Loading...
HomeMy WebLinkAboutC102 SWPPP PHASE 2146TH STREET DAVID & BETH BIDGOOD INST. NO. 2015009469 OVERBROOK FARMS SEC. 1 INST. NO. PC 4, SLIDE 161 OVERBROOK FARMS SEC. 2 INST. NO. 2014053278 OVERBROOK FARMS SEC. 3 INST. NO. 2014053278 EX.SANITARY MANHOLE DAVID & BETH BIDGOOD INST. NO. 2015009469 OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU S89°43'27"W 656.65' S0 0 ° 0 7 ' 2 8 " W 3 2 8 . 5 8 ' N0 0 ° 0 9 ' 2 8 " E 1 3 1 4 . 0 0 ' N89°42'35"E 1312.54' SA N SA N SA N SA N SAN SAN SA N SAN SAN SAN E( U ) E( U ) E( U ) E( U ) E( U ) E( U ) E(U)E(U) C O M ( U ) CO M ( U ) CO M ( U ) CO M ( U ) CO M ( U ) CO M ( U ) COM(U)COM(U) E(U)E(U)COM(U) D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D DDDDDD D D D D DDD D D D SF SF S F SF S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF S F S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF STAGING AREA 146TH STREET 15' DRAINAGE EASEMENT 20' ACCESS EASEMENT PROPOSED 30' SANITARY SEWER EASEMENT CD CD CD CD CD CD CD CD SF SF SF SF STOCKPILE AREA IP IP IP IP IP * CONTACT PERSON FOR EROSION CONTROL & SEDIMENT PRACTICES WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. INDIANAPOLIS, IN 46268 TELEPHONE: (317) 846-6611 FAX: (317) 843-0546 EMAIL: PARKERF@WEIHE.NET CONTACT PERSON: FRED PARKER, CPESC -WARNING- THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. -NOTE- THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED AFTER SOIL STRIPPING AND PAD BUILDING HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR MEASURES REQUIRED UNTIL PROPERTY TURNED OVER FOR DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS. DISTURBED ACREAGE = 9.76± AC. LAND DESCRIPTION (INSTRUMENT #2015009469) THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION NINETEEN (19), TOWNSHIP EIGHTEEN (18) NORTH, RANGE THREE (3) EAST. EXCEPT THE NORTH ONE-HALF (1/2) OF THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER. C102 SW P P P P H A S E 2 W1 6 0 0 6 6 - C 1 0 2 s w p p p 2 SWPPP PHASE 2 LEGEND - INLET PROTECTION - USE SUBSURFACE INLET PROTECTION WITH OVERFLOW CAPABILITY (DANDY SAC) - PERMANENT/TEMPORARY SEEDING USE PLANTING CHART - EROSION CONTROL BLANKET - USE S150BN BIO-NET AS SUPPLIED BY NORTH AMERICAN GREEN OR APPROVED EQUAL - CONSTRUCTION ENTRANCE - STAGING AREA - POSTING AREA - 4" PVC TUBE WITH END CAPS ATTACHED TO PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED CONSTRUCTION DRAWINGS AND PERMITS FOR INSPECTORS. - CONCRETE WASHOUT - SILT FENCE - INSTALL STRAW WATTLES (GRASS AREA) OR SILT DIKES (PAVEMENT AREA) AS SHOWN. CONTRACTOR TO ADD ADDITIONAL MEASURES AS CONSTRUCTION PHASING AND SITE CONDITIONS DICTATE - ROCK CHECK DAM - LIMITS OF DISTURBANCE (CONSTRUCTION LIMITS) - RIPRAP, REFER TO GRADING PLAN SHEET C300 FOR SIZING - SITE DISCHARGE POINT SD IP SF * D LINE TYPES UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS OVERHEAD UTILITY RIGHT OF WAY LINE SILT FENCE BUILDING SETBACK LINE BOUNDARY LINE FLOW LINE E E E C C C OHU OHU SF SF SECTION LINE FARM FENCE INDEX CONTOUR INTERMEDIATE CONTOUR STORM SEWER EROSION CONTROL NOTES 1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE BEDS. 2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT FENCE TO FOLLOW CONTOUR. 3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN THE STREET. 4.REFER TO SHEET C105 FOR VEGETATED SWALE DETAILS. EROSION CONTROL SPECIFICATIONS 1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. 2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS. 3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. 4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. 5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. 6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. 7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. 8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER. 9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. 10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. 11.PORTABLE TOILETS MUST BE ANCHORED. CD RE V I S I O N S A N D I S S U E S Se c t i o n 1 9 , T o w n s h i p 1 8 N o r t h , R a n g e 3 E a s t , C l a y T o w n s h i p , H a m i l t o n C o u n t y , I n d i a n a W16.0066 PR E P A R E D F O R : 14 3 3 0 S H E L B O R N E R D , C A R M E L I N PROJECT NO. SHEET NO. CH E C K E D B Y : DR A W N B Y : SS R DE S I G N E D B Y : DW G N A M E : PR O J E C T N O . : W1 6 . 0 0 6 6 DA T E BY 04 . 0 7 . 2 0 1 6 EA C DA T E : SS R EN G I N E E R S 31 7 | 8 4 6 - 6 6 1 1 80 0 | 4 5 2 - 6 4 0 8 31 7 | 8 4 3 - 0 5 4 6 fa x W E I H E La n d S u r v e y i n g | C i v i l E n g i n e e r i n g La n d s c a p e A r c h i t e c t u r e AL L A N H . W E I H E , P . E . , L . S . - F O U N D E R 10 5 0 5 N . C o l l e g e A v e n u e In d i a n a p o l i s , I n d i a n a 4 6 2 8 0 we i h e . n e t Know what's below. before you dig.Call R A P P R O V A L P E N D I N G NO T F O R C O N S T R U C T I O N ST A B L E S A N D R I D I N G A R E N A W S N E STEVEN SCOTT RUCKER P.E. 11300279 ORIGINATING BENCHMARK - HAM 40 DESCRIPTION: DNR TABLET SET IN THE TOP OF A CONCRETE POST AT THE SOUTHEAST CORNER OF THE INTERSECTION OF SHELBOURNE AND 146TH STREET. ELEVATION: 906.08 NAVD 88 TEMPORARY BENCHMARK - MAG NAIL A MAG NAIL IN A UTILITY POLE NEAR THE NORTHWEST CORNER OF THE PARCEL. THE MAG NAIL IS SET ON THE SOUTHEAST SIDE OF THE UTILITY POLE AND 0.5 FEET ABOVE GRADE. ELEVATION: 900.32 NAVD 88