher J.Miller 1 4/1/2016 `
Supervisor approved Brian N.Miller f 4/3/2016 i
I _ -
Accounting approved Michael D Farrell 4/5/2016
Supervisor Signature Date i_ __ ___ _ _.
Timesheet
United Consulting
i/ Employee status to print:Active
U,N I T, E" .D,
Limit report by:No limit
_Consulthig
Invoice Number: 13319-22
Tuesday,May 03,2016
Page 13 of 14
Christopher J.Miller Employee Status:Active;
`*Notes
Christopher J..Miller Timesheet date:4/1/2016
15-315 Avon Avenue Bridge
Pre-Construction Activities
Construction Schedule Development
Project Time/Construction Manager 1
3/30/20161 5.00 Regular j Employee Note- Meeting with Ryan Cannon,BLN and Donohue,and United concerning utilities and letting schedule
I j development
Overhead
Pre-Contract
3/28/2016 4.00 Regular Employee Note: Westfield LOI,BG LOI,Terre Haute LOI _ —j