Loading...
HomeMy WebLinkAboutM101 00 MECHANICAL FLOOR PLAN.pdf6 EG-2 150 EG-1 300 10"Ø 10"Ø EH-1 CD2-8 150 8"Ø CD2-8 250 8"Ø 16"Ø DB-1 3150 14"Ø 10"Ø 8 12 13 S RTU-1 T RH-1 19 CD5 300 CD5 300 12"Ø CD5 300 21 28/28 18"Ø 8"Ø 4 EG-2 150 25 25 10"Ø 8"Ø 8"Ø 20 M502 8 M502 7 CD5 100 16"Ø 26 26 26 26 27 1 3 2 EH-1 CD3-10 300 CD2-6 50 CD-12 650 CD2-8 2009 CD-10 300 CD-12 650 RG-1 1875 6"Ø 10"Ø 12"Ø 14"Ø 12"Ø CD-12 650 CD-12 400 12"Ø 14"Ø TG-1 - - - TG-1 - - -10/10 24"Ø 10"Ø 10"Ø 8"Ø 12"Ø S RTU-2 30"Ø 14 11 CD-10 275 SSAC-1 16 1718 22 4 10 23 24 INDOOR UNIT 15 TG-1 5RTU-1& RTU-2 ALARM KEY STATIONS. 18"Ø CD-12 450 CD-12 450 12"Ø 12"Ø CD5 200 8"Ø CH-2 25 CD5 20026 CD5 30026 H H B 1 C 1 2 3 A D 2 3 f r o n t f r o n t C L E A R A N C E f r o n t f r o n t 2 - 9 8 - H T C - C T F R Y f r o n t 3 3 " h i g h f r o n t f r o n t f r o n t f r o n t 4 " c l e a r a n c e t o p 2 " c l e a r a n c e s i d e 2 " c l e a r a n c e s i d e 3 " c l e a r a n c e 2 " t o p c l e a r a n c e 1 " c l e a r a n c e 1 " c l e a r a n c e c l e a r a n c e w h e n d r a w e r i s o p e n f r o n t f r o n t 4 " c l e a r a n c e t o p 2 " c l e a r a n c e s i d e 2 " c l e a r a n c e s i d e f r o n t f r o n t 74 " h i g h fro n t fro n t fro n t fro n t 7 4 " h i g h f r o n t 74" h i g h f r o n t 74 " h i g h fro n t fro n t f r o n t f r o n t fro n t fro n t f r o n t A U T O S L I C E R fro n t 4" C L E A R A N C E B E H I N D U N I T 12 " C L E A R A N C E O N T H E T O P O F U N I T f r o n t AIR I N AIR O U T D C fro n t 5" C L E A R A N C E 5" CLEARANCE 5 " C L E A R A N C E fro n t F R O N T 74" high fr o n t fr o n t fr o n t E1E2 fr o n t RE Q U I R E D C L E A R A N C E S E R V I C E A C C E S S C L E A R A N C E 7 4 " h i g h 7 4 " h i g h f r o n t f r o n t front 74" h i g h 74" high fro n t fro n t fro n t fro n t fro n t fro n t fro n t f r o n t R R D C 8" C L E A R A N C E 5 " C L E A R A N C E 8" C L E A R A N C E f r o n t 3 " C L E A R A N C E A L L S I D E S 1 2 " C L E A R A N C E O N T H E T O P O F U N I T f r o n t f r o n t f r o n t f r o n t f r o n t f r o n t f r o n t f r o n t CADDY CONTROLPANEL 2" BALLVALVE 2" EVAC.PORT front front74" high front 74" high 7 4 " h i g h 74" high fr o n t frontfront f r o n t fr o n t f r o n t f r o n t f r o n t f r o n t KEY NOTESKEY NOTES TRANSITION AS REQUIRED FOR CONNECTION TO KITCHEN HOOD H-1 TRANSITION IN VERTICAL AS REQUIRED FOR CONNECTION TO EXHAUST FAN EF-1 ON ROOF. 12/12 GREASE EXHAUST DUCT WITH ZERO-CLEARANCE TO COMBUSTIBLE INSULATION. 2 3 4 12/12 EXHAUST DUCT UP TO EXHAUST FAN EF-2 ON ROOF. 6 FIELD COORDINATE UNIT MOUNTING HEIGHT WITH TO MATCH ADJACENT ARCHITECTURAL CLOUDS. 7 TRANSITION DUCT TO BELOW STRUCTURAL BEAM.8 SUSPEND DIFFUSER AT 10'-0" AFF. FLEXIBLE DUCT NOT PERMITTED IN THIS LOCATION. 9 10 MOUNT UNIT AT TOP OF WALL BELOW CEILING. INSTALL PER MANUFACTURER'S INSTRUCTIONS. COORDINATE FINAL PLACEMENT AND MOUNTING HEIGHT WITH RESPECT TO MANUFACTURER'S CLEARANCE REQUIREMENTS. 11 RETURN DUCT MOUNTED BETWEEN JOISTS. TERMINATE PER DETAIL X-M502. 12 TOP OF SUPPLY BOX TO BE MOUNTED AT BOTTOM OF JOISTS. PROVIDE TRANSITION AND SUPPLY BOX CAP AS REQUIRED TO CONNECT TO SUPPLY DUCT ABOVE. 13 TRANSITION RETURN BRANCH DUCTS AS REQUIRED TO MATCH RETURN GRILLES TO CEILING GRID. 14 ROUTE 5/8" CONDENSATE DRAIN THROUGH WALL TO ADJACENT HAND SINK. DISCHARGE TO SAFE WASTE LOCATED UNDER SINK WITH AIR GAP. REFERENCE PLUMBING PLANS. 15 REFRIGERATION LINES. SIZE PER MANUFACTURER'S INSTALLATION REQUIREMENTS. REFERENCE 1-M201 FOR CONTINUATION. 16 17 TRANSITION FROM 26/28 RETURN UP TO 18/28 AT RTU-2. 18 20/24 SUPPLY DOWN FROM RTU-2. 19 PROVIDE THERMOSTAT WITH CLEAR LOCKING COVER. MOUNT AT 48"AFF. 20 TRANSITION TO 28/20 SUPPLY DOWN FROM RTU-1. 21 TRANSITION FROM 28/28 RETURN DUCT UP TO RTU-1 RETURN OPENING. 22 MOUNT THERMOSTAT AT 48"AFF. COORDINATE FINAL MOUNTING LOCATION OWNERS REPRESENTATIVE. 23 FULLY RECESSED REMOTE PULL STATION FOR HOOD FIRE SUPPRESSION SYSTEM. E.C. SHALL INSTALL FLUSH MOUNTED OCTAGONAL JUNCTION BOX AND CONDUIT AS SHOWN ON ELECTRICAL PLANS. HOOD SUPPRESSION VENDOR SHALL INSTALL PULL STATION PER HOOD MANUFACTURER'S INSTRUCTIONS. M.C. SHALL LABEL EACH PULL STATION FOR ASSOCIATED HOOD WITH RED PHENOLIC ENGRAVED LABEL WITH /12" HIGH WHITE LETTERS. M.C. SHALL INSTALL HOOD FURNISHED BY OWNER IN ACCORDANCE WITH HOOD MANUFACTURER'S INSTRUCTIONS. MOUNT HOOD AT HEIGHT INDICATED ON ASSOCIATED DETAIL. PROVIDE 20 GAUGE STAINLESS STEEL SHROUD EXTENSIONS FROM TOP OF HOOD TO 18" ABOVE HOOD OR 6" ABOVE CEILING (WHICH EVER IS GREATER) ON ALL 3 SIDES OF THE HOOD. CONFIRM CEILING HEIGHT WITH ARCHITECTURAL PLANS. 5 PROVIDE AND INSTALL 20 GAUGE STAINLESS STEEL BACK SPLASH AND SIDE SPLASH FROM FLOOR TO BOTTOM OF HOOD AND WIDTH TO MATCH HOOD FROM EDGE TO EDGE. 24 DIFFERENTIAL SPACE TEMPERATURE SENSOR FOR HOOD FIRE SUPPRESSION SYSTEM FURNISHED AS ACCESSORY TO HOOD PACKAGE. E.C. SHALL INSTALL SENSOR AT 8'-0" AFF. AND WIRE PER MANUFACTURER'S INSTRUCTIONS. 25 26 PROVIDE GRILLE WITH ACCESSORY ASD (AIR SCOOP DAMPER) WITH SCREWDRIVER ADJUSTMENT FROM GRILL FACE FOR VOLUME BALANCING. 27 MOUNT TEMPERATURE SENSOR AT 7'-0" AFF. MOUNT RTU ALARM MONITOR/KEY STATIONS AT 48" AFF. FIELD COORDINATE FINAL LOCATION WITH FIRE MARSHALL'S OFFICE PRIOR TO INSTALLATION. 1 FIELD COORDINATE FINAL MOUNTING HEIGHT. MECHANICAL FLOOR PLAN M101 AS NOTED JPO PIB SCALE: MECHANICAL FLOOR PLAN 3/16" = 1'-0"1 XXX REV. NO. SPCR NO. PROJECT LOCATION FILE NAME LAYERS DATE SCALE SHEET NO. DWG. TITLE OWNER USERNAME PROJECT NO. PLANNER KICK OFF MEETING ISSUED FOR 90% ISSUED FOR PERMIT FINAL APPROVED PLAN RECORD DRAWINGS DRAWN BY CHECKED BY GETGO #3557 4927 EAST 146TH STREET 261 KAPPA DRIVE, DATE REVISIONS BY ISSUED FOR REDLINE REVIEW GIANT EAGLE, INC. 750 HOLIDAY DRIVE, SUITE 200 PITTSBURGH, PA 15220 PHONE: 412-921-4300 FAX: 412-921-4313 PITTSBURGH, PA 15238 2016003.00 01-20-15 CARMEL, IN 46062 02-26-16 02-26-16