HomeMy WebLinkAboutLandscape Plan stamped approved p1-2 dated 7-15-16APP
JTS
09-11-15
Old Meridian Overlay MU: No more than 50% of front setback shall be paved.
Type A Buffer side buffer: 3 Shade Trees + 2 Ornamental Trees + 15 Shrubs
4 shade trees + 20 shrubs/100 l.f.
MATCHLINE: SEE L101MATCHLINE: SEE L101
construction. Refer to Specs. & Planting Details L110.
Protected Root Zone, to be protected throughout
Legend
Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.
All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the Landscape Architect. Any plant material installed in an incorrect
Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work.
The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications. Contractor shall coordinate quantity and placement of topsoil.
Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and
Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material.
plant schedule requirements (i.e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install appropriatequantities as governed by
plant spacing per schedule. Plant material quantities shown on plan are minimum quantities. Additional material may be needed to
All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect to inspect all plant locations and plant bed
Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule and Planting Details for additional information.
The Contractor shall maintain all plant material and lawns until the project is fully accepted by the Landscape Architect, unless otherwise noted.
Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall be installed using tree pit drainage.
Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specifications for topsoil source and placement requirements)
Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's satisfaction at no additional cost.
Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or sod treatment.
All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year after Final Acceptance.
location, by the judgment of the Landscape Architect, shall be reinstalled at the Contractor's expense.
All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwise noted).
PLANTING PLAN
conditions prior to installation. On-site adjustments may be required.
Trees shall be matched in groups unless otherwise noted.
meet spacing requirements and field conditions.
General Landscape & Planting Notes
93'-0" - 6' tall ornamental fencing
10.11.12.13.14.15.
2.3.4.5.6.7.8.9.
1.
APP
JTS
09-11-15
construction. Refer to Specs. & Planting Details L510.
Protected Root Zone, to be protected throughout
Old Meridian Overlay MU: No more than 50% of front setback shall be paved.
Type A Buffer side buffer: 3 Shade Trees + 2 Ornamental Trees + 15 Shrubs
4 shade trees + 20 shrubs/100 l.f.
Legend
PLANTING PLAN
MATCHLINE: SEE L130
MATCHLINE: SEE L130