Loading...
HomeMy WebLinkAboutCity of Carmel #11-09 Road Plans 45 "PR-A"Line 17+36.0 21+00.0 364 24+00.0 12 28+00.0 12 29+00.0 36+12.0 712 32+00.0 12 37+53.0 42+37.0 484 40+50.0 43+44.0 294 42+77.0 47+85.0 508 47+50.0 54+23.5 674 48+43.0 54+23.5 581 199+52.8 200+70.0 118 199+52.8 200+70.0 118 "D"Line 55+25.0 9 58+25.0 9 58+30.0 59+65.0 135 58+30.0 60+82.0 252 62+00.0 62+58.0 58 62+75.0 63+75.0 100 63+00.0 64+00.0 100 "C"Line 100+96.0 103+00.0 204 "E"Line 322+00.0 12 325+60.0 12 325+79.0 1 325+95.0 12 "S-1-B"Line 445+00.0 12 445+00.0 12 448+00.0 12 448+00.0 12 448+50.0 1 450+26.0 455+35.0 509 451+20.0 1 454+00.0 1 454+30.0 12 Undistributed 5211 2 150 200 70 673 12 2 10422 4 300 200 70 673 12 4 HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. ofDESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER FOR APPROVAL RECOMMENDED DATE EROSION CONTROL TABLE sbalog 10:02:06 PM3/28/2012 P:\2009\01768\D. Drawings\2009.01768.RD.EC.06.dgn LOCATION STATION TO STATION S I L T F E N C E T E M P O R A R Y (ft)EACH R E V E T M E N T R I P R A P C H E C K D A M T E M P O R A R Y (TON)(TON)EACH R I P R A P S P L A S H P A D (TON) S E E D M I X T U R E , T (lb) M A T E R I A L M U L C H I N G (TON) F E R T I L I Z E R (TON) I N L E T P R O T E C T I O N T E M P O R A R Y D I T C H EACH ( N O T A P A Y I T E M ) I N T E R C E P T O R D I T C H (ft) EROSION CONTROL TABLE LOCATION STATION TO STATION LOCATION STATION TO STATION EROSION CONTROL TABLE EROSION CONTROL TABLE 45 CITY OF CARMEL sbalog 10:02:06 PM3/28/2012 P:\2009\01768\D. Drawings\2009.01768.RD.EC.06.dgn 11-09 124 P R O T E C T I O N P I P E C U L V E R T N O . 2 S T O N E P R O T E C T I O N C U R B I N L E T S I L T F E N C E T E M P O R A R Y (ft)EACH R E V E T M E N T R I P R A P C H E C K D A M T E M P O R A R Y (TON)(TON)EACH R I P R A P S P L A S H P A D (TON) S E E D M I X T U R E , T (lb) M A T E R I A L M U L C H I N G (TON) F E R T I L I Z E R (TON) I N L E T P R O T E C T I O N T E M P O R A R Y D I T C H EACH ( N O T A P A Y I T E M ) I N T E R C E P T O R D I T C H (ft) P R O T E C T I O N P I P E C U L V E R T N O . 2 S T O N E P R O T E C T I O N C U R B I N L E T S I L T F E N C E T E M P O R A R Y (ft)EACH R E V E T M E N T R I P R A P C H E C K D A M T E M P O R A R Y (TON)(TON)EACH R I P R A P S P L A S H P A D (TON) S E E D M I X T U R E , T (lb) M A T E R I A L M U L C H I N G (TON) F E R T I L I Z E R (TON) I N L E T P R O T E C T I O N T E M P O R A R Y D I T C H EACH ( N O T A P A Y I T E M ) I N T E R C E P T O R D I T C H (ft) P R O T E C T I O N P I P E C U L V E R T N O . 2 S T O N E P R O T E C T I O N C U R B I N L E T N/A N/A SB SB KGJ KGJ 03/28/2012 No. STATE OFANAIDNI DERETSIGER R E E NIGNE LANOI S S EFO R P 10505104 GOLA B LEUMAS .J