Loading...
HomeMy WebLinkAboutConstruction Plans18Q M 0 0 dd 0 C N C 0 r w Y T > N O M a vi CD 0 N 0 0 U lY r J w Y T a v o a� o' Q 0- V) 0 U w In w w x 0 3' 0 M 0 GROUND LINE AS APPLICABLE IIDOT CA -6 GRANULAR LEVELING PAD 6" THICK I RW -3 EXPOSE UNDISTURBED SOIL I RW -2 9 t 0 2 A 0 v 7 a 1: ri n N V 2 ti It v { O K N m K NOTE: -LIMIT CHANGES IN BASE ELEVATION TO 6" PER STEP TO AVOID DIFFERENTIAL SETTLEMENT -STEP OFTEN ENOUGH TO MAINTAIN MINIMUM REQUIRED EMBEDMENT RETAINING WALL BASE SCALE: NONE PROVIDE AND INSTALL CAP UNITS TO PROVIDE CONTINUOUS WALL FACE ON BOTH FRONT AND BACK OF WALL GENERAL NOTES FOR CAPPING: 1. CAPS SHALL BE ADHERED TO WALL USING CONCRETE ADHESIVE 2. WHEN SPLITTING CAP UNIT FOR WALL END DO NOT USE A CAP SECTION LESS THAN 6" WIDE. IMPERVIOUS FILL 12" DEEP SEED 4:1 N1AX• CURB AND GUTTER 6" TOPSOIL GEOGRID REINFORCEMENT / TO BE DESIGNED BY WALL MANUFACTURER \ DRAINAGE AGGREGATE 12" THICK MIN. CAP UNIT INSTALL USING ADHESIVE SEGMENTAL RETAINING WALL. CONSTRUCT A -Y4 MAX. BATTER ON THE FACE OF THE WALL. CLOSED FACE WALL SYSTEM (TYP.) RETAINING WALL CAP ST -1 SCALE: NONE FILTER FABRIC SEED 4:1 MX. 4" 0 PERFORATED DRAIN PIPE WRAPPED WITH FILTER FABRIC OUTLET AT ENDS OF WALL LEVELING BASE 6 MIN. CA -6 OR CONCRETE TYPICAL RETAINING WALL RW -1 SCALE NONE CONCRETE j- COLLAR 12" min. Ci I B-I A ASPHALT SETTING CONCRETE COLLAR RIM ELEVATION 10' 6" min. CONC. COLLAR LL_ F F e� r• e� CASTING DESCRIPTION A" B" C" D" E" F" G" H' BOX INLET ri CONCRETE j- COLLAR 12" min. Ci I B-I A ASPHALT SETTING CONCRETE COLLAR RIM ELEVATION 10' 6" min. CONC. COLLAR LL_ F F CA -5 RECTANGULAR INLET CASTING SETTING DETAIL DB -1 SCALE:NONE T Ww J m �a A 6" io BOX INLET SCHEDULE FRONT SIDE STRUCTURES CASTING DESCRIPTION A" B" C" D" E" F" G" H' BOX INLET MANHOLE R U05 INLET Z 32.7 24.7 22 6 23.63 32.7 24.7 23.63 A, AaVI, B', E', MANHOLE R -3472 INLET E 34 220 20 8 21.75 34 220 21.75 A, A-M, B', E *, MANHOLE NO- • - 4' FLATTOP REQUIRED ** - 6" FLATTOP REQUIRED CA -5 RECTANGULAR INLET CASTING SETTING DETAIL DB -1 SCALE:NONE T Ww J m �a A 6" io BOX INLET SCHEDULE SEE STORM STRUCTURE INLET TYPE A B MAX PIPE 0 TYPE A * 22" 22" 15" 15" TYPE AM * 24" 24" 18" 18" TYPE B 30" 46" 21" 21" TYPE E,F * 30" 30" 21" 1 21" TYPE J,M * 24" 36" 18" 27" TYPE S,T 15" 61" 0" 36" * - PRECAST ADJUSTING SECTIONS AVAILABLE SEE STORM STRUCTURE LEGEND RIM ELEVATION DATA TABLE FOR CASTING -� Ln OC u z fir- =-mil II Bc = OUTSIDE DIAMETER `- a 7 10 ® z 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. - -- D = INSIDE DIAMETER 2. WHEN STONES HAVE BEEN DISPLACED, REMOVE ANY DEBRIS AND REPLACE THE STONES IN SUCH A WAY 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, } O c =6 Q A AS TO NOT RESTRICT THE FLOW AREA. CURB, GUTTER OR d = DEPTH OF BEDDING E 3. GIVE SPECIAL ATTENTION TO OUTLETS AND POINTS WHERE CONCENTRATED FLOW ENTERS THE CHANNEL, 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS w a ~ _j � MATERIAL BELOW PIPE a- = 0 = t 4. CHECK FOR SEDIMENT ACCUMULATION, PIPING, BANK INSTABILITY, AND SCOUR HOLES; REPAIR PROMPTLY. C o L Y 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SS NO- v o_ t o �? C Ic � o " N f7 z r EUjW' I I I EC -11 RIPRAP LINED CHANNEL MIN 6" TOPSOIL TAPE IN ACCORDANCE SILT FENCE BARRIER INSTALLATION • SCALE: NONE OR #8 STONE CU -16 STANDARD GUARDRAIL BOLT DETAIL 1" BEVELLED EDGE #5 REBAR 1'-6" LONG W/ 3/4" HOLE CAST PRECAST CONC. PARKING BARRIERS (4000 PSI.) #5 REBAR 1'-6" LONG W/ 3/4" HOLE CAST CONCRETE PARKING BUMPER SCALE: NONE C SPLICE BOLT SLOTS FOR 5/8 "x 1 1/4" LG. SPLICE BOLT WITH 5/8 "x 7/8" OVAL SHOULDER WASHER AND HEX NUT (8- REQ'D) '4 CV POST 8"x8 "x6' TREATED WOOD POST W/ CHAMFERED TOP SPACED @ 6'-3" O.C. i v 11.0. CONCRETE FOOTING SECTION MI-2C OX INLET DETAIL I PA -1 SCALE: NONE DANDY BAG 11 Installation and Maintenance Guidelines Installation: Remove the grate from catch basin. If using optional oil absorbents; place absorbent pillow in unit. Stand the grate on end. Move the top lifting straps out of the way and place the grate into the Dandy Bat II so that the grate is below the top straps and above the lower straps. Holding the lifting devices, insert the grate into the inlet Maintenance: Remove all accumulated sediment and debris from vicinity of unit after qpch storm event. After each storm event and at regular intervals, look into the Dandy Baf II. If the containment area is more than 1/3 full of sediment, the unit must be emptied. To empty unit, lift the unit out of the inlet using the lifting straps and remove the grate. N using optional oil absorbents; replace absorbent when near saturation. 'TRAPS DANDY BAG Oil STANDARD FABRIC IS AN ORANGE WOVEN MONOFILAMENT DUMPING STRAP ALLOWS FOR EASY REMOVAL OF CONTENTS DANDY BAGS Installation and Maintenance Guidelines Installation: The empty Dandy Be$ should be placed over the grate as the grate stands on end. If using optional oil absorbents; place absorbent pillow in pouch, on the bottom (below -grade side) of the unit. Attach absorbent pillow to tether loop. Tuck the enclosure flap inside to completely enclose the grate. Holding the lifting devices (do not rely on lifting devices to support the entire weight of the grate), place the grate into its frame. Maintenance: Remove all accumulated sediment and debris from surface and vicinity of unit after each storm event. Remove sediment that has accumulated Witten the containment area Of the Dandy B4 as needed. If using optional oil absorbents; remove and replace absorbent pillow when near saturation. DANDY BAG* FLAP FOLDS OVER TO ENCLOSE GRATE VELCRO r- CLOSURE GRATE LIFTING STRAPS ALLOW EAE MOVEMEN OF UNIT WITH GRA1 �- STANDARD FABRIC IS AN ORANGE WOVEN MONOFILIMENT GRATE DANDY BAG 1 " #11 H.A.C. SURFACE' 2"#9 H.A.C. BINDER 6"#53 COMPACTED AGGREGATE STONE COMPACTED SUBGRADE SPLICE BOLT SLOT TERMINAL SECTION STANDARD GUARDRAIL (GALV. BETHLEHEM STEEL C. BG - 210 -12 GUAGE OR APPROVED EQUAL _, ,- 4" OF 4,000 PSI CONCRETE CU -17 Z 0 > W tY L. Ix U w v 0 CONCRETE GUTTER L SCALE: NONE d� CRUSHED STONE V, BACKFILLANZD LEGEND I4' x COMPACT SECTION Ln OC u z S .8 MAINTENANCE Bc = OUTSIDE DIAMETER `- a 7 10 ® 0 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. EDGE OF PAVEMENT, D = INSIDE DIAMETER 2. WHEN STONES HAVE BEEN DISPLACED, REMOVE ANY DEBRIS AND REPLACE THE STONES IN SUCH A WAY 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, } O c =6 Q A AS TO NOT RESTRICT THE FLOW AREA. CURB, GUTTER OR d = DEPTH OF BEDDING E 3. GIVE SPECIAL ATTENTION TO OUTLETS AND POINTS WHERE CONCENTRATED FLOW ENTERS THE CHANNEL, 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS w a ~ _j SIMILAR STRUCTURE MATERIAL BELOW PIPE a- = 0 = t 4. CHECK FOR SEDIMENT ACCUMULATION, PIPING, BANK INSTABILITY, AND SCOUR HOLES; REPAIR PROMPTLY. C w L 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND cc O > a NO- SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. o_ t o �? C DETECTABLE WARNING o " N f7 z r EUjW' -�N+ EC -11 RIPRAP LINED CHANNEL MIN 6" TOPSOIL TAPE IN ACCORDANCE SILT FENCE BARRIER INSTALLATION • SCALE: NONE 3 SCALE: NONE o, & o > c t WITH SPECIFICATIONS a -- -- Job No. 7n11 -nvil Ito C� ELEVATION C 12" 'L' 5 FT. OR LESS: J "B"BORROW OR EQUIV. GRANULAR MIN. 1.25 Bc02" MATERIAL COMPACTED TO 95% %n N TYPICAL GUARDRAIL STANDARD PROCTOR DENSITY.- Z MO SCALE: NONE m 'L' GREATER THAN 5 FT.: REGULAR BACKFILL � Q O Q O :. •• o �LMZ "B" BORROW OR EQUIV. W W GRANULAR MATERIAL COMPACTED TO w -77 ---x- A_ HAUNCHING 95% STANDARD PROCTOR DENSITY** w � F- W �. (BC /6) Bc *`UNLESS J Z Cn d MORE = STRINGENT REQUIREMENT O Q DEPTH OF BEDDING cr) LO U MATERIAL BELOW PIPE NOTES: INCLUDED IN SPECIFICATIONS D d MIN. 1. ALL BEDDING, HAUNCHING, AND INITIAL BACKFILL SHALL BE INSTALLED IN 6" BALANCED LIFTS. 27"& SMALLER 3" 30" TO 60" 4" 2. A MINIMUM 9" CLEARANCE SHALL BE PROVIDED ON EACH SIDE 66"& LARGER 6" OF THE INSTALLED PIPE. O Z Z PAVEMENT SECTION ST -3 REINFORCED CONCRETE PIPE (RCP) TRENCH DETAIL SCALE: NONE SCALE: NONE O N O STEP 1: STEP 2: EXCAVATE A 6" X 4 'DEEP CRUSHED STONE V, BACKFILLANZD V N C M I4' x COMPACT SECTION Ln OC u z S .8 MAINTENANCE MAINTENANCE `- a 7 10 X X X 1. INSPECT CHANNELS AT REGULAR INTERVALS AND AFTER STORM EVENTS. 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. *� o c m ` a 2. WHEN STONES HAVE BEEN DISPLACED, REMOVE ANY DEBRIS AND REPLACE THE STONES IN SUCH A WAY 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, } O c =6 B AS TO NOT RESTRICT THE FLOW AREA. REPLACE THE AFFECTED PORTION IMMEDIATELY. o E 3. GIVE SPECIAL ATTENTION TO OUTLETS AND POINTS WHERE CONCENTRATED FLOW ENTERS THE CHANNEL, 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS w a ~ _j AND REPAIR ERODED AREAS PROMPTLY. LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. a- = 0 = t 4. CHECK FOR SEDIMENT ACCUMULATION, PIPING, BANK INSTABILITY, AND SCOUR HOLES; REPAIR PROMPTLY. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. w E 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND cc O > a SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. o_ t o �? C o " N f7 z r EUjW' EC -11 RIPRAP LINED CHANNEL EIC SILT FENCE BARRIER INSTALLATION SCALE: NONE SCALE: NONE o, & o > c t a -- -- Job No. 7n11 -nvil 1 STAPLES PER SO. YD. 1.5 STAPLES PER SQ. YD. 2 STAPLES PER SQ. YD. 3.5 STAPLES PER SQ. YD. 300 275 • 250 225 0 200 y 175 150 125 100 75 50 25 ft 3' I4' x : X B S .8 3' X X X C C x B 4' x x C B x x x D C x x x A x x x _j 1 STAPLES PER SO. YD. 1.5 STAPLES PER SQ. YD. 2 STAPLES PER SQ. YD. 3.5 STAPLES PER SQ. YD. 300 275 • 250 225 0 200 y 175 150 125 100 75 50 25 ft 4:1 3:1 21 11 LOW MED /HIGH FLOW FLOW CHANNEL CHANNEL SLOPE GRADIENT AND SHORELINE EC -14 E.C. BLANKET STAPLE PATTERN GUIDE EC -15 SCALE: NONE 4 -- - - \\\����U�U�un' P \� GISTERee' 4 ; No. -� 3. 2• _ ' PESS00055 � STATE OF i 0 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, 4. THE EDGES OF PARALLEL BLANKETS MUST BE INCLUDING APPLICATION OF LIME, FERTILIZER, AND STAPLED WITH APPROXIMATELY 2" OVERLAP. SEED. NOTE: WHEN USING CELL-0-SEED, DO 5. WHEN BLANKETS MUST BE SPLICED DOWN THE NOT SEED PREPARED AREA CELL O SEED MUST SLOPE, PLACE BLANKETS END OVER END BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY OVERLAP, STAPLE THROUGH OVERLAPPED AREA, ANCHORING THE BLANKET IN A 6" DEEP X 6' APPROXIMATELY 12"APART. WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. REFER TO GENERAL STAPLE PATTERN 3. ROLL THE BLANKETS DOWN THE SLOPE IN THE GUIDE EC-14 FOR CORRECT STAPLE DIRECTION OF THE WATER FLOW. PATTERN RECOMMENDATIONS. MAINTENANCE 1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. Date: February 1, W11 Scale: 1" =## Title: DETAILS Sheet: SLOPE EROSION CONTROL BALNKET C2m3 SCALE: NONE C B C C B C D A A B B 4:1 3:1 21 11 LOW MED /HIGH FLOW FLOW CHANNEL CHANNEL SLOPE GRADIENT AND SHORELINE EC -14 E.C. BLANKET STAPLE PATTERN GUIDE EC -15 SCALE: NONE 4 -- - - \\\����U�U�un' P \� GISTERee' 4 ; No. -� 3. 2• _ ' PESS00055 � STATE OF i 0 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, 4. THE EDGES OF PARALLEL BLANKETS MUST BE INCLUDING APPLICATION OF LIME, FERTILIZER, AND STAPLED WITH APPROXIMATELY 2" OVERLAP. SEED. NOTE: WHEN USING CELL-0-SEED, DO 5. WHEN BLANKETS MUST BE SPLICED DOWN THE NOT SEED PREPARED AREA CELL O SEED MUST SLOPE, PLACE BLANKETS END OVER END BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY OVERLAP, STAPLE THROUGH OVERLAPPED AREA, ANCHORING THE BLANKET IN A 6" DEEP X 6' APPROXIMATELY 12"APART. WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. REFER TO GENERAL STAPLE PATTERN 3. ROLL THE BLANKETS DOWN THE SLOPE IN THE GUIDE EC-14 FOR CORRECT STAPLE DIRECTION OF THE WATER FLOW. PATTERN RECOMMENDATIONS. MAINTENANCE 1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. Date: February 1, W11 Scale: 1" =## Title: DETAILS Sheet: SLOPE EROSION CONTROL BALNKET C2m3 SCALE: NONE