EROSION CONTROL NOTES
1. THE EROSION AND SEDIMENT CONTROL MEASURES SHOWN ON THE DRAWINGS ARE
CONSIDERED THE MINIMUM PRACTICES NECESSARY FOR COMPLIANCE WITH THE NPDES
GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY
AS IDENTIFIED UNDER SECTION 327 -IAC -15-5 OF THE INDIANA ADMINISTRATIVE CODE. HOWEVER,
SITE CONDITIONS, CONSTRUCTION METHODS, SEQUENCING OF WORK AND GENERAL PRACTICE
_ _ ___ . __.._ ------
MAY WARRANT VARIATION AND /OR ADDITIONS TO THE QUANTITIES AND LOCATIONS OF
MEASURES AS SHOWN.
— -- —
2. UNLESS OTHERWISE SHOWN, TEMPORARY CONTROL MEASURES SHALL BE REMOVED UPON
" - - - -
SATISFACTORY ESTABLISHMENT OF PERMANENT VEGETATION.
3. SEE SHEET C2.3 FOR DETAILS REFERENCED ON THIS SHEET.
1
4. PERIMETER CONTROL MEASURES (I.E. SILT FENCE, DIVERSION DITCHES, TREE PROTECTION
120
12 8
FENCING) SHALL BE INSTALLED PRIOR TO COMMENCING EARTHWORK ACTIVITIES.
5. IN ADDITION TO THE MAINTENANCE REQUIREMENTS IDENTIFIED FOR INDIVIDUAL MEASURES, ALL
EROSION CONTROL MEASURES INSTALLED UNDER THIS PROJECT SHALL BE INSPECTED WEEKLY
TO ENSURE THEY ARE FUNCTIONING PROPERLY. MEASURES FOUND TO BE DEFICIENT SHALL BE
REPAIRED OR REPLACED IMMEDIATELY THEREAFTER.
z
0
w
of
6. THE CONTRACTOR SHALL MAINTAIN A STABLE CONSTRUCTION ENTRANCE AT ALL TIMES AND
SHALL MAKE EFFORTS TO MINIMIZE THE ACCUMULATION OF SOIL, MUD AND DEBRIS ON
ADJOINING ROADWAYS.
7. TEMPORARY SOIL STOCKPILES SHALL BE CONSTRUCTED IN A MANNER SUCH THAT PROPER
DRAINAGE OF THE SITE IS NOT IMPEDED. STOCKPILES SHALL BE CONTAINED WITHIN A
PERIMETER CONTROL MEASURE (I.E. SILT FENCE, STRAW BALES OR OTHER BARRIER) TO TRAP
SEDIMENT. STOCKPILES THAT WILL REMAIN IN EXCESS OF 6 MONTHS SHALL BE TEMPORARILY
SEEDED.
o
a
v
y
o
``,O` ` ♦`.` SF
8. SYMBOLS FOR INLET PROTECTION MEASURES AND DITCH CHECKS ARE SHOWN LARGER THAN
ACTUAL SIZE.
SR-
,
o:
'
'v
EROSION CONTROL LEGEND
-
.:..
"!
..
17 ,.
..
+.
j ..
.. ...
.. •'
• • - - • . . .
a' _.
�.
x
. • , ,F 3 � 1
1TH STREET
. - ., tt :,. .'. .x ,... _:.;. ... ..- , -.. _ ,_ ,. -. ..;� . .. _ . ca aeae.: c... e .............:�.r...;,.at.isu..
� ,._;, . �. �,.,�„� ,.>� _+.�an�n4r x- ,Q�..,:r+a,.'w d§FiuD&a�t w5x9;��xFw� .uuuvna�i...ro-attte.� .a�.,x.a�.., tb+4�GU�, a-.. to sa .� .b..�., ewxxexasse aesS ano. case
• s _;..use, - '. acaa..... ;'s:.r.. xx..., ', °. .. k ea e ec txuxaax. v,iixm•. r1S xx.n,.wn 4M�,r.�k,psM mmrnr�,Fx..w...m _
.
,. P RIVAT E),-.
T -
<. n
.'.. <., x w -
.
of 12" FOP PIPE @ 1
....
.. .
819.00 :' '
.10
2'x2' B Inlet
Casting; R
...
® 0
�, O
_ N
�
O
3 (a
?�
C
LINE TYPE / SYMBOL DESCRIPTION LINE TYPE / SYMBOL DESCRIPTION
SF EC -2 p�P TEMPORARY DROP INLET PROTECTION
SILT FENCE
EDIMENT FENC)
PERMANENT SEEDING
WITH EROSION CONTROL
RIPRAP
BLANKET-S75
4:1 - 3:1 SLOPES
SEEDING
WITH MULCH
:.
(SEE LANDSCAPE PLAN FOR
TO BE SODDED) AND AREAS
LL
w
o_
U1 N
CL Z o
p Q
p o �
—
� Z
_
w w
w l— J
UJ
O �
O V
Ln
r
r
EROSION CONTROL SEQUENCE AND NOTES
M S AND ANY AREA WITH SUITABLE VEGETAT
1. I IT ION
FOR FILTER STRIPS IN PERIMETER AREAS
2. INSTALL INITIAL PERIMETER PRACTICES, INCLUDING PERIMETER SILT FENCE AND INLET
PROTECTION PRACTICES FOR EXISTING STORM STRUCTURES.
3. STRIP TOPSOIL IN AREAS OF TEMPORARY SEDIMENT BASINS. EXCAVATE SEDIMENT BASINS AND
INSTALL EMERGENCY SPILLWAYS AND PRIMARY DISCHARGE STRUCTURES. TEMPORARY SEED
• ? �
_
BASIN SLOPES AND BOTTOM. CONSTRUCT DIVERSIONS TO DIRECT RUNOFF FROM SITE TO THE
BASIN.
•' ' '
..
"'
_ -
STRIP TOPSOIL, STOCKPILE QUANTITIES NECESSARY F
4 OR COMPLETION OF THE PROJECT AND
O
..
. .
REMOVE EXCESS FROM THE SITE SEED STOCKPILES
'
• • • • • • • •
y�
• • • • ,•1`
,.
•.•,-
-,
`` `;, �� ' .•: _ '
•+
��. ..
819.00 c
81350 'a
fi
:0 • • +
14
m�
�..
�' ' `. ` `, ♦,. `,
; ,,
°♦
,, ,, ,,`'`
•
=x ``�
......
125
} 1
5. INSTALL STORM SEWER EXTENSIONS.
6. INSTALL RETAINING WALL.
7 COMPLETE GRADING AND SEED AREAS AS SHOWN ON PLAN
8. INSTALL STONE BASE FOR PARKING AREAS AS SO ON AS GRADE IS ESTABLISHED.
T AND FINISH BACKFILL SEED
9. INSTALL PAVEMENT DISTURBED AREAS NOT PREVIOUSLY SEEDED.
COMMON AREA N
10. FINISH PERIMETER AND O RE LANDSCAPING. SEED OR SOD AREAS PER PLAN.
11. REMOVE TEMPORARY EROSION CONTROL PRACTICES AFTER VEGETATION IS ESTABLISHED AND
PROJECT SITE IS PERMANENTLY STABILIZED.
12. MAINTAIN EROSION AND SEDIMENT PRACTICES TM ROUGHOUT THE DURATION OF THE PROJECT.
Z
g
d
O
F-
�
U
O O
Z W z
Q Q
�
O O Z
W O J
w
U)
O Q
a �
0.
The disturbance assoaat
associated with this project is 0.23-acres. . s project Is
T e land d s Since this area is less than 1 acre, this
not required to submit a NOI letter to IDEM under the requirements of 327 -IAC -15-5 (aka Rule 5).
„♦ ♦ t� ♦ .............
r�:c .•
♦ ,,
,.
,, ..
..
.. . . ... .... ... . . ..
...... e.
`♦ .♦ ♦ .•
..
. . •
¢a:
i
;.
...........
...........
5
J
♦
...
♦ ,
o; , .,, ♦., ...
c
„ ♦♦
: o
•
. . . . . . .... .... . v �
:
• .
- --- - - ------
y
'j F4
O 4
in
w E +
a m off.
O
a�
Z m
O rn o
g
1 C L
E
N
11 III
\ \111 II 1111/
1 /
P
E 1 ST
F
\ / s
\
1
STATE OF /
NA-
111111 1 111
„ ♦o .........
♦, ,, ,, ,♦ ...•.. ,
♦ ♦ , ,♦ , ,♦ .......
... ..'
...........
....................
....'. ...'.'
................... - - a3a1.F.w,.3
u p�
. ..... .............. ........... 7
..... .............. ..... .........
• ..... ............................... Kam•, �
..................... ..........
.............. ..... i
.................... ............
•.•.•
........
�.
1
-----
x
,
CONTACT PERSON
CONTACT: Mr. Matt Lohmeyer / PULTE Group
Date:
February 1, 11
_
..
11590 N. Merdian Street, Ste. 530
Carmel, IN, 46032
sale:
"
Ph: (317) - 575 - 2350
O
I 7w
Title:
EROSION
CONTROL PLAN
r i
_
s
m
.
Sheet:
C2.2