Loading...
HomeMy WebLinkAboutConstruction Plan3v Z co co Z 0 co 0o 0- L a M �T6 Q 3z Q p� "-a a 0 0 ad M t w FILE VA s/ AOL 14 6, 'q "f Due to the generic nature of these Construction Documents, all Subcontractors must review each sheet thoroughly, as any information, notation, or detail may apply as a whole to these Documents. Any material, component, or assembly not specified shall at least meet the applicable building codes. Any questions should be directed to Summit Design Group, Inc., at 317 -546 -9990. Hollensbe Addition Carmel, Indiana Q� I i N W � Q N l N W �J tJ� iI wU .a -P w t D IAWtN SZ T DATE REL. No. No. REVISIONS Q DATE ?P -N S1 715 I M [iT j J3 m x � TV I � � = I I � I i Q �Q C- PT Q � I j Due to the generic nature of these Construction Documents, all Subcontractors must review each sheet thoroughly, as any information, notation, or detail may apply as a whole to these Documents. Any material, component, or assembly not specified shall at least meet the applicable building codes. Any questions should be directed to Summit Design Group, Inc., at 317 -546 -9990. Hollensbe Addition Carmel, Indiana Q� I i N W � Q N l N W �J tJ� iI wU .a -P w t D IAWtN SZ CK. BY T, DATE REL. No. No. REVISIONS BY DATE ?P -N S1 715 Aln Summit Design Group, Inc. INDIANAPOLIS, INDIANA Architecture and Planning