Loading...
HomeMy WebLinkAboutCity of Carmel #11-09 Contract book Table of Contents TOC - 1 TABLE OF CONTENTS SUBJECT PAGES NOTICE TO BIDDERS NTB-1 INSTRUCTIONS TO BIDDERS ITB-1 BIDDER'S ITEMIZED PROPOSAL AND DECLARATIONS BID-1 POST BID SUBMITTAL POST-BID-1 BID BOND BB-1 MAINTENANCE BOND MB-1 PAYMENT BOND PMB-1 PERFORMANCE BOND PFB-1 AGREEMENT A-1 ADDITIONAL REQUIREMENTS AR-1 City of Carmel Sample Forms AR-2 Common Construction Wage Rates AR-7 STANDARD GENERAL CONDITIONS (INCORPORATED BY REFERENCE) Article 1 - Abbreviations and Definitions G-1 Article 2 - Preliminary Matters G-5 Article 3 - Contract Documents G-7 Article 4 - Availability of Lands; Physical Conditions G-8 Article 5 - Bonds and Insurance G-13 Article 6 - CONTRACTOR’s Responsibilities G-17 Article 7 - Work by Third Parties G-28 Article 8 - OWNER’s and ENGINEER’s Status During Construction G-29 Article 9 - Changes in the Work G-31 Article 10 - Change of Contract Price G-32 Article 11 - Change of Time; Liquidated Damages; Delays and Hindrances G-36 Article 12 - Warranties, Test and Defective Work G-38 Article 13 - Payments to CONTRACTOR and Completion G-41 Article 14 - Suspension of Work and Termination G-48 TOC - 2 Article 15 - Dispute Resolution G-50 Article 16 - Miscellaneous G-52 Attachment A to Article 15 G-58 SUBJECT TECHNICAL SPECIFICATIONS SP-1 Existing Conditions of Utilities, Additional R/W, Encroachments SP-2 Construction Scheduling SP-3 Failure Coordination with City Services SP-4 Failure to Complete on Time for Road Closure SP-5 Clearing Right-of-Way SP-6 Chemical Modification of Soils SP-7 Existing Section Corners SP-8 Erosion Control Measures SP-9 Applicable Specifications SP-10 Material Testing SP-11 Intermediate Completion Date SP-12 Decorative Concrete Coloring & Jointing SP-13 Removal of Existing HMA Pavement SP-14 Roundabout Pavement Markings SP-15 Decorative Street Signs SP-16 Sawcut SP-17 Adjust Casting to Grade SP-18 Drainage Structures SP-19 Pipe End Sections SP-20 Cable Interduct SP-21 Sanitary Sewer Manholes SP-22 Topsoil SP-23 Irrigation Conduit SP-24 Catch Basin Hood SP-25 Raised Pavement Markers SP-26 Water Main TOC - 3 SP-27 Sanitary Sewer SP-28 Temporary Capped Inlets SP-29 High Pressure Gas Line SP-30 Existing Conditions SP-31 Pending Permits SP-32 Decorative Street Lighting SP-33 Alternate Bid SP-34 HMA for Approaches