HomeMy WebLinkAboutM101 00 MECHANICAL FLOOR PLAN.pdf6
EG-2
150
EG-1
300
10"Ø
10"Ø
EH-1
CD2-8
150
8"Ø
CD2-8
250
8"Ø
16"Ø
DB-1
3150
14"Ø
10"Ø
8
12
13
S
RTU-1
T
RH-1
19
CD5
300
CD5
300
12"Ø
CD5
300
21
28/28
18"Ø
8"Ø
4
EG-2
150 25
25
10"Ø
8"Ø
8"Ø
20
M502
8
M502
7
CD5
100
16"Ø
26 26 26 26
27
1
3
2 EH-1
CD3-10
300
CD2-6
50
CD-12
650
CD2-8
2009
CD-10
300
CD-12
650
RG-1
1875
6"Ø
10"Ø
12"Ø
14"Ø
12"Ø
CD-12
650
CD-12
400
12"Ø
14"Ø
TG-1
- - -
TG-1
- - -10/10
24"Ø
10"Ø
10"Ø
8"Ø
12"Ø
S
RTU-2
30"Ø
14
11
CD-10
275
SSAC-1
16
1718
22
4
10
23
24
INDOOR UNIT
15
TG-1
5RTU-1& RTU-2
ALARM KEY
STATIONS.
18"Ø
CD-12
450
CD-12
450 12"Ø
12"Ø
CD5
200
8"Ø
CH-2
25
CD5
20026
CD5
30026
H
H
B
1
C
1
2
3
A D
2
3
f
r
o
n
t
f
r
o
n
t
C
L
E
A
R
A
N
C
E
f
r
o
n
t
f
r
o
n
t
2
-
9
8
-
H
T
C
-
C
T
F
R
Y
f
r
o
n
t
3
3
"
h
i
g
h
f
r
o
n
t
f
r
o
n
t
f
r
o
n
t
f
r
o
n
t
4
"
c
l
e
a
r
a
n
c
e
t
o
p
2
"
c
l
e
a
r
a
n
c
e
s
i
d
e
2
"
c
l
e
a
r
a
n
c
e
s
i
d
e
3
"
c
l
e
a
r
a
n
c
e
2
"
t
o
p
c
l
e
a
r
a
n
c
e
1
"
c
l
e
a
r
a
n
c
e
1
"
c
l
e
a
r
a
n
c
e
c
l
e
a
r
a
n
c
e
w
h
e
n
d
r
a
w
e
r
i
s
o
p
e
n
f
r
o
n
t
f
r
o
n
t
4
"
c
l
e
a
r
a
n
c
e
t
o
p
2
"
c
l
e
a
r
a
n
c
e
s
i
d
e
2
"
c
l
e
a
r
a
n
c
e
s
i
d
e
f
r
o
n
t
f
r
o
n
t
74
"
h
i
g
h
fro
n
t
fro
n
t
fro
n
t
fro
n
t
7
4
"
h
i
g
h
f
r
o
n
t
74"
h
i
g
h
f
r
o
n
t
74
"
h
i
g
h
fro
n
t
fro
n
t
f
r
o
n
t
f
r
o
n
t
fro
n
t
fro
n
t
f
r
o
n
t
A
U
T
O
S
L
I
C
E
R
fro
n
t
4"
C
L
E
A
R
A
N
C
E
B
E
H
I
N
D
U
N
I
T
12
"
C
L
E
A
R
A
N
C
E
O
N
T
H
E
T
O
P
O
F
U
N
I
T
f
r
o
n
t
AIR
I
N
AIR
O
U
T
D C
fro
n
t
5" C
L
E
A
R
A
N
C
E
5" CLEARANCE
5
"
C
L
E
A
R
A
N
C
E
fro
n
t
F
R
O
N
T
74" high
fr
o
n
t
fr
o
n
t
fr
o
n
t
E1E2
fr
o
n
t
RE
Q
U
I
R
E
D
C
L
E
A
R
A
N
C
E
S
E
R
V
I
C
E
A
C
C
E
S
S
C
L
E
A
R
A
N
C
E
7
4
"
h
i
g
h
7
4
"
h
i
g
h
f
r
o
n
t
f
r
o
n
t
front
74"
h
i
g
h
74" high
fro
n
t
fro
n
t
fro
n
t
fro
n
t
fro
n
t
fro
n
t
fro
n
t
f
r
o
n
t
R
R
D
C
8" C
L
E
A
R
A
N
C
E
5
"
C
L
E
A
R
A
N
C
E
8" C
L
E
A
R
A
N
C
E
f
r
o
n
t
3
"
C
L
E
A
R
A
N
C
E
A
L
L
S
I
D
E
S
1
2
"
C
L
E
A
R
A
N
C
E
O
N
T
H
E
T
O
P
O
F
U
N
I
T
f
r
o
n
t
f
r
o
n
t
f
r
o
n
t
f
r
o
n
t
f
r
o
n
t
f
r
o
n
t
f
r
o
n
t
f
r
o
n
t
CADDY
CONTROLPANEL 2" BALLVALVE
2" EVAC.PORT
front
front74" high
front
74" high
7
4
"
h
i
g
h
74" high
fr
o
n
t
frontfront
f
r
o
n
t
fr
o
n
t
f
r
o
n
t
f
r
o
n
t
f
r
o
n
t
f
r
o
n
t
KEY NOTESKEY NOTES
TRANSITION AS REQUIRED FOR CONNECTION TO
KITCHEN HOOD H-1
TRANSITION IN VERTICAL AS REQUIRED FOR
CONNECTION TO EXHAUST FAN EF-1 ON ROOF.
12/12 GREASE EXHAUST DUCT WITH
ZERO-CLEARANCE TO COMBUSTIBLE INSULATION.
2
3
4
12/12 EXHAUST DUCT UP TO EXHAUST FAN EF-2 ON
ROOF.
6
FIELD COORDINATE UNIT MOUNTING HEIGHT WITH
TO MATCH ADJACENT ARCHITECTURAL CLOUDS.
7
TRANSITION DUCT TO BELOW STRUCTURAL BEAM.8
SUSPEND DIFFUSER AT 10'-0" AFF. FLEXIBLE DUCT NOT
PERMITTED IN THIS LOCATION.
9
10
MOUNT UNIT AT TOP OF WALL BELOW CEILING.
INSTALL PER MANUFACTURER'S INSTRUCTIONS.
COORDINATE FINAL PLACEMENT AND MOUNTING
HEIGHT WITH RESPECT TO MANUFACTURER'S
CLEARANCE REQUIREMENTS.
11
RETURN DUCT MOUNTED BETWEEN JOISTS.
TERMINATE PER DETAIL X-M502.
12
TOP OF SUPPLY BOX TO BE MOUNTED AT BOTTOM
OF JOISTS. PROVIDE TRANSITION AND SUPPLY BOX
CAP AS REQUIRED TO CONNECT TO SUPPLY DUCT
ABOVE.
13
TRANSITION RETURN BRANCH DUCTS AS REQUIRED
TO MATCH RETURN GRILLES TO CEILING GRID.
14
ROUTE 5/8" CONDENSATE DRAIN THROUGH WALL
TO ADJACENT HAND SINK. DISCHARGE TO SAFE
WASTE LOCATED UNDER SINK WITH AIR GAP.
REFERENCE PLUMBING PLANS.
15
REFRIGERATION LINES. SIZE PER
MANUFACTURER'S INSTALLATION REQUIREMENTS.
REFERENCE 1-M201 FOR CONTINUATION.
16
17 TRANSITION FROM 26/28 RETURN UP TO 18/28 AT
RTU-2.
18 20/24 SUPPLY DOWN FROM RTU-2.
19 PROVIDE THERMOSTAT WITH CLEAR LOCKING
COVER. MOUNT AT 48"AFF.
20 TRANSITION TO 28/20 SUPPLY DOWN FROM RTU-1.
21 TRANSITION FROM 28/28 RETURN DUCT UP TO RTU-1
RETURN OPENING.
22 MOUNT THERMOSTAT AT 48"AFF. COORDINATE
FINAL MOUNTING LOCATION OWNERS
REPRESENTATIVE.
23 FULLY RECESSED REMOTE PULL STATION FOR
HOOD FIRE SUPPRESSION SYSTEM. E.C. SHALL
INSTALL FLUSH MOUNTED OCTAGONAL JUNCTION
BOX AND CONDUIT AS SHOWN ON ELECTRICAL
PLANS. HOOD SUPPRESSION VENDOR SHALL
INSTALL PULL STATION PER HOOD
MANUFACTURER'S INSTRUCTIONS. M.C. SHALL
LABEL EACH PULL STATION FOR ASSOCIATED HOOD
WITH RED PHENOLIC ENGRAVED LABEL WITH /12"
HIGH WHITE LETTERS.
M.C. SHALL INSTALL HOOD FURNISHED BY OWNER
IN ACCORDANCE WITH HOOD MANUFACTURER'S
INSTRUCTIONS. MOUNT HOOD AT HEIGHT
INDICATED ON ASSOCIATED DETAIL. PROVIDE 20
GAUGE STAINLESS STEEL SHROUD EXTENSIONS
FROM TOP OF HOOD TO 18" ABOVE HOOD OR 6"
ABOVE CEILING (WHICH EVER IS GREATER) ON ALL 3
SIDES OF THE HOOD. CONFIRM CEILING HEIGHT
WITH ARCHITECTURAL PLANS.
5
PROVIDE AND INSTALL 20 GAUGE STAINLESS STEEL
BACK SPLASH AND SIDE SPLASH FROM FLOOR TO
BOTTOM OF HOOD AND WIDTH TO MATCH HOOD FROM
EDGE TO EDGE.
24 DIFFERENTIAL SPACE TEMPERATURE SENSOR FOR
HOOD FIRE SUPPRESSION SYSTEM FURNISHED AS
ACCESSORY TO HOOD PACKAGE. E.C. SHALL
INSTALL SENSOR AT 8'-0" AFF. AND WIRE PER
MANUFACTURER'S INSTRUCTIONS.
25
26 PROVIDE GRILLE WITH ACCESSORY ASD (AIR
SCOOP DAMPER) WITH SCREWDRIVER
ADJUSTMENT FROM GRILL FACE FOR VOLUME
BALANCING.
27 MOUNT TEMPERATURE SENSOR AT 7'-0" AFF.
MOUNT RTU ALARM MONITOR/KEY STATIONS AT 48"
AFF. FIELD COORDINATE FINAL LOCATION WITH
FIRE MARSHALL'S OFFICE PRIOR TO INSTALLATION.
1
FIELD COORDINATE FINAL MOUNTING HEIGHT.
MECHANICAL FLOOR PLAN
M101
AS NOTED
JPO
PIB
SCALE:
MECHANICAL FLOOR PLAN
3/16" = 1'-0"1
XXX
REV.
NO.
SPCR
NO.
PROJECT
LOCATION
FILE NAME LAYERS
DATE
SCALE
SHEET NO.
DWG. TITLE
OWNER
USERNAME
PROJECT NO.
PLANNER
KICK OFF MEETING
ISSUED FOR 90%
ISSUED FOR PERMIT
FINAL APPROVED PLAN
RECORD DRAWINGS
DRAWN BY
CHECKED BY
GETGO #3557
4927 EAST 146TH STREET
261 KAPPA DRIVE,
DATE REVISIONS BY
ISSUED FOR REDLINE REVIEW
GIANT EAGLE, INC.
750 HOLIDAY DRIVE, SUITE 200
PITTSBURGH, PA 15220
PHONE: 412-921-4300
FAX: 412-921-4313
PITTSBURGH, PA 15238
2016003.00
01-20-15
CARMEL, IN 46062
02-26-16
02-26-16