Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LS.2 - LIFE SAFETY PLAN.pdf
Project Number: Revisions: Drawn By Checked ByIssue Date Architecture / Project Managment: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: Sheet Title: Project: Developer: By: HA R R I S O N & M O B E R L Y , L L P Ca r m e l , In d i a n a 4 6 0 3 2 Ca r m e l C i t y C e n t e r - B l d g A 76 0 R a n g e l i n e R o a d , S u i t e 1 6 4 COPYRIGHT & OWNERSHIP OF DOCUMENTS State Release Set: 8/5/16 N PEDCOR DESIGN GROUP LS.2 LIFE SAFETY PLAN CONSTRUCTION DOCUMENTS MC BR8/5/16 PLAZA LEVEL KEY PLAN N.T.S. THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. © COPYRIGHT 2016 JAMES R. STUTZMAN, AIA, Carmel, Indiana. 760 Rangeline Road FREST ROOM 105 CONFERENCE ROOM 106 STORAGE 104 MECH ROOM 110 OFFICE 113 OFFICE 112 OFFICE 111 RECEPTION AREA 101 COPY/FILE ROOM 107 COFFEE BAR AREA 109 OPEN OFFICE 108 OFFICE 103 CONFERENCE ROOM 102 ENTRY ALCOVE 100 HARRISON & MOBERLY 2,043 SQUARE FEET 12 OCCUPANTS 77'-0" Stair SA6 Elev EA11 Stair SA6 Elev EA11 R R.1 R.2 R.3 R.5 R.6Q.2 Q.5 R R.1 R.2 R.3 R.5 R.6Q.2 Q.5 HARRISON & MOBERLY, LLP LIFE SAFETY & CODE SUMMARY PROJECT SUMMARY This project is a new tenant improvement project known as Harrison & Moberly, LLP, occupying 2,043 square feet of the 1st floor of an existing Shell and Core project known as Carmel City Center. Harrison & Moberly, LLP is a Group B occupancy, and the construction type is I-B. The entire facility is fully protected by an automatic sprinkler system, and is surrounded by at least 30 feet of yard depth. The Harrison & Moberly, LLP tenant is a Business Occupancy providing an office facility and meeting spaces. APPLICABLE CODES & STANDARDS Indiana General Administrative Rules (675 IAC 12) 2006 Indiana Building Code (IBC 2012) 2014 Accessibility-Indiana Building Code (ANSI A117.1-2009) 2014 Minimum Design Loads for Buildings (ASCE 7-2010) 2014 Indiana Plumbing Code (UPC 1997) 2012 Indiana Mechanical Code (IMC 2012) 2014 Indiana Electrical Code (NFPA 70-2008) 2009 Indiana Fuel Gas Code (IFGC 2012) 2014 Indiana Fire Code (IFC 2012) 2014 Indiana Energy Conservation Code (ASHRAE 90.1 2007) 2010 NFPA 1 0-2010 Portable Fire Extinguishers 2012 NFPA 13-2010 Installation of Fire Sprinkler Systems 2012 NFPA 72-2010 National Fire Alarm Code 2014 NFPA 90A- Installation of Air Conditioning & Ventilating Systems 2015 NFPA 90B — Installation of Warm Air Heating & Air Conditioning Systems 2015 Americans with Disabilities Act (2010 Standards for Accessible Design) 2010 OCCUPANCY CLASSIFICATIONS : Polleo Systems: Group B Building Shell & Core: Group A-2, A-3, B, M, R-2 Parking Garage: Group S-2, B, M OCCUPANT LOAD Harrison & Moberly, LLP Total Gross Area 2,043 sq ft (B Occupancy, Actual Load) 12 persons CONSTRUCTION TYPES: Office Space Tenant: Type I-B Upper Building Shell & Core: Type I-B Parking Garage: Type I-A BUILDING AREAS: Harrison & Moberly, LLP: 2,043 sf Shell & Core: (Total Building A) 309,587 sf FIRE RESISTANCE Office Space Tenant & Shell & Core (Ground Floor): Walls: All construction to be non-combustible Exit Passageways: 2 hours Fire walls: 2 hours Exit Access Corridors: 1 hour Ceiling: 3 hours INTERIOR FINISHES Office Space Tenant & Shell & Core (Ground Floor): Vertical Exits & Passageways: Class B Exit Access Corridors Class C All Others Class C FIRE PROTECTION 100% protection by an automatic sprinkler system per NFPA 13-2010 100% protection by a fire alarm & enunciator system meeting NFPA 72-2002 Sprinkler fire pump and backup power meeting NFPA 20-1999 Stairway pressurization meeting IBC 2008 and NFPA 92A-2002 ACCESSIBILITY REQUIREMENTS All tenant restrooms comply with ICC/ANSI A117.1-2009 PREVIOUS IDHS APPROVALS Project No. 317769 CDR Letter Foundation Release 04.25.06 Project No. 317796 CDR Letter Standard Release - Architectural & Structural 06.19.07 Project No. 352730 CDR Letter Standard Release - Architectural Structural Electrical 07.19.11 18.1 18 17.1 17 16.1 16 16.9 18.1 18 17.1 17 16.1 16 16.9