Loading...
HomeMy WebLinkAboutM001 00 MECHANICAL DATA SHEET.pdfSUPPLY AIR RETURN AIR RETURN DUCT (UP & DN.) UP UP UP DN DN DN FLEXIBLE DUCT (MAX. LENGTH 5 FEET) TRANSITION THERMOSTAT NEW WORK PRESENT TO REMAIN (PR) DEMOLITION BACKGROUND HIDDEN LINE POINT OF CONNECTION - NEW TO EXISTING POINT OF DISCONNECTION - CAP EXISTING DETAIL NUMBER SHEET WHERE IT APPEARS DEMOLITION (DRAWING SPECIFIC) NOTE WxD" TAG FOR SCHEDULED CENTRAL EQUIPMENT SA RA P ROUND ELBOW (1.5Ø RADIUS) EXHAUST AIR - GENERAL EXHAUSTEA SUPPLY RETURN/EXHAUST/TRANSFER/OUTDOOR AIR INDOOR AIR QUALITY SENSOR (CO, CO2, HUMIDITY, ODORS/GASES) CENTER LINE NEW WORK (DRAWING SPECIFIC) NOTE NORTH ARROW SECTION LETTER SHEET WHERE IT APPEARS 1.ALL DUCTWORK INDICATED IS SCHEMATIC AND SHOW ONLY RELATIVE POSITIONS. PROVIDE OFFSETS, RISES, TRANSITIONS AND ELBOWS AS NEEDED TO INSTALL PROPERLY. 2.DUCT DIMENSIONS SHOWN ARE CLEAR INSIDE FACE-TO-FACE DIMENSIONS AND DO NOT INCLUDE DUCT LINER WHERE SPECIFIED. INCREASE DIMENSIONS OF LINED DUCTWORK TO PROVIDE FREE INSIDE AREA EQUAL DIMENSIONS SHOWN. REFER TO THE SPECIFICATIONS FOR LOCATION OF LINED DUCTWORK. 3.FINAL CONNECTIONS FROM HIGH VELOCITY MAIN DUCTS TO AIR TERMINAL UNITS SHALL BE MADE WITH FLEXIBLE DUCTWORK NOT EXCEEDING 3 FEET IN LENGTH. CONNECTIONS BETWEEN LOW VELOCITY DUCTWORK AND/OR TERMINAL UNITS TO AIR INLETS AND OUTLETS SHALL BE MADE WITH FLEXIBLE DUCTWORK NOT EXCEEDING 5 FEET IN LENGTH. LONGER DUCT RUN OUTS SHALL BE CONSTRUCTED OF HARD DUCT OF THE SAME MATERIAL SPECIFIED FOR THE SYSTEM SERVED AND INSULATED AS SPECIFIED FOR THAT SYSTEM. FLEXIBLE DUCTWORK SHALL BE OF THE PRESSURE CLASS AND FACTORY INSULATED AS SPECIFIED FOR THE SYSTEM WHERE INSTALLED. 4.FLEXIBLE DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS WITHOUT ANY SAGS, SHARP TURNS OR KINKS. AT THE MINIMUM, THE FLEXIBLE DUCTWORK SHALL BE FASTENED TO THE HARD DUCT BY A NYLON STRAP SECURED BY SHEETMETAL SCREWS TO PREVENT SLIPPING OFF FROM COLLAR. 5.PROVIDE VOLUME DAMPERS AT EACH AIR OUTLET, AIR INLET AND TERMINAL DEVICE 6.PROVIDE VOLUME DAMPER AT EACH BRANCH TAKE-OFF CONNECTION FROM THE MAIN. SUPPLY DUCT (UP & DOWN) EXHAUST DUCT (UP & DOWN) DUCT DIMENSIONS (INSIDE CLEAR AREA) W INDICATES WIDTH D INDICATES DEPTH Ø" INDICATES DIAMETER OF ROUND DUCT ARROW INDICATES DIRECTION OF FLOW SQUARE ELBOW W/ DOUBLE THICKNESS TURNING VANES STANDARD BRANCH TAKE-OFF (LOW VELOCITY SUPPLY- USE SINGLE BLADE EXTRACTOR) EQUIPMENT FLEXIBLE CONNECTION ACCESS DOOR ADAD WxD WxD Ø"Ø" CHANGE IN ELEVATION ARROW INDICATES DIRECTION OF FLOW R INDICATES RISE, DN INDICATES DROP R CD-X CFM DN OUTDOOR AIR - GENERAL VENTILATIONOA RELIEF AIRREL SUPPLY AIR DIFFUSER (ROUND NECK) CD INDICATES CEILING DIFFUSER RCD INDICATES ROUND CEILING DIFFUSER CFM - AIRFLOW RATE SQUARE-TO-ROUND DUCT TRANSITION SUPPLY AIR OUTLET (G - GRILLE, R - REGISTER) CFM - AIRFLOW RATE SG-X CFM RETURN or EXHAUST AIR INLET (G - GRILLE, R - REGISTER) CFM - AIRFLOW RATE RG-X CFM TWO OR THREE-WAY DIFFUSER HATCHED AREA INDICATES BLOCKED OFF SECTION LINEAR SUPPLY AIR DIFFUSER CFM - AIRFLOW RATE LD-X CFM MANUAL VOLUME CONTROL DAMPER RG-X CFM RETURN or EXHAUST AIR INLET (G - GRILLE, R - REGISTER) CFM - AIRFLOW RATE TRANSFER RETURN AIR GRILLE CFM - AIRFLOW RATE TG-X CFM FLOOR SUPPLY AIR GRILLE CFM - AIRFLOW RATE FSG-X CFM HUMIDISTAT DUCT SMOKE DETECTOR DUCT THERMAL DETECTOR SPACE TEMPERATURE SENSOR CARBON DIOXIDE (CO2) SENSOR BEACON STROBE LIGHT FOR HVAC ALARM SYSTEMS, (SEE SPECS) PUSH BUTTON STATION FOR ALARM SYSTEM (WITH PROTECTIVE RING) WALL SWITCH M MOTORIZED AIR DAMPER (PNEUMATIC P - ELECTRIC M ) REVISION TRIANGLE VERTICAL FIRE DAMPER (WITH ACCESS DOOR AND SLEEVE) HORIZONTAL FIRE DAMPER (WITH ACCESS DOOR AND SLEEVE) BACKDRAFT DAMPER CONTROL DEVICES T H S D S T D S CO2 S IAQ AD AD BDD BDD DCP-X EQUIPMENT TAG - MARK (X) RCD-X CFM DUCTWORK - DAMPERS1.THE CONTRACT DOCUMENT DRAWINGS ARE DIAGRAMMATIC ONLY, AND ARE INTENDED TO CONVEY THE SCOPE AND GENERAL ARRANGEMENT OF WORK. 2.ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE VERIFIED BY THE CONTRACTOR BY FIELD INSPECTION PRIOR TO BIDDING. ANY INTERFERENCES TO INSTALLATION SHALL BE NOTED AND THE CONTRACTOR SHALL INCLUDE IN HIS BID PRICE THE COST TO AVOID OR RELOCATE ITEMS THAT INTERFERE, INCLUDING THE COST TO RELOCATE ITEMS OF OTHER TRADES. 3.LOCATIONS OF TERMINAL DEVICES, AIR OUTLETS AND INLETS ARE APPROXIMATE. LOCATE PER THE ARCHITECTURAL DRAWINGS AND TO AVOID OTHER TRADE'S WORK. COORDINATE LOCATIONS WITH OTHER TRADES. CONSULT ARCHITECT/ENGINEER FOR CLARIFICATION IF CONFLICTS OCCUR. 4.ALL MATERIALS FURNISHED, AND ALL WORK PERFORMED BY THE MECHANICAL CONTRACTOR SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER AND ALL APPLICABLE CODES AND REGULATIONS, INCLUDING BUT NOT LIMITED TO THE LATEST EDITIONS OF NFPA, IEEE, OSHA, SMACNA, INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, STATE, COUNTY, AND LOCAL CODES. 5.THE MECHANICAL CONTRACTOR SHALL GIVE ALL NOTICES, OBTAIN ALL PERMITS, AND PAY ALL TAXES, FEES, AND OTHER COSTS ASSOCIATED WITH HIS WORK. THE MECHANICAL CONTRACTOR SHALL FILE ALL APPROVALS OF ALL REQUIRED CERTIFICATES AND INSPECTION FOR HIS WORK JURISDICTION, AND DELIVER SAME TO THE ENGINEER BEFORE REQUEST FOR ACCEPTANCE AND FINAL PAYMENT FOR THE WORK. THE MECHANICAL CONTRACTOR SHALL INCLUDE IN HIS SCOPE OF WORK, WITHOUT EXTRA COST TO THE OWNER, ALL LABOR, MATERIALS, SERVICES, APPARATUS, DRAWINGS (IN ADDITION TO CONTRACT AND DOCUMENTS) IN ORDER TO COMPLY WITH ALL APPLICABLE CODES, LAWS, ORDINANCES, RULES AND REGULATIONS. 6.THE MECHANICAL CONTRACTOR SHALL FURNISH ALL EQUIPMENT, MATERIALS, APPLIANCES, TOOLS, RIGGING, AND ACCESSORIES, AND PERFORM ALL LABOR REQUIRED TO PROVIDE, INSTALL, CONNECT AND TEST COMPLETE HEATING, VENTILATING AND AIR CONDITIONING EQUIPMENT AND SYSTEMS IN ACCORDANCE WITH THE SPECIFICATIONS, DRAWINGS AND THE APPLICABLE CODES. 7.THE MECHANICAL CONTRACTOR SHALL INSTALL ALL HVAC EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. THE MECHANICAL CONTRACTOR SHALL VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. 8.THE MECHANICAL CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION AND HEIGHT OF ALL HVAC EQUIPMENT AND COORDINATE WITH ALL OTHER MECHANICAL, ELECTRICAL, ARCHITECTURAL, AND STRUCTURAL SYSTEMS. 9.THE MECHANICAL CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL OTHER TRADES INVOLVED. ALL RISERS, DROPS, OFFSETS, AND TRANSITIONS IN DUCTWORK AND PIPING AROUND OBSTACLES SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. 10.THE MECHANICAL CONTRACTOR SHALL COORDINATE THE LOCATION AND SIZE OF ALL FLOOR, WALL AND ROOF OPENINGS WITH THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL PROVIDE ALL OPENINGS UNLESS OTHERWISE NOTED. 11.THE MECHANICAL CONTRACTOR SHALL COORDINATE THE LOCATION AND SIZE OF ALL EQUIPMENT, DUCTWORK, AND PIPING SUSPENDED FROM THE BUILDING STRUCTURE WITH THE GENERAL CONTRACTOR. 12.THE MECHANICAL CONTRACTOR SHALL SUPPORT ALL EQUIPMENT, DUCTWORK, AND PIPING MOUNTED ABOVE THE CEILING DIRECTLY FROM THE STRUCTURE. THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STRUCTURAL STEEL REQUIRED AND/OR AS SPECIFIED AND SHOWN IN THE DETAILS (UNLESS OTHERWISE NOTED). ALL EQUIPMENT SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE WITH COMBINATION SPRING AND NEOPRENE-IN-SHEAR HANGER RODS. ALL SUPPORTS SHALL BE PROVIDED AS REQUIRED TO ASSURE A VIBRATION FREE INSTALLATION. ALL ATTACHMENTS TO BEAMS, TRUSSES, OR JOIST SHALL BE MADE AT PANEL POINTS WITH BEAM CLAMPS MEETING MSS STANDARDS. 13.THE MECHANICAL CONTRACTOR SHALL VERIFY THE VOLTAGE OF ALL HVAC EQUIPMENT WITH THE ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIPMENT. 14.THE MECHANICAL CONTRACTOR SHALL PROVIDE MOTORS AND STARTERS FOR ALL HVAC EQUIPMENT. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL POWER WIRING. 15.THE MECHANICAL CONTRACTOR SHALL PROVIDE DISCONNECT SWITCHES FOR ALL HVAC EQUIPMENT, INCLUDING WEATHERPROOF UNITS AS REQUIRED. 16.THE MECHANICAL CONTRACTOR SHALL PROVIDE PHASE LOSS PROTECTION FOR POLY-PHASE MOTOR DEVICES FOR ALL EQUIPMENT. 17.PROVIDE ACCESS DOORS OF SUFFICIENT SIZE TO SERVICE ALL CONCEALED APPARATUS INCLUDING VALVES, DAMPERS, COILS, TERMINAL DEVICES, VENTS, DRAINS, DRIPS, AIR BOXES, EQUIPMENT, ETC., WHERE INACCESSIBLE OR WHERE CEILINGS ARE NOT REMOVABLE. CONCEALED SPLINE CEILINGS ARE NOT CONSIDERED REMOVABLE. MINIMUM DOOR SIZE IS 18" x 18". 18.ALL DUCTWORK AND PIPING SHALL BE ROUTED AS CLOSE TO AND PARALLEL TO THE BUILDING STRUCTURE AS POSSIBLE TO MAINTAIN GRADIENT AND BE INSTALLED AT A COMMON ELEVATION WHEREVER PRACTICAL. 19.ALL CONTROL WIRING AND CONDUIT PROVIDED AND INSTALLED FOR HVAC CONTROLS SHALL BE IN ACCORDANCE WITH NEC AND ELECTRICAL SPECIFICATIONS. 20.ALL THERMOSTATS SHOULD BE MOUNTED AT 48" AFF PER ADA REQUIREMENTS. PROVIDE ALL THERMOSTATS IN PUBLIC SPACES WITH CLEAR LOCKING PLASTIC COVERS. NON CONTROLLABLE SPACE TEMPERATURE SENSORS SHOULD BE MOUNTED AT 60" AFF UNLESS OTHERWISE NOTED ON PLANS. 21.BUILDING CPC NETWORK CONTROLLER PROVIDED BY OWNER. REFRIGERATION CONTRACTOR TO INSTALL AND PROGRAM. COORDINATE WIRING REQUIREMENTS AND FINAL LOCATIONS OF ALL ACCESSORY DEVICES WITH E.C. 22.R.C. IS RESPONSIBLE FOR PROVIDING ALL SENSORS AND ASSOCIATED COMPONENTS FOR INTEGRATION INTO THE NETWORK CONTROLLER. M.C. IS RESPONSIBLE FOR COORDINATION OF QUANTITIES, LOCATIONS, AND INTEGRATION OF CONTROLS FOR A COMPLETE AND OPERATIONAL SYSTEM. E.C. IS RESPONSIBLE FOR WIRING AND INSTALLATION OF CONTROL COMPONENTS AND WIRING. 23.M.C. IS RESPONSIBLE FOR PROVIDING ALARM MONITORING STATIONS AS WELL AS ALL NON NETWORK THERMOSTATS, AND CONTROLS FOR HVAC EQUIPMENT AS ACCESSORIES TO THE EQUIPMENT. E.C. IS RESPONSIBLE FOR INSTALLATION AND WIRING OF THERMOSTATS AND ALARM MONITORING STATIONS. M.C. TO COORDINATE FINAL LOCATIONS WITH E.C. PRIOR TO RUNNING WIRE. 24.M.C. AND R.C. TO COORDINATE DUCT AND PIPING ELEVATIONS AT LOCATIONS WHERE REFRIGERATION PIPING AND DUCTS CROSS. COORDINATION TO OCCUR PRIOR TO INSTALLATION OF REFRIGERATION LINES OR DUCTWORK. DUCTWORK- GENERALGENERAL AIR INLETS & OUTLETS UC GENERAL NOTES DUCTWORK NOTES SYMBOLS TRANSFER AIR VIA UNDER CUT DOOR 1 X XXX XX XXX XX-# PIPING- GENERAL CONDENSATE DRAINCD RS REFRIGERANT SUCTION RL REFRIGERANT LIQUID DIRECTION OF PIPE PITCH DOWN DIRECTION OF FLOW PIPE BREAK PIPE RISE OR DROP CAPPED OUTLET ELBOW TURNED UP 1.ALL PIPING SHOWN HAS BEEN DRAWN SCHEMATICALLY FOR CLARITY AND SHOW ONLY RELATIVE POSITIONS. PROVIDE OFFSETS AND ELBOWS AS NEEDED TO INSTALL PROPERLY AND TO AVOID INTERFERENCES. 2.TERMINATE CONDENSATE PIPING WITH AIR GAP AT SAFE WASTE OR FLOOR DRAIN WHERE INDICATED ON PLANS PIPING NOTES MECHANICAL CONTRACTOR ELECTRICAL CONTRACTOR REFRIGERATION CONTRACTOR M.C. E.C. R.C. MECHANICAL DATA SHEET M001 AS NOTED JPO PIB XXX REV. NO. SPCR NO. PROJECT LOCATION FILE NAME LAYERS DATE SCALE SHEET NO. DWG. TITLE OWNER USERNAME PROJECT NO. PLANNER KICK OFF MEETING ISSUED FOR 90% ISSUED FOR PERMIT FINAL APPROVED PLAN RECORD DRAWINGS DRAWN BY CHECKED BY GETGO #3557 4927 EAST 146TH STREET 261 KAPPA DRIVE, DATE REVISIONS BY ISSUED FOR REDLINE REVIEW GIANT EAGLE, INC. 750 HOLIDAY DRIVE, SUITE 200 PITTSBURGH, PA 15220 PHONE: 412-921-4300 FAX: 412-921-4313 PITTSBURGH, PA 15238 2016003.00 01-20-15 CARMEL, IN 46062 02-26-16 02-26-16