HomeMy WebLinkAbout259356 06/10/16 I
I
%'-�_,qb CITY OF CARMEL, INDIANA VENDOR: 254004
"® t� ONE CIVIC SQUARE DUKE!ENERGY CHECK AMOUNT: $"""44,631.77•
,. ?� CARMEL, INDIANA 46032 PO BOX 1326 CHECK NUMBER: 259356
+M TON ` CHARLOTTE NC 26201-1326 CHECK DATE: 06/10/16
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
2201 4348000 56403842015 175.69 56403842015
1091 4348000 60103608018 3,765.93 60103608018
2201 4348000 70303728013 21.20 70303728013
2201 4348000 71803816012 76.40 71803816012
651 5023990 72003287018 45.60 72003287018
1125 4348000 74703295014 28.24 74703295014
2201 4348000 75003846016 19.15 75003846016
2201 4348000 79203824012 31.04 79203824012
110 4348000 87403794021. 385.60 87403794021
2201 4348000 90503834013 280.76 90503834013
651 5023990 91103050028 58.28 91103050028
2201 4348000 91803816013 87.38 91803816013
2201 4348000 95503714010 54.96 95503714010
I
i
VOUCHER # 165403 WARRANT # ALLOWED
254004 IN SUM OF $
DUKE/PSI ENERGY
PO BOX 9001076
Louisville, KY 40290-1076
Carmel Wastewater Utility
ON ACCOUNT OF APPROPRIATION FOR
Board members
PO# INV# ACCT# AMOUNT Audit Trail Code
41103050020 01-7153-05 $5,722.70
91 I030sc'&A 01 ag ,
9h030SOw3 , 01 --7ISO-o3 ?. 9y
7 ®01399101'$ 01 --7150-03
ry 060010 01—'71lSV-z) 3 Jq.3-7,
5i503987033 01 -7150-0,3
d3. dof�
Voucher Total
Cost distribution ledger classification if
claim paid under vehicle highway fund
Page 1 of 1
<>< »:::> :
z►t..rl`. dd#er�� ..................................................t"olr..tn. utrta ' atl :::: ::::<::>:::;::<:< " ► ft1...1
City Of Carmel Duke Energy 1-877-499-7859 5150-3287-03-3
Carmel Utilities For Account Services,please contact
11511 Westfield Blvd Jessica Jackman'
Carmel IN 46032
Arte»tt ; I. t l
. o.:.. . . . :.. in: ::: ............... .: . : c ...:.:.:::.
PO Box 1326 Payments after May.31 not included Bill prepared on May 31,2016
Charlotte NC 28201-1326 Last payment received May 09 Next meter reading Jun 24,2016
mate..........................Meter::::Readtn
Elec 077707179 Apr 26 May 26 30 1750 1867 1 117 0.00
Vic: :. .... rb
Usage- 117 kWh Amt Due- Previous Bill $27.53
Duke Energy- Rate CSNO $23.66 Paymerit(s) Received 27.53cr
Current Electric Charges 23.66 Balance Forward 0.00
Current Electric Charges 23.66
L S L� Current Amount Due 23.66
03
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
�r
i
I
Average Cost: $0.2022 per kWh Jun 22,2016 $23.66
ENERGY.
www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160531010101_1.CSV-19113-000018005 0 Printed on recyclable paper.
rLtHJt Htl UHN I ht-I UV rUh I IUN VVI I H TUUM rATNItN I Page of
I
e>fire.. WA'd.":>«:>«<:<:>:<:«::::=«:>:::>::::»:::>:::>::>:>::>=>�ar:#M. u ... ... 3
City Of Carmel Duke Energy 1-877-499-7859 2240-3050-01-0
3417 116Th St E For Account Services,please contact
Carmel IN 46033 Jessica Jackman
............................ail 's><::<:<>e ': <> .
PO Box 1326 Payments after May 31 not included Bill prepared on May 31,2016
Charlotte NC 28201-1326 Last payment received May 09 Next meter reading Jun 24,2016
: r:RIPA.P i<` ......:>::::>:<:>:<:>:<:>::>::::><::::>::::><::«<:>
>I`1~nm::>::::: ::>::>::::>::: . : revts:::p eeiit::>::::>Itlfia :
:: :::.:.:.:::::::::::::.SL:::.::..::::::::::.:::::::::::'.:.::.:::::::::.,.::::::::::::::::::: .::
Elec 108051372 Apr 26 May 26 30 69 70 80 80 0.00
H#Irn
: citrtc>::;::Cc�mlmer�tal. .. >:.;.:»:<:.>::::>>�;>:::;::::>:;:.»::>:.::::>::>:>:;:.::<:<:.<>�:::>:::::.;::>;»>:
Usage- 80 kWh Amt!Due- Previous Bill $24.37
Duke Energy- Rate SWP $24.37 Payment(s) Received 24.37cr
Current Electric Charges 24.37 Balance Forward 0.00
Current Electric Charges 24.37
LS i Current Amount Due 24.37
Ol X150,OJ
_ --- — --Energy theft-affects-allof-us--driving-up-energy-costs-and-increasing-the_riskto public safety.-You-can- -
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
i
I
I
i
I
Average Cost: $0.3046 per kWh Jun 22,2016 $24.37
4� DUKE
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160531010101_1.CSV-19117-000018004 a%Printed on recyclable paper.
Page 1 of 1
tars;:::::<': ra1L «' '<"<<« <' Acittittiiiiet >'
:Haiti+ >l......................'................................
dC s> >>'<`' ;'>; >>
.... ltr
City Of Carmel Duke Energy j 1-877-499-7859 7200-3287-01-8
Carmel Utilities For Account Services,please contact
Dir Gray Rd Jessica Jackman
I
Ac#rut€lilssrrxa. ......... .. ..
............:............................: `:::: ::>:::»[::>:::'.
PO Box 1326 Payments after May 31!not included Bill prepared on May 31,2016
Charlotte NC 28201-1326 Last payment received:May 09 Next meter reading Jun 24,2016
.:::::::::.:.:....::...................
I
rese�i#............i
:::................................................................................................... ....................:..............:::.
Elec 108083635 Apr 26 May 26 30 13178 13461 1 283 0.96
i
Cis":'an ''Iillii' >= >> >>=> == =i >> <
Iifatriic.. m
rr
Usage- 283 kWh Amt Due- Previous Bill $45.60
Duke Energy- Rate SWP $45.60 Payment(s) Received 45.60cr
Current Electric Charges 45.60 Balance Forward 0.00
Current Electric Charges 45.60
Current Amount Due 45.60
p l .7i So. 03
Energy_theftaffects-all of-us-_drivingup-energy-costs-and-increasing-the-risk-to-public safety-.-You-can---
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
i
i
I
t sue >'
Average Cost: $0.1611 per kWh Jun 22,2016 $45.60
DUKE
`Z ENERGY® www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160531010101_1.CSV-19115-000018005 *Printed on recyclable paper.
Page 1 of 1
:::::>:::......
fa lry.. . Ks[drss>'»> <«
City Of Carmel Duke Energy 1-877-499-7859 2210-3050-02-6
Carmel Utilities For Account Services,please contact
4879 Woodfield Dr Jessica Jackman
Carmel IN 46033
I
1S aill'a::>::::>:>'eats « ...... > € : : > : :>:<:::>>_>:::::
......................A�cvunt.lnical <> >;::>:::>:::::::>>=:><:«=>::':::>'::>:::
PO Box 1326 Payments after May 18 not included Bill prepared on May 18,2016
Charlotte INC 28201-1326 Last payment received May 02 Next meter reading Jun 14,20-6
>;.::::>;;::;:>::><
a F .. . ie e »N :rir .
s.. ....V ...
Elec 108036934 Apr 15 May 16 31 21786 ,22139 1 353 6.93
I
Usage- 353 kWh Amt Due- Previous Bill $48.63
Duke Energy- Rate SWP $52.94 Payments) Received 48.63cr
Current Electric Charges 52.94 Balance Forward 0.00
Current]Electric Charges 52.94
LS l Current Amount Due
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or!complete an energy theft form at
duke-energy.com,under the customer service link.
I
i
i
i
i
i
Average Cost: $0.1500 per kWh Jun 9,2016 $52.94
DUKE
ENERGY® www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160618010101_1.CSV-53209-000006481 *Printed on recyclable paper.
Page 1 of 1
s > <..... » > >>>> >>. >»><
ar.ttr. uiriesfall::.........::> ><< <>> Acc#uric l>urri er»>
d.........::..................:..::...:.:....................................
City Of Carmel Duke Energy 1-877-499-7859 9110-3050-02-8
Carmel Utilities For Account Services,please contact
Carmel Water Works Jessica Jackman
11468 Wood Creek Dr
Carmel IN 46033
.;;: aylxlei is TA :: :.:;:::::>:::::. : ...... A�c�uat I �rtna ton;;;: ::»::»:<:::;>:«:::>:::: :..........................
:::>;:
...........................................................................................
PO Box 1326 Payments after May 27 not!included Bill prepared on May 27,2016
Charlotte NC 28201-1326 Last payment received May 09 Next meter reading Jun 23,2016
. 'a3eadin"' 3Ie' '. _<;>:;>> 'Mee Re``:<>::.:.:.«'.?': <> '. > >...................
::>::>::::>::::%<::::>::>:::-:>: r . aticrt .............................................................Actual......
::::::.:.::.......�.::::::::.:..:::.:..::::..:::::::.:.::::::: ....:.::::::::.:
.
ete%rs:::::;::>:.umi et.:>::>:::riiii:<:::=:>: ::>:»':>::: >. .s:?:: :YV U>Is ::r..esetlt:'::::':<: ti ti1::>:::::>:::: s$ :[::>:> :::
Elec 106939238 Apr 25 May 25 30 43350 ,43754 1 404 1.76
I
f:[e .........._.... .
Usage- 404 kWh Amt Due- Previous Bill $61.19
Duke Energy- Rate SWP $58.28 Payments) Received 61.19cr
Current Electric Charges 58.28 Balance'Forward 0.00
Current Electric Charges 58.28
I 1 Curren4mount Due 58.28
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.5212232 or complete an energy theft form at
duke-energy.com,under the customer service link.
i
I
I
Average Cost: $0.1443 .per kWh Jun 21,2016 $58.28
DUKE
ENERGY® I www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160527010101_1.CSV-41693-000007738 Printed on recyclable paper.
r�rra�nuumn in❑ivr rani ivry wvnn rvun r„rmervi
I Page 1 of 1
c€dts ;:.;:.:.:.;:.::.::.;:.: t r tune fail...:;:.;:.;:.::.;:.;:.;:.:.;:.;:.;:;;:.:•:; 1ca ►uz! Uurrie
City Of Carmel Duke Energy 1-877-499-7859 4110-3050-02-0
Carmel Utilities For Account Services,please contact
Carmel Water Works Jessica Jackman
10601 Hazel Dell Pkwy
Carmel IN 46033
I
..... nits T:::.;:.;:.;:.;:.;:.;:...............:.:.;;:.:.;:.;:..................................... ..A c�ur�t l #axma cx E.;:.;:.:.;;:.::.;:.:;..:.;:.;:.;:.;::::..::.:::;.::.::;.;;::.:;:..
PO Box 1326 Payments•after May 26 not included Bill prepared on May 26,2016
Charlotte NC 28201-1326 Last payment received May 09 Next meter reading Jun 24,2016
A<=>NlsterReatx '< > s `> ` `:<` < `< <':<' <' < =>` c#xat......
..... .:re a .... .: :> >::l It:::::>::::>::>:
Elec 108206789 Apr 26 May 25 29 78,014
On Peak I 211.70
mer al`> >' <> >'>` an!'S `' <>'> ..... .............
'>'>' >'> > > ..
.. .. . .. . ...... ...
Usage- 78,014 kWh Amt Due- Previous Bill $5,712.36
Duke Energy- Rate SWP $5,722.70 Payment(s)I Received 5,712.36cr
Current Electric Charges 5,722.70 Balance Forward 0.00
Current Electric Charges 5,722.70
5 ' Current Amount Due $5,722.70
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete-an energy theft form at
duke-energy.com,under the customer service link.
I
i
I
i
I
i
i
I
:
>::>
.......................... ' >>
Average Cost: $0.0734 per kWh Jun 17,2016 $5,722.70
DUKE
�CENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160526010101_1.,IV-36251-000007414 0 Printed on recyclable paper. —
VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201(Rev.1995)
DUKE ENERGY ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
PO BOX 1326 IN SUM OF$ CITY OF CARMEL
An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
CHARLOTTE, NC 28201-1326 rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
$131.60 Payee
Purchase Order#
ON ACCOUNT OF APPROPRIATION FOR
Carmel Fire Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
3960-3050-01-4 43-480.00 $131.60 1 hereby certify that the attached invoice(s),or 6/7/16 3960-3050-01-4 $131.60
1120 101 1120 101
bill(s)is(are)true and correct and that the
-- —— ---- — materials or services itemized thereon for
which charge is made were ordered and
received except
Tuesday, June 07,2016
David Haboush
Fire Chief
I hereby certify that the attached invoice(s),or bill(s), is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
20
Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
fLCMJC AGI VnIV InC IVr rVn11 MY n IVVn I'n llvlclYl
Page 1 of 1
<. rurao .:fall;;;:.;;:.;;:::.;:.;;:.;;:::.;;»:..
Ait1101.:�1#Xr��1
>.lu rt
City Of Carmel Duke Energy i 1-800-521-2232 3960-3050-01-4
1..a..::.:.... ...............................................:.::::::::::::::::: ::::::::::.:::.:,.:.::::.:::::::::::::::::::::::::: ........_..::::::::.
aid t
.::: :::::........
.................. .........................................................................................
PO Box 1326 Payments after May 31 not included Bill prepared on May 31,2016
Charlotte NC 28201-1326 Last payment received May 26I
Cu°en
Qty 14 Usage-0 Amt Due- Previous Bill $ 131.60
Duke Energy- Rate CSN9 Payment(s)'Received 131.60cr
Comm Sry-Fire Siren 131.60 Balance Forward 0.00
Current Unmetered Charges $131.60 Current Unmetered Charges 131.60
Current Amount Due $131.60
i
DUKE
I
i
I
I
I
I
I
I
IJun 22,2016 $131.60
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160531010101_1.CSV-38479-000010110 0 Printed on recyclable paper.
i
I
'oucher No. Warrant No. j
254004 Duke Energy Allowed 20
PO Box 1326
Charlotte, NC 28201-1326
In Sum of$
$ 36,889.40
ON ACCOUNT OF APPROPRIATION FOR
101 -General Fund/109 -Monon Center
PO#or INVOICE NO. ACCT#/TITLE AMOUNT Board Members
Dept#
1125 0600-3660-01-8 4348000 $ 87.61 I hereby certify that the attached invoice(s),or
1125 7470-3295-01-4 4348000 $ 28.24 bill(s) is(are)true and correct and that the
1125 1650-3050-01-7 4348000 $ - materials or services itemized thereon for
1125 0990-3736-01-9 4348000 $ 204.84 which charge is made were ordered and
1125 5260-3287-01-0 4348000 $ 113.11 received except
1125 3890-3290-02-9 4348000 $ 10.39
1125 4260-3287-01-5 4348000 $ 454.36
1125 1660-3622-01-8 4348000 $ 144.81
09 6010-3608-01-8 4348000 $ 3,765.93
1091 ,5010-3608-01-2 4348000 $ 32,080.11 I June 1, 2016
i
Signature
$ 36,889.40 j Accounts Payable Coordinator
Cost distribution ledger classification if Title
claim paid motor vehicle highway fund
I
Page 1 of 2
Carmel Clay Parks&Recreation Duke Energy 1-800-774-1202 0600=366 �8
City Of Carmel
Dir 116Th St E
Monon Trail
I
_ B
Ni
PO Box 1326XFF.,i2Yiz 1SeYSPayments after Jun 02 not included Bill prepared on Jun 92,i20L16�
Charlotte NC 28201-1326 Last payment received May 16 Next meter reading Ju 8,2016
4.
Elec 106950892 Apr 29 May 30 31 28750 294221 1 672 0.00
Usage- 672 kWh Amt Due-Previous Bill $87.52JUN - 3 2016
Duke Energy-Rate CSNO $87.61 Payment(s) Received 87.52c
Current Electric Charges $$7�� Balance Forward 0.00
Current Electric Charges 87.61 -
Current Amount Due $ T 6 ---
I
j
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link. j
i
I
S. . ,.
Average Cost: $0.1304 per kWh Jun 24,2016 $87.61
I
;DUKE
ENERGYu Visit us at www.duke-energy.com
ASt DUKE To view information printed on the back of your bill please click or
ENERGY., go to www.duke-energy.com/indiana/billing/back-of-bill.asii Pape 2 of 2
..
Garmel Clay Parks&Recreation Dir 116Th St E 0600-3660-01-8
City Of Carmel Monon Trail
+at c
Electric Duke Energy
Meter- 106950892 Rate CSNO -Commercial Service
Multipliers 1
kWh Usage- 672 Connection Charge $9.40
Energy Charge
300 kWh 9 $0.08240900 24.72
Apr 29-May 30 372 kWh @ $0.07287300 27.11
31 Days Rider 60-Fuel Adjustment 1
672 kWh @ $0.00964100 6.48
Rider 61 -Coal Gasification Adj
672 kWh 9 $0.01348900 9.06
Rider 62-Pollution Cntl Adj 1
672 kWh @ $0.00437700 2.94
Rider 63- Emission Allowance
672 kWh @ $0.00003600cr 0.02cr
Rider 66-A-Energy Eff Adj 1
672 kWh @ $0.00166400 1.11
Rider 67-Cinergy Merger Credit
672 kWh @ $0.00060300cr 0.41 cr
Rider 68-Midwest Ind Sys Oper Adj
672 kWh @ $0.00260900 1.75
Rider 70- Reliability Adjustment
672 kWh 9 $0.00081300 0.55
Rider 71 -Clean Coal Adjustment
672 kWh @ $0.00724200 4.87
Rider 72- Federally Mand Cost Adj
672 kWh @ $0.00007600 0.05 $87.61
F $87.61
kWh Electric Usage
I
1,000-
800-
60
,00080060
400
200
0
M M
Calculations based on most recent 12 month history
Total Usage 8,163
Average Usage 680
I
MA JUN JU AUG SEP OCTNO iDEC JAN FEB MAR APR MAY
Electric 611 53 51 51 73 74 92 69 631 771 671 672
I
I
ENERGY, I Visit us at www.duke-energy.com
Page 1 of 2
ame Fall d: o eXG,a
Carmel Clay Parks&Recreation Duke Energy 1-800-521-2232 X7970.3295-01-4
City Of Carmel
Outdoor Light Meadow Lark Park
cc
PO Box 1326 Payments after Jun 02 not included Bill prepared`on.Ju.n.02_,2016
Charlotte NC 28201-1326 Last payment received May 16
u:"ettt„” tt„
Qty 2 Usage-324 kWh Amt Due-Previous Bill $28.22
Duke Energy Payment(s)Received 28.22cr JUN °' 3 2016
2 @ Rate SUOL $28.24 Balance Forward _Tb
Current OL Charges $_TM Current OL Charges 28.24 , ,-.--
w
Current Amount Due +' 8.24 --- —
61
,R?
Outdoor Lighting(OL) Duke Energy
Quantity- 2 Rate SUOL -Unmetered Outdoor Ltg Sry
Lumens- 50,000
Type- High Press Sodium Energy Charge
kWh Usage- 324 Energy Charge $14.70
May 02-Jun 01 Lighting Maint Charge 9.00
30 Days Rider 60- Fuel Adjustment 3.12
Rider 61 -Coal Gasification Adj 0.08
Rider 62-Pollution Cntl Adj 0.32
Rider 63- Emission Allowance 0.02cr
Rider 66-A-Energy Eff Adj 0.52
Rider 67-Cinergy Merger Credit! 0.30cr
Rider 68-Midwest Ind Sys Oper Adj 0.16
Rider 70- Reliability Adjustment 0.12
Rider 71 -Clean Coal Adjustment 0.54
Rider 72- Federally Mand Cost A'dj $28.24
o afu re s es $28.24
•
Jun 24,2016 $28.24
vr
DU - Visit us at www.duke-ener com
ENERGY gy
DUKE To view information printed on the back of your bill please click or
ENERGY go to www.duke enerey.com/mdiana/billing/back-of-'bill.aso Pape 2 of 2
Carmel Clay Parks&Recreation 7470-3295-01-4
City Of Carmel
Outdoor Light Meadow Lark Park
kWh Electric Usage
0—
so-
210-
140-
7 0 so2101407o
0
M M
i
Calculations based on most recent 12 month history
Total Usage 3,888
Average Usage 324
JUN JU AU SEP OC NOV DEC JAN FEB MA APR MAY JUN
Dectric 32 32 32 324 32 -Al32 324 32 32 324 324 324
I
DUKE
I
I
I
i
I
'Z"ENERGY. Visit us at www.duke-energy.com
Page 1 of 2
M-------------------- do ix
Carmel Clay Parks&Recreation Duke Energy 1-800-521-2232 00990_37.36=01.9
City Of Carmel
11675 Hazel Dell Pkwy
Carmel IN 46033
I
POBox1326 PaymentsafterJun 02 not included Bill prepared on Ju-'02,2016..
Charlotte NC 28201-1326 Next meter reading Jun 28,2016
a = > eat .,.,,
Ali„ ;?a ' e �.
Elec 093535442 Apr 29 May 28 29 14558 166221 1 2,064 0.00
JUN - 3 2616
.e ._ -
Usage- 2,064 kWh Amt Due-Previous Bill $27.01 c
Duke Energy-Rate CSNO $231.85 Balance Forward c
Current Electric Charges $131 85 Current Electric Charges 231:85--
Current Amount Due i x$,4.$4--
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
I
i
I
Wn",
jut,
tie,t
Average Cost: $0.1123 per kWh Jun 24,2016 $204.84 $210.99
,fiT-D KE Visit us at www.duke-energy.com
�N_.ERGX�.'
DUKE To view information printed on the back of your bill please click or
v ENERGY., go to www.duke-energy.com/indiana/billing/back-of-bill.asli Pa e 2 of 2
,n
�, 5'
Carmel Clay Parks&Recreation 11675 Hazel Dell Pkwy 0990-3736-01-9
City Of Carmel Carmel IN 46033
a ca , r. a
Electric Duke Energy
Meter- 093535442 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge 1 $9.40
kWh Usage- 2,064 Energy Charge
300 kWh @ $0.08240900 24.72
Apr 29-May 28 700 kWh @ $0.07287300 51.01
29 Days 1,064 kWh @ $0.06169600 65.64
Rider 60- Fuel Adjustment
2,064 kWh @ $0.00964100 19.90
Rider 61 -Coal Gasification Adj
2,064 kWh @ $0.01348900 27.84
Rider 62- Pollution Cntl Adj 1
2,064 kWh 9 $0.00437700 9.03
Rider 63-Emission Allowance
2,064 kWh @ $0.00003600cr 0.07cr
Rider 66-A-Energy Eff Adj 1
2,064 kWh @ $0.00166400 3.45
Rider 67-Cinergy Merger Credit
2,064 kWh @ $0.00060300cr 1.24cr
Rider 68-Midwest Ind Sys Oper Adj
2,064 kWh @ $0.00260900 5.38
Rider 70- Reliability Adjustment
2,064 kWh 9 $0.00081300 1.68
Rider 71 -Clean Coal Adjustment
2,064 kWh @ $0.00724200 14.95
Rider 72-Federally Mand Coast Adj
2,064 kWh 9 $0.00007600 0.16 $231.85
--% $231.85
kWh Electric Usage
3,500-
2,800
2,100
1,400
700
0
M J4&M
Calculations based on most recent 12 month history
Total Usage 20,618
Average Usage 1,718
MA JUN JU AUG SEP OCTNOV DEC JAN FEB MA APR MAY
Electric 621 551 3 61 1,20 1,96 2,245 2,36 3,23 2,95 1,588 1,413 2,064
I
I
III
DUKE
ENERGY, j Visit us at www.duke-energy.com
Page 1 of 2
d tU
t::, , An of lz[ttr n
p�evsa��+�- �
Carmel Clay Parks&Recreation^% Duke Energy 1-800-774-1202 5260 3287=b1 0
1427 116Th St E
Carmel IN 46032
l` a aA 'ho
PO Box 1326 Payments after May 31 not inclu'Ided Bill prepared on=" 1;6
Charlotte NC 28201-1326 Last payment received May 09 Next meter reading Jun 242016
ea g3} M.e. .
t)a � o `PresWNW
VM
Elec 063601950 Apr 26 May 26 30 20059 21050 1 991 0.00
Usage- 991 kWh Amt Due-Previous Bill $118.26
Duke Energy-Rate RSNO $113.11 Payment(s) Received 118.26c
Current Electric Charges $ 3 ii Balance Forward 0.00
Current Electric Charges 113 11
Current Amount Due $� ;
TR-1311�C i"'11
_
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link. J U N
I
i
Average Cost: $0.1141 per kWh Jun 22,2016 $113.11
DUKE
d ENERGY Visit us at www.duke-energy.com
f DUKE To view information printed on the back of your bill please click or
' ENERGY., go to www.duke-enerev.com/indiana/billing/back of-bill.aso Pa e 2 of 2
r r:_ ���ccou
Carmel Clay Parks&Recreation 1427 116Th St E 5260-3287-01-0
Carmel IN 46032
I
p"[ I✓ r. n ski
Electric Duke Energy
Meter- 063601950 Rate RSNO -Residential Service
Multipliers- 1
kWh Usage- 991 Connection Charge $9.40
Energy Charge
300 kWh @ $0.09294500 27.88
Apr 26-May 26 691 kWh Co) $0.05417800 37.44
30 Days Rider 60- Fuel Adjustment
991 kWh 9 $0.00964100 9.55
Rider 61 -Coal Gasification Adj
991 kWh 9 $0.01267300 12.56
Rider 62-Pollution Cntl Adj 1
991 kWh @ $0.00374100 3.71
Rider 63- Emission Allowance
991 kWh @ $0.00003600cr 0.04cr
Rider 66-A-Energy Eff Adj 1
991 kWh @ $0.00388000 3.85
Rider 67-Cinergy Merger Credit
991 kWh @ $0.00052600cr 0.52cr
Rider 68-Midwest Ind Sys Oper Adj
991 kWh 9 $0.00275000 2.73
Rider 70-Reliability Adjustment
991 kWh @ $0.00068500 0.68
Rider 71 -Clean Coal Adjustment
991 kWh Co) $0.00586200 5.81
Rider 72- Federally Mand Coast Adj
991 kWh @ $0.00006400 0.06 $113.11
F� $113.11
kWh Electric Usage
2,500-
2,000-
1,500-
1,000-
500—
Calculations
,5002,0001,5001,000500Calculations based on most recent 12 month history
Total Usage 16,574
Average Usage 1,381
MA JUN JU AUG SEP OCTNOV DEC JAN FEB MA APR MAY
Electric 1,10 1,80 1,79 2,04 1,67 1,129 1,40 ;1,394 1,15 1,024 1,100 1,05 991
I
I
I
I
g( DUKE
ENERGY, Visit us at www.duke-energy.com
i
Page 1 of 2
a►ri • Asal :o
Carmel Clay Parks&Recreation Duke Energy 1,800-774-1202 3890 3290=02-9'
City Of Carmel.
11813 River Ave
Carmel IN 46033 j
PO Box 1326 .„ Payments after Jun 02 not included Bill prepared/C—T Jun 02 2016. EJU
Charlotte NC 28201-1326 Last payment received May 16 Next meter readig Jun 2 1028 6
Urgent Message-The electric charges on this bill have been estimated because the poison ivy/oak ZQ16
prevented access.Please call us to make permanent meter reading arrangements before your next
scheduled meter reading date.
......... . .. ..... ..e rp X V----...M. .. .... ...... _ Y... M ... ....:, � i
e .0.1. e, 0 EN ......
Elec 106957100 Apr 29 May 27 28 1143 1151;E 1 8 0.00
Usage- 8 kWh Amt Due-Previous Bill $10.49
Duke Energy-Rate CSNO $10.39 Payment(s)Received 10.49c
Current Electric Charges $TUM Balance Forward —0-360-
Current Electric Charges 10.39
Current Amount Due �.
I
SO
I
I
I
Average Cost: $1.2988 per kWh Jun 24,2016 $10.39
I
U�
ENERGY Visit us at www.duke-energy.com
f. DUKE To view information printed on the back of your bill please click or
"S ENERGY go to www.duke-eneray.com/indiana/billing/back-of-bill.asp Pa9e 2 of 2
Carmel Clay Parks&Recreation 11813 River Ave 3890-3290-02-9
City Of Carmel Carmel IN 46033
Electric Duke Energy
Meter- 106957100 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge $9.40
kWh Usage- 8
Energy Charge
8 kWh 9 $0.08240900 0.66
Apr 29-May 27 Rider 60-Fuel Adjustment j
28 Days 8 kWh @ $0.0096,4100 0.08
Rider 61 -Coal Gasification Adj
8 kWh @ $0.01348900 0.11
Rider 62- Pollution Cntl Adj 1
8 kWh 9 $0.00437700 0.04
Rider 63- Emission Allowance 1
8 kWh @ $0.00003600cr 0.00
Rider 66-A-Energy Eff Adj
8 kWh 9 $0.00166400 0.01
Rider 67-Cinergy Merger Credit
8 kWh @ $0.00060300cr 0.00
Rider 68-Midwest Ind Sys Oper Adj
8 kWh @ $0.00260900 0.02
Rider 70-Reliability Adjustment
8 kWh @ $0.00081300 0.01
Rider 71 -Clean Coal Adjustment
8 kWh @ $0.00724200 0.06
Rider 72- Federally Mand Cost Adj
8 kWh @ $0.00007600 0.00 $10.39
oiai <,xt >ett: .. MI $10.39
kWh Electric Usage
1
e I
6-
3—
M
3M M M
Calculations based on most recent 12 month history
Total Usage 111
Average Usage 9
MA JUN JU AUG SEP OC NOV DEC JAN FEB MA APR MAY
Sectric 11 1 1 8
I
I
I
i
i
DUKE
Z ENERGY Visit us at www.duke-energy.com
I
I Page 1 of 3
ACco >� m
SEMI- .
Carmel Clay Parks&Recreation Duke Energy 1 1.800-774-1202"",',-A4246--O"-7"3-28-7,;Z. 1 5
1411 116Th St E
Carmel IN 46032
r:
PO Box 1326 Payments after May 31 not included Bill prepared on May.31,2016
Charlotte NC 28201-1326 Last payment received May 09 Next meter reading Jun 24;2
O"M
t x .xf. ,�x =
�w
Elec 108036629 Apr 26 May 26 30 13421 13540 40 4,760 0.00
Usage- 4,760 kWh Amt Due-Previous Bill $627.42
Duke Energy-Rate RSNO $426.75 Payment(s)Received 627.42c
Current Electric Charges $-4-2U.76 Balance Forward 030
Current Electric Charges 426.75
�y Current OL Charges 27161—
Current Amount Due
�$r
Qty 2 Usage-184 kWh R
Duke Energy
1 @ Rate SOLU $18.35
1 @ Rate SUOL 9.26
Current OL Charges 2 .6
i
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
JUN - 1 2016
I
I
Average Cost: $0.0897 per kWh Jun 22,2016 $454.36
qjA
DUKE��
" ENERGY Visit us at www.duke-energy.com
f DUKE To view information printed on the back of your bill please click or
ENERGY go to www.duke-enerev.com/indiana/billing/back-of-bill.asp Pa e 2 of 3
,,...,.>.., <..R. ,<... ..., ...,. S. x ........... ......... .....> d
Carmel Clay Parks&Recreation 1411 116Th St E 4260-3287-01-5
Carmel IN 46032
zf Fan i►' o >C rr n .....,_..
%
Electric Duke Energy
Meter- 108036629 Rate RSNO -Residential Service
Multipliers- 40
kWh Usage- 4,760 Connection Charge 1 $9.40
Energy Charge
300 kWh @ $0.09294500 27.88
Apr 26-May 26 700 kWh Co) $0.05417800 37.92
30 Days 3,760 kWh @ $0.0446400 167.18
Rider 60- Fuel Adjustment
4,760 kWh 9 $0.00964100 45.89
Rider 61 -Coal Gasification Adj
4,760 kWh @ $0.01267300 60.32
Rider 62-Pollution Cntl Adj 1
4,760 kWh @ $0.00374100 17.81
Rider 63- Emission Allowance
4,760 kWh Co) $0.00003600cr 0.17cr
Rider 66-A-Energy Eff Adj 1
4,760 kWh @ $0.00388000 18.47
Rider 67-Cinergy Merger Credit
4,760 kWh @ $0.00052600cr 2.50cr
Rider 68-Midwest Ind Sys Oper Adj
4,760 kWh 9 $0.00275000 13.09
Rider 70- Reliability Adjustment
4,760 kWh @ $0.00068500 3.26
Rider 71 -Clean Coal Adjustment
4,760 kWh 9 $0.00586200 27.90
Rider 72-Federally and Cost Adj
4,760 kWh @ $0.000106400 0.30 $426.75
nit $426.75
....
Outdoor Lighting(OL) Duke Energy
Quantity- 1 Rate SOLU -Outdoor Lighting Sry
Lumens- 30,000
Type- High Press Sodium Energy Charge
kWh Usage- 104 Lighting Maint Charge $3.21
Apr 26-May 25 Lighting Equip Charge 8.95
29 Days Energy Charge 4.72
Rider 60- Fuel Adjustment 1.00
Rider 61 -Coal Gasification Adj 0.02
Rider 62- Pollution Cntl Adj I 0.11
Rider 63-Emission Allowance
Rider 66-A-Energy Eff Adj 0.17
Rider 67-Cinergy Merger Credit 0.10cr
Rider 68-Midwest Ind Sys Oper Adj 0.05
Rider 70-Reliability Adjustment 0.04
Rider 71 -Clean Coal Adjustment 0.18
Rider 72- Federally Mand Cost Adj 18.35
Outdoor Lighting(OL) Duke Energy
Quantity- 1 Rate SUOL -Unmetered Outdoor Ltg Sry
Lumens- 8,000
Type- Mercury Vapor Energy Charge
kWh Usage- 80 Energy Charge $3.63
Lighting Maint Charge 4.50
29 Dpr 2ays May 25 Rider 60-Fuel Adjustment 0.77
Rider 61 -Coal Gasification Adj 0.02
Rider 62-Pollution Cntl Adj 1 0.08
Rider 63- Emission Allowance
Rider 66-A-Energy Eff Adj 1 , 0.14
Rider 67-Cinergy Merger Credit 0.08cr
Rider 68-Midwest Ind Sys Oper Adj 0.04
Rider 70-Reliability Adjustment 0.03
Rider 71 -Clean Coal Adjustment 0.13
Rider 72- Federally Mand Cost Adj 9.26
1 Yrges $27.61
,.I.x
I
tDUKE
�c ENERGY Visit us at www.duke-energy.com
I
I
I
i
DUKE To view information printed on the back of your bill please click or
ENERGY., go to www.duke-enerev.com/indiana/billing/back-of-bill.asi) Pa9e 3 of 3
a
Carmel Clay Parks&Recreation 1411 116Th St E 4260-3287-01-5
Carmel IN 46032
kWh Electric Usage
20,000-
16,000 VM4M 12,0008,0004,0000 now M
Calculations based on most recent 12 month history
Total Usage 99,368
Average Usage 8,281
MA JUN JU AUG SEPTOC NOV DEC JAN FEB MAR APR MAY
Electric 5,02 6,22 6,02 6,6 5,5 4,22 8,8 11,544 17,264 13,3 7,624 7,024 4,944
,f DUKE
EN RGYgy
Visit us at www.duke-energy.com
Page 1 of 2
r.
OWNS- .
111
City Of Carmel Duke Energy 11-877-499-7859 ')-660:=3622=0t-8--,
Carmel Clay Parks For Account Services,please contact _ f
1235 Central Park Dr E Jessica Jackman
Misc:Lagoon Pum
Carmel IN 46032
PO Box 1326 Payments after Jun 02 not included Bill prepared oroJun 02,2016
Charlotte NC 28201-1326 Last payment received May 16 Next meter reading Jun-28,2016,
00
zaMEM. _
..` in !
IrS 1
Elec 106906084 Apr 29 May 31 32 98042 99244 1 1,202 0.00
Usage- 1,202 kWh Amt Due-Previous Bill $143.17 �'�'�' a' ' " `.j�,�
Duke Energy- Rate CSNO $144.81 Payment(s) Received 143.17c
Current Electric Charges $74M Balance Forward —Tb
Current Electric Charges 144.81 JUN - 3 2016
Current Amount Due r–$ y
i – -- - j —
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or com ilete an energy theft form at
duke-energy.com,under the customer service link.
!
i
I
I
i
i
. .
Average Cost: $0.1205 per kWh Jun 24,2016 $144.81
Dl1KE 7
Zi ENERGY�/ Visit us at www.duke-energy.com
tDUKE To view information printed on the back of your bill please click or
ENERGY., gotowww.duke-energy.com/indiana/billint?/back of-bil,.aso Page 2 of 2
r s eau
City Of Carmel 1235 Central Park Dr E ! 1660-3622-01-8
Carmel Clay Parks Misc:Lagoon Pum i
Carmel IN 46032
� ., ,.
Electric Duke Energy
Meter- 106906084 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge $9.40
kWh Usage- 1,202 Energy Charge 1
300 kWh @ $0.08240dOO 24.72
Apr 29-May 31 700 kWh @ $0.07287300 51.01
32 Days 202 kWh @ $0.06169600 12.46
Rider 60-Fuel Adjustment
1,202 kWh 9 $0.00964100 11.59
Rider 61 -Coal Gasification Adj j
1,202 kWh @ $0.01348900 16.21
Rider 62- Pollution Cntl Adj I
1,202 kWh 9 $0.00437700 5.26
Rider 63- Emission Allowance
1,202 kWh @ $0.00003600cr 0.04cr
Rider 66-A- Energy Eft Adj
1,202 kWh @ $0.00166400 2.01
Rider 67-Cinergy Merger Credit
1,202 kWh @ $0.00060300cr 0.72cr
Rider 68-Midwest Ind Sys Oper,'Adj
1,202 kWh @ $0.00260200 3.14
Rider 70-Reliability Adjustment
1,202 kWh @ $0.00081300 0.98
Rider 71 -Clean Coal Adjustment
1,202 kWh 9 $0.00724200 8.70
Rider 72- Federally Mand Cost Adj
1,202 kWh 9 $0.00007j600 0.09 $144.81
$144.81
kWh Electric Usage
2,000-
1,600-
1.200-
800-
400-
0-
16
,0001,6001,2008004000
M M
I
Calculations based on most recent 12 month history
Total Usage 12,041
Average Usage 1,003
MA JUN JU AUG SEP OCTNOV DEC JAN FEB MA APR MAY
Electric 1,19 1,03 38 501 61 65 1,730 11,137 1,29 9 1,103 1,18 1,202
I
I
I
1
DUKE Visit us at www.duke-energy.com
ENERGY
I
Page 1 of 2
IX0 eC4
City Of Carmel Duke Energy -800-774-12024&0101360&014-
Carmel Clay Parks
1235 Central Park Dr E
Misc:Main Bldg --,
Carmel IN 46032 FJU
. ` ; 2016
PO Box 1326 Payments after Jun 02 not included Bill prepared n 02-2046Charlotte NC 28201-1326 Last payment received May 16 Next meter reading Jun 28,2016 --
-Ea -
tau�t.�
Elec 106940254 Apr 28 May 27 29 40,225
On Peak 366.70
f~ECir�FSttY� )a #6�4 th
�t�Blfft _-__ _
Usage- 40,225 kWh 193.00 kVar Amt Due-Previous Bill $2,148.20
Duke Energy-Rate LSNO $3,765.93 Payment(s)Received 2,148.20c
Current Electric Charges3�,T65M Balance Forward
Current Electric Charges 3_,765.93
Current Amount Due
I
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link. i
i
I
I
I
i
I
I
........................
.
i
. x
Average Cost: $0.0936 per kWh Jun 24,2016 $3,765.93
1&DKE
Visit us at www.duke-energy.com
2` ENERGY;
(�DUKE To view information printed on the back of your bill please click or
ENERGY., go to www.duke-en,-rgy.com/indiana/billing/back-of-bill.aso Ne 2 of 2
e..: coo
City Of Carmel 1235 Central Park Dr E 6010-3608-01-8
Carmel Clay Parks Misc:Main Bldg
Carmel IN 46032
xypl I� I MIu
Electric Duke Energy j
Meter- 106940254 Rate LSNO -Low Load Factor Sec Sry
kWh Usage- 40,225 Connection Charge $15.00
Actual kW- 366.70 Energy Charge
Actual kVa- 414.40 300 kWh Co) $0.10788900 32.37
Billed Kvar- 193.00 700 kWh @ $0.08688900 60.82
Power Factor- 88.5% 1,500 kWh @ $0.07798900 116.98
37,725 kWh @ $0.05818900 2,195.18
Date of Peak 05/25/2016 KVAR Charge
Time of peak 21.30.00 193.00 Kvar @ $0.24000000 46.32
Rider 60-Fuel Adjustment
Apr 28-May 27 40,225 kWh @ $0.00964100 387.81
29 Days Rider 61 -Coal Gasification Adj
40,225 kWh Co) $0.01000200 402.33
Rider 62- Pollution Cntl Adj
40,225 kWh @ $0.00332500 133.75
Rider 63-Emission Allowance 1
40,225 kWh @ $0.00003600cr 1.45cr
Rider 66-A-Energy Eff Adj
40,225 kWh @ $0.00166,400 66.93
Rider 67-Cinergy Merger Credit
40,225 kWh Co) $0.00029500cr 11.87cr
Rider 68-Midwest Ind Sys Oper Adj
40,225 kWh 9 $0.00178300 71.72
Rider 70- Reliability Adjustment
40,225 kWh Co) $0.00056500 22.73
Rider 71 -Clean Coal Adjustment
40,225 kWh @ $0.00559900 225.22
Rider 72- Federally Mand Cost Adj
40,225 kWh 9 $0.00005200 2.09 $3,765.93
KENN.=.. � i1� �t ��.Mt0G's $3,765.93
\1...\.
i
kWh Electric Usage
150,000-
120,000-
90,000-
60,000-
30,000
50,000120,00090,00060,00030,000
0
M M M
Calculations based on most recent 12 month history
Total Usage 748,068
Average Usage 62,339
i
MA JUN JU AUG SEP OC NO DEC JAN FEB MA APR MAY
Electric 62,55 121,83 131,98 106,4 71,071 37, 33,09 44;981 53,79 50,1 34, 22,401 40,225
DUKE
ENERGY, Visit us at www.duke-energy.com
Page 1 of 2
City Of Carmel Duke Energy I' 1-877-499-7859 501;0 3fi08_-01 2
Carmel Clay Parks For Account Services,please contact
1235 Central Park Dr E Jessica Jackman
Carmel IN 46032
c a
...........................:...<:.,,., .,., ,............................................,., ........,.,....,....,.,..,,,._.,,. � � `'
PO Box 1326 Payments after Jun 02 not included Bill prepared�on.Jun 02 2016
Charlotte NC 28201-1326 Last payment received May 16 Next meter reading Jun 28-2016 JUN - 32016
t M8t4 d
Elec 108068377 Apr 28 May 27 29 355,666
On Peak 875.20
I
Usage- 355,666 kWh 875.20 kW Amt Due-Previous Bill $29,094.16
467.20 War Payment(s)Received 29,094.16c
Duke Energy-Rate HSNO $32,080.11 Balance Forward 0.00
Current Electric Charges $ GST Current Electric Charges 32_,080.11
Current Amount Due
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or compl to an energy theft form at
duke-energy.com,under the customer service link.
I
I
I
..�
h.� x' xK. un;nwh. YJ14'�X,?'vRx!i]VK'vYF1
Average Cost: $0.0902 per kWh Jun 24,2016 $32,080.11
tzfe DUKE , f Visit us at www.duke-energy.com
.-ENERGY'?
efft,DUKE To view information printed on the back of your bill please click or
ENERGY go to www.duke-enersy.com/indiana/billing/back-of-bill.asp Pa e 2 of 2
11211
s.
0
City Of Carmel 1235 Central Park Dr E 5010-3608-01-2
Carmel Clay Parks Carmel IN 46032
Oman
c I
Electric Duke Energy !
Meter- 108068377 Rate HSNO -High Load Factor Sec Sry
kWh Usage- 355,666 Connection Charge $15.00
Actual kW- 875.20 Demand Charge I
Actual kVa- 992.10 875.20 kW @$14.06000000 12,305.31
Billed Kvar- 467.20 Energy Charge
Power Factor- 88.2% 355,666 kWh @ $0.01683000 5,985.86
KVAR Charge
467.20 Kvar @ $0.24000000 112.13
Date of Peak 05/25/2016 Rider 60-Fuel Adjustment
Time of peak 18.30.00 355,666 kWh @ $0.00964100 3,428.98
Apr 28-May 27 Rider 61 -Coal Gasification Adj 1
29 Days 875.20 kW 0 $5.51965200 4,830.80
Rider 62- Pollution Cntl Adj 1
875.20 kW 0 $1.72535800 1,510.03
Rider 63- Emission Allowance 1
355,666 kWh @ $0.00003600cr 12.80cr
Rider 66-A- Energy Eft Adj
355,666 kWh @ $0.00166400 591.82
Rider 67-Cinergy Merger Credit
355,666 kWh 9 $0.00033300cr 118.44cr
Rider 68-Midwest Ind Sys Oper Adj
355,666 kWh @ $0.00170500 606.41
Rider 70- Reliability Adjustmerit
355,666 kWh 9 $0.00060100 213.76
Rider 71 -Clean Coal Adjustment
875.20 kW @ $2.95187500 2,583.48
Rider 72-Federally Mand Cost Adj
875.20 kW Co) $0.03172600 27.77 $32,080.11
e $32,080.11
I
kWh Electric Usage
500,000-
400,000
00,000 400,000
i
300,000
1
200,000
100,000
0
I
M M M
I
Calculations based on most recent 12 month history
Total Usage 4,594,392 1
Average Usage 382,866
i
MA JUN JU AUG SEP OCTNOV IDEC JAN FEB MA APR MAY
Electric 416,01 491,59 491,32 463,405 452,79 353.3W 316,3 35891 326,801 316,5 329,53 338,09 355,666
I
I
I
I
I
I
I
i
-P DUKE
Visit us at www.duke-energy.com
ENERGY, gY•
'oucher No. Warrant No.
i
254004 Duke Energy Allowed 20
PO Box 1326
Charlotte, NC 28201-1326
In Sum of$
i
$ 467.22
ON ACCOUNT OF APPROPRIATION FOR j
101 General Fund /110 Facilities
I
PO#or INVOICE NO. ACCT#/TITLE AMOUNT Board Members
Dept#
I
1125 5710-3301-01-9 4348000 $ - I hereby certify that the attached invoice(s), or
1125 2810-3743-01-1 4348000 $ 63.81 bill(s) is(are)true and correct and that the
1125 1810-3743-01-6 4348000 $ 17.81 materials Ior services itemized thereon for
1125 1310-3278-01-0 4348000 $ - which charge is made were ordered and
1125 3190-3277-01-0 4348000 $ - received except
1125 7280-3771-01-5 4348000 $ -
<z " ( 8740-3794-02-1 4348000 $ 385.60
1125 1550-3287-02-9 4348000 $ -
June 1, 2016
'P
*M"VXtAj
Signature
$ 467.22 Accounts Payable Coordinator
Cost distribution ledger classification if I Title
claim paid motor vehicle highway fund
I
I
Page 1 of 2
re` a u s •MiMffl
City Of Carmel Duke Energy I 1-877-499-7859' 2$1'_0 3743:01.-1'
Carmel Clay Parks For Account Services,please contact
1235 Central Park Dr E Jessica Jackman
Misc:Shelter
Carmel IN 46032 I __
PO Box 1326 Payments after May 31 not included Bill prepared2 - "� JUN —
Charlotte NC 28201-1326 Last payment received May 09 Next meter reading Jun 24,!_l6
....
w -x
e e
Elec 106826790 Apr 26 May 26 30 936 1396 1 460 0.00
i
%�gCtt�L �.rO[TflST {d �17fi�t31��tM.,.
Usage- 460 kWh Amt Due-Previous Bill $73.05
Duke Energy-Rate CSNO $63.81 Payment(s) Received 73.05c
Current Electric Charges $-6M Balance Forward —T-'
Current Electric Charges 63.81_
Current Amount Due '
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
I
i
i
i
I
f 8 ,AiIkG fft. eKHow.
.
>
Average Cost: $0.1387 per kWh Jun 22,2016 $63.81 $65.72
DUKE
E!N,.ERGY Visit us at www.duke-energy.com
DUKE To view information printed on the back of your bill please click or
r►: ENERGY., go to www.duke-enerev.com/indiana/billing/back-of-bill.aso Pa e 2 of 2
City Of Carmel 1235 Central Patio Dr E 2810-3743-01-1
Carmel Clay Parks Misc:Shelter
Carmel IN 46032
I
I
Electric Duke Energy
Meter- 106826790 Rate CSNO -Commercial Service
Multipliers- 1
kWh Usage- 460 Connection Charge $9.40
Energy Charge
300 kWh @ $0.08240900 24.72
Apr 26-May 26 160 kWh Co) $0.07287300 11.66
30 Days Rider 60- Fuel Adjustment 1
460 kWh @ $0.00964100 4.43
Rider 61 -Coal Gasification Adj
460 kWh 9 $0.01348900 6.20
Rider 62- Pollution Cntl Adj ,
460 kWh @ $0.00437700 2.01
Rider 63- Emission Allowance
460 kWh @ $0.00003600cr 0.02cr
Rider 66-A-Energy Eff Adj
460 kWh 0 $0.00166400 0.76
Rider 67-Cinergy Merger Credit
460 kWh @ $0.000,60300cr 0.28cr
Rider 68-Midwest Ind Sys Oper Adj
460 kWh @ $0.00260900 1.20
Rider 70- Reliability Adjustment
460 kWh 9 $0.00081300 0.37
Rider 71 -Clean Coal Adjustment
460 kWh @ $0.007,24200 3.33
Rider 72-Federally and Cost Adj
460 kWh @ $0.00 07600 0.03 $63.81
ar tt� •e
qhs $63.81
__
kWh Electric Usage
1,000
800
600
400
200
0 WOWJ
Calculations based on most recent 12 month history
Total Usage 6,742
Average Usage 562
MA JUN JULAUG SEP OC NOV DEC JAN FEB MAR APR MAY
Electric 501 46 46 4 58 45 67 77 77 661 394 542 460
I
I
I
I
I
DUKE
ENERGY Visit us at www.duke-energy.com
Page 1 of 2
i2 MEN. oGotrra�
City Of Carmel Duke Energy 1-800-521-2232 18110 3743=0,9'=6''
Carmel Clay Parks ``'"
1235 Central Park Dr E
Misc:Lighting
Carmel IN 46032
..
PO
31
pre
Box 1326 tmiafter
ct inluded Bill
mete'ue d M
Charlotte NC 28201-1326 LasPaYmentreeived May06Next Jun 24 20x'6
9
RE
xx�x99ffl§= �; W- w
xzs�a�a aa�n��,rYeuc
bNil-
-- -MMrays were �
Elec 038130351 Apr 26 May 26 30 4846 4915 1 69 0.00
Usage- 69 kWh Amt Due-Previous Bill $18.89 JUN - 12016
Duke Energy-Rate CSNO $17.81 Payment(s) Received 18.89c
Current Electric Charges 5TTU Balance Forward —uu -
Current Electric Charges ,„ 17;81--
Current Amount Due
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
I
i
... e� s. �,,,.
w�nx,=+s..x�...,xFn_ 3r3s•. xxxxF� a�•r-x,�znn�n r�nr�_••
Average Cost: $0.2581 per kWh Jun 22,2016 $17.81 $18.34
D11�+ E�
ENERGY Visit us at www.duke-energy.com
d-,DUKE To view information printed on the back of your bill please click or
ENERGY., gotowww.duke-energy.com/indian bill.asp Page 2 of 2
+� r s;.. cn :irtiber
City Of Carmel 1235 Central Park Dr E 1810-3743-01-6
Carmel Clay Parks Mise:Lighting
Carmel IN 46032
Electric Duke Energy
Meter- 038130351 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge $9.40
kWh Usage 69 Energy Charge
69 kWh @ $0.08240900 5.69
Apr 26-May 26 Rider 60- Fuel Adjustment
30 Days 69 kWh @ $0.00964100 0.67
Rider 61 -Coal Gasification Adj
69 kWh @ $0.01348900 0.93
Rider 62- Pollution Cntl Adj 1
69 kWh 9 $0.00437700 0.30
Rider 63- Emission Allowance
69 kWh @ $0.00003600cr 0.00
Rider 66-A-Energy Eff Adj 11
69 kWh 9 $0.00166400 0.11
Rider 67-Cinergy Merger Credit
69 kWh @ $0.00060300cr 0.04cr
Rider 68-Midwest Ind Sys Oper Adj
69 kWh 9 $0.00260900 0.18
Rider 70- Reliability Adjustm6nt
69 kWh @ $0.00081300 0.06
Rider 71 -Clean Coal Adjustrr ent
69 kWh @ $0.00724200 0.50
Rider 72- Federally Mand Cost Adj
69 kWh 9 $0.00067600 0.01 $17.81
KWh Electric Usage
150-
120-
90--
60-
5012090 60
30
0
M M
I
Calculations based on most recent 12 month history
Total Usage 1,002
Average Usage 84
I
MA JUN JU AUG SEP OC NOVI DEC JAN FEE MAR APR MAY
Electric 71 6 7 76 6 B 9 10 111 8 7 69
I
i
i
'e'DUKE
Visit us at www.duke-energy.com
v, ENERGY, gy
Page 1 of 2
atn e- t tqu e m
Carmel Clay Parks&Recreation Duke Energy 1-800-521-223%("07.10 3794-02=1
11675 Hazel Dell Pkwy
Misc:Pavilion
Carmel IN 46033 _ t
4" _
W-1-NO :.............. JUN - 3 2016
i
PO Box 1326cxi%x „' .,. �_<Payments after Jun 02 not included , Bill prepared on Jun 02 2015
Charlotte NC 28201-1326 Last payment received May 16 Next meter reading�Jun-28,201-6__.-__-
--
[ Qa s 1 --
F Wow- •�
Elec 106959482 Apr 29 May 28 29 2988 3074 40 3,440 13.60
tee t .e. Sint. �
Usage- 3,440 kWhNs 1.10 War Amt Due-Previous Bill $458.14
Duke Energy-Rate LSNO $385.60 Payment(s) Received 458.14c
Current Electric Charges Balance Forward —Tb
Current Electric Charges 385.60
Current Amount Due
i
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
�I
i
I
i
I
I
Average Cost: $0.1121 per kWh Jun 24,2016 $385.60
j�`t-NER. Visit us at www.duke-energy.com gy.com
tDUKE To view information printed on the back of your bill please click or
-SENERGY., go to www.duke-energV.com/indiana/billing/back-of-bill.aso Page 2 of 2
a u t
r .
Carmel Clay Parks&Recreation 11675 Hazel Dell Pkwy 8740-3794-02-1
Misc:Pavilion !
Carmel IN 46033
...,
10
------------
Electric Duke Energy !
Meter- 106959482 Rate LSNO -Low Load Factor Sec Sry
Multipliers- 40 Connection Charge $15.00
kWh Usage- 3,440 Energy Charge
Demand Read- 00.34 300 kWh @ $0.10788900 32.37
Actual kW- 13.60 700 kWh @ $0.08688900 60.82
Billed Kvar- 1.10 1,500 kWh @ $0.07798900 116.98
Power Factor- 99.6% 84 kWh @ $0.05818900 4.89
Load Factor-Next 110 Hrs Use
Apr 29-May 28 856 kWh Co) $0.05158800 44.16
29 Days KVAR Charge
1.10 Kvar @ $0.24000000 0.26
Rider 60-Fuel Adjustment
3,440 kWh @ $0.0096,4100 33.17
Rider 61 -Coal Gasification Adj
3,440 kWh @ $0.0100'0200 34.41
Rider 62-Pollution Cntl Adj 1
3,440 kWh @ $0.00332500 11.44
Rider 63- Emission Allowance,
3,440 kWh @ $0.00003600cr 0.12cr
Rider 66-A- Energy Eft Adj 1
3,440 kWh @ $0.00166400 5.72
Rider 67-Cinergy Merger Credit
3,440 kWh @ $0.00029500cr 1.01cr
Rider 68-Midwest Ind Sys Oper Adj
3,440 kWh @ $0.00178300 6.13
Rider 70- Reliability Adjustment
3,440 kWh 0 $0.00056500 1.94
Rider 71 -Clean Coal Adjustment
3,440 kWh 0 $0.00559900 19.26
Rider 72- Federally Mand Cost Adj
3,440 kWh @ $0.00005200 0.18 $385.60
kWh Electric Usage
10,000-
81000-
6,000
0,0008,0006,000
4,000-
2,000
0
&Jm ,
Calculations based on most recent 12 month history
Total Usage 63,160
Average Usage 5,263
!
MA JUN JU AUG SEP OCT11
NOV IDEC JAN FEB MARI APR MAY
Electric2,40 4,16 4,28 4,52 4,32 4,20 5,040 6,720 9,280 8,080 4,840 4,280 3,440
i
i
(D DUKE ENERGY, Visit us at www.duke-energy.com
VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201(Rev.1995)
DUKE ENERGY ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
PO BOX 1326 IN SUM OF$ CITY OF CARMEL
An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
CHARLOTTE, NC 28201-1326 rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
$40.05 Payee
ON ACCOUNT OF APPROPRIATION FOR Purchase Order#
General Administration Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
0700-3295-03-0 43-480.00 $40.05 I hereby certify that the attached invoice(s),or 6/7/16 0700-3295-03-0 $40.05
1205 101 1205 101
bill(s)is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Tuesday, June 07,2016
n
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
20
Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
".v 1—i yr rvn I I In win rrn mrw i
Page 1 of 1
City Of Carmel Duke Energy 1-800-774-1202 0700-3295-03-0
261 2ND St SW
Carmel IN 46032 j
Ac�unt Intc�racn
PO Box 1326 Payments!after Jun 02 not included Bill prepared on Jun 02,2016
Charlotte NC 28201-1326 Last payment received May 16
Qty 2 Usage-521 kWh I Amt Due- Previous Bill $40.00
Duke Energy Payment(s) Received 40.00cr
2 @ Rate SUOL $40;05 Balance Forward 0.00
Current OL Charges 40105 Current OL Charges 40.05
Current Amount Due 40.05
i
i
I
i
i
I
Submitted To
i
JUN 0 6 2016
i
Clerk Treasurer
` <> >
! Jun 24,2016 $40.05
ENERGY.
i www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160602010101_1.CSV-50007-000020735 printed on recyclable paper.
Prescribed by State Board of Accounts City Form No.201 (Rev.1995)
VOUCHER NO. WARRANT NO.
ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
DUKE ENERGY
PO BOX 1326 IN SUM OF$ CITY OF CARMEL
An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
CHARLOTTE, NC 28201-1326 rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
$1,175.95 Payee
ON ACCOUNT OF APPROPRIATION FOR Purchase Order#
Street Department Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
0 43-480.00 $713.62 1 hereby certify that the attached invoice(s),or 6/7/16 0 $462.33
2201 201 2201 201
0 43-480.00 $462.33 bill(s)is(are)true and correct and that the 6/7/16 0 $713.62
2201 1 1 201 1 materials or services itemized thereon for 2201 1 201
-- --- ------ -------- - ----
which charge is made were ordered and
received except
Tuesday,June 07,2016
0
Street CnmmisSlonef
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
20
Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
rLtA=r1r I UPIN itiL iur rVH I 1UN MIN YUUMrATMt--N I
Page 1 of 1
..... . . .... ...... .......... ......
...............
. ................
......... . .......
...........
...............
.... ... ........................ un! I0,...
....................
...... ....
... ................
... . ...... .
..............
............ 1:.;:.;:.;:.;:.»;;:: .........
... . ... ............. .. ........... .........
. ..........
..................
City Of Carmel Duke Energy 1-800-521-2232 9550-3714-01-0
Street Department
11599 Keystone
Carmel IN 46032
................................
......... ..
.... ........
%..%.......1% ......... ...
......... .........
a Mvmen
......... . ..
PO Box 1326 Payments after May 31 not included Bill prepared on May 31,2016
Charlotte NC 28201-1326 Lasi,payment received May 09 Next meter reading Jun 24,2016
....................
...................................... ....... ...........
........ .... .......%.............
.......................
.. ..............
............... ::»»>:::......
............. ...............
. ... ...... �IlaterU...........
Me,......... Una .
........ ..
................. ..... ..
Elec 035185747 Apr 26 May 26 30 70410 70930 1 520 0.00
................................
........... ........ .. .......
.... .....
...........................
........................
.. ...............................
nib ... .......
'd
Usage- 520 kWh Amt Due- Previous Bill $66.29
Duke Energy- Rate SMHL 1$54.96 Payment(s) Received 66.29cr
Current Electric Charges 54.96 Balance Forward 0.00
Current Electric Charges 54.96
Current Amount Due --54.96
-Ehbr0V-theft—a06c--tsall of us driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
---------- .........
........................................... .....................
..........
...... . ... ..... ...........
........ ...... .. --.. ****......
..... . ... ...........
....... .....
lue .....
.............
0.................. ---... .......
...................... ........... .. ...o.......
....... ............... —. ... ..
.................. .......... ...............%
Average Cost: $0.1057 per kWh I Jun 22,2016 $54.96
DUKE
ENERGY® www.duke-energy.com
13M BW.DEMW.DUKE.INREG.20160531010101 1.CSV-9297-000022028 a Printed on rervclahlp nanpr.
_. ......._. . . .............. ._ ........._..
I Page 1 of 1
> ara r`«u K a►)<
..............................' Xcc u ! I r er <
:casae:frvciAdr;ta s= <>>»:<:>:«<:>><<:::>:<`;»: ;:<:::.........
:::Q:::.::.:::::: ...........:::::::::::::::::::::::::::::::::::::::::::.
City Of Carmel Duke Energy 1-800-521-2232 7180-3816-01-2
699 Pro-Med Ln
Carmel IN 46032
I
PO Box 1326 Payments after Jun 01 not included Bill prepared on Jun 01,2016
Charlotte NC 28201-1326 Last,payment received May 16 Next meter reading Jun 29,2016
.'>' ter Rea is 11 >``' `>` `> < < ...A to
> Ratin .
:.;;;;;Da.s:::>:Ipxevrtus>:pr..esent:::::::::::>:
..........
e..... ......tr:»::>::>:7 <:>>:::.............
Elec 108224923 May 02 May 31 1 29 9090 9662 1 572 0.00
`
vtntl�ro a .. .. urnt
Usage- 572 kWh Amt Due- Previous Bill $72.75
Duke Energy- Rate CSNO ,$76.40 Payment(s) Received 72.75cr
Current Electric Charges 76.40 Balance Forward 0.00
Current Electric Charges 76.40
Current Amount Due 76.40
i
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete-an-energy theft form at —
duke-energy.com,under the customer service link.
ONE
I
Average Cost: $0.1336 per kWh Jun 23,2016 $76.40
DUKE
ENERGY. I www.duke-energy.com
BM -7519000025290 @ Printed on recyclable paper.
- - ..._. ...... .__........._ . Page 1 of 1
I
Ia1i ( vacld#ass:<`<'"'':``` '<'' % <<» <..::.>:<::::>:><;::.;:::::,:::,.,<:,,;:: » < <`< `> _>::::>::::>:::::<:::>::>:<:;:<:>:::>:>«:;:;:>::<::
i*dritngrtiri Call.:: :1#ccu1 !i�lt�m#;<er
City Of Carmel Duke Energy 1-800-521-2232 9180-3816-01-3
699 Pro-Med Ln
Carmel IN 46032
:.MAWR
::.:::.::.::.:::.::: .;:.;:.;:.;:.;:.;:.;:.;:.;:.;:.;:.;;;:.;:.;:.;:;:;::»::::: Acriur�i I1ItvtxaatlolR
PO Box 1326 Payments after Jun 01 not included Bill prepared on Jun 01,2016
Charlotte NC 28201-1326 Last payment received May 16 Next meter reading Jun 29,2016
:<::::>«::.:..:.............u:: :::::: ::: << A
€ ' moi>' <» »r.vii r ' » :: MEN=urn
Elec 108224922 May 02 May 31 29 10686 11356 1 670 0.00
`Etecfrcro` <`<
.................................. Cirrar�t:l3tflrn
mete
Usage- 670 kWh Amt Due- Previous Bill $84.19
Duke Energy- Rate CSNO $87.38 Payment(s) Received 84.19cr
Current Electric Charges 87.38 Balance Forward 0.00
Current Electric Charges 87.38
Current Amount Due 87.38
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity:-Call 800.521.2232 or-complete-an-energy-thef-forrr-at -
duke-energy.com,under the customer service link.
i
X.
I
... beE?a <'>``
i
Average Cost: $0.1304 per kWh Jun 23,2016 $87.38
DUKE
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160601010101_1.CSV-7521-000025290 9}Printed on recvclable oaoer.
! Page 1 of 1
........ +e< .vii. .A-"Mj!!I; : ' ?<> ::;<::::<::::<:>
..:........:ftS . ::: ............. r:fi r.. �i►kt II.::::::.:::::::::::::::::::::::::.A....ecc us t. It m er::.:
City Of Carmel Duke Energy 1-800-621-2232 7030-3728-01-3
Dir Cherry Creek By
Hazel Dell
:.;:.;:.;:.;:.:.;:.;;:.;:.; :.;,;;:.;:: ... .: .. .:
:.Acc�u>Ittal iortnaN :<:<> >...:>' >'<': :>:.........................: >> '
...........:: . .. .:::::::.::::::::::::::::::::::.:.::::
PO Box 1326 Payments after Jun 01 not included Bill prepared on Jun 01,2016
Charlotte NC 28201-1326 Last payment received May 16 Next meter reading Jun 27,2016
:.:
5 :..::.:..:::.::,::. .::::::: : :::-:...:.:::::::::.
eters>:>::> liief rm>''>:::a>::>:::::::: >::D :s«'Ilsevfinus:<::1�resetit:>:::::Ntui. ::::::::>;:::ls :::>::>:::»:>><::fVt/:>::::>::::>::::
:..:::::::::::::::::::.:.::::::::::..::::::::::::::::::::::.:::::::::::::::::.:$Y.:::::.::::.:._::::::::::::::::::::::::::::::::::........::::::::::::::::::::::::::::g.:.::::::.:
Elec 071377135 Apr 28 May 27 29 14166 14263 1 97 0.00
............. .......;:.:...*..............................;......
:l~ti e.11M.:=C i ifFme c a...
Usage- 97 kWh Amt Due- Previous Bill $21.68
Duke Energy- Rate CSNO ;$21.20 Payment(s) Received 21.68cr
Current Electric Charges 21.20 Balance Forward 0.00
Current Electric Charges 21.20
Current Amount Due -21.2 0
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can_
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
Average Cost: $0.2186 per kWh Jun 23,2016 $21.20
DUKE
ENERGY® www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160601010101_1.CSV-7517-000025290 0 printed on recyclable paper.
Page 1 of 1
stele f et Ite Adde` ... quir
City Of Carmel Duke Energy 1-800-521-2232 5640-3842-01-5
Carmel Street Dept
11601 Pennsylvania St N
Indianapolis IN 46280
t cc�utItetot rtra Toff"',
:::.:<.; :::::. : ;....: : ...
PO Box 1326 Payments after Jun 01 not included Bill prepared on Jun 01,2016
Charlotte NC 28201-1326 Last payment received May 16 Next meter reading Jun 29,2016
•:<>:::»>:<::<.<.:>::»>::>::>::>::>::»::>:::;:>:: . ................ ................:..............:::.:::......t�.r..:R�adfn .::::..:::::.:.....:..........................................Actftal......
.............................................................................................................................end;::>::::::,.M.f�ltt:>::::>::;;::.;<:.:Us:a �:>::::>::::::::>:::::<::::�>::klllt<:::::::::
Elec 108252827 Apr 29 May 31 32 5786 7294 1 1,508 0.00
Usage- 1,508 kWh Amt Due- Previous Bill $163.19
Duke Energy- Rate CSNO $ 175.69 Payment(s) Received 163.19cr
Current Electric Charges $175.69 Balance Forward 0.00
Current Electric Charges 175.69
Current Amount Due $175.69
I
Energy theft affects.all of us.--driving!up energy-costs and increasing the risk-tcpublic safety.You can
help-by reporting suspicious activity.ba1I7800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
I
...........
I
Average Cost: $0.1165 per kWh h Jun 23,2016 $175.69 $ 180.96
DUKE
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160601010101_1.CSV-8249-000024935 0 Printed on recyclable paper.
_v �.._. ......,�, ..,.......... ..,....... Page 1 of 1
orin'' ireal< < »<'><<>>> > ticculI #er>
.a..m....::..:.:.......................................:..........,...::::::.::::.::::::::.... ......::.:::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::.:.::......:::.:::::::::::........::... .
..................................................................................................................................................................................
City Of Carmel Duke Energy 1-800-521-2232 0230-3727-01-1
Street Department
936 Main St E
Carmel IN 46032
........::Y ::::::::.:::::::::::::::::::::..............:::.:::::::.:.:::::: ::::::::::.;:::::::::: :.;.: ::.::.::.;::.::..;.:.::.::.;::.:.:.:.;:::::::.::.:::.
PO Box 1326 Payments after Jun 01 not included Bill prepared on Jun 01,2016
Charlotte INC 28201-1326 Last'payment received May 09 Next meter reading Jun 27,2016
> .....€i.. . r.
X:... :::::.:... :::::::..:::::::..:::.<.Ds.:s:..:;.:Prevtn0s:>:t r..ese t:> >:Mi} > <:tfst »::>::<:::::>k > >
. um#>er....;;Ftn:.;:.;:.;: :.;::.;:.;;.:.;::::::.Y.:::.:::::::::::::::::::::::.::::::::::::.::::::::..:::::::::::::::::::::::::::::::::::8::..,:::..::::.:::::::::::::::::::::::
Elec 082820039 Apr 27 May 27 30 59253 60055 1 802 0.00
i
irrenlBifl
Usage- 802 kWh Amt Due- Previous Bill $50.52
Duke Energy- Rate SMLC $46.70 Payment(s) Received 50.52cr
Current Electric Charges 46.70 Balance Forward 0.00
Current Electric Charges 46.70
Current Amount Due 46.70
i
-Energy theft affects-all of us_driving up-energy-costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
I
> >:::::Cue>€) a3e< >`> <` >kinut€13ue '
i
Average Cost: $0.0582 per kWh Jun 23,2016 $46.70
DUKE
ENERGY. I www.duke-ener .com
BM_BW.DEMW.DUKE.INREG.20160601010101_1.CSV-6247-000024936
Printed on recyclable paper.
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT Page 1 of 1
City Of Carmel Duke Energy 1-800-521-2232 7920-3824-01-2
Street Department
95 106Th St E
Indianapolis |N4828O
PO Box 1326 Payments after Jun 02 not included Bill prepared on Jun 02,2016
Charlotte NC 28201-1326 Last payment received May 16 Next meter reading Jun 28,2016
E|oo 108220718 Apr 28 May 31 / 32 090 888 1 178 0.00
Usage- 178 kWh i Amt Due- Previous Bill $9.40
Duke Energy- Rate CSNO $31.04 Payment(s) Received 9.40cr
Current Electric Charges —31.0 4 Balance Forward 0.00
Current Electric Charges 31.04Current Amount Due V3-1.04/
Energy theft affects all of us-driving up energy costs and increasing
the risk to public safety.You ran
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under"=^""~' er= ==,~='" k.
|
Average
/
/
|
/
|
/
Cost: $01744 per kWh Jun 24,2016 $31.04
404DUKE
)ENERGY. www.duke-energy.com
BM-BW.o�oo���m�1mml.���1� �w����p�
VL"Zjt HtI UHN[Ht I VY YUHI IUN WI I H YUUH I-AYMtN I Page 1 of 2
T am
d . U e;f.Gail..:: :': <':
City Of Carmel Duke Energy 1-800-521-2232 5340-3669-01-2
Street Department
st ar f aytrrants Tex M coup Irrlivt rat n:::::::. ::::::%::::::
-----------------------
PO Box 1326 Payments after Jun 02 not included Bill prepared on Jun 02,2016
Charlotte NC 28201-1326 Last payment received May 16
s::: Dur t:8rllrn
rely ::....................... ..... ::..:.:::.:.::.:.:.::.:::.;:::.:.;:.:.:.:.:;:
Qty 1 Usage-62 kWh Amt Due- Previous Bill $7.19
Duke Energy Payment(s) Received 7.19cr
1 @ Rate SULP $3.67 Balance Forward 0.00
Current Street Light Charges 3.67 Current Street Light Charges 3.67
Other Credits/Charges 3.52
Current Amount Due 7.19
I
DUKE
i
i
f
..........................................
i Jun 24,2016 $7.19
ENERGY. I www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160602010101_1.CSV-73787-000010547 Printed on recyclable paper.
DUKE ENERGY
Pacie2of2
City Of Carmel 5340-3669-01-2
Street Department
Street Lights Duke;Energy
Quantity- 1 Rate SULP -Unmetered Outdoor Ltg Sry
Lumens - 16,000
Type- High Press Sodium Energy Charge
kWh Usage- 62 62 kWh @ $0.04538700 $2.81
Unit kW- 0.186 Rider 60- Fuel Adjustment
2 Burn Hours- 333.33 i 62 kWh @ $0.00964100 0.60
May 02-Jun 01 Rider 61 -Coal Gasification Adj
30 days 62 kWh @ $0.00023400 0.01
Rider 62- Pollution Cntl Adj
62 kWh 0 $0.00101200 0.06
Rider 63- Emission Allowance
-- 62- kWh @ $0.00003600cr 0.00
- - - - - Rider 66-A--'Energy-Eff Adj - --
Ride62 kWh @ $0.00166400 0.10
r 67-Cinergy Merger Credit
1 62 kWh @ $0.00090900cr 0.06cr
Rider 68-Midwest Ind Sys Oper Adj
62 kWh 0 $0.00051700 0.03
Rider 70- Reliability Adjustment
1 62 kWh @ $0.00034200 0.02
Rider 71 -Clean Coal Adjustment
62 kWh @ $0.00168500 0.10
Rider 72- Federally Mand Cost Adj
62 kWh @ $0.00001800 0.00 $3.67
3.67
I
eir:C a s. .re d�. ....................................................................
Other Credits/Charges i.....
Lighting Maint Charge $3.52 $3.52
3.52
kWh Electric Usage
I
100-
80-
6
00806
40
20
0
M M
Calculations based on most recent 12 month history
Total Usage 744
Average Usage i 62
JUN JU AU SEP OC NOV DEC JAN FEB MAR AP MAY JUN
Electric 62 6 6 1 62 62
i
DUKE
I
i
i
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20160602010101_1.CSV-73789-000010547 0 Printed on recyclable paper.
,....... , Page 1 of 1
:.;:.;;:.:.;:.:.;;::.;:.;::.:_;•.;:::::: dt' :$....:.. II:.;:.;:.:.:.;;:.:;;.:
City Of Carmel Duke Energy 1-800-521-2232 2370-3824-01-3
Street Department
51 111Th E
Carmel IN 46032
Ji
��{
ry I
M�a::iA�l: ::::':::::::i::::::::::i:::::: ::i:::::::%::'<:: :::: :;::;:;;;::::.:::;:::>:::;::>:G::::::; ::::::'::::::::::i::::::::::::<:::;:
Aocvuxt_Intvrralf :.;:.:.; :..;:.
PO Box 1326 Payments after Jun 02 not included Bill prepared on Jun 02,2016
Charlotte NC 28201-1326 Last payment received May 16 Next meter reading Jun 28,2016
:'R iad>::;s:::;>;:;:;.•<;:::: >`:< > >': ':>>< >:><::>:<. <::>::::»::>><::>:::: `': ':#< ? <`:`:> `'. .. ....
:::>::>:>::>;> ......::::..................i11 : 3at :::::._:::::::::::::::::::Me# r;Readrn .::::..:::::::.:::..:.........................................Ac#ual.:::::.
Muer::::>::::> 11mber:::::::::::.:. >:
: .:...........................................::......... :s..:::.::.r..evfoli>:::;F?.r:.even#:.::.;:.;:;i itil .::::..:::::::l3sa ..::.;:.;:.;:.:.;:.;: ilf..........
Elec 108228208 Apr 29 May 31 32 9147 10047 1 900 0.00
minji
rc>>
Usage- 900 kWh Amt Due- Previous Bill $ 118.69
Duke Energy- Rate CSNO $113.20 Payment(s) Received 118.69cr
Current Electric Charges $113.20 Balance Forward 0.00
Current Electric Charges 113.20
Current Amount Due $113.20
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
I
I
I
i
I
I
IGT
Average Cost: $0.1258 per kWh Jun 24,2016 $113.20 $116.60
�� DUKE
ENERGY. www.duke-energy.com
BM_MDEMW.DUKE.INREG.2016060201 01 01_1.CSV-73785-000010547 Printed on recyclable paper.
--_--_------_--------__-- —
PLEAS E RETURN THE TOP PORTION WITH YOUR PAYMENT Page 1 of 1
U .
City Of Carmel Duke' Energy 1-800-521-2232 0810-3666-01-6
Street Department
Dir Old Meridian
Grand Blvd
jaa
PO Box 1326 Payments after Jun 02 not included Bill prepared on Jun 02,2016
Charlotte NC 28201-1326 Last 1payment received May 16 Next meter reading Jun 29,2016
Elec 106954344 Apr 30 Jun 01 11 32 24034 24086 1 52 0.00
Usage- 52 kWh Amt Due- Previous Bill $11.35
Duke Energy- Rate SMLC $ 11.83 Payment(s) Received 1 1.35cr
Current Electric Charges 1-1.8-3 Balance Forward 0.00
Current Electric Charges 11.83
Current Amount Due 1--11.83
�
'
/
/
/
/
|
$0.2275 pet I Jun 24,2016 $11.83
PLtAZ I RtI URN IHt IOP PORI ION WITH YOUR PAYMENT Page 1 of 1
;::;; ddr sor ltrc t ric G i� A0.9gat�l>#m �lr...
City Of Carmel Duke, Energy 1-800-521-2232 7500-3846-01-6
Traffic Signal
697 Carmel Dr W
Misc:Traf Signl
Carmel IN 46032
i
Mad aSinFtents � :::.;::......:;.::.; :.;;:.;::.><.;:.;.;:. ;;:.::.......... t I farmatcor► .;:.;;:.;:.;:.;:.;:.;;:;.;;:.;;:;.;:.;:.;:.;:.;:.;;:.;:.;:.;:.;
PO Box 1326 Payments after Jun 02 not included Bill prepared on Jun 02,2016
Charlotte INC 28201-1326 Lastlpayment received May 16 Next meter reading Jun 29,2016
>3a at>3..........................Meter`Repiiiri '::<::......::»:»>:>
::: ::::::::::..........::>::>::>::>::>::> Actual......
Elec 108236845 Apr 30 Jun 01 32 767 847 1 80 0.00
::::.::.::.::.::.::.;:.;:.;:.;:.;:.;:.:>::>::>::>::>::>::::>:::;::;>::>::»:<::....:....:....:............<:;;
I............................................... rreri#<;8`i[lin :>>::>:>:>::::::>::::::>:::::::::: ::>::>:>:;:::>::::::>::::::>:::::<:<:>::::>::::>:::<:>:.
.........................................................
Usage- 80 kWh Amt Due- Previous Bill $20.49
Duke Energy- Rate CSNO I$19.15 Payment(s) Received 20.49cr
Current Electric Charges 19.15 Balance Forward 0.00
Current Electric Charges 19.15
Current Amount Due 19.15
I
I
.. C:'>: `
Alt =`s' `
of : oar >Ce<
I
Average Cost: $0.2394 per kWh Jun 24,2016 $19.15 $19.72
ENERGY. I www.duke-energy.com
BMBW.DEMW.DUKE.INREG.20160602010101_l.CSV-73755-000010561 Printed on recyclable paper.
PLEAS1 RETURN THE TOP PORTION WITH YOUR PAYMENT page 1 of 1
I.N:.;:.;:.:;.;:.;:.;:.:.;:.:.;:.;:.;:.:.;;;:;: ddf s ......: dor tilt u�r�vs ....:
......,:....
..................................:......................................:::::..,:.::::.:.........:::::::.......::...........:...............................:.::.:.::::.............::::::.._::.....................
City Of Carmel Duke Energy 1-800-521-2232 0280-3816-01-0
1480 Main St W i
Carmel IN 46032
N[ l Part > s;Tx:.;;:.;:.;:.;:.;:.;;:;.::.;:;:.::.::::...::::. ::::::::::::::::. :Acvurlt Inlarnral .......::::.:::::::::.::;:.;:.:;:.;;:.;:.:.;:.;:.;:.;:.;:.;:.;:.:
::::I:::::..
PO Box 1326 Payments after Jun 02 not included Bill prepared on Jun 02,2016
Charlotte NC 28201-1326 Last payment received May 16 Next meter reading Jun 28,2016
:>:><::>::»»::>::»:::<::::::<:><» ::.::..:::::.::::::::::::::::::.:.............................Ac�iat......
eter.::::::>::>::f�lttrr Ifsex:::::::>::;.+a .>:::<:>:: ::::>::>:>::>::>:;:
rtt........ r......... ..De..s::.....�r'evtn s.......e en€<::<::::>:: uttr::>::::>::«:>::>
1 :::::::::::::::::::::::::::..::. > .::::::::.::::::::::::::::::::::::::.:Si.:::::.:::::::::::: .::::::::: Aft::::::::::::::::..;.:Us :::::::::::::::::: :::::::::.
Elec 106931911 Apr 28 May 28 i 30 19432 20546 1 1,114 0.00
pct :<.:°:r«`'`
1.
ut rent..l3iflui' < ':
Usage- 1,114 kWh I Amt Due- Previous Bill $155.60
Duke Energy- Rate CSNO $1135.92 Payment(s) Received 155.60cr
Current Electric Charges $135.92 Balance Forward 0.00
Current Electric Charges 135.92
Current Amount Due $135.92
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
i
J
I
I
I
I
I
I
I
j:: :: :�/'F1:tQi ::::i:::::::::::
...
EfICe€ < 1uri 4<
.:::::::::::::.
Average Cost: $0.1220 per kWh Jun 24,2016 $135.92 $140.00
ENERGY. I www.duke-energy.com
BM BW.DEMW.DUKE.INREG.20160602010101_1.CSV-73679-000010592 Printed on recyclable paper.
--- - - -- - - - -- - ------
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT Page 1 of 1
taf ::lSrv .. ;ddr: ssr. u�r, .:Gail:.;;:.;:.;:.::.:::.::.;:<.;::::::: :.;:.
#:::. .:.........................:......::::::::::::.AC >I :Izlur
City Of Carmel Duke Energy 1-800-521-2232 1280-3816-01-6
1482 Main St W
Carmel IN 46032
i
:::::::::.:.................................................A1<grunt::l ivr ra <:>:::>;>::>::>::::;::>:....;:;>:.:<:>:::::: ::::::;:::::::;«:::
.::.:::.:::.::..............................::.::::::::::::::::::::::::::::::::::............::: :::::::.:..........................::::::::::::.:.:::::._::.:::
........................................................
PO Box 1326 Payments after Jun 02 not included Bill prepared on Jun 02,2016
Charlotte NC 28201-1326 Last payment received May 16 Next meter reading Jun 28,2016
W
.........................:.;:.;;;:
........... . :f . . ... .. .... ... ::::::>,�::::.:::. :=:::>: :::..:..... ....
.::::::. :. ; . ..:: . : t iat............... l..fuer::::; rar#1 ;:<::: > De.. ....m-1, c s.<>:1 :eseiit:::>::::::»1Vlt It:.;;:.;:.;:.;:.;:.:l sa ::»:::::;:::>::»•:;;;;; .
Elec 106961329 Apr 28 May 2& 30 15492 16404 1 912 0.00
Iectt�....�ammercta�l
. ................. ....................... ............. .......
Usage- 912 kWh Amt Due- Previous Bill $ 126.82
Duke Energy- Rate CSNOi$
$ 114.53 Payment(s) Received 126.82cr
Current Electric Charges $114.53 Balance Forward 0.00
Current Electric Charges 114.53
Current Amount Due $114.53
Energy theft affects all of us-driving up energy costs and increasing the risk to public safety.You can
help by reporting suspicious activity.Call 800.521.2232 or complete an energy theft form at
duke-energy.com,under the customer service link.
I
I
I
i
Average Cost: $0.1256 per kWh Jun 24,2016 $114.53 $ 117.97
ENERGY. www.duke-energy.com
BM_13W.DEMW.DUKE.INREG.20160602010101_1.CSV-73681-000010592 0 Printed on recyclable paper.
VLt:AjhHh I UHN I HL:I QV VUK I IUNVVI I H MUHPAYMEN I Page 1 of 1
. ............o.........
................................ ................................................. ..........
. ...........
%...'.....................
......... ...........
City Of Carmel Duke Energy 1-800-521-2232 9050-3834-01-3
1328 Main St W
Misc:Lights
Carmel IN 46032
..............................
................................ ............
...................
. ................
. I .. ... .. . . ............ ...... .. .................................. .......
.. ............
PO Box 1326 Payments after Jun 02 not included Bill prepared on Jun 02,2016
Charlotte NC 28201-1326 Last"Payment received May 16 Next meter reading Jun 29,2016
Meer >............................... er> rQii ..
.............................
...........
..........
Elec 108228207 Apr 30 Jun 01 132 19369 21930 1 2,561 0.00
e#rii .................
......... ................
..................... ....... ........
.................
d
Usage- 2,561 kWh Amt Due- Previous Bill $291.78
Duke Energy- Rate CSNO $1280.76 Payment(s) Received 291.78cr
Current Electric Charges $!280.76 Balance Forward 0.00
Current Electric Charges 280.76
-' —
Current Amount Due $280.76
.................................
..........
.... ......... ..........
.........
..............
.. ...........
...... ..................................
............ ............ .....
...............
..............
Average Cost: $0.1096 per kWhi .........Jun 24,2016 $280.76
DUKE
ENERGY. I www.duke-energy.com
BNI-D-D.M.,DUKE.INREG.2016060201 0101 I.CSV-73683-000010592 Printed on recyclable paper.
I
i
r 4�q �
%` CITY OF CARMEL, INDIANA VENDOR: 254004
ONE CIVIC SQUARE V V 0000 1 DDD CHECK AMOUNT: $*********0.00*
:9 _� CARMEL, INDIANA 46032 v v i0 0 I D D CHECK NUMBER: 259355
�roN
VV 0 0 I D D CHECK DATE: 06/10/16
V 0000 1 DDD
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
2201 4348000 023037270111 46.70 02303727011
2201 4348000 02803816010 135.92 02803816010
1125 4348000 0600366001.8 87.61 06003660018
1205 4348000 0700329503'0 40.05 07003295030
2201 4348000 08103666016 11.83 08103666016
1125 4348000 09903736019 204.84 09903736019
2201 4348000 12803816016 114.53 12803816016
1125 4348000 16603622018 144.81 16603622018
1125 4348000 18103743016 17.81 18103743016
651 5023990 22103050026 52.94 22103050026
601 5023990 22403050010 24.37 22403050010
2201 4348000 23703824013 113.20 23703824013
1125 4348000 28103743011 63.81 28103743011
1125 4348000 38903290029 10.39 38903290029
1120 4348000 39603050014 131.60 39603050014
651 5023990 41103050020 5,722.70 41106050020
1125 4348000 42603287015 454.36 42603287015
1091 4348000 50103608012 32,080.11 50103608012
601 5023990 51503287033 23.66 51503287033
1125 4348000 52603287010 113.11 52603287010
2201 4348000 534036690112 7.19 53403669012