Loading...
HomeMy WebLinkAboutC101 SWPPP PHASE 1146TH STREET DAVID & BETH BIDGOOD INST. NO. 2015009469 OVERBROOK FARMS SEC. 1 INST. NO. PC 4, SLIDE 161 OVERBROOK FARMS SEC. 2 INST. NO. 2014053278 OVERBROOK FARMS SEC. 3 INST. NO. 2014053278 EX.SANITARY MANHOLE DAVID & BETH BIDGOOD INST. NO. 2015009469 OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU S89°43'27"W 656.65' S0 0 ° 0 7 ' 2 8 " W 3 2 8 . 5 8 ' N0 0 ° 0 9 ' 2 8 " E 1 3 1 4 . 0 0 ' N89°42'35"E 1312.54' D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D DDDDDD D D D D DDD D D D SF SF S F SF S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF S F S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF STAGING AREA 146TH STREET SF SF SF SF STOCKPILE AREA C101 SW P P P P H A S E 1 W1 6 0 0 6 6 - C 1 0 1 s w p p p 1 GENERAL NOTES 1.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY WITH THE OWNER DURING BIDDING AND DURING CONSTRUCTION ACTIVITIES ALL ITEMS TO BE REMOVED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ANY MATERIALS AND/OR STRUCTURES NOT LOCATED ON THIS SURVEY FOR THE INSTALLATION OF THE NEW WORK. 2.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL EXISTING UTILITIES PERTAINING TO THEIR PHASE OF WORK, AND TO VERIFY WHICH UTILITIES WILL BE REMOVED BY UTILITY COMPANY. ANY AND ALL UTILITIES NOT REMOVED BY THE UTILITY COMPANY SHALL BE REMOVED BY THE CONTRACTOR. 3.UTILITIES ARE SHOWN TO BE APPROXIMATE AND SHALL BE RELOCATED AND/OR CAPPED AND ABANDONED BEFORE CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER. 4.ALL DEMOLITION MATERIAL AND SALVAGEABLE MATERIAL IS THE PROPERTY OF THE DEMOLITION CONTRACTOR AND SHALL BE PROPERLY DISPOSED OF OFF THE SITE. 5.SLABS ON GRADE MUST BE REMOVED COMPLETELY AND TAKEN OFF THE SITE. 6.ALL UTILITIES MUST REMAIN ACTIVE FOR AREA TENANTS THAT ARE REMAINING. NO UTILITY SERVICE SHALL BE INTERRUPTED DURING THE CONSTRUCTION PROCESS. 7.BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT INFORMATION. 8.ANY EXISTING TREE(S) THAT MAY REQUIRE REMOVAL BUT ARE NOT SHOWN ON THE PLAN AS BEING REMOVED MAY BE DONE SO, AS LONG AS THE TREE(S) ARE RELOCATED TO AN APPROVED ALTERNATIVE LOCATION ON SITE. 9.IF THERE ARE ANY QUESTIONS CONCERNING THIS DEMOLITION PLAN, PLEASE CONTACT THE ENGINEER BEFORE CONTINUING WORK. EXISTING AREAS TOTAL SITE = 29.48 AC. DISTURBED = 9.76 AC. PERVIOUS = 29.48 AC. IMPERVIOUS = 0.0 AC. SWPPP PHASE 1 LEGEND - INLET PROTECTION - USE SUBSURFACE INLET PROTECTION WITH OVERFLOW CAPABILITY (DANDY SAC) - CONSTRUCTION ENTRANCE - STAGING AREA - POSTING AREA - 4" PVC TUBE WITH END CAPS ATTACHED TO PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED CONSTRUCTION DRAWINGS AND PERMITS FOR INSPECTORS. - INSTALL STRAW WATTLES (GRASS AREA) OR SILT DIKES (PAVEMENT AREA) AS SHOWN. CONTRACTOR TO ADD ADDITIONAL MEASURES AS CONSTRUCTION PHASING AND SITE CONDITIONS DICTATE - CONCRETE WASHOUT - STOCKPILE AREA (TEMPORARY SEEDING REQUIRED) - SILT FENCE - TREE PROTECTION - LIMITS OF DISTURBANCE SD IP SF D EROSION CONTROL NOTES 1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE BEDS. 2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT FENCE TO FOLLOW CONTOUR. 3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN THE STREET. CONTACT PERSON FOR EROSION CONTROL & SEDIMENT PRACTICES EROSION CONTROL SPECIFICATIONS 1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. 2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS. 3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. 4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. 5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. 6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. 7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. 8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER. 9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. 10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. 11.PORTABLE TOILETS MUST BE ANCHORED. WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. INDIANAPOLIS, IN 46268 TELEPHONE: (317) 846-6611 FAX: (317) 843-0546 EMAIL: PARKERF@WEIHE.NET CONTACT PERSON: FRED PARKER, CPESC SITE PREPARATION / SWPPP PHASE 1 NOTES INSTALL PERMIT POSTING AREA. 4" PVC TUBE WITH END CAPS ATTACHED TO PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED CONSTRUCTION DRAWINGS AND PERMITS FOR INSPECTORS. INSTALL CONSTRUCTION ENTRANCE. REFER TO DETAIL ON SHEET C201 INSTALL CONCRETE WASHOUT. REFER TO DETAIL ON SHEET C201 INSTALL SILT FENCE. REFER TO DETAIL ON SHEET C201 INSTALL TREE PROTECTION. REFER TO DETAIL ON SHEET C201 LIMITS OF PROPOSED BUILDING REMOVE EXISTING TREE(S) AND VEGETATION STAGING AREA. PROVIDE CONSTRUCTION DUMPSTER, FUELING AREA, AND PORT-O-LET AS NEEDED. 1 2 3 4 5 6 7 8 LINE TYPES UNDERGROUND GAS UNDERGROUND WATER OVERHEAD UTILITY RIGHT OF WAY LINE SILT FENCE BUILDING SETBACK LINE BOUNDARY LINE FLOW LINE G G G W W OHU OHU SF SF SECTION LINE FARM FENCE INDEX CONTOUR INTERMEDIATE CONTOUR RE V I S I O N S A N D I S S U E S Se c t i o n 1 9 , T o w n s h i p 1 8 N o r t h , R a n g e 3 E a s t , C l a y T o w n s h i p , H a m i l t o n C o u n t y , I n d i a n a W16.0066 PR E P A R E D F O R : 14 3 3 0 S H E L B O R N E R D , C A R M E L I N PROJECT NO. SHEET NO. CH E C K E D B Y : DR A W N B Y : SS R DE S I G N E D B Y : DW G N A M E : PR O J E C T N O . : W1 6 . 0 0 6 6 DA T E BY 04 . 0 7 . 2 0 1 6 EA C DA T E : SS R EN G I N E E R S 31 7 | 8 4 6 - 6 6 1 1 80 0 | 4 5 2 - 6 4 0 8 31 7 | 8 4 3 - 0 5 4 6 fa x W E I H E La n d S u r v e y i n g | C i v i l E n g i n e e r i n g La n d s c a p e A r c h i t e c t u r e AL L A N H . W E I H E , P . E . , L . S . - F O U N D E R 10 5 0 5 N . C o l l e g e A v e n u e In d i a n a p o l i s , I n d i a n a 4 6 2 8 0 we i h e . n e t Know what's below. before you dig.Call R A P P R O V A L P E N D I N G NO T F O R C O N S T R U C T I O N ST A B L E S A N D R I D I N G A R E N A W S N E STEVEN SCOTT RUCKER P.E. 11300279