Loading...
HomeMy WebLinkAboutC800 UTILITY PLAN146TH STREET OVERBROOK FARMS SEC. 1 INST. NO. PC 4, SLIDE 161 OVERBROOK FARMS SEC. 2 INST. NO. 2014053278 OVERBROOK FARMS SEC. 3 INST. NO. 2014053278 EX.SANITARY MANHOLE OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU SA N SA N SA N SA N SAN SAN SA N SAN SAN SAN E( U ) E( U ) E( U ) E( U ) E( U ) E( U ) E(U)E(U) C O M ( U ) CO M ( U ) CO M ( U ) CO M ( U ) CO M ( U ) CO M ( U ) COM(U)COM(U) E(U)E(U)COM(U) 146TH STREET 15' DRAINAGE EASEMENT 20' ACCESS EASEMENT PROPOSED 30' SANITARY SEWER EASEMENT STORM SEWER STRUCTURE DATA TABLE STRUCTURE NUMBER 100 101 102 201 202 203 204 205 206 207 208 209 210 211 STRUCTURE TYPE ??? MANHOLE ??? ??? MANHOLE MANHOLE INLET TYPE A INLET TYPE A MANHOLE INLET TYPE A ??? ??? ??? ??? TOP OF CASTING 888.13 896.00 888.08 901.40 902.16 901.80 901.90 903.00 903.27 902.75 896.74 898.50 896.74 897.32 CASTING TYPE ??? NEENAH R-1642 ??? ??? NEENAH R-4342 NEENAH R-4342 NEENAH R-3405 NEENAH R-3405 NEENAH R-4342 NEENAH R-3405 ??? ??? ??? ??? INVERT INV IN = 887.00(NE) INV IN = 889.85(N) INV OUT = 889.85(SW) INV OUT = 890.00(S) INV IN = 899.08(NW) INV IN = 899.22(W) INV IN = 899.53(N) INV OUT = 899.10(SE) INV IN = 899.86(N) INV OUT = 899.76(E) INV IN = 900.20(NE) INV OUT = 900.10(S) INV OUT = 900.50(SW) INV IN = 899.96(NW) INV OUT = 899.86(S) INV OUT = 900.10(SE) INV IN = 898.83(NE) INV OUT = 899.25(SW) INV IN = 898.50(NE) INV OUT = 898.70(SW) END SECTION END SECTION END SECTION END SECTION END SECTION N/A N/A N/A N/A N/A END SECTION N/A END SECTION N/A GENERAL UTILITY NOTES 1.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND LOCATION SERVICE AT LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL CONTACT THE OWNER AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE IN CONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 2.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED. 3.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR. 4.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY AND ALL FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES. 5.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY. 6.ANY PART OF SANITARY OR STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL. 7.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND ELEVATION OF EXISTING UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS RELATED TO THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS. 8.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE BETWEEN STORM / SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE. SANITARY SEWER LINE IN PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE PVC. 9.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWERS, WATER MAINS AND STORM SEWERS IS 18" OR LESS. 10.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 11.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. 12.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED AREAS. 13.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVE TRAFFIC BEARING RING AND COVERS. 14.PROVIDE THRUST BLOCKS FOR ALL WATER LINE BENDS AND TEES, INCLUDING TAP CONNECTION. 15.CONTRACTOR SHALL COORDINATE WITH WATER COMPANY FOR DOMESTIC AND FIRE SERVICE. CONNECT TO BUILDING DOMESTIC AND FIRE LINE. COORDINATE WITH PLUMBING DRAWINGS. 16.COORDINATE LOCATION OF ELECTRICAL AND COMMUNICATION LINES WITH LOCAL UTILITIES. 17.COORDINATE LOCATION OF REQUIRED CONDUITS FOR ELECTRIC SERVICE, LIGHT POLES, COMMUNICATION SERVICE AND IRRIGATION SYSTEM. 18.COORDINATE LOCATION AND SIZE OF GAS SERVICE CONNECTION AND INSTALLATION OF SERVICE LINE AND METER WITH GAS COMPANY. 19.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH PLUMBING DRAWINGS. 20.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO DOMESTIC/FIRE LINE INSTALLATION AND STORM SEWER / SANITARY SEWER INSTALLATION. 21.SANITARY SEWER LATERAL, WATER SERVICE, & ELECTRICAL/COMMUNICATION CONDUITS SHALL BE GRANULAR BACKFILL FOR ENTIRE RUN. 22.ALL EXISTING MANHOLE AND CATCH BASIN GRATES, WATER OR GAS VALVES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATIONS. UTILITY PLAN NOTES SANITARY SEWER NOTES CONNECT PROPOSED 6" SANITARY SEWER LATERAL TO EXISTING SANITARY SEWER MANHOLE. COORDINATE CONNECTION WITH MEP. PROVIDE CLEANOUTS AS REQUIRED/SHOWN. VERIFY INVERTS ON EXISTING LINE AND COORDINATE CONDITIONS WITH MEP. ADJUST AS REQUIRED. EXISTING SANITARY SEWER MANHOLE. CREATE INTERNAL DROP FOR PROPOSED LATERAL CONNECTION. REFER TO DETAIL ON SHEET C801. PROPOSED SANITARY LATERAL CLEANOUT TYPE 1 (IN LANDSCAPE AREAS WITHIN 3' OF BUILDING). REFER TO DETAIL ON SHEET [C801]. PROPOSED SANITARY LATERAL CLEANOUT TYPE 2 (IN PAVED AREAS OUTSIDE OF 3' OF BUILDING). REFER TO DETAIL ON SHEET [C801]. PROPOSED SANITARY LATERAL CLEANOUT TYPE 3 (IN NON-PAVED AREAS ONLY). REFER TO DETAIL ON SHEET [C801].. SS3 SS2 SS4 E1 E2 C1 SS5 SS1 C800 UT I L I T Y P L A N ELECTRICAL RISER GUY ANCHOR ELECTRIC JUNCTION BOX STREET LIGHT ELECTRIC MANHOLE ELECTRIC OUTLET UTILITY POLE UTILITY POLE W/ TRANSFORMER TRANSFORMER COMMUNICATIONS JUNCTION BOX COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL RIGHT OF WAY LINE FENCE GUARD RAIL BOUNDARY LINE WATER MANHOLE WELL HEAD WATER METER WATER VALVE GAS METER GAS VALVE ELECTRIC METER TRAFFIC SIGNAL POLE TRAFFIC SIGNAL BOLLARD FLAG POLE PARKING METER POST SIGN PARKING WHEEL STOP DOWN SPOUT HANDICAPPED SPACE GATE POST COMMUNICATIONS RISER STORM CLEANOUT BEEHIVE INLET CURB INLET FLOOR DRAIN ROUND INLET SQUARE INLET STORM MANHOLE SANITARY SEWER CLEANOUT LIFT STATION SANITARY SEWER MANHOLE SANITARY STUB MARKER PARKING LOT LIGHT (1 HEAD) PARKING LOT LIGHT (2 HEAD) ROW RIGHT OF WAY ESMT EASEMENT D.&U.E.DRAINAGE AND UTILITY EASEMENT FFE FINISH FLOOR ELEVATION TOC TOP OF CASTING CMP CORRUGATED METAL PIPE RCP REINFORCED CONCRETE PIPE PVC POLYVINYL CHLORIDE PIPE VCP VITRIFIED CLAY PIPE HDPE HIGH DENSITY POLYETHYLENE PIPE DIP DUCTILE IRON PIPE SSD SUB SURFACE DRAIN PIPE STM STORM SAN SANITARY STR STRUCTURE CO CLEANOUT UTILITY PLAN LEGEND UTILITIES ABBREVIATIONSOTHER LINE TYPES FLOW LINE SANITARY SEWER MAIN STORM SEWER MAIN UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN G G G W W E(A)E(A) E E E C C C C(A)C(A) OHU OHU FM FM AERIAL FIBER OPTIC CABLEFO(A)FO(A) UNDERGROUND FIBER OPTICFOFO SANITARY SEWER LATERALSANSAN ROOF DRAINSTMSTM SUB SURFACE DRAIN C2 ELECTRIC NOTES: COORDINATE AND CONNECT BUILDING ELECTRICAL LINE FROM SERVICE DROP LOCATION TO BUILDING. COORDINATE CONNECTION WITH POWER COMPANY AND ELECTRICAL DRAWINGS. ADJUST AS REQUIRED. BUILDING ELECTRICAL LINE POINT OF CONNECTION. COORDINATE CONNECTION WITH POWER COMPANY AND ELECTRICAL DRAWINGS. ADJUST AS REQUIRED. COMMUNICATION NOTES: COORDINATE AND CONNECT BUILDING COMMUNICATION SERVICE LINE(S) TO CONNECTION POINT AS SHOWN. ADJUST AS REQUIRED. 4" PVC CONDUIT TO BE INSTALLED WITH PULL STRINGS. CONTRACTOR TO PROVIDE #6 GROUND WIRE AT THE D-MARC LOCATION. 7 LINES ANTICIPATED FOR SERVICE. (4 PHONE, 1 DATA, 1 SECURITY, AND 1 FAX/MODEM) COORDINATE CONNECTION WITH SITE DRAWINGS AND SERVICE PROVIDER. RE V I S I O N S A N D I S S U E S Se c t i o n 1 9 , T o w n s h i p 1 8 N o r t h , R a n g e 3 E a s t , C l a y T o w n s h i p , H a m i l t o n C o u n t y , I n d i a n a W16.0066 PR E P A R E D F O R : 14 3 3 0 S H E L B O R N E R D , C A R M E L I N PROJECT NO. SHEET NO. CH E C K E D B Y : DR A W N B Y : SS R DE S I G N E D B Y : DW G N A M E : PR O J E C T N O . : W1 6 . 0 0 6 6 DA T E BY 04 . 0 7 . 2 0 1 6 EA C DA T E : SS R EN G I N E E R S 31 7 | 8 4 6 - 6 6 1 1 80 0 | 4 5 2 - 6 4 0 8 31 7 | 8 4 3 - 0 5 4 6 fa x W E I H E La n d S u r v e y i n g | C i v i l E n g i n e e r i n g La n d s c a p e A r c h i t e c t u r e AL L A N H . W E I H E , P . E . , L . S . - F O U N D E R 10 5 0 5 N . C o l l e g e A v e n u e In d i a n a p o l i s , I n d i a n a 4 6 2 8 0 we i h e . n e t Know what's below. before you dig.Call R A P P R O V A L P E N D I N G NO T F O R C O N S T R U C T I O N ST A B L E S A N D R I D I N G A R E N A W S N E STEVEN SCOTT RUCKER P.E. 11300279