HomeMy WebLinkAbout305312 11/14/16 4'*'.�,qMf CITY OF CARMEL, INDIANA VENDOR: 00351256
® r ONE CIVIC SQUARE UNITED CONSULTING CHECK AMOUNT: $****15,390.47*
f �� CARMEL, INDIANA 46032 1625 N POST ROAD CHECK NUMBER: 305312
v;«oN�` INDIANAPOLIS IN 46219 CHECK DATE: 11/14/16
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
202 R4350900 25302 13319-26 6,233.12 LPA CONTRACT-111TH &
202 R4350900 25302 13319-27 4,242.45 LPA CONTRACT-111TH &
900 R4462864 25302 13319-27 4,914.90 LPA CONTRACT-111TH &
VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201(Rev.1995)
UNITED CONSULTING ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
1625 N POST ROAD IN SUM OF$ CITY OF CARMEL
An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
INDIANAPOLIS, IN 46219 rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
$6,233.12 Payee
ON ACCOUNT OF APPROPRIATION FOR Purchase Order#
Enaineerinq Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
25302 13319-26 43-509.00 $6,233.12 1 hereby certify that the attached invoice(s),or 9/6/16 13319-26 111th and Penn RAB $6,233.12
2200 Encrrmbered 202 2200 202
bill(s)is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Friday,October 28,2016
1 hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
20
Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
4
1625 North.Post Road
Indianapolis, IN 46219
-UNITED Bus. (317)895-2585
Consulting= Fax (317)895-2596
P. o . 2�3n,Z
2G 2 -6e-4 3 5 0 9 C7-0
Carmel, City of Invoice number 13319-26
Jeremy Kashman, P.E. Date 09/06/2016
One Civic Square
Carmel, IN 46032 Project 13-319 City of Carmel - 111th and
Pennsylvania Intersecton Improvements
For Professional Services rendered after July 31, 2016 through August 31,2016
LPA
Project Name: 111th and Pennsylvania Intersection Improvements-Carmel
Contract No.:R-35550
Des No.: 1297165
Original Agreement Not to Exceed, Dated 07/31/2013=$182,000.00
Invoice Summary
Contract Total Current
Description Amount Billed Billed
Inspection 182,000.00 172,038.38 6,233.12
Total 182,000.00 172,038.38 6,233.12
Inspection
Professional Fees
Billed
Hours Rate Amount
Department Manager
Brian N. Miller
Project Time 2.00 193.42 386.84
Construction Manager 1
Christopher J. Miller
Project Time 51.50 113.52 5,846.28
Invoice total 6,233.12
Aging Summary
Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120
13319-25 08/09/2016 4,355.47 4,355.47
13319-26 09/06/2016 6,233.12 6,233.12
Total 10,588.59 C588*�5 --�.�0.00 0.00 0.00 0.00
r SEp16
'1
Carmel,City of Invoice number4s f9 P2
Page 1 of 2
Carmel,City of Invoice number 13319-26
" Project 13-319 City of Carmel - 111th and Pennsylvania Intersecton Improvements Date 09/06/2016
Approved by:
;K;�' '.� A- �
Brian N. Miller
Manager Const. Engineering Dept
Carmel,City of Invoice number 13319-26
Page 2 of 2
Timesheet
United Consulting
I Employee status to print:Active
UNITEDLimit report by:No limit
Invoice Number:13319-26
Consulting=
Tuesday,September 06,2016
Page 1 of 12
Brian N.Miller Employee Status:Active
Timesheet date:8/26/2016 Total hours:40.00
Target percent billable 0.00% Timesheet percent billable.21.25%
Artivity . . i
City of Carmel - 111 th and
Pennsylvania Intersecton
Improvements Department
13-319 i Inspection Project Time Manager 1.00, 1.00
;146th Street from Ditch Road to
'Springmill Road Department
14-310 I Inspection Project Time 'Manager 1.00: 1.00 2.00
Spring Mill Road Reconstruction- Spring Mill Design and Plans-
111th to Main Street SERVICE CATAGORY DESIGN Department
*;16-404 Road Design and Plans Project Time .Manager 3.50 3.50
'Illinois Street Mitigation at Brookshire
Golf Course Department
16-308_ i Part Time Inspection Project Time 'Manager 2.00 2.00
Direct Total 0.00 0.00 0.00- 4.50 2.00 2.00 0.00 8.50
j*,'Pre-Contract 3.00 2.00 2.50 7.50
Administration 2.50, 4.50 1.50 4.00' 4.50 4.50 21.50
Leave 2.50 2.50
Overhead Total' 0.00, 2.50 4.50, 4.50 6.00 7.00 7.00• 31.50.
Regular Total 0.00: 2.50• 4.50 9.00 8.00 9.00 7.00 40.00
Timesheet Total0.00. 2.50 4.50 9.00 8.00 9.00 7.00 40.00
Employee Signature Date Name Date
Employee submitted ;Brian N.Miller 8/30/2016
Supervisor approved Brian N.Miller 8/30/2016
_ _ _.
Supervisor Signature Date Accounting approved
Timesheet
United Consulting
/ Employee status to print:Active
I! '
UNITED,
Limit report by:No limit
CO11SLlltlllg= Invoice Number:13319-26
Tuesday,September 06,2016
Page 2 of 12
i Brian N.Miller Employee Status:Active
I*Notes
Brian N.Miller Timesheet date:8/26/2016
16-404 Spring Mill Road Reconstruction-111th to Main Street
Spring Mill Design and Plans-SERVICE CATAGORY DESIGN
Road Design and Plans
Project Time/Department Manager
-------
8/23/20161 3.50 Regular Employee Note Plan submittal review with B Smiley&B Curtis
Overhead
Administration
8/21/2016! 2.50:Regular Employee Note: Time and Expense review and approval
8/22/2016 4.50,Regular Employee Note: Time and Expense review and approval
8/25/2016i: 4.50:Regular Employee Note: Scheduling and misc
8/26/2016! 4.50;Regular Employee Note:i Scheduling and prep for Martinsville Mayor meeting on 8/29
Pre-Contract
8/23/2016; 3.00;Regular Employee Note: DPW Central Ave Ce agreement revisions
8/24/2016; 2.00;Regular Employee Note:!DPW Central Ave Ce agreement BOD meeting
__ _
__-_ -_.._.: _..._...--__.__ ..___.._. _._.. .
8/25/2016; 2.501 Regular Employee Note:,DPW Central Ave Ce agreement information to DPW,Floyd Co Br 3 inspection and Scope for BOD meeting
Timesheet
United Consulting
Employee status to print:Active
UNITEDLimit report by:No limit
1 Invoice Number:13319-26
Consulting=
Tuesday,September 06,2016
Page 3 of 12
Brian N.Miller Employee Status:Active
Timesheet date:8/1212016 Total hours:40.50
Target percent billable 0.00% Timesheet percent billable,30.86%
City of Carmel - 111th and
Pennsylvania Intersecton
Improvements Department
13-319 i Inspection ;Project Time Manager 1.00, 1.00
i INDOT State Road 67 Bridge
Rehabilitation Department
15-314 Inspection Project Time Manager 0.50 0.50
River Ridge Gateway Phase 1A and Construction Inspection Services
1 B,Segments B2&B3 Phase IA-(Transportation Corridor Department
15-320 Segment 131) Project Time Manager 0.50 0.50
2016 Roadway Improvements Department
16-403 Construction Inspection Project Time Manager 1.50 1.50
River Ridge Gateway Phase 1A and
1 B,Segments B2&B3 Construction Inspection Services Department
15-320 Phase 1B-Gateway Lake and Dam ;Project Time Manager 0.50 0.50
City of Logansport 18th and Main
Street Intersection Department
16-301 Inspection Project Time j Manager 0.50 0.50
146th Street from Ditch Road to
'Springmill Road Department
14-310 'Inspection Project Time 'Manager 2.00 2.00
Industrial Park Road Reconstruction Department
i 16-304 iConstruction Inspection Project Time i Manager 1.00' 0.50. 1.50
Henly Drain at 146th Street Department
116-303 Part Time Inspection Project Time Manager 0.50 0.50
River Ridge Gateway Phase 1A and
i 1 B,Segments B2&B3 Construction Inspection Services Department
15-320 Phase 1B-Gateway Lake and Dam i Project Time Manager 0.50 0.50
Wayne County Bridge 173 Department
15-301 Inspection — Project Time Manager 1.00, 1.00
!City of Columbus Indiana Avenue from
!State Street to Marr Road j Department
14-322 Inspection _,Project Time 'Manager 0.50 0.50
Timesheet
United Consulting
f' Employee status to print:Active
UNITEDLimit report by:No limit
Invoice Number:13319-26
Consulting=
Tuesday,September 06,2016
Page 4 of 12
Brian N.Miller Employee Status:Active
Timesheet date:8/12/2016 Total hours:40.50
Target percent billable 0.00% Timesheet percent billable.30.86%
15-317-02 INDOT-US 31 IR-30201,
INDOT-US 31 IR-30201,IR 35563, IR 35563,IR-35600,&IR-35602
IR-35600,and IR-35602 Inspection DES 1296427 Department
15-317 Inspection DES 1296427 Project Time Manager 0.50 0.50
'River Ridge Gateway Phase 1A and !Construction Inspection Services
1 B,Segments B2&B3 ' Phase 1 A-(Transportation Corridor Department
15-320 Segment B1) Project Time Manager 0.50 0.50
.146th Street from Ditch Road to
Springmill Road Department
14-310 +Inspection Project Time Manager 1.00 1.00
Direct Total 0.00: 0.00 4.50 0.00` 1.50. 6.50 0.00 12.50
Administration 1.504' 4.00 5.50 1.00' 2.00 14.00
_ --------_--
:*1 Pre-Contract
'1Pre-Contract 8.00 2.00 2.00 2.00 14.00
Overhead Total 0.00, 1.50 4.00 8.00 7.50 3.00 4.00 28.00
Regular Total 0.00`, 1.50 8.50, 8.00. 9.00'. 9.50 4.00 40.50
Timesheet Total, 0.00' 1.50 8.50 8.00' 9.00 9.50 4.00 40.50.
Employee Signature Date Name Date
Employee submitted Brian N.Miller 8/15/2016
Supervisor approved !Brian N.Miller 8/15/2016
Supervisor Signature Date Accounting approved Michael D Farrell 9/2/2016
Timesheet
United Consulting
Employee status to print:Active
/
UNITED, Limit report by:No limit
�J
Consulting Invoice Number:13319-26
Tuesday,September 06,2016
Page 5 of 12
Brian N.Miller Employee Status:Active
'*Notes
;Brian N.Miller.. Timesheef date:8/12/2016.__
Overhead
Administration
8/7/20161 1.50.,Regular Employee Note: time and expense approval
8/8/20161 4.00 Regular Employee Note: Time sheets and expense review and approval,misc,
8/10/2016 j 5.50 Regular j Employee Note::Department Manager Meeting
i
8/12/2016; 2.00 Regular Employee Note 'ORB Invoice
Pre-Contract
8/9/20161 8.00,Regular Employee Note::Madison 502 site visit,and meeting with County Engineer for Bridge Inspection
8/10/2016 2.00'Regular Employee Note: Central Ave.CE Agreement
8111/2016 2.00:Regular Employee Note: Central Ave.CE Agreement
8/12/2016 2.00.Regular Employee Note:,'40th and Butler Inspection agreement meeting with Sherry Davis
Timesheet
United Consulting
J ° Employee status to print:Active
Limit report b No limit
` Jl .,.UNITED,, Invoice Number:13319-26
Consulting=
Tuesday,September 06,2016
Page 6 of 12
Christopher J.Miller Employee Status:Active
Timesheet date:9/2/2016 Total hours:40.00
Target percent billable 0:00% Timesheet percent billable-87.50%
•
Avon Avenue Bridge Pre-Construction Activities Construction
I' 15-315 Utility Coordination Project Time i Manager 1 1.00; 5.00 6.00
City of Carmel - 111 th and
Pennsylvania Intersecton f
Improvements Construction 10
13-319 I Inspection Project Time Manager 1 4.00' 6.00 3.00 4.00 17.00
Avon Avenue Bridge Pre-Construction Activities :Construction
15-315 ; Utility Coordination Project Time Manager 1 4.00 4.00
MSD 2016 Bond Projects Construction Inspection Construction
16-914 16-914-01 Construction Inspection Project Time Manager 1 8.00, 8.00
Direct Total` 0.00 i 0.00' 8.00 7.00 8.00 8.00 4.00 35.00
Leave i 4.00 4.00
!*'Administration 1.00 1.00
Overhead Total 0.00' 0.000.00: 1.00 0.00 0.00 4.00 5.00
Regular Total' 0.00 0.00; 8.00 8.00, 8.00. 8.00 8.00 40.00
Timesheet Total;.._._ 0.00 ......_._ .. .. _ . . ._
0.00' 8.00 8.00' 8.00 8.00 0, 8.00 40.00
- -------------- _- --......__..._._.. _-_.--...--- - - _...- •----. -
Employee Signature Date Name Date
Employee submitted Christopher J.Miller 9/2/2016
Supervisor approved Brian N.Miller 9/2/2016
Supervisor Signature Date -Accounting approved
Timesheet
United Consulting
Employee status to print:Active
-f NITED
E Limit report by:No limit
Consulting= Invoice Number: 13319-26
Tuesday,September 06,2016
Page 7 of 12
Christopher J.Miller Employee Status:Active
*Notes
Christopher J.Miller Timesheet date:9/2/2016
15-315 Avon Avenue Bridge
Pre-Construction Activities
Utility Coordination
Project Time/Construction Manager 1
8/29/2016; 4.00 Regular Employee Note:;Utility Inspection
8/30/20161 1.00;Regular Employee Note: Discuss erosion control plans with contractor
i^ 9/1/2016 5.00 Regular Employee Note: schedule meetings,erosion control measures inspection
Overhead
Administration
8/30/2016! 1.00!Regular Employee Note: call contractors for Beech Grove 2016 bid
Timesheet
United Consulting
j Employee status to print:Active
I!
f ���� Limit report by:No limit
Invoice Number: 13319-26
Consulting=
Tuesday,September 06,2016
Page 8 of 12
Christopher J.Miller Employee Status:Active
Timesheet date:8/26/2016 Total hours:40.00
Target percent billable 0:006% Timesheet percent billable 96.25%
. . .:
Avon Avenue Bridge Construction Activities Construction
*'15-315 Full-Time Inspection Project TimeManager 1 1.00 2.00 1.00. 1.00 1.00 6.00
Elevated Conveoyer 160th Street
'between Cherry Tree Road and River
Road Construction
16-305 f Part Time Inspection Project Time Manager 1 1.00` 1.00
City of Carmel - 111th and
Pennsylvania Intersecton
Improvements Construction
13-319 Inspection Project Time Manager 1 3.00 3.00 5.00 7.00 4.50 22.50
?Avon Avenue Bridge i Pre-Construction Activities Construction
*i 15-315 Utility Coordination Project Time Manager 1 1.00 1.00
Johnson County Bridge 604 'Construction
15-318 Inspection Project Time Manager 1 4.00 1.00 5.00
._.__ -_ -..._...
I Post Road from 1-70 to 46th Street Construction
15-304 Inspection Project Time .Manager 1 3.00 3.00
Direct Total 0.00. 1.00 9.00; 8.00: 8.00 8.00 4.50 38.50
',*!Administration 0.50.
Pre-Contract 1.00 1.00
-- - - - - - .
Overhead Total. 0.00 0.50 0.00 1.00 0.00 0.00 0.00 1.50
Regular Total 0.00 1.50 9.00 9.00 8.00- 8.00 4.50 40.00
Timesheet Total; 0.00; 1.50 9.00: 9.00 8.00 8.00 4.50, 40.00
Employee Signature Date Name Date
Employee submitted ;Christopher J.Miller 8/26/2016
Supervisor approved Brian N.Miller 9/1/2016
Supervisor Signature Date Accounting approved
Timesheet
United Consulting
r' 1 Employee status to print:Active
>/
UNITED
Limit report by:No limit
�l Invoice Number:13319-26
Consulting=
Tuesday,September 06,2016
Page 9 of 12
Christopher J.Miller Employee Status:Active
`*Notes -
Christopher J.,Miller Timesheet date:,8/26/2016
15-315 Avon Avenue Bridge
Construction Activities
Full-Time Inspection
Project Time/Construction Manager 1
8/21/2016;, 1.00,Regular + Employee Note:!Donohue emails concerning RFI's
8/22/2016; 2.00 Regular Employee Note. Preconstruction meetin minutes and followup
8/23/2016 1.00 Regular Employee Note:,Submittal follow up
8/24/2016, 1.00'Regular Employee Note: Project submittals
8/25/2016' 1.00;Regular Employee Note:'Submittals;emails
Pre-Construction Activities
Utility Coordination
Project Time/Construction Manager 1
8/24/2016 1.00 Regular Employee Note:i Utility Follow u
Overhead
Administration
8/21/2016 j 0.50 Regular Employee Note: Time Sheet
Pre-Contract
8/23/2016; 1.00 Regular Employee Note ;DPW Central Ave
Timesheet
United Consulting
g TT Employee status to print:Active
� 1,' � 1�1 ��j� Limit report by:No limit
'UNITED, Invoice Number:13319-26
Consulting=
/ Tuesday,September 06,2016
Page 10 of 12
Christopher J.Miller Employee Status:Active
i
Timesheet date:8/12/2016 Total hours:40.00
Target percent billable 0.00% Timesheet percent billable 85.00%
. -
!Avon Avenue Bridge Pre-Construction Activities Construction
"15-315 s Utility Coordination i Project Time i Manager 1 2.00 1.00 1.00 1.00• 1.00 6.00
City of Carmel - 111th and
Pennsylvania Intersecton
i Improvements ;Construction
13-319 Inspection i Project Time Manager 1 3.00; 5.00' 8.00 3.00 19.00
i Johnson County Bridge 604 :Construction
,15-318 Inspection Project Time Manager 1 4.00 4.00
Elevated Conveoyer 160th Street
{between Cherry Tree Road and River
i Road Construction
16-305 Part Time InspectionProject Time J Manager 1 1.00' 1.00 3.00• 5.00
._Direct Total... -0.00: 0.00 __. _ _.
3.00 9.00 9.00 9.00 4.00 34.00
j Leave 5.00 1.00 6.00
Overhead Total, 0.00, 0.00. 5.00: 0.00 0.00 0.00 1.00 6.00
Regular Total 0.00; 0.00; 8.00, 9.00 9.00 9.00 5.00_ 40.00
Timesheet Total 0.00.Y 0.00 •8.00 9.00..._. .___... . ... _.. -.._
9.000 9.00 5.00 40.00
--- -- -..�_.._ -- ------------ -----
Employee Signature Date Name Date
Employee submitted Christopher J.Miller 8/15/2016
Supervisor approved .!Brian N.Miller 8/21/2016
Supervisor Signature Date ! Accounting approved
Michael D Farrell 9/2/2016
Timesheet
United Consulting
Employee status to print:Active
f 'UNITED Limit report by:No limit
JInvoice Number: 13319-26
Consulting=
Tuesday,September 06,2016
Page 11 of 12
Christopher J.Miller Employee Status:Active
*Notes
j ChristopherJ..Miller Timesheet date:.8/12/2016
15-315 Avon Avenue Bridge
Pre-Construction Activities
Utility Coordination
Project Time/Construction Manager 1
8/8/2016` 2.00 Regular Employee Note: RFI's and general project resp once
8/9/20161 1.00 Regular Employee Note.;Project Updates
8/10/2016 1.00 Regular Employee Note: Project updates
8/11/2016 1.00'Regular Employee Note: Project updates-RFI's
8/12/2016; 1.00',Regular Employee Note:;Project updates
VOUCHER NO. WARRANT NO. Prescribed by state Board of Accounts City Form No.201 (Rev.1995)
UNITED CONSULTING ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
1625 N POST ROAD IN SUM of$ CITY OF CARMEL
An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
INDIANAPOLIS, IN 46219 rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
C\�� Payee
ON ACCOUNT OF APPROPRIATION FOR Purchase Order#
Engineering Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
5302
g3Alq6 4 09.00 $6,2 I hereby certify that the attached invoice(s),or9/6/16 13319-26 111th and Penn RAB $6,233.12
mbere 202 2200 202
25302 13319-27 44-628.64 $4,914.90 bill(s)is(are)true and correct and that the 10/4/16 13319-27 111th and Penn RAB $4,914.90
2200 Encumbered 900 materials or services itemized thereon for 2200 1 900
25302 I 13319-27 I 43-509.00 $4,242.45 which charge is made were ordered and 10/4/16 I 13319-27 I 111th and Penn RAB I $4,242.45
2200 Eacrrmbered 202 2200 202
received except
Friday,October 28,2016
hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
20
Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
1625 North Post Road p d, 2 573 0 2
Indianapolis, IN 46219
Bus- (317)895-2585
COrnsulting= Fax (317)895-2596 goo"Qyy('28�'y a
202--y35oq 0 O ""4,214Z. 145
Carmel, City of Invoice number 13319-27
Jeremy Kashman, P.E. Date 10/04/2016
One Civic Square
Carmel, IN 46032 Project 13-319 City of Carmel - 111th and
Pennsylvania Intersecton Improvements
For Professional Services rendered after August 31,2016 through September 30, 2016
LPA
Project Name: 111th and Pennsylvania Intersection Improvements-Carmel
Contract No.:R-35550
Des No.: 1297165
Original Agreement Not to Exceed, Dated 07/31/2013=$182,000.00
Invoice Summary
Contract Total Current
Description Amount Billed Billed
Inspection 182,000.00 181,195.73 9,157.35
Total 182,000.00 181,195.73 9,157.35
Inspection
Professional Fees
Billed
Hours Rate Amount
Department Manager
Brian N. Miller
Project Time 4.50 193.42 870.39
Construction Manager 1
Christopher J. Miller
Project Time 73.00 113.52 8,286.96
Invoice total 9,157.35
Aging Summary
Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120
13319-25 08/09/2016 4,355.47 4,355.47
13319-26 09/06/2016 6,233.12 6,233.12
13319-27 10/04/2016 9,157:35 9,157.35
Total 19,745.94 15,390.47 4,355.r7o0�004 j„ 0.00 0.00
��CEIVEDA2016RMI=LNGIIV8M
Carmel,City of Invoice number 13319-27
2. 6, 7 Pagel of t
Carmel,City of Invoice number 13319-27
Project 13-319 City of Carmel - 111th and Pennsylvania Intersecton Improvements Date 10/04/2016
Approved by:
,Ki .
Brian N. Miller
Manager Const. Engineering Dept
Carmel,City of Invoice number 13319-27
Page 2 of 2
--.59TATFo� LPA INVOICE VOUCHER INDOT USE ONLY
4% y State Form 52663(112/6-16) PS Receipt No.
t a
)z INDIANA DEPARTMENT OF TRANSPORTATION
`'`•;f Appoved by State Board of.Accounts,2016 PS Voucher ID No.
Approved by Auditor of State,2016
INDOT Invoice No.
LPA'S NAME AND REMIT TO ADDRESS PO Number 0014804652
City of Carmel Net Amount of Claim $ 7,325.88
One Civic Square
Carmel, IN 46032 Vendor Code 0000059287
CFDA Number 20.205
TO: INDIANA DEPARTMENT OF TRANSPORTATION
CARE OF: Greenfield District Program.Coordinator EXEMPT PER I.C. 5-17-5-2
ADDRESS: 32 South Broadway Street
Greenfield, Indiana 46140
PO Number Invoice Number Amount
0014804652 13319-27 $9,157.35
0014804652
0014804652
1 Claim No. 27 Des. No. 1297165
2 This claim voucher is for: Construction Engineering
3 Project Description: 111th and Pennsylvania Intersection Improvements
Contract#11-35550
4 Period covered by this claim. From:`_ 9/1/2016 To:.. 9/30/2016
5 Gross amount of previous claims. $ 172,038.38;
6 Net amount of previous claims. $ 137,630.71;
7 This (is) (is not) a final claim. IS NOT FINAL;
8 Gross amount of this claim. $ 9,157.35
9 Federal Share Reimbursable(Line 8 x Fed.%) 80 % $ 7,325.88
10 Net amount of claim. $ 7,325.88;
11 am aware of the:pro�eef end'°date(this rnay:or may°r'ot be the same as th'e P,O end date;)
Yes,LPA is:aware of the Project End Date.,
12My last reimbursement request was within the last six(6) months.
.Yes
Note: If funds are removed, no reimbursement will be g-iven.
RECOMMENDED FOR APPROVAL
INDOT OFFICIAL INITIATING THE CHARGE DATE (Month,Day,Year)
I certify that this claim is correct and valid and is a proper charge against the State Agency indicated.
Authorized Signature of State Agency Date (Month,Day,Year)
Pursuant to the provisions of Indiana Code 5-1-10-1,1 hereby certify that the amount claimed is legally due after aowing 011just credits,an
that no part of the said has been paid.
Signature of Vendor Official Title Date(Month,Day,Year)
Timesheet
United Consulting
Employee status to print:Active
t/r`
UNITE. Limit report by:No limit
-, Invoice Number:13319-27
Consulfing=
Tuesday,October 04,2016
Page 1 of 17
Brian N.Miller Employee Status:Active
Timesheet date:9/30/2016 Total hours:40.50
i ,
Target percent billable 0:00% Timesheet percent billable.30.86%
River Ridge Gateway Phase 1A and !Construction Inspection Services
18,Segments B2&B3 f Phase 1A-(Transportation Corridor Department
j 15-320 Segment 131) Project Time ?Manager 0.50, 0.50 0.50 1.50
{ 3 River Ridge Gateway Phase 1 A and s s
r 1 B,Segments B2&B3 ;Construction Inspection Services Department I '
j
115-320 i Phase 113-Gateway Lake and Dam i Project Time ;Manager 0 50 0.50 1.00
Springmill Road from 0.5 miles South i
i E of 106th Street to Main Street z Department
i 16-309 Inspection i Project Time Manager 0.50 4.00 4.50
i City of Carmel - 111th and
Pennsylvania Intersecton i
I Improvements Department
113-319 (Inspection Project Time !Manager 0.50' 0.50
City of Logansport 18th and Main ? ,
i +Street Intersection Department
=16-301 s Inspection i Protect Time ;Manager 5.00 5.00
Direct Total 0.00; 0.00', 1.00, 1.00, 4.00: 6.00' 0.50; 12.50
Administration 350 300" 100; 1.00 2.00 10.50
'i Pre-Contract 4.50! 5.00 t 3.00' 2.50, 2.50: 17.50.
Overhead Total, 0.00 0.00 i 8.00 8.001 4.00 3.50, 4.50 28.00
Regular Total 0.00 0.00 9.00i 9.00= 8.00! 9.50; 5.00; 40.50
Timesheet Total 0.00 0.00 9.00' 9.00 8.00; 9.50 5.00 40.50,
Employee Signature Date Name Date
Employee submitted Brian N.Miller 10/2/2016
Supervisor approved Brian N.Miller 10/2/2016
Supervisor Signature Date i Accounting approved
Timesheet
United Consulting
Employee status to print:Active
UNITED
Limit report by:No limit
Invoice Number: 13319-27
Consulting=
Tuesday,October 04,2016
Page 2 of 17
Brian N.Miller Employee Status:Active
I'Notes
[Brian N.Miller Timesheet date:9/30/2016
Overhead
Administration
? 9/26/2016 3.50E Regular Employee Note: Time sheet review/approval,misc.
9/30/20161 2.00'Regular ! Employee Note:;printing mileage logs for expenses and misc.
_._..____-_-----
—
Pre-Contract
--4.50;Regular - n - --Employee Note:,Laporte Trail LOI,Hendricks Countyli
9/26/2016% LOI s,Gibson County Tulip Tree Road CE agreement
9/27/2016 i 5.00!Regular
Employee Note: Gibson County Tulip Tree Road CE agreement
9/28/2016; 3.00;Regular Employee Note:;Gibson County Tulip Tree Road CE agreement
9/29/20161 2.50,Regular Employee Note:;Gibson County Tulip Tree Road CE agreement,Carmel CE fees for three bridges
I 9/30/2016' 2.50;Regular Employee Note: Carmel Bridge RFP inspection write up and manhours
Timesheet
United Consulting
/
UNITED
Employee status to print:Active
� Limit report by:No limit
Invoice Number:13319-27
Consulting=
Tuesday,October 04,2016
Page 3 of 17
Brian N.Miller Employee Status:Active
Timesheet date:9/23/2016 Total hours:40.00
+ Target percent billable 0.00% Timesheet percent bil4ible.-25.00%
._ . . U. i
i Johnson County Bridge 604 I Department '
15-318 ;Inspection Project Time Manager 2.00, 2.00
I City of Carmel - 111th and
Pennsylvania Intersecton i I
i Improvements ; Department
13-319 ;Inspection {Project Time 1 Manager 2.00, 1.00 3.00
146th Street from Ditch Road to
Springmill Road I Department
14-310 Inspection Project Time Manager 2.00 2.00
Springmill Road from 0.5 miles South
i of 106th Street to Main Street Department
i 16-309 Inspection i Project Time Manager 1.00 s 2.00' 3.00 i
__-___ Direct Total;-- 0.00: 0.00; 2.00; 1.00 000! 6.00; 1.00• 10.00',
Leave 6.50 4.50. 11.00
*j Administration i 1.50' 7.00 1.50 2.00: 1.00' 2.00 15.00
- -------- _--- ---- 1 --- _ - - -- -- - - - -
� i 2.00' 2.00. 4.00
";Pre-Contract � ! '
Overhead Total 0.00 1.501 7.00 8.00 6.50 3.00 4.00. 30.00
Regular Total'. 0.00; 1.50; 9.00' 9.00 6.50 9.00 5.00 40.00
Timesheet Total, 0.00 i 1.50 9.00 9.00T, 6.50 9.00; 5.00 40.00.
Employee Signature Date Name Date
j Employee submitted- !Brian N.Miller 9/26/2016
Supervisor approved ;Brian N.Miller 9/26/2016
Supervisor Signature Date Accounting approved -
Timesheet
United Consulting
V
/ Employee status to print:Active
�7 'ti�
Limit report by:No limit
,UNI� ED Invoice Number:13319-27
Consulting=
Tuesday,October 04,2016
Page 4 of 17
Brian N.Miller Employee Status:Active
*Notes
;Brian N.Miller Timesheet date:9/2312016..,
Overhead
Administration
9/18/2016' 1.50 i Regular Employee Note:j Time and Expense review and approval for CE Dept.
1 9/19/2016i 7.00;Regular Employee Note:jime and Expense review and approval for CE Dept.,schedule update
9/20/2016' 1.50?Re Regular
Employee Note ORB conference call and scheduling for 2017 for ORB with Chris Coffey
g -
9/21/2016; 2.00 Regular Employee Note: ORB 2017 call with Parsons,Chris Coffey misc
9/22/2016 1.00 Regular Employee Note:!misc.
Pre-Contract
9/22/2016 2.00;Regular Employee Note:,Laporte Co.LOI,Hendricks Co new LOls
9/23/2016, 2.00,Regular Employee Note:;Hendricks County LOI's,LaPorte LOI info to Jen Grawcock
Timesheet
United Consulting
Employee status to print:Active
Fit VNITED Invoice
report by:No limit
oice Number:13319-27
ii
Consulting=
Tuesday,October 04,2016
Page 5 of 17
Brian N.Miller Employee Status:Active
Timesheet date:9/9/2016 Total hours:40.00
Target percent billable 0.00% Timesheet percent billable 30.0%•
;IN DOT State Road 67 Bridge i
Rehabilitation ! Department
'15-314 j inspection ;Project Time Manager 0.50 0.50
Industrial Park Road Reconstruction i Department
f 16-304 j Construction Inspection Project Time ;Manager 1.00: 1.00
161st and Oakridge RoundaboutInspection Department
:15-306 ; Inspection(MOT Plan Revisions) Project Time Manager 0.50 0.50
I City of Carmel - 111 th and !
'Pennsylvania Intersecton
Improvements ;Department
13-319 j Inspection Project Time Manager 0.50 0.50 1.00
{ ( 15-317-02 INDOT-US 31 IR-30201,
AR 35563,IR-35600,&IR-35602
i INDOT-US 31 IR-30201,IR 35563, Inspection DES 1296427
IR-35600,and IR-35602 Inspection DES 1296427 Department
15-317 ;supplement Project Time Manager 1.00 1.00 2.00
146th Street from Ditch Road to {
Springmill Road { Department
114-310 Inspection Project Time Manager 1.00 1.00
'River Ridge Gateway Phase 1A and 1
i i 1 B,Segments B2&B3 I Construction Inspection Services Department
i 15-320 f Phase 1B-Gateway Lake and Dam Project Time Manager 1.00 1.00
_._.-..---....__
River Ridge Gateway Phase 1A and !Construction Inspection Services
11B,Segments B2&B3 1 Phase 1A-(Transportation Corridor Department i
15-320 !Segment 61) Project Time J (Manager 1.00; 1.00
!Avon Avenue Bridge Construction Activities Department
• 15-315 Full-Time Inspection ;Project Time Manager 2.50, 2.50.
City of Logansport 18th and Main ;
1 Street Intersection 3 Department f
Replacement of Decatur Count Bride - .___ 1 ____ ._.._ 1 00 1.00;
p y g
i 116-301 a Inspection Project Time Manager S
2,carrying Old US 421 over Clifty
I i Creek I Department
114-302 '•Inspection i Project Time Manager i 0.50 0.50
Direct Total' 0.001 0.00' 0.00, 0.00; 4.00; 8.00; 0.00, 12.00
Timesheet
United Consulting
�l Employee status to print:Active
UNITED Limit report by:No limit
= Invoice Number: 13319-27
=Consulting
,j
Tuesday,October 04,2016
Page 6 of 17
Brian N.Miller Employee Status:Active
Timesheet date:9/9/2016 Total hours:40.00
Target percent billable 0:00,% Timesheet percent billable 30.0%
Pre-Contract ! i 2.50_ 2.00 1.00 1.00 6.50
Leave 5.50 5.50
Administration i
4.00: 3.00: 7.00
j i Holiday 9.00 ; 9.00
Overhead Total; 0.00; 0.00. 9.00 6.50 5.00 1.00 6.50 28.00
Regular Total 0.00', 0.00' 9.00 6.50; 9.00 9.00 6.50. 40.00
Timesheet Total. 0.00', 0.00 9.00 6.50 9.00 9.00 6.50 40.00
Employee Signature Date i Name Date
Employee submitted Brian N.Miller 9/12/2016
Supervisor approved Brian N.Miller 9/12/2016
Supervisor Signature Date Accounting approved Valli L Shattuck 9/30/2016
Timesheet
United Consulting
r` Employee status to print:Active
l !/ UTED Limit report by:No limit
j Invoice Number:13319-27
Consulting=
Tuesday,October 04,2016
Page 7 of 17
I*Notes
Brian N.Miller Timesheet date:9/9/2015
15-315 Avon Avenue Bridge
Construction Activities
Full-Time Inspection
Project Time/Department Manager
9/7/20161 2.50 Regular Employee Note:;Meeting to discuss project schedule with current permit and Duke Engergy delay.
...... ._.,.. .._ _ _ .
Overhead
Administration
9/6/2016; 4.001 Regular Employee Note: Keystone Supplement,emails etc.
j 9/7/2016;— 3.00;Regular Employee Note:;Misc,and revising CE Agreement template
Pre-Contract
9/6/20161 2.501 Regular —Employee Note:'Martinsville Task order#1 prep
9/7/20161 2.00!Regular Employee Note: Martinsville Task order#1 with client and sales staff
9/8/2016 1.00;Regular Employee Note:!Martinsville revised Task order#1
1 9/9/2096 __1_ Regular Employee Note: Carmel Springmill Road
Timesheet
United Consulting
Employee status to print:Active
f
j Limit report by:No limit
J ,UNITED
Invoice Number:13319-27
Consulting=
Tuesday,October 04,2016
.Page 8 of 17
Christopher J.Miller Employee Status:Active
Timesheet date:9/30/2016 Total hours:40.00
Target percent billable 0.006/6 Timesheet percent billable,37:50%
Phase, g
.> i• __
Avon Avenue Bridge !Construction Activities Construction
*!15-315 Full-Time Inspection !Project Time _I Manager 1 1.00 1.00, 2.0.0 1.00' 5.00
;City of i Street Intersection ort 8th and Main
I Construction
16-301 inspection Project Time Manager 1 1.00 1.00
City of Carmel - 111th and
Pennsylvania Intersecton
Improvements Construction
13-319 !Inspection !Project Time i Manager 1 5.00; 4.00 9.00
Direct Total;
0.00; 0.00, 1.00 6.00 7.00 1.00, 0.00 15.00
_ --_ _ . ;
_
Leave 5.00 5.00
j* Pre-Contract 200, 1.00 4.50 6.00 13.50
i*:Administration 6.50 6.50
Overhead Total, 0.00 0.00; 5.00 2.001 1.00' 11.00 6.00 25.00
Regular Total; 0.00 0.00; 6.00 8.00; 8.00 12.00; 6.00 40.00
Timesheet Total: 0.00 i 0.00; 6.00' 8.00 8.00 12.00' 6.00 40.00
Employee Signature Date Name Date
Employee submitted ;Christopher J.Miller 9/30/2016
Supervisor approved 'Brian N.Miller 10/2/2016
Supervisor Signature Date Accounting approved
Timesheet
United Consulting
/ Employee status to print:Active
J�,/
UNITE
Limit report by:No limit
"Jf Consulting DInvoice Number: 13319-27
Tuesday,October 04,2016
Page 9 of 17
i Christopher J.Miller Employee Status:Active
!*Notes
Christopher J..Miller Timesheet date:-9/30/2016
15-315 Avon Avenue Bridge
Construction Activities
Full-Time Inspection
Project Time/Construction Manager 1
-- 9/26/2016; 1.00 1 Regular Employee Note:!RFI No 2 review and submittal
9/27/20161 1.00Regular ? Employee Note:+Specification review and Shop Drawings
9/28/2016; 2.00!Regular Employee Note: RFI Responces,General Communication
9/29/2016 1.00!Regular Employee Note: RFI Responces and EMails
Overhead
Pre-Contract
9/27/2016; 2.00 i Regular Employee Note:;Lincoln Trail LOI
9/28/2016 1.00 Regular Employee Note Lincoln Trail LOI
9/29/20161 4.50!Regular Employee Note:;Carmel LOI's,Lincoln Trail LOI
j 9/30/2016; 6.00;Regular Employee Note:'Lincoln Trail LOI
Administration
,`J 9/29/20161 — _6.50 Regular______ Employee Note:!IUPUI Career Fair
Timesheet
United Consulting
Employee status to print:Active
JLimit report by:No limit
-..UNITED, Invoice Number:13319-27
Consulting=
Tuesday,October 04,2016
Page 10 of 17
i
Christopher J.Miller Employee Status:Active
Timesheet date:9/23/2016 Total hours:40.00
Target percent billable 0.00% Timesheet percent billable 97.50%
r
City of Carmel - 111 th and I 1
i Pennsylvania Intersecton
!Improvements ! Construction
i 13-319 ;Ins ection 4 Project Time i Manager 1 9.00 9.00' 8.00; 8.00 2.00 36.00
Avon Avenue Bridge !Construction Activities Construction
I*'15-315 Full-Time Inspection Project Time Manager 1 3.00 3.00
Direct Total 0.00, 0.00; 9.00 9.00' 8.00. 8.00 5.00 39.00
* Pre-Contract 1.00, 1.00
Overhead Total: 0.00, 0.00 0.00, 0.00 1.00. 0.00 0.00 1.00.
Regular Total 0.00 0.00' 9.00' 9.00 9.00 8.00 5.00 40.00
---- - ----------
._.._. _ . ._
Timesheet Total 0.001 0.00' 9.00 9.00 9.00 8.005.00 40.00
Employee Signature Date Name Date
Employee submitted 1 Christopher J.Miller 9/23/2016
Supervisor approved Brian N.Miller 9/26/2016
Supervisor Signature Date Accounting approved _
!*Notes
Christopher J.Miller Timesheet date:9/23/2016
15-315 Avon Avenue Bridge
Construction Activities
Full-Time Inspection
Project Time/Construction Manager 1
9/23/2016;! 3.00 Regular Employee Note:;Material Testing review,RFI's and Shop Drawing submittal review
Overhead
Pre-Contract
9/21/2016' 1.00 Regular -Employee Note:<Lincoln Trail LOI
Timesheet
United Consulting
1 i Employee status to print:Active
� ,UNITED Limit report by:No limit
Consulting Invoice Number:13319-27
Tuesday,October 04,2016
Page 11 of 17
Christopher J.Miller Employee Status:Active
Timesheet date:9/16/2016 Total hours:40.00
j. Target percent billable 0.00%° Timesheet percent billable;80.0%
ivity St I--
. .
r f
I MSD 2016 Bond Projects Construction Inspection I Construction i
116-914 16-914-01 Construction Inspection Project Time Manager 1 _ 9.00 9.00 18.00
IAvon Avenue Bridge 1 Pre-Construction Activities Construction
!R1 15-315 Utility Coordination ;Project Time :Manager 1 8.00 8.00
I City of Carmel - 111 th and !
Pennsylvania Intersecton '
Improvements Construction
113-319 Inspection Project Time Manager 1 6.00 6.00
Direct Total; 0.00: 0.00 9.00, 0.00! 8.00, 6.00, 9.00' 32.00'
r.1 Pre-Contract ! 1.001 2.00' 3.00,
:*!Administration 5.00 5.00
Overhead Total 0.00 0.00 0.00 5.00! 1.00: 2.00 0.00 8.00
Regular Total, 0.00! 0.00 9.00 5.00 9.00'i 8.00 9.00 40.00
Timesheet Total 0.00! 0.00,- ---_ _ ._ _....._.- . . _. _. . . ..
9.00; 5.00: 9.00: 8.00 i 9.00 40.00
Employee Signature Date Name Date
Employee submitted Christopher J.Miller 9/15/2016
Supervisor approved �Brian N.Miller 9/17/2016
Supervisor Signature Date ; Accounting approved a Valli L Shattuck 9/30/2016
Timesheet
United Consulting
Employee status to print:Active
N-ITT " Limit report by:No limit
Invoice Number:13319-27
LV__Consulting
=
Tuesday,October 04,2016
Page 12 of 17
Christopher J.Miller Employee Status:Active
*Notes
Christopher J.,Miller Timesheet date:9/16/2016
15-315 Avon Avenue Bridge
Pre-Construction Activities
Utility Coordination
Project Time/Construction Manager 1
9/14/20161 8.001 Regular Employee Note: Utility Coordination Progress meeting,agenda,meeting minutes,site inspection
Overhead
Administration
i 9/13/2016; 5.00 i Regular Employee Note:I Purdue/IPS Science Bound Outing
Pre-Contract
_ 9/14/20161 1.00;Regular Employee Note:!Beech Grove Agenda
9/15/2016! 2.00;Regular Employee Note:;Beech Grove Precon
Timesheet
United Consulting
J Employee status to print:Active
1 UNI ED Limit report by:No limit
Consulting= Invoice Number:13319-27
J ' Tuesday,October 04,2016
Page 13 of 17
j Christopher J.Miller Employee Status:Active
I Timesheet date:919/2016
Total hours:40.00
Target percent billable 0.006/6 Timesheet percent billable_77.50%
1111112=7M Avon Avenue Avenue Bridge Construction Activities Construction
I*I 15-315 N Full-Time Inspection Project Time !Manager 1 i 4.00; 4.00' 4.00 12.00
!Avon Avenue Bridge ;Pre-Construction Activities Construction
*;15-315 ! Utility Coordination ;Project Time ;Manager 1 4.00; 4.00
City of Carmel - 111th and ;
Pennsylvania Intersecton
j Improvements 'Construction
I13-319 Inspection ;Project Time Manager 4.00 4.00, 7.00 15.00
Direct Total; 0.001 0.00+ 0.00 8.00; 8.00' 8.00 7.00' 31.00'
'Holiday 9.00
Overhead Total 0.00' 0.00; 900; 0.00' 0.00 0.00 0.00, 9.00'
Regular Total' 0.00; 0.00 9.00. 8.00, 8.00• 8.00'. 7.00 40.00
Timesheet Total: 0.00; 0.00: 9.00! 8.00
8.00. 8.00' 7.00 40.00
Employee Signature Date Name Date
Employee submitted Christopher J.Miller 9/9/2016
Supervisor approved ;Brian N.Miller 9/12/2016
Supervisor Signature Date I Accounting approved Valli L.Shattuck 9/30/2016
Timesheet
United Consulting
Employee status to print:Active
I
J UNITED.
Limit report by:No limit
Invoice Number:13319-27
Consulting=
Tuesday,October 04,2016
Page 14 of 17
i.
Christopher J.Miller Employee Status:Active
*Notes
1ChristopherJ..Miller Timesheet date:0/912016
15-315 Avon Avenue Bridge
Construction Activities
Full-Time Inspection
Project Time/Construction Manager 1
+ 9/6/20161 4.00€Regular Employee Note:!Scheduling meeting prep
I 9/7/2016+ — 4.00 Regular Employee Note:-Scheduling Meeting
i 9/8/20161 4.00_________-------..,---.__.----------_.___.--___-------.----------_-__..__..__ _-- -... . . . . ..... . . _ -- _ _
—` ^�v_ i Regular Employee Note: Meeting Minutes
Pre-Construction Activities
Utility Coordination
Project Time/Construction Manager 1
9/7/2016: 4.00.Regular Employee Note:;Utility Coordination
u
Timesheet
United Consulting
i Employee status to print:Active
f sf' S E
Limit report by:No limit
- UNIT Invoice Number:13319-27
,i Consulting=
Tuesday,October 04,2016
Page 15 of 17
Christopher J.Miller Employee Status:Active
I Timesheet date:9/2/2016 , Total hours:40.00
Target percent billable 0.00% Timesheet percent billable 87.50%
- . i i
City of Carmel - 111th and
Pennsylvania Intersecton
Improvements i Construction O7
(13-319 !Inspection Project Time ;Manager 1 ! ; 4.00 i 6.00 3.00 4.00 V-00-01
'Avon Avenue Bridge j Pre-Construction Activities ; Construction i
!• 15-315 I Utility Coordination Project Time :Manager 1
1.00: 5.00 6.00
-
1 °Avon Avenue Bridge !Pre-Construction Activities Construction
15-315 Utility Coordination 'Project Time Manager 1 4.00 4.00
MSD 2016 Bond Projects Construction Inspection ; Construction
?16-914 16-914-01 Construction Inspection Project Time :Manager 1 8.00 8.00
Direct Total! 0.00; 0.00. 8.00! 7.00: 8.00; 8.00 4.00: 35.00
Leave 4.00 4.00
L Administration- ---- - ----- i- .,-- - ---- 1.00; _. ._ _ .. . 1.00
Overhead Total, 0.001 0.001 0.00 i 100' 0.00: 0.00; 4.00; 5.00'
---
Regular Totall 0.00; 0.001 8.00; 8.001 8.00' 8.00; 8.00, 40.00;
Timesheet Total 0.00 0.00 8.00: 8.001 8.00; 8.00; 8.00. 40.00
Employee Signature Date i Name Date
Employee submitted ;Christopher J.Miller 9/2/2016
Supervisor approved Brian N.Miller 9/2/2016
Accounting approved Valli L.Shattuck 9/7/2016
Supervisor Signature Date �_ ._ .._-- 9 a_PPro_._ -.—. -----.__ __ . .._. _
M
Timesheet
United Consulting
Employee status to print:Active
�f
`UNITED Invoice
report by:No limit
Consulting= oice Number:13319-27
Tuesday,October 04,2016
Page 16 of 17
_
Christopher J.Miller Employee Status:Active
i*Notes _
'.Christopher J.,Miller Timesheet date:9/2/2016
15-315 Avon Avenue Bridge
Pre-Construction Activities
Utility Coordination
Project Time/Construction Manager 1
i 8/29/2016'1 4.00 1 Regular Employee Note:'Utility Inspection
8/30/2016; 1.00 Regular Employee Note:'!Discuss erosion control plans with contractor
9/1/20161 6.00!Regular T V Employee Note:I schedule meetings,erosion control measures inspection
Overhead
Administration
8/30/2016 1.00';Regular Employee Note:!:call contractors for Beech Grove 2016 bid