Loading...
HomeMy WebLinkAboutA103 03 REFLECTED CEILING PLAN A.pdfB 1 C 1 2 3 A D 2 3 A B C DC.3A.2 A.8 B.4 B.5 C.2 C.6 +9'-0" METAL SOFFIT BY CANOPY MFR. CUSTOMER SERVICE 103 COOLER FREEZER COOLER +9'-0" +9'-0" +9'-0" +9'-0" +9'-6" +9'-6" +9'-6" OFFICE 104 FOOD PREP 105 ELECTRICAL EQUIPMENT 106 BREAK AREA 107 CAFE 101 SALES FLOOR 102 EXHAUST HOOD BULKHEAD @ 8'-0" A.F.F. A103 2 BULKHEAD @ 8'-0" A.F.F. +9'-0" B/ TRUSS @ 10'-6" (TYP.) MG-1 MG-1 MG-2 MG-2 B/ BEAM @ 11'-9" (REFER TO STRUCT. DWGS.) 8' - 4 " 8' - 4 " 8' - 4 " EQ U A L EQ U A L EQ.EQ. C L C L C L C L CL 2' - 9 1 8 " 2'-014" 2' - 1 " 6'-6" 2'-0"5'-0"4'-0"4'-0" 5'- 9 " 12 ' - 4 " A103 2 4' - 1 1 " EQ . EQ . EQ. METAL SOFFIT BY CANOPY MFR. EQ. METAL SOFFIT BY CANOPY MFR. CL C L LIGHTING FIXTURE, CENTERED IN CANOPY SOFFIT CL LIGHTING FIXTURE, CENTERED IN DOOR OPENING COOLER +9'-0" +9'-0" MEN'S RESTROOM 108 WOMEN'S RESTROOM 109 RECESSED HEATER, FINISH TO MATCH PTD. GWB. CLG. (REFER TO MECH. DWGS.) 4' - 0 " 2' - 0 " 2'-0"7" 1'-0" 1'-0" 1'- 0 " 1' - 0 " 11" 1' - 9 " 10" 1' - 9 " 2'-0" 9' - 4 " 2'-6" 6' - 4 " 2' - 1 0 " 5' - 8 " 6' - 0 " 1'-10" 1'-10" EQ 8' - 0 " 8' - 0 " EQ 4'-0" 3'-7" CL CL C L C L C L CL C L CL P P CL C L 2' - 3 " C L CL 2'-7" 4' - 4 " 1'-9" EQ8'-0"EQ 5' - 0 " CL 5' - 0 " EQEQ C L C L CL CL C L 1 ' - 5 " 5'- 3 1 2 " 13'-0"   ƒ 1' - 4 1 2 " A202 13 BULKHEAD @ 7'-4" A.F.F. BULKHEAD @ 8'-0" A.F.F. 11'- 6 " 3' - 1 1 2 “ 1 5 ' - 0 " 3'- 1 1 2 " A202 13 A202 13 6'-3 " 2' - 8 " A202 13 BULKHEAD @ 8'-0" A.F.F. BULKHEAD @ 5'-6" A.F.F. FINISH FACE OF BULKHEAD TO ALIGN WITH FINISH FACE OF CASE BELOW (VERIFY DIMS. IN FIELD) A202 13C - O P E N I N G L BULKHEAD @ 8'-4" A.F.F. 3" BULKHEAD @ 7'-1" A.F.F. FINISH FACE OF BULKHEAD TO ALIGN WITH FINISH FACE OF CASE BELOW (VERIFY DIMS. IN FIELD) P P CL CL CL A202 4 MG-1 SUSPENDED CEILING GRIDS - REFER TO FINISH LEGEND ON SHEET A702 C L C L C L C L C L 12 ' - 0 " 5' - 0 " 7' - 1 1 4 " 7' - 1 " 2' - 4 1 4 " 3'-112"4'-0" AL I G N AL I G N 2'-1012" C L EQ.EQ. C L C L 2' - 1 " 2' - 1 " AL I G N AL I G N 1' - 1 0 " 1' - 1 0 " EQ . EQ. 4'-0"7'-114"4'-1012" 7' - 1 1 1 2 " AL I G N 12 ' - 0 " C L 2'- 2 1 2 " C - W I N D O W L PP P P PP P6' - 7 " 8'-0"8'-0"8'-0"8'-0" CL CL 10'-414"7'-4" CL CL 1' - 1 0 1 2 " 8' - 6 3 4 " 1' - 6 " 4'-212" 2' - 7 " 6'-83 4"10'-83 4"10'-83 4"6'-83 4" EQUALEQUAL EQUALEQUAL CL CL CL 2' - 8 " 2' - 8 " C L C L C L EQ . EQ . 1' - 9 " C L 1 ' - 0 " C - DOOR OPENINGL 5' - 0 " EQ U A L EQ U A L P P R4 ' - 0 " R4 ' - 0 " R4 ' - 0 " R3 ' - 0 " R3 ' - 0 " +9'-0" 12"x12" ACCESS PANEL (REFER TO 16/A202) 4'-0 " 6'- 4 " EQ 6'- 4 " EQ 5'- 0 " 6" 1' - 2 " 1' - 7 " 1 ' - 1 0 1 2 " 6' - 0 " 3'-6" 2'-1" C L 6' - 1 1 1 4 " C L 1' - 7 " 6' - 0 " 9" 5" EXIT SIGN, REFER TO ELECTRICAL DWGS. 2'x4' RECESSED LIGHTING FIXTURES, REFER TO LIGHTING DWGS. SUPPLY AIR DIFFUSER, SEE MECHANICAL DWGS. 2' x 4' CEILING GRID AND TILE BULKHEAD, COORDINATE W/ SHEET A101 2' x 2' CEILING GRID AND TILE +10'-0"CEILING HEIGHT INDICATOR PENDANT LIGHTING FIXTURE REFER TO LIGHTING DWGS. HIGH PERFORMANCE SURFACE MOUNTED LIGHTING FIXTURE REFER TO LIGHTING DWGS. CEILING MOUNTED OCCUPANCY SENSOR CEILING MOUNTED PHOTO CENSOR DOWNLIGHT REFLECTED CEILING PLAN LEGEND EXHAUST GRILLE, SEE MECHANICAL DWGS. PENDANT LIGHTING FIXTURE, REFER TO LIGHTING DWGS.P CONTINUE 1 1/2" 16 GA CHANNEL THRU STEEL STUD KNOCKOUT TIE W/ 18 GA TIE WIRE 4'-0" TO BOTTOM OF JOISTS 6" STEEL STUDS AT 16" O.C. 3 5/8" STEEL STUD BRACING AT EVERY JOIST (NOTE: WHERE SOFFIT RUNS PARALLEL TO JOISTS, PROVIDE DIAGONAL BRACING AT 4'-0" O.C.) CONTINUE GYPSUM BOARD TO 1'-0" ABOVE CEILING CEILING, REFER TO 1/A105 REFER TO REFLECTED CEILING PLAN FOR BULKHEAD ELEVATION 3 5/8" DIAGONAL METAL STUD BRACE @ 8'-0" O.C. ATTACH BRACE 1'-0" ABOVE SCHEDULED CEILING, %5$&(#ƒ72%8/.+($' CONTINUOUS HORIZONTAL 16 GA. 1 1/2" COLD-ROLLED STEEL CHANNEL CONTINUOUS HORIZONTAL 16 GA. 1 1/2" COLD ROLLED STEEL CHANNEL 9 GA. WIRE @ 5'-0" O.C. THREADED RODS FASTEN TO JOISTS AT PANEL POINTS 1.ALL WORK IS TO BE PERFORMED IN STRICT ACCORDANCE WITH PREVAILING FEDERAL, STATE, AND LOCAL LAWS, CODES, AND REGULATIONS. 2.DO NOT SCALE DRAWINGS. 3.VERIFY EXISTING CONDITIONS BEFORE BEGINNING WORK AND IMMEDIATELY NOTIFY THE ARCHITECT IN CASE OF DISCREPANCIES BETWEEN DRAWINGS AND EXISTING CONDITIONS. DO NOT BEGIN WORK WITHOUT OBTAINING DIRECTION FROM THE ARCHITECT. 4.ACOUSTICAL TILE CEILING GRIDS ARE TO BE BALANCED IN EACH DIRECTION UNLESS INDICATED OTHERWISE. 5.CEILING-MOUNTED DEVICES IN ACOUSTICAL TILE CEILINGS ARE TO BE CENTERED IN CEILING TILES UNLESS INDICATED OTHERWISE. 6.USE NON-SAG GYPSUM WALL BOARD. 7. DO NOT FASTEN ANY CEILING GRID ITEMS TO THE STAINLESS STEEL HOOD ENCLOSURES 8.PROVIDE UNI-STRUT FRAMING ABOVE TV'S. COORDINATE LOCATION WITH DRAWING T-1 AND AETOS CONSTRUCTION PROJECT MANAGER 9.PROVIDE SOUND ATTENUATING BATT INSULATION ABOVE ALL TOILET ROOM CEILINGS 10. REFER TO DRAWING LD100 FOR LIGHTING FIXTURE TYPES 11. COORDINATE LOCATION OF AIR VENTS IN DUCTWORK TO NOT INTERFERE WITH LATERAL BRACING BETWEEN TRUSSES. (REFER TO MECH. DWGS.) REFLECTED CEILING PLAN GENERAL NOTES CONTINUE 1 1/2" 16 GA CHANNEL THRU STEEL STUD KNOCKOUT TIE W/ 18 GA TIE WIRE 4'-0" TO BOTTOM OF JOISTS 3 5/8" STEEL STUDS AT 16" O.C. 3 5/8" STEEL STUD BRACING AT EVERY JOIST (NOTE: WHERE SOFFIT RUNS PARALLEL TO JOISTS, PROVIDE DIAGONAL BRACING AT 4'-0" O.C.) CONTINUE GYPSUM BOARD TO BOTTOM OF JOIST REFER TO REFLECTED CEILING PLAN FOR BULKHEAD ELEVATION CEILING, REFER TO 1/A105 . A103REFLECTED CEILING PLAN SCALE 3/16" = 1'-0" 1 1/2" = 1'-0" DETAIL - BULKHEAD 3 1/2" = 1'-0" DETAIL - BULKHEAD ATTACHMENT 2 1/2" = 1'-0" DETAIL - BULKHEAD AS NOTED 02-26-16 REV. NO. SPCR NO. 4927 EAST 146TH STREET 261 KAPPA DRIVE, DATE REVISIONS BY GIANT EAGLE, INC. PITTSBURGH, PA 15238 2016007.00 01-20-16 CARMEL, IN 46033 02-26-16 02-24-16 104-27-16 BULLETIN #1--- 207-19-16 BULLETIN #3--- 309-28-16 BULLETIN #5--- 3 3 3 3 3 3 3 3 3 3