HomeMy WebLinkAbout303383 09/26/16 CITY OF CARMEL, INDIANA VENDOR: 371023
..i; ® �•: ONE CIVIC SQUARE GONZALES HOME IMPROVEMENT&CORIM AMOUNT: $""39,531.67`
CARMEL, INDIANA 46032 133W 161ST ST CHECK NUMBER: 303383
vM_ WESTFIELDIN 46074 CHECK DATE: 09/26/16
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
609 5023990 14106 5,814.00 OTHER EXPENSES
609 5023990 14107 33,717.67 OTHER EXPENSES
VOUCHER # 162769 WARRANT# ALLOWED
371023 IN SUM OF $
GONZALEZ HOME IMPROVEMENT & C
133 W 161 ST Street
Westfield, IN 46074
Carmel Water Utility
ON ACCOUNT OF APPROPRIATION FOR
Board members
PO# INV# ACCT# AMOUNT Audit Trail Code
14107 07-1052-23 33,717.67
f (dG o 7-(052.,23 5$1�,or�
Voucher Total
Cost distribution ledger classification if
claim paid under vehicle highway fund
Prescribed by State Board of Accounts City Form No.201 (Rev 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show, kind of service,where
performed, dates of service rendered, by whom, rates per day, number of units,
price per unit, etc.
Payee
371023
GONZALEZ HOME IMPROVEMENT&CONSTR Purchase Order No.
133 W 161 ST Street Terms
Westfield, IN 46074 Due Date 9/20/2016
Invoice Invoice Description
Date Number (or note attached invoice(s) or bill(s)) Amount
9/20/2016 14107 33,717.67
lereby certify that the attached invoice(s), or bill(s) is(are)true and
)rrect and I have audited same in accordance with IC 5-11-10-1.6
Date Officer
Gonzalez Home Improvement
and Construction, Inc Invoice
133 W. 161st Street
Westfield, In 46074
Date Invoice#
Bill To 9/9/2016 14106
City of Carmel*
1 Civic Square Ship To
Carmel,IN 46032
4425E 126th Street
Carmel,IN 46032
P.O. No. Terms Project
Net 30
Description Rate Qty Amount
remove six windows (two doubles, two singles) 75.00 6 450.00
frame 6 window openings with 2x6's -two 3x4' and two 6x4' 400.00 1 400.00
- 16"on center
install 3/4 plywood t1-11 exterior rated siding (smooth) in 60.00 4 240.00
all four openings
install around opening 1x6 cedar-trim board - per lineal 12.00 46 552.00
feet
cost for eight Fypon 12x48"shutters, with center rail - 325.56 0 0.00
smooth white primed ready to paint(menards product)
LVSH12x48 FNCR3S - includes taxes
install eight Fypon 12x48" shutters, with center rail -smooth 30.00 0 0.00
white primed ready to paint
paint eight shutters -color TBD 10.00 0 0.00
caulk all trim around four openings (where windows were 145.00 4 580.00
removed from) prime cedar trim and plywood -two coats of
paint matching existing as close as possible
remove all trim around three dormers 90.00 3 270.00
install tyvek, ice water shield around the walls along the roof 35.00 3 105.00
line approx three ft around
Total
Phone# Fax# E-mail Web Site
317-867-5356 317-867-5356 gonzalez-construction@hotmail.com www.gonzalez-construction.com
Page 1
C
Gonzalez Home Improvement
and Construction, Inc Invoice
W. 161st Street
Westfield, In 46074
Date Invoice#
Bill To 9/9/2016 14106
City of Carmel*
1 Civic Square Ship To
Carmel,IN 46032 4425 E 126th Street
Carmel,IN 46032
P.O. No. Terms Project
Net 30
Description Rate Qty Amount
install 1x4 engineered LP trim on corners of three dormers 120.00 3 360.00
along the roof line and along the metal cap
install Z flashing along the bottom 1x4, step flashing,sheet 60.00 3 180.00
metal, roof sealant,
install fiber cement boards (lap siding) on all three dormers 90.00 3 270.00
caulk three dormers, prime-two coats of paint matching 180.00 3 540.00
existing siding
dormer materials cost 664.00 1 664.00
sherwin williams primer and paint to be used (super paint
exterior acrylic latex) paintable exterior lifetime caulk
primer and paint cost 129.00 1 129.00
material pick up and delivery 75.00 1 75.00
haul away and disposal of debris 0.00 1 0.00
ADDITIONAL
install one more window 75.00 75.00
frame additional window 66.00 66.00
install 1/2" OSB plywood -additional window 60.00 60.00
install cedar trim around window opening per lineal ft 12.00 16 192.00
Total
Phone# Fax# E-mail Web Site
317-867-5356 317-867-5356 gonzalez-construction@hotmail.com www.gonzalez-construction.com
Page 2
Gonzalez Home Improvement
and Construction, Inc Invoice
133 W. 161st Street
Westfield, In 46074
Date Invoice#
Bill To 9/9/2016 14106
City of Carmel*
1 Civic Square Ship To
Carmel,IN 46032
4425E 126th Street
Carmel,IN 46032
P.O. No. Terms Project
Net 30 T_
Description Rate Qty Amount
caulk, prime and paint additional trim -one window 145.00 145.00
install fiber cement siding 5/16 fiber cement siding per 25.00 7 175.00
window opening -cut out a 4x8x8' -approved by Tom
Schreiber
fiber cement cost-4x8' smooth no groove fiber cement 40.00 4 160.00
panel SKU 1408888
paint metal flu liner from top down to roof level 90.00 90.00
spray paint cost for metal flu liner 36.00 36.00
Total $5,814.00
Phone# Fax# E-mail Web Site
317-867-5356 317-867-5356 gonzalez-construction@hotmail.com www.gonzalez-construction.com
Page 3
s o� 2 •Z�
Gonzalez Home Improvement
and Construction, Inc Invoice
133 W. 161st Street
Westfield, In 46074
Date Invoice#
Bill To 9/9/2016 14107
City of Carmel*
1 Civic Square Ship To
Carmel,IN 46032
RFQ 3-16
Water Plant#3
P.O. No. Terms Project
Net 30
Description Rate Qty Amount
remove approx 75 squares of fiber glass shingles 45.00 75 3,375.00
remove max of 5 sheets of 1/2" -4x8's OSB plywood 40.00 5 200.00
remove approx 490 In ft of drip edge along gutter board and 1.50 490 735.00
gable ends
remove approx 16 In ft of damaged 1x6" trim board on the 45.00 16 720.00
sides of front entry bump out roof(this must be removed to
be able to install flashing, rotted trim cannot be re-used)
custom cut and install approx 32 In ft of 1x6" (16' on each 5.00 32 160.00
side of front entry roof)
cedar trim cost only for front entry 36.00 1 36.00
install 490 In ft of gutter apron and drip edge on gable ends 2.75 490 1,347.50
and gutter board
cut plywood 4" along the ridge approx 6'from each end for 5.00 110 550.00
new ridge vent to be installed - per In ft
install ice and water shield along gutter lines, gable ends 1.75 500 875.00
and two valleys - per In ft
install 8 bundles of shingle starter 110.00 8 880.00
install Summit synthetic roofing underlayment 20.00 75 1,500.00
Methods of payment accepted, cash, check. We accept credit cards as well
with a processing fee.
Total
Phone# Fax# E-mail Web Site
317-867-5356 317-867-5356 gonzalez-construction@hotmail.com www.gonzalez-construction.com
Page 1
_ T
Gonzalez Home Improvement
and Construction, Inc Invoice
W. 161st Street
Westfield, In 46074
Date Invoice#
Bill To 9/9/2016 14107
City of Carmel*
1 Civic Square Ship To
Carmel,IN 46032
RFQ 3-16
Water Plant#3
P.O. No. Terms Project
Net 30
Description Rate Qty Amount
install 75 squares of Castlebrook Weatherwood (color TBD) 130.00 75 9,750.00
35 year dimensional fiber glass shingles
haul away and disposal of roofing debris 1,200.00 1 1,200.00
install ridge vent with ridge cap 110 In ft 15.00 110 1,650.00
Castlebrook Weatherwood (color TBD) 35 year dimensional 7,778,17 1 7,778,17
fiber glass shingles- material cost includes taxes
5% shingles added for cuts and waste
available colors, desert shake, weatherwood, hearthstone
gray, heatherblend, woodland green, dove gray, burnt
sienna, black shadow and pewter
remove galvanized flashing around furnace chimney at roof 35.00 1 35.00
level, galvanized storm collar
install new galvanized flashing around furnace chimney at 150.00 1 150.00
roof level,galvanized storm collar
galvanized flashing, galvanized storm collar-material cost 136.00 1 136.00
only
some materials might be on sale at the time of purchase,
material cost might change
Methods of payment accepted, cash, check. We accept credit
cards as well
if any additional work is found we will notify immediately for
work approval prior to doing the work- pictures will be
taken for your records
Methods of payment accepted, cash, check. We accept credit cards as well
with a processing fee.
Total
Phone# Fax# E-mail Web Site
317-867-5356 317-867-5356 gonzalez-construction@hotmail.com www.gonzalez-construction.com
Page 2
Gonzalez Home Improvement
and Construction, Inc Invoice
133 W. 161st Street
Westfield, In 46074
Date Invoice#
Bill To 9/9/2016 14107
City of Carmel*
1 Civic Square Ship To
Carmel,IN 46032
RFQ 3-16
Water Plant#3
P.O. No. Terms Project
Net 30
Description Rate Qty Amount
site will be clean at end of the day each day and fully
cleaned at time of completion
double pass magnet at time of completion
this project will take one to two weeks to complete this
project weather permitting, in case of rain we will tarp the
work area
additonal
remove additional 10 sheets of 1/2" -4x8's OSB plywood 40.00 10 400.00
10 additional 4x8' plywood cost 12.00 10 120.00
one trip required to get additional plywood 75.00 75.00
re-nail all roof decking approved by Tom Schreiber 1,800.00 1 1,800.00
nails cost (re-nail all roof) - ring shank 2 1/4" galvanized 115.00 115.00
triple coated
sister two joists - includes lumber 65.00 2 130.00
Methods of payment accepted, cash, check. We accept credit cards as well
with a processing fee.
Total $33,717.67
Phone# Fax# E-mail Web Site
317-867-5356 317-867-5356 gonzalez-construction@hotmail.com www.gonzalez-construction.com
Page 3