Loading...
HomeMy WebLinkAboutC600 Storm Plan & Profile-C60015' R.D.E. T/BANK ELEV. = 916.73 50' R/W 50' R/W 50' R/W 50' R/W 30' B-B 30' B-B 30' B-B 30' B-B 20' D.&U.E. 20' D.U.&S.S.E. 30' B.L. 30' B.L. 35' B.L. 30' B.L. 30' B.L. 30' B.L. 30' B.L. 30' B.L. 30' B.L. 30'B.L. 15' R.D.E. 15' R.D.E. VAR. R.D.E. 15' R.D.E. 15' R.D.E. 30' R.D.E.&U.E. 20' D.&U.E. 15' R.D.E. 20' D.U.&S.S.E. 20' D.U.&S.S.E. 30' D.U.&S.S.E 20' D.&U.E. 20' D.&U.E. 20' D.&U.E. 20' D.U.&S.S.E. 146th STREET 15' BUFFER EASEMENT 15' BUFFER EASEMENT 15' BUFFER EASEMENT 10' BUFFER EASEMENT TALLYN WAY TALLYN WAY TAMERLANE PLACE TRAHAN DRIVE 1 2 3 4 5 20 21 22 23 24 25 26 27 19 15' R.D.E. 15' R.D.E. 15' R.D.E. T.O.B. T.O.B. T.O.B. T.O.B. N.P.= 10 YEAR ELEV.= 2 YEAR ELEV.= 100 YEAR ELEV.= BOTTOM ELEV.= LAKE #1 914.03 914.34 914.60 915.54 906.03 75' 1/2 R/W 75' 1/2 R/W 30' R.D.E. 10' D.U.&S.S.E. 10' D.U.&S.S.E. 15' U.E. 15' U.E. VAR. R.D.E.&D.&U.E. VAR. R.D.E. 15' 10' BUFFER EASEMENT 15' 10' BUFFER EASEMENT VAR. L.M.A.E. 5' N.A.E. 5' N.A.E. 10' SIGN ESMT. 10' SIGN ESMT. VAR. L.M.A.E. VAR. L.M.A.E. 5' N.A.E. 15' R.D.E. 15' R.D.E. 5' R.D.E. VAR. R.D.E. 30' R.D.E.&U.E. 30' R.D.E.&U.E. VAR. R.D.E. 30' VAR. R.D.E. SIGN 14X2 (BASE) 17.8' 18.2' 29.2' 110.7' 17.5' 51.0' SCALE: 1"=50' HOR. 1"=5' VERT. DBL CURB INLET #135 EJ-7495-M1/M2 [SPEC. STR.] STA. 1+80 TC=919.39 EXISTING GRADE PROPOSED GRADE TALLYN WAY INV.=912.41 150 L.F. 0.30% 18" R.C.P. CLASS III 914.45 914.90 30 L.F. 0.50% 12" R.C.P. CLASS III UP INV.=915.15 DOWN INV.=915.00 YARD INLET #129 EJ-6489-N [STD MH] STA. 0+86 TC=918.07 8" S.D.R. 35 P.V.C DBL CURB INLET #134 EJ-7495-M4 [SPEC. STR.] W/2' SUMP STA. 1+50 TC=919.48 HYDRAULIC GRADE LINE 18" R.C.P. NW INV.=914.35 15" R.C.P. S INV.=914.45 18" R.C.P. E INV.=914.45 6"S.S.D. 6"S.S.D. 6"S.S.D. 0.23 % 3 0.67 % 3 914.55 3 915.20 3 914.45 914.55 914.55 918.14 919.44 919.44 SCALE: 1"=50' HOR. 1"=5' VERT. YARD INLET #142 EJ-6489-N [STD MH] STA. 3+21 TC=918.78 111 L.F. 0.58% 12" R.C.P. CLASS III 914.98 915.62 CURB INLET #141 EJ-7495-M4 [STD MH] STA. 2+10 TC=922.16 END SECTION #138 STA. 0+00 YARD INLET #143 EJ-6489-N [2' x 2' BOX] STA. 4+22 TC=919.77 EXISTING GRADE PROPOSED GRADE N.P.=914.03 180 L.F. 0.41% 15" R.C.P. CLASS III 913.90 914.64 30 L.F. 0.47% 12" R.C.P. CLASS III UP INV.=914.88 DOWN INV.=914.74 101 L.F. 1.07% 12" R.C.P. CLASS III 915.72 916.80 HYDRAULIC GRADE LINE TALLYN WAY CURB INLET #140 EJ-7495-M4 [STD MH] W/2' SUMP STA. 1+80 TC=922.09 6"S.S.D. 6"S.S.D. 6"S.S.D. 6"S.S.D. 6"S.S.D. 6"S.S.D. 0.39 % 0.54 % 0.30 % 1.00 % 181 112 100 914.03 914.73 915.02 3 3 9 16.72 922.18 922.18 918.90 920.00 3 914.92 914.74 SCALE: 1"=50' HOR. 1"=5' VERT. 60 L.F. 0.39% 12" R.C.P. CLASS III 914.00 914.24 YARD INLET #145 R-6489-N [2' x 2' BOX] STA. 0+60 TC=917.35 END SECTION #144 STA. 0+00 EXISTING GRADE PROPOSED GRADE N.P.=914.03 HYDRAULIC GRADE LINE 6"S.S.D. 65 0.30 % 914.22 914.03 917.44 SCALE: 1"=50' HOR. 1"=5' VERT. CURB INLET #125 EJ-7495-M4 [STD MH] STA. 3+71 TC=919.60 END SECTION #130 STA. 0+00 86 L.F. 0.50% 18" R.C.P. CLASS III 913.92 914.35 YARD INLET #129 EJ-6489-N [STD MH] STA. 0+86 TC=918.07 145 L.F. 0.25% 15" R.C.P. CLASS III 914.45 914.82 YARD INLET #127 EJ-1045 [STD MH] STA. 2+31 TC=919.59 CURB INLET #126 EJ-7495-M4 [STD MH] 2' SUMP STA. 3+41 TC=919.64 30 L.F. 0.57% 12" R.C.P. CLASS III UP INV.=915.55 DOWN INV.=915.38 EXISTING GRADE PROPOSED GRADE TAMERLANE PLACE HYDRAULIC GRADE LINE 18" R.C.P. NW INV.=914.35 15" R.C.P. S INV.=914.45 18" R.C.P. E INV.=914.45 110 L.F. 0.33% 12" R.C.P. CLASS III 914.92 915.28 6"S.S.D. 6"S.S.D. 6"S.S.D. 6"S.S.D. 918.14 87 0.48 % 914.03 0.22 % 149 0.30 % 108 3 0.33 % 914.45 914.55 914.88 914.98 915.30 915.50 915.40 919.70 919.58 919.58 914.55 914.55 914.45 DATE MARK REVISIONS BY CERTIFIED: S & A JOB NO. SHEET NO. DRAWN BY: CHECKED BY: 672(33(/:(57+ $/:$<621 (DVWWK6WUHHW)LVKHUV,1 SKRQHID[ STORM PLAN & PROFILE C600 ADDED STORM PROFILE JSM REVISED PER CLIENT COMMENTS ADG ASBUILTS ADG CONTRACTOR SHALL VERIFY DEPTHS OF ALL EXISTING ONSITE UTILITIES PRIOR TO CONSTRUCTION TO CONFIRM THERE IS NOT ANY CONFLICTS WITH OTHER UTILITIES, STORM SEWERS OR STREETS. CONFLICTS AFTER CONSTRUCTION BEGINS ARE SOLELY THE CONTRACTOR'S RESPONSIBILITY. THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. DEVIATIONS FROM THE APPROVED DESIGN SHALL ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OR CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF ANY SUCH DEVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS-BUILT/RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 FPS OR LESS AND 10 FPS OR GREATER (AT FULL FLOW CAPACITY) SHALL REQUIRE AS-BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION, PRIOR TO BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED TO AS-BUILT EACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL. STORM SEWER NOTE 67302PLA TALLYN'S RIDGE JSM/ADG BAH CLAY TOWNSHIP HAMILTON COUNTY, INDIANA 11/25/2015 APPROVAL PENDING NOT FOR CONSTRUCTION 08/21/15 11/25/15 REVISED PLANS PER NEW DEVELOPER 01/18/16 REVISED PER CROSSROADS COMMENTS ADG Know what's R CONSTRUCTION LIMITS 1" = 50 FT NOTES: ALL STORM STRUCTURES TO RECEIVE SOLID LID CASTINGS ARE TO BE CONSTRUCTED TO PROVIDE ONE 4" RISER RING NO MORE, NO LESS TO ACHIEVE PLAN RIM GRADE. ALL YARD INLETS ARE TO BE CONSTRUCTED AT A TOLERANCE OF +0.00' TO -0.20' OF PLAN GRADE. ALL STORM SEWER CASTINGS SHALL BE LABELED "DUMP NO WASTE-DRAINS TO WATERWAY" ALL SSD'S (SUBSURFACE DRAINS) WILL NEED TO BE DOUBLE WALL SMOOTH BORE PERFORATED (HDPE) PIPE. DEBRIS GUARDS ARE TO BE INSTALLED ON ALL OPEN ENDED INLETS. FOR STORM STRUCTURE SIZING AND CASTING TABLE SEE SHT. C203. ALL STORM SEWERS WITHIN PUBLIC RIGHT-OF-WAY SHALL BE RCP CLASS III. FOR INSTALLATION OF STORM UNDER CITY STREETS AND COVER REQUIREMENTS, SEE SHEETS No. C802 ON THE TRENCH DETAIL. THERE SHOULD BE NO LESS THAN 2.5 FEET OF COVER ALONG ANY PART OF THE PIPE FROM FINAL PAVEMENT OR FINAL GROUND SURFACE ELEVATION TO THE TOP OF THE PIPE. DENOTES FULL DEPTH GRANULAR BACKFILL (SEE RCP TRENCH DETAIL 10-28 ON SHEET C802 FOR MATERIAL AND SPECIFICATIONS.)