Loading...
HomeMy WebLinkAboutCity of Carmel #11-09 Road Plans 11P e n n s y l v a n i a S t r e e t 111th Street 116th Street 106th Street I l l i n o i s S t r e e t S p r i n g m i l l R o a dC l a y C e n t e r R o a d 6 P o i n t s R o a d 1" = 500’ DETOUR ROAD CLOSED SIGN LEGEND ROAD CLOSED AHEAD DETOUR AHEAD END CONSTRUCTION ROAD CLOSED TO THRU TRAFFIC ROAD CLOSED ROAD CONSTRUCTION AHEAD QUANTITY SUMMARY 111th STREET ROAD CLOSURE PLAN HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. ofDESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER FOR APPROVAL RECOMMENDED DATE sbalog 10:01:27 PM3/28/2012 P:\2009\01768\D. Drawings\2009.01768.RD.DPL.01.dgn 11 CITY OF CARMEL JSB AJE KGJ JSB sbalog 10:01:27 PM3/28/2012 P:\2009\01768\D. Drawings\2009.01768.RD.DPL.01.dgn 1" = 30’ N/A 11-09 124 03/28/2012 LEGEND 31 31 For Detour Route Marker Assemblies A, B, C and D, see Standard Drawing E801-TCDT-03. NOTES: XW20-3 XW20-2 XG20-2 1 2 3 4 RCSA-1 R11-4 RCSA-3 R11-2 RCSA-2 XM4-10 (L or R) R11-2 and 1 RCSA-1 Req’d. 12’ of Type III-B Barricades and 1 RCSA-1 Req’d. 12’ of Type III-B Barricades and 1 RCSA-3 Req’d. 24’ of Type III-A Barricades and 1 RCSA-3 Req’d. 24’ of Type III-A Barricades XW20-1 and 1 RCSA-3 Req’d. 84’ of Type III-A Barricades 132 5 0 Each 0 Each Lft. Lft. Each Detour Route Marker Assembly Construction Sign, Type A Road Closure Sign Assembly 24 No. STATE OFANAIDNI DERETSIGER R E E NIGNE LANOI S S EFO R P 10505104 GOLA B LEUMAS .JConstruction Sign, Type A Construction Warning Light, Type "A" Construction Warning Light, Type "B"Construction Area Flashing Arrow Sign Direction of Traffic Flow Detour Route A B C Advance Turn D.R.M.A. Directional D.R.M.A. Confirming D.R.M.A. D End D.R.M.A.