Loading...
HomeMy WebLinkAbout303560 09/26/16 0 CITY OF CARMEL, INDIANA VENDOR: 355790 ONE CIVIC SQUARE TORIC ENGINEERING INC CHECK AMOUNT: $**'****528.00* CARMEL, INDIANA 46032 150 W CLINTON STREET CHECK NUMBER: 303560 , DANVILLE IN 46122 CHECK DATE: 09/26/16 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 651 5023990 4221 528.00 OTHER EXPENSES VOUCHER # 166202 WARRANT # ALLOWED 355790 IN SUM OF $ TORIC ENGINEERING INC 150 W. CLINTON STREET DANVILLE, IN 46122 Carmel Wastewater Utility ON ACCOUNT OF APPROPRIATION FOR Board members PO# INV* ACCT# AMOUNT Audit Trail Code 4221 01-7363-06 528.00 Voucher Total 528.00 Cost distribution ledger classification if claim paid under vehicle highway fund Prescribed by State Board of Accounts City Form No.201 (Rev 1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show, kind of service, where performed, dates of service rendered, by whom, rates per day, number of units, price per unit, etc. Payee 355790 TORIC ENGINEERING INC Purchase Order No. 150 W. CLINTON STREET Terms DANVILLE, IN 46122 Due Date 9/19/2016 Invoice Invoice Description Date Number (or note attached invoice(s) or bill(s)) Amount 9/19/2016 4221 528.00 I hereby certify that the attached invoice(s), or bill(s) is (are)true and correct and I have audited same in accordance with IC 5-11-10-1.6 Date Officer TOi:Kl C 1.317.718. 800 EN (31 N -E -E -R 1 N 13 wr.toriceng.cram 1 t 0 W..Clinton Street Danville,1N 46122 (317)718-1800 INVOICE# 4221 INVUICEDATE 09/15/2016 DUEDATE 10/15/2016 BILL TO Carmel WWTP 9609 Hazel Dell Parkway lindianapolis, IN 46280 ------ DESCRiPTION TY 1 TE16-S133 Carmel 1,336 Plus 11 Not Accelerating 4 132.00 528.00 PO#S16468 Engineer Mike Leader September 6, 2016 Work performed: Engineer was able to get the 1336 Plus 11 Drive on Pump 2 to work properly again. Engineer set the drive back to factory defaults and then did a new start-up again. After engineer reprogrammed the drive from factory,defaults, he was able get the pump to accelerate at the given acceleration time instead of it ramping up immediately. Engineer set the ramp time to 10 seconds. BALANCE DUE $528.00