Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LS.1 - LIFE SAFETY PLAN.pdf
Project Number: Revisions: Drawn By Checked ByIssue Date Architecture / Project Managment: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: Sheet Title: Project: Developer: By: HA R R I S O N & M O B E R L Y , L L P Ca r m e l , In d i a n a 4 6 0 3 2 Ca r m e l C i t y C e n t e r - B l d g A 76 0 R a n g e l i n e R o a d , S u i t e 1 6 4 COPYRIGHT & OWNERSHIP OF DOCUMENTS State Release Set: 8/5/16 N PEDCOR DESIGN GROUP LS.1 LIFE SAFETY PLAN CONSTRUCTION DOCUMENTS MC BR8/5/16 PLAZA LEVEL KEY PLAN N.T.S. THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. © COPYRIGHT 2016 JAMES R. STUTZMAN, AIA, Carmel, Indiana. 760 Rangeline Road N R.6 Plaza P111 Color Concrete Paving.bpn PLAZA RA N G E L I N E R O A D BE BE BE PE BE BE PE & BE PE BE PLAZA BUILDING A BUILDING B BE SCALE: 1" = 20' 1 PHASE I LIFE SAFETY PLAN LS.1 WALL TYPES-FIRE RATINGS 1 HOUR RATED 2 HOUR RATED 3 HOUR RATED EGRESS PATH EXITS AND LOCATIONS BE PE PARKING EXIT BUILDING EXIT OP ORIGINATION POINT CARMEL CITY CENTER -PHASE 1 BUILDINGS 2. HORIZONTAL FIRE SEPARATIONS: ● ASSEMBLIES SEPARATING THE GARAGE PARKING LEVEL AND FIRST FLOOR OF BUILDINGS ABOVE IS THREE HOURS(3HRS.) ● ASSEMBLIES SEPARATING THE GARAGE PARKING LEVEL AND PLAZA ABOVE IS ONE AND ONE HALF HOUR (1 1/2 HR.) ● ASSEMBLIES SEPARATING THE FIRST FLOOR OF BUILDINGS AND SECOND FLOOR ABOVE IS TWO HOURS (2 HRS). CONSTRUCTION DESIGN RELEASE SHELL & CORE PROJECT NUMBER: 317796 RELEASE DATE: 06.19.07 HARRISON & MOBERLY - BLDG A 1ST FLR CITY CENTER DRIVE BE