Loading...
HomeMy WebLinkAboutCity of Carmel #11-09 Road Plans 444 4 5 Spring Mill Road Spring Mill Road 1 1 6 t h S t r e e t 4 5 0 4 5 5 Spring Mill Road 443+70.00 "S-1-B" BEGIN CONSTRUCTION 455+35.00 "S-1-B" END CONSTRUCTION LINE "S-1-B" EROSION CONTROL DETAILS HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. ofDESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER FOR APPROVAL RECOMMENDED DATE sbalog 10:02:06 PM3/28/2012 P:\2009\01768\D. Drawings\2009.01768.RD.EC.05.dgn 44 CITY OF CARMEL sbalog 10:02:06 PM3/28/2012 P:\2009\01768\D. Drawings\2009.01768.RD.EC.05.dgn 1" = 30’ N/A JSB AJE KGJ JSB 11-09 124 03/28/2012 T R 8 5 0 8 5 5 8 5 5 8 5 5 8 5 5 8 5 5 8 5 5 8 5 5 850 850 SD SP DIP CDRR ST RRSP T C D R R C D R R C D R R DIP DIP C D R R C D R R C D R R C D R R Line "S-1-B" L i n e "E " L i n e "C " Line "S-1-B" Line "S-1-B" No. STATE OFANAIDNI DERETSIGER R E E NIGNE LANOI S S EFO R P 10505104 GOLA B LEUMAS .JInterceptor Ditch - Earth Ditch Inlet Protection Splash PadCheck Dam Riprap Temporary Silt Fence Riprap Splash Pad Check Dam Straw Bales Temporary Seeding Proposed Ditch Erosion Control Blanket Temporary Slope Drain Temporary Sediment Trap Temporary Culvert Pipe Protection