Loading...
HomeMy WebLinkAboutCity of Carmel #11-09 Road Plans 401 5 2 0 2 5 3 0 Illinois Street Illinois Street LINE "PR-A" EROSION CONTROL DETAILS 17+36.11 "PR-A" BEGIN PROJECT 8 2 5 8 2 5 8 2 5 8 2 5 8 3 0 8 3 0 8 3 0 8 3 5 8 3 5 8 3 5 840 840 840 8 4 0 840 840 8 4 0 8 4 0 HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. ofDESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER FOR APPROVAL RECOMMENDED DATE sbalog 10:02:00 PM3/28/2012 P:\2009\01768\D. Drawings\2009.01768.RD.EC.01.dgn 40 CITY OF CARMEL sbalog 10:02:00 PM3/28/2012 P:\2009\01768\D. Drawings\2009.01768.RD.EC.01.dgn 1" = 30’ N/A JSB AJE KGJ JSB 11-09 124 03/28/2012 83 5 8 4 0 840 8 4 0 8 4 0 SD SP DIP CDRR ST RRSP T C D R R C D R R C D R R C D R R C D R R (woods)(woods) (woods) (woods) (woods)(woods) (woods) (field)(field) (field) (field) (field) (woods) (gate) (pool heater) (4 " steel) 18" (woods) (woods) (woods) T (woods)(woods) (woods) (woods)(woods) (woods) (woods)(woods) (woods) (woods)(woods) (field) (field) (field) (field) (field) (field) (conc) (6’ clf) T TT T Line "PR-A" Line "PR-A" Connect to Pipe by Others No. STATE OFANAIDNI DERETSIGER R E E NIGNE LANOI S S EFO R P 10505104 GOLA B LEUMAS .JInterceptor Ditch - Earth Ditch Inlet Protection Splash PadCheck Dam Riprap Temporary Silt Fence Riprap Splash Pad Check Dam Straw Bales Temporary Seeding Proposed Ditch Erosion Control Blanket Temporary Slope Drain Temporary Sediment Trap Temporary Culvert Pipe Protection