HomeMy WebLinkAboutConstruction Plan3v
Z
co
co
Z
0
co
0o
0-
L
a
M
�T6
Q
3z
Q
p�
"-a
a
0
0
ad
M
t
w
FILE
VA s/ AOL
14
6, 'q "f
Due to the generic nature of these Construction Documents, all Subcontractors
must review each sheet thoroughly, as any information, notation, or detail may
apply as a whole to these Documents. Any material, component, or assembly
not specified shall at least meet the applicable building codes. Any questions
should be directed to Summit Design Group, Inc., at 317 -546 -9990.
Hollensbe Addition
Carmel, Indiana
Q�
I
i
N
W �
Q
N
l
N
W
�J
tJ�
iI
wU
.a
-P
w
t
D IAWtN SZ
T
DATE
REL. No.
No.
REVISIONS
Q
DATE
?P -N
S1
715
I
M
[iT
j
J3
m
x
�
TV
I
�
�
=
I
I
�
I
i
Q
�Q
C-
PT
Q
�
I
j
Due to the generic nature of these Construction Documents, all Subcontractors
must review each sheet thoroughly, as any information, notation, or detail may
apply as a whole to these Documents. Any material, component, or assembly
not specified shall at least meet the applicable building codes. Any questions
should be directed to Summit Design Group, Inc., at 317 -546 -9990.
Hollensbe Addition
Carmel, Indiana
Q�
I
i
N
W �
Q
N
l
N
W
�J
tJ�
iI
wU
.a
-P
w
t
D IAWtN SZ
CK. BY T,
DATE
REL. No.
No.
REVISIONS
BY
DATE
?P -N
S1
715
Aln
Summit Design Group, Inc.
INDIANAPOLIS, INDIANA
Architecture and Planning