TABLE OF CONTENTS
SUBJECT PAGES
NOTICE TO BIDDERS NTB-1
INSTRUCTIONS TO BIDDERS ITB-1
BIDDER'S ITEMIZED PROPOSAL AND DECLARATIONS BID-1
POST BID SUBMITTAL POST-BID-1
BID BOND BB-1
MAINTENANCE BOND MB-1
PAYMENT BOND PMB-1
PERFORMANCE BOND PFB-1
AGREEMENT A-1
ADDITIONAL REQUIREMENTS AR-1
City of Carmel Sample Forms AR-2
Common Construction Wage Rates AR-7
STANDARD GENERAL CONDITIONS (INCORPORATED BY REFERENCE)
Article 1 - Abbreviations and Definitions G-1
Article 2 - Preliminary Matters G-5
Article 3 - Contract Documents G-7
Article 4 - Availability of Lands; Physical Conditions G-8
Article 5 - Bonds and Insurance G-13
Article 6 - CONTRACTOR’s Responsibilities G-17
Article 7 - Work by Third Parties G-28
Article 8 - OWNER’s and ENGINEER’s Status During Construction G-29
Article 9 - Changes in the Work G-31
Article 10 - Change of Contract Price G-32
Article 11 - Change of Time; Liquidated Damages;
Delays and Hindrances G-36
Article 12 - Warranties, Test and Defective Work G-38
Article 13 - Payments to CONTRACTOR and Completion G-41
Article 14 - Suspension of Work and Termination G-48
TOC - 2
Article 15 - Dispute Resolution G-50
Article 16 - Miscellaneous G-52
Attachment A to Article 15 G-58
SUBJECT TECHNICAL SPECIFICATIONS
SP-1 Existing Conditions of Utilities, Additional R/W, Encroachments
SP-2 Construction Scheduling
SP-3 Failure Coordination with City Services
SP-4 Failure to Complete on Time for Road Closure
SP-5 Clearing Right-of-Way
SP-6 Chemical Modification of Soils
SP-7 Existing Section Corners
SP-8 Erosion Control Measures
SP-9 Applicable Specifications
SP-10 Material Testing
SP-11 Intermediate Completion Date
SP-12 Decorative Concrete Coloring & Jointing
SP-13 Removal of Existing HMA Pavement
SP-14 Roundabout Pavement Markings
SP-15 Decorative Street Signs
SP-16 Sawcut
SP-17 Adjust Casting to Grade
SP-18 Drainage Structures
SP-19 Pipe End Sections
SP-20 Cable Interduct
SP-21 Sanitary Sewer Manholes
SP-22 Topsoil
SP-23 Irrigation Conduit
SP-24 Catch Basin Hood
SP-25 Raised Pavement Markers
SP-26 Water Main
TOC - 3
SP-27 Sanitary Sewer
SP-28 Temporary Capped Inlets
SP-29 High Pressure Gas Line
SP-30 Existing Conditions
SP-31 Pending Permits
SP-32 Decorative Street Lighting
SP-33 Alternate Bid
SP-34 HMA for Approaches