HomeMy WebLinkAbout301160 07/25/16 CITY OF CARMEL, INDIANA VENDOR: 367204
(i% 4
ONE CIVIC SQUARE TSW UTILITY SOLUTIONS INC CHECK AMOUNT: $****12,088.00*
CARMEL, INDIANA 46032 1970 MIDWEST BLVD CHECK NUMBER: 301 160
y�ioN E° INDIANAPOLIS IN 46214 CHECK DATE: 07/25/16
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
601 5023990 834 12,088.00 OTHER EXPENSES
VOUCHER # 162098 WARRANT # ALLOWED
367204 IN SUM OF $
TSW UTILITY SOLUTIONS INC
1970 MIDWEST BLVD
INDIANAPOLIS, IN 46214
Carmel Water Utility
ON ACCOUNT OF APPROPRIATION FOR
Board members
PO# INV# ACCT# AMOUNT Audit Trail Code
834 01-1420-00 12,088.00
Voucher Total 12,088.00
Cost distribution ledger classification if
claim paid under vehicle highway fund
TSW Utility Solutions,Inc. I
- P 2w3 nvoice
1970 Midwest Blvd.
Indianapolis, IN 46214 ® I;,4
Date Invoice#
v° 7/5/2016 834
Bill To
Carmel Water Utilities
5484 E. 126th Street
Carmel,IN 46033
P.O.No. Terms Project
Per Steve Cook Net 30 FY16-36 Oswego&Winona...
:Quanti Descn :tion ..::: :r .`: ::U/M::: :' :>:. Rafe: ::'::.' ::<;:':
tY P , :.... : . . ......:..: :....:: . . . ...... . ..... . .. ......... .. ..:....:. .Am...... ...
I Labor 5,571.00 5,571.00
.1 'Equipment:&Truclang ; :':;.;::::::.: :;:.. :3:..g. 'Q` 3,58:1.00..
I Fill and Traffic Control 1,786,00 1,786.00
1 Mob/DeMob
U/47''M lffl t/ 1-o,tileR &A
Total $12,088.00
Project#: FY16-36 Trucking #:I #NIA Date: Mon,Jun 20, 16
Project Name: Oswego and Winona Weather. sunny
Classlfieatlon :ee:Name°.;:-::':;;`;�::.::':; .:<:
Foreman Brian Wuest 8 2 06:30:00 AM 04:30:00 PM
Operator 1 Steve Wilkison 7.5 07:30:00 AM 03:00:00 PM
Laborer 1 Josh McElhan 8 07:30:00 AM 04:00:00 PM
Laborer 2 B ce Clark 8 0.5 07:30:00 AM 04:00:00 PM
Laborer 2 David Baker 8 07:30:00 AM 04:00:00 PM
Laborer 2 Justin Barger ✓ 8 1 07:00:00 AM 04:00:00 PM
:rtlent::and
Unit# Type Description H ns Owned Rented
115 F350 White Utility 10 X
2o6 Trailer Vision Tan Ax Cargo#9900 Enclosed Trailer io X
3oi Med Excavator Kamatsu Excavator 210 7 X
304 Skidsteer Kubota SVL90 3 X
Description Supplier Quantity OT
Flowable
Concrete
Stone
Sand Martin Marietta 40.78
Cold Mix
Arrow Board
Traffic Guard Trinity 1 guard 8.5
Barrels
Trucking Kopetsky 9
Dumps Blue Lake Dump 2
Saw Cutting
SUMMARY OF TODAY;indlude ex lanations of aanti chow es or'overaies;:alsainclu&flttin s,installed:.fhat are.`noE:on.the. ro eCts.list
We unloaded the skid-steer and plates first thing this morning.We built the lowering while we waited on the 290 to be brought up.We also cut the
road so we could start digging at noon when the locates are good.Once we could dig we dug down to the top of main.While doing so we hit a
service that was not located and is not tied into any homes.We had to go to Fergusons to get a 6"full circle clamp on the main to cover.They
never could get the water off so we shored and plated the hole.Parked equipment out of the way and made the site as safe as we could till we
come back.
Project#: FY16-36 Trucking #:I #NIA Date: Tue,Jun 28, 16
Project Name: Oswego and Winona Weather. Partly Sunny
:G I n
Foreman Brian Wuest 8 2 06:30:00 AM 04:30:00 PM
Operator 1 Steve Wilkison 6 07:30:00 AM 01:30:00 PM
Laborer 1 Josh McElhan 8 07:30:00 AM 03:30:00 PM
Laborer 2 Chad Dixon 8 .5 07:00:00 AM 03:30:00 PM
Laborer 2 Brent McCleere 8 07:30:00 AM 03:30:00 PM
. . .... .. a pm..n. an ...:... ..i . :.. .
Unit# Type Description Hrs Owned Rented
115 F350 White Utili ✓ 101 X
206 Trailer Vision Tan Ax Cargo#9900 Enclosed Trailer 101 X
301 Kamatsu Excavator 210 6 X
304 Skidsteer Kubota SVL90 8 X
Wt.. als a:rid Subs Su; tied b: TSVI(;
Descri ption Supplier Quantity OT
Flowable
Concrete Sa amore Ready Mix 4
Stone
Sand
Cold Mix
Arrow Board
Traffic Guard Trinity 1 guard 8
Barrels
Trucking Kopetsky 6.5
Dumps Blue Lake Dump 2
Saw Cutting
W.
SLlMMAR`C OFTODAIf iriclude:ex lanatioris:of. a.
p anti xhari es:or.:over es;
We did the lowering today.Water went off at 9:30.lowering went smooth.Carmel supplied all the material.This was a 5'lowering. We
used 29'of 8"DI 2-8"sleeves 4-8"45'bends We were done
and was ready for water to start coming on at 11:30. We backfilled the main
With sand and capped with concrete.We put the other contractors barrels and plates back on and around the hole.While cleaning the street we
lost a hydo hose on the skid-steer.Loaded the skid-steer and plates out after we got the skid-steer was fixed.