HomeMy WebLinkAboutM001 00 MECHANICAL DATA SHEET.pdfSUPPLY AIR
RETURN AIR
RETURN DUCT (UP & DN.)
UP
UP
UP
DN
DN
DN
FLEXIBLE DUCT (MAX. LENGTH 5 FEET)
TRANSITION
THERMOSTAT
NEW WORK
PRESENT TO REMAIN (PR)
DEMOLITION
BACKGROUND
HIDDEN LINE
POINT OF CONNECTION - NEW TO EXISTING
POINT OF DISCONNECTION - CAP EXISTING
DETAIL NUMBER
SHEET WHERE IT APPEARS
DEMOLITION (DRAWING SPECIFIC) NOTE
WxD"
TAG FOR SCHEDULED CENTRAL EQUIPMENT
SA
RA
P
ROUND ELBOW (1.5Ø RADIUS)
EXHAUST AIR - GENERAL EXHAUSTEA
SUPPLY
RETURN/EXHAUST/TRANSFER/OUTDOOR AIR
INDOOR AIR QUALITY SENSOR
(CO, CO2, HUMIDITY, ODORS/GASES)
CENTER LINE
NEW WORK (DRAWING SPECIFIC) NOTE
NORTH ARROW
SECTION LETTER
SHEET WHERE IT APPEARS
1.ALL DUCTWORK INDICATED IS SCHEMATIC AND SHOW ONLY RELATIVE POSITIONS.
PROVIDE OFFSETS, RISES, TRANSITIONS AND ELBOWS AS NEEDED TO INSTALL
PROPERLY.
2.DUCT DIMENSIONS SHOWN ARE CLEAR INSIDE FACE-TO-FACE DIMENSIONS AND DO
NOT INCLUDE DUCT LINER WHERE SPECIFIED. INCREASE DIMENSIONS OF LINED
DUCTWORK TO PROVIDE FREE INSIDE AREA EQUAL DIMENSIONS SHOWN. REFER
TO THE SPECIFICATIONS FOR LOCATION OF LINED DUCTWORK.
3.FINAL CONNECTIONS FROM HIGH VELOCITY MAIN DUCTS TO AIR TERMINAL UNITS
SHALL BE MADE WITH FLEXIBLE DUCTWORK NOT EXCEEDING 3 FEET IN LENGTH.
CONNECTIONS BETWEEN LOW VELOCITY DUCTWORK AND/OR TERMINAL UNITS TO
AIR INLETS AND OUTLETS SHALL BE MADE WITH FLEXIBLE DUCTWORK NOT
EXCEEDING 5 FEET IN LENGTH. LONGER DUCT RUN OUTS SHALL BE CONSTRUCTED
OF HARD DUCT OF THE SAME MATERIAL SPECIFIED FOR THE SYSTEM SERVED AND
INSULATED AS SPECIFIED FOR THAT SYSTEM. FLEXIBLE DUCTWORK SHALL BE OF
THE PRESSURE CLASS AND FACTORY INSULATED AS SPECIFIED FOR THE SYSTEM
WHERE INSTALLED.
4.FLEXIBLE DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTIONS WITHOUT ANY SAGS, SHARP TURNS OR KINKS.
AT THE MINIMUM, THE FLEXIBLE DUCTWORK SHALL BE FASTENED TO THE HARD
DUCT BY A NYLON STRAP SECURED BY SHEETMETAL SCREWS TO PREVENT
SLIPPING OFF FROM COLLAR.
5.PROVIDE VOLUME DAMPERS AT EACH AIR OUTLET, AIR INLET AND TERMINAL DEVICE
6.PROVIDE VOLUME DAMPER AT EACH BRANCH TAKE-OFF CONNECTION FROM THE
MAIN.
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
DUCT DIMENSIONS (INSIDE CLEAR AREA)
W INDICATES WIDTH
D INDICATES DEPTH
Ø" INDICATES DIAMETER OF ROUND DUCT
ARROW INDICATES DIRECTION OF FLOW
SQUARE ELBOW
W/ DOUBLE THICKNESS TURNING VANES
STANDARD BRANCH TAKE-OFF
(LOW VELOCITY SUPPLY-
USE SINGLE BLADE EXTRACTOR)
EQUIPMENT FLEXIBLE CONNECTION
ACCESS DOOR
ADAD
WxD WxD
Ø"Ø"
CHANGE IN ELEVATION
ARROW INDICATES DIRECTION OF FLOW
R INDICATES RISE, DN INDICATES DROP
R
CD-X
CFM
DN
OUTDOOR AIR - GENERAL VENTILATIONOA
RELIEF AIRREL
SUPPLY AIR DIFFUSER (ROUND NECK)
CD INDICATES CEILING DIFFUSER
RCD INDICATES ROUND CEILING DIFFUSER
CFM - AIRFLOW RATE
SQUARE-TO-ROUND DUCT TRANSITION
SUPPLY AIR OUTLET (G - GRILLE, R - REGISTER)
CFM - AIRFLOW RATE
SG-X
CFM
RETURN or EXHAUST AIR INLET
(G - GRILLE, R - REGISTER)
CFM - AIRFLOW RATE
RG-X
CFM
TWO OR THREE-WAY DIFFUSER
HATCHED AREA INDICATES BLOCKED OFF SECTION
LINEAR SUPPLY AIR DIFFUSER
CFM - AIRFLOW RATE
LD-X
CFM
MANUAL VOLUME CONTROL DAMPER
RG-X
CFM
RETURN or EXHAUST AIR INLET
(G - GRILLE, R - REGISTER)
CFM - AIRFLOW RATE
TRANSFER RETURN AIR GRILLE
CFM - AIRFLOW RATE
TG-X
CFM
FLOOR SUPPLY AIR GRILLE
CFM - AIRFLOW RATE
FSG-X
CFM
HUMIDISTAT
DUCT SMOKE DETECTOR
DUCT THERMAL DETECTOR
SPACE TEMPERATURE SENSOR
CARBON DIOXIDE (CO2) SENSOR
BEACON STROBE LIGHT FOR HVAC ALARM SYSTEMS,
(SEE SPECS)
PUSH BUTTON STATION FOR ALARM SYSTEM
(WITH PROTECTIVE RING)
WALL SWITCH
M MOTORIZED AIR DAMPER
(PNEUMATIC P - ELECTRIC M )
REVISION TRIANGLE
VERTICAL FIRE DAMPER
(WITH ACCESS DOOR AND SLEEVE)
HORIZONTAL FIRE DAMPER
(WITH ACCESS DOOR AND SLEEVE)
BACKDRAFT DAMPER
CONTROL DEVICES
T
H
S
D
S
T
D
S
CO2
S
IAQ
AD AD
BDD BDD
DCP-X EQUIPMENT TAG - MARK (X)
RCD-X
CFM
DUCTWORK - DAMPERS1.THE CONTRACT DOCUMENT DRAWINGS ARE DIAGRAMMATIC ONLY, AND ARE
INTENDED TO CONVEY THE SCOPE AND GENERAL ARRANGEMENT OF WORK.
2.ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE VERIFIED BY THE
CONTRACTOR BY FIELD INSPECTION PRIOR TO BIDDING. ANY INTERFERENCES TO
INSTALLATION SHALL BE NOTED AND THE CONTRACTOR SHALL INCLUDE IN HIS BID
PRICE THE COST TO AVOID OR RELOCATE ITEMS THAT INTERFERE, INCLUDING THE
COST TO RELOCATE ITEMS OF OTHER TRADES.
3.LOCATIONS OF TERMINAL DEVICES, AIR OUTLETS AND INLETS ARE APPROXIMATE.
LOCATE PER THE ARCHITECTURAL DRAWINGS AND TO AVOID OTHER TRADE'S WORK.
COORDINATE LOCATIONS WITH OTHER TRADES. CONSULT ARCHITECT/ENGINEER
FOR CLARIFICATION IF CONFLICTS OCCUR.
4.ALL MATERIALS FURNISHED, AND ALL WORK PERFORMED BY THE MECHANICAL
CONTRACTOR SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER
AND ALL APPLICABLE CODES AND REGULATIONS, INCLUDING BUT NOT LIMITED TO
THE LATEST EDITIONS OF NFPA, IEEE, OSHA, SMACNA, INTERNATIONAL MECHANICAL
CODE, INTERNATIONAL BUILDING CODE, STATE, COUNTY, AND LOCAL CODES.
5.THE MECHANICAL CONTRACTOR SHALL GIVE ALL NOTICES, OBTAIN ALL PERMITS, AND
PAY ALL TAXES, FEES, AND OTHER COSTS ASSOCIATED WITH HIS WORK. THE
MECHANICAL CONTRACTOR SHALL FILE ALL APPROVALS OF ALL REQUIRED
CERTIFICATES AND INSPECTION FOR HIS WORK JURISDICTION, AND DELIVER SAME
TO THE ENGINEER BEFORE REQUEST FOR ACCEPTANCE AND FINAL PAYMENT FOR
THE WORK. THE MECHANICAL CONTRACTOR SHALL INCLUDE IN HIS SCOPE OF
WORK, WITHOUT EXTRA COST TO THE OWNER, ALL LABOR, MATERIALS, SERVICES,
APPARATUS, DRAWINGS (IN ADDITION TO CONTRACT AND DOCUMENTS) IN ORDER TO
COMPLY WITH ALL APPLICABLE CODES, LAWS, ORDINANCES, RULES AND
REGULATIONS.
6.THE MECHANICAL CONTRACTOR SHALL FURNISH ALL EQUIPMENT, MATERIALS,
APPLIANCES, TOOLS, RIGGING, AND ACCESSORIES, AND PERFORM ALL LABOR
REQUIRED TO PROVIDE, INSTALL, CONNECT AND TEST COMPLETE HEATING,
VENTILATING AND AIR CONDITIONING EQUIPMENT AND SYSTEMS IN ACCORDANCE
WITH THE SPECIFICATIONS, DRAWINGS AND THE APPLICABLE CODES.
7.THE MECHANICAL CONTRACTOR SHALL INSTALL ALL HVAC EQUIPMENT IN
ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. THE MECHANICAL
CONTRACTOR SHALL VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S
CERTIFIED DRAWINGS.
8.THE MECHANICAL CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION AND
HEIGHT OF ALL HVAC EQUIPMENT AND COORDINATE WITH ALL OTHER MECHANICAL,
ELECTRICAL, ARCHITECTURAL, AND STRUCTURAL SYSTEMS.
9.THE MECHANICAL CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL OTHER
TRADES INVOLVED. ALL RISERS, DROPS, OFFSETS, AND TRANSITIONS IN DUCTWORK
AND PIPING AROUND OBSTACLES SHALL BE PROVIDED AT NO ADDITIONAL COST TO
THE OWNER.
10.THE MECHANICAL CONTRACTOR SHALL COORDINATE THE LOCATION AND SIZE OF
ALL FLOOR, WALL AND ROOF OPENINGS WITH THE GENERAL CONTRACTOR. THE
GENERAL CONTRACTOR SHALL PROVIDE ALL OPENINGS UNLESS OTHERWISE NOTED.
11.THE MECHANICAL CONTRACTOR SHALL COORDINATE THE LOCATION AND SIZE OF
ALL EQUIPMENT, DUCTWORK, AND PIPING SUSPENDED FROM THE BUILDING
STRUCTURE WITH THE GENERAL CONTRACTOR.
12.THE MECHANICAL CONTRACTOR SHALL SUPPORT ALL EQUIPMENT, DUCTWORK, AND
PIPING MOUNTED ABOVE THE CEILING DIRECTLY FROM THE STRUCTURE. THE
MECHANICAL CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STRUCTURAL
STEEL REQUIRED AND/OR AS SPECIFIED AND SHOWN IN THE DETAILS (UNLESS
OTHERWISE NOTED). ALL EQUIPMENT SHALL BE SUPPORTED FROM THE BUILDING
STRUCTURE WITH COMBINATION SPRING AND NEOPRENE-IN-SHEAR HANGER RODS.
ALL SUPPORTS SHALL BE PROVIDED AS REQUIRED TO ASSURE A VIBRATION FREE
INSTALLATION. ALL ATTACHMENTS TO BEAMS, TRUSSES, OR JOIST SHALL BE MADE
AT PANEL POINTS WITH BEAM CLAMPS MEETING MSS STANDARDS.
13.THE MECHANICAL CONTRACTOR SHALL VERIFY THE VOLTAGE OF ALL HVAC
EQUIPMENT WITH THE ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIPMENT.
14.THE MECHANICAL CONTRACTOR SHALL PROVIDE MOTORS AND STARTERS FOR ALL
HVAC EQUIPMENT. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL POWER
WIRING.
15.THE MECHANICAL CONTRACTOR SHALL PROVIDE DISCONNECT SWITCHES FOR ALL
HVAC EQUIPMENT, INCLUDING WEATHERPROOF UNITS AS REQUIRED.
16.THE MECHANICAL CONTRACTOR SHALL PROVIDE PHASE LOSS PROTECTION FOR
POLY-PHASE MOTOR DEVICES FOR ALL EQUIPMENT.
17.PROVIDE ACCESS DOORS OF SUFFICIENT SIZE TO SERVICE ALL CONCEALED
APPARATUS INCLUDING VALVES, DAMPERS, COILS, TERMINAL DEVICES, VENTS,
DRAINS, DRIPS, AIR BOXES, EQUIPMENT, ETC., WHERE INACCESSIBLE OR WHERE
CEILINGS ARE NOT REMOVABLE. CONCEALED SPLINE CEILINGS ARE NOT
CONSIDERED REMOVABLE. MINIMUM DOOR SIZE IS 18" x 18".
18.ALL DUCTWORK AND PIPING SHALL BE ROUTED AS CLOSE TO AND PARALLEL TO THE
BUILDING STRUCTURE AS POSSIBLE TO MAINTAIN GRADIENT AND BE INSTALLED AT A
COMMON ELEVATION WHEREVER PRACTICAL.
19.ALL CONTROL WIRING AND CONDUIT PROVIDED AND INSTALLED FOR HVAC
CONTROLS SHALL BE IN ACCORDANCE WITH NEC AND ELECTRICAL SPECIFICATIONS.
20.ALL THERMOSTATS SHOULD BE MOUNTED AT 48" AFF PER ADA REQUIREMENTS.
PROVIDE ALL THERMOSTATS IN PUBLIC SPACES WITH CLEAR LOCKING PLASTIC
COVERS. NON CONTROLLABLE SPACE TEMPERATURE SENSORS SHOULD BE
MOUNTED AT 60" AFF UNLESS OTHERWISE NOTED ON PLANS.
21.BUILDING CPC NETWORK CONTROLLER PROVIDED BY OWNER. REFRIGERATION
CONTRACTOR TO INSTALL AND PROGRAM. COORDINATE WIRING REQUIREMENTS
AND FINAL LOCATIONS OF ALL ACCESSORY DEVICES WITH E.C.
22.R.C. IS RESPONSIBLE FOR PROVIDING ALL SENSORS AND ASSOCIATED COMPONENTS
FOR INTEGRATION INTO THE NETWORK CONTROLLER. M.C. IS RESPONSIBLE FOR
COORDINATION OF QUANTITIES, LOCATIONS, AND INTEGRATION OF CONTROLS FOR A
COMPLETE AND OPERATIONAL SYSTEM. E.C. IS RESPONSIBLE FOR WIRING AND
INSTALLATION OF CONTROL COMPONENTS AND WIRING.
23.M.C. IS RESPONSIBLE FOR PROVIDING ALARM MONITORING STATIONS AS WELL AS
ALL NON NETWORK THERMOSTATS, AND CONTROLS FOR HVAC EQUIPMENT AS
ACCESSORIES TO THE EQUIPMENT. E.C. IS RESPONSIBLE FOR INSTALLATION AND
WIRING OF THERMOSTATS AND ALARM MONITORING STATIONS. M.C. TO
COORDINATE FINAL LOCATIONS WITH E.C. PRIOR TO RUNNING WIRE.
24.M.C. AND R.C. TO COORDINATE DUCT AND PIPING ELEVATIONS AT LOCATIONS WHERE
REFRIGERATION PIPING AND DUCTS CROSS. COORDINATION TO OCCUR PRIOR TO
INSTALLATION OF REFRIGERATION LINES OR DUCTWORK.
DUCTWORK- GENERALGENERAL
AIR INLETS & OUTLETS
UC
GENERAL NOTES DUCTWORK NOTES SYMBOLS
TRANSFER AIR VIA UNDER CUT DOOR
1
X
XXX
XX
XXX
XX-#
PIPING- GENERAL
CONDENSATE DRAINCD
RS REFRIGERANT SUCTION
RL REFRIGERANT LIQUID
DIRECTION OF PIPE PITCH DOWN
DIRECTION OF FLOW
PIPE BREAK
PIPE RISE OR DROP
CAPPED OUTLET
ELBOW TURNED UP
1.ALL PIPING SHOWN HAS BEEN DRAWN SCHEMATICALLY FOR CLARITY AND SHOW
ONLY RELATIVE POSITIONS. PROVIDE OFFSETS AND ELBOWS AS NEEDED TO
INSTALL PROPERLY AND TO AVOID INTERFERENCES.
2.TERMINATE CONDENSATE PIPING WITH AIR GAP AT SAFE WASTE OR FLOOR DRAIN
WHERE INDICATED ON PLANS
PIPING NOTES
MECHANICAL CONTRACTOR
ELECTRICAL CONTRACTOR
REFRIGERATION CONTRACTOR
M.C.
E.C.
R.C.
MECHANICAL DATA SHEET
M001
AS NOTED
JPO
PIB
XXX
REV.
NO.
SPCR
NO.
PROJECT
LOCATION
FILE NAME LAYERS
DATE
SCALE
SHEET NO.
DWG. TITLE
OWNER
USERNAME
PROJECT NO.
PLANNER
KICK OFF MEETING
ISSUED FOR 90%
ISSUED FOR PERMIT
FINAL APPROVED PLAN
RECORD DRAWINGS
DRAWN BY
CHECKED BY
GETGO #3557
4927 EAST 146TH STREET
261 KAPPA DRIVE,
DATE REVISIONS BY
ISSUED FOR REDLINE REVIEW
GIANT EAGLE, INC.
750 HOLIDAY DRIVE, SUITE 200
PITTSBURGH, PA 15220
PHONE: 412-921-4300
FAX: 412-921-4313
PITTSBURGH, PA 15238
2016003.00
01-20-15
CARMEL, IN 46062
02-26-16
02-26-16