Loading...
HomeMy WebLinkAboutFULL AdddendumNo1-(16-02)Page 1 of 2 DATE: April 1, 2016 PROJECT: Project 16-02 – Emerson Road Storm Sewer Reconstruction City of Carmel, Indiana NOTICE OF ADDENDUM NUMBER 1 1) The Prj. No. 16-02 Pre-Bid Meeting Minutes have been included. 2) A digital Itemized Proposal excel file has been included. 3) A copy of the current plan holders list has been included. 4) Sheets 400 through 405 have been revised to show all gas main depth information provided by Vectren. 5) Sheets 300, 301, 400 through 405, and 600 have been revised to eliminate gas and water utility conflicts with the proposed storm system. 6) Exhibits indicating all known utility conflicts has been included. 7) Sheet 203 and 302 have been revised to show a temporary bypass for the Monon Trail. 8) The Project Manual has been revised and included. The following items have been revised: o Section 1.5 – Anticipated Notice to Proceed date has been revised to May 4, 2016 o TS 2 – Anticipated Notice to Proceed date has been revised to May 4, 2016 o TS 15 – Maintaining Traffic has been revised to include verbiage for the temporary Monon Trail Bypass o TS 40 – HMA, Surface, 9.5 mm, 1.5” has been revised to include the work of installing asphalt for the temporary Monon Trail Bypass o TS 50 – Compacted Aggregate, No. 53 Stone has been revised to include the work of installing stone base for the temporary Monon Trail Bypass 9) The Itemized Proposal, Sheet BID-4, has been revised and included. The following items have been revised/added: o Item 8 – Fence, Remove and Reset – revised quantity is 72 LFT Page 2 of 2 o Item 13 – HMA Surface, 9.5 mm, 1.5”, Storm Sewer – revised quantity is 50 TON o Item 15 – Compacted Aggregate, No. 53 Stone – revised quantity is 147 TON o Item 17 – 8” PVC – added quantity is 13 LFT 10) The City of Carmel is requiring all bid submittals to include an E-Verify certification, pursuant to Indiana Code 22-5-1.7-11. This E-Verify document is enclosed within this addendum, and shall be included with all bid submittals. 11) The Bidder shall acknowledge receipt of this Addendum by inserting the number and date in the space provided on page BID-6, Part 4.2 of the Bid Form. Prj. #16-02 – Emerson Road Storm Sewer Reconstruction Pre-Bid Meeting Minutes April 1, 2016 1 April 1, 2016 Mr. Jeremy Kashman, P.E., City Engineer City of Carmel, Engineering Department Carmel City Hall One Civic Square Carmel, IN 46032 RE: Pre-Bid Meeting Minutes Prj. #16-02 – Emerson Road Storm Sewer Reconstruction Dear Mr. Kashman: The following contains the minutes of the subject meeting held in the Caucus Room on the 2nd floor of Carmel City Hall (One Civic Square), 10:00 a.m. on March 29, 2016. These minutes will serve as a portion of Addendum 1 for the project listed above. The attendees for this meeting are as follows: Mr. William Hall, CrossRoad Engineers, P.C. Mr. Michael Kalberg, CrossRoad Engineers, P.C. Mr. Josh Plummer, Eagle Valley Inc. The meeting began with project descriptions and the overall scope of the project. The meeting continued with general comments concerning the project. The general comments included the following: 1. Key Personnel - City of Carmel Project Manager: Jeremy Kashman - Design Firms: CrossRoad Engineers - William Hall, PE / Trent Newport, PE, LS 2. Bids for the project are due no later than 10:00 a.m. (Local Time) on April 6, 2016 at the Office of the Clerk Treasurer, Carmel City Hall, One Civic Square, Carmel, IN. 3. Bids for the project will also be opened on April 6, 2016. It was noted that it is imperative that all documentation needs to be included with the bid submittal. Incomplete bids will not be considered valid bids. The "BID PROPOSAL SUMMARY PAGE" that is included within the bid documents shall be completed, and be the first page of the bid that is submitted. 4. It was indicated that the award date will be as soon as feasible if Carmel elects to award the project and has a responsible and responsive low bidder. Any Contract Document dates that cannot be achieved due to delay in issuance of the Notice to Proceed shall be adjusted by the same number of days of delay for the issuance of the Notice to Proceed. Prj. #16-02 – Emerson Road Storm Sewer Reconstruction Pre-Bid Meeting Minutes April 1, 2016 2 Issues of Discussions at Meeting: 1. The completion time for the project is sixty (90) days from the NTP issuance date. Construction and/or material ordering can begin immediately after the NTP. The anticipated Notice to Proceed is April 20, 2016 (Per discussion with Jeremy Kashman with the City of Carmel, the anticipated Notice to Proceed shall be May 4, 2016). Coordination with other nearby projects is required. a. Project Phasing i. Phase I: Installation of all work associated with the connection to the Monon Sewer, underground detention system, outlet structure (Str. #55), stubs into the underground detention system, and the diversion structure (Str. #53A and 53B) and all work associated with the existing building demolition sidewalk, steps, railings, walls, foundations, etc. DURATION = 20 days ii. Phase II: Installation of all work associated with the sanitary sewer system, the Stormwater Quality Unit (Str. #54), and all storm sewer from Str. #46 to Str. #53. DURATION = 20 days iii. Phase III: Installation of all remaining work and final restoration/clean-up per Project #16-02 Contract Documents. DURATION = 50 days b. Road Closure Durations i. Phase I: Monon Trail Closure – 5 days (Per discussion and correspondence with Jeremy Kashman with the City of Carmel, a temporary bypass path shall be installed to avoid a closure of the Monon Trail.) ii. Phase II: 3rd/4th Avenue SW Closure – 20 days iii. Phase III: Emerson Road, Park Lane, and York Drive Closure – 50 days (This work shall be completed under limited access. Driveways to property owners shall be kept open during the closure.) c. Should the contractor desire to adjust the original Maintenance of Traffic Plan, written notification to the City of Carmel is required 14 days prior to that work commencing per TS 15. 2. All known utilities have been made aware of the project and are reviewing. Coordination with the existing utilities shall take place per TS 6. a. Carmel Water test holed several locations of potential conflicts and provided information to CRE for review. CRE revised the construction plans to eliminate potential conflicts. CRE has provided Carmel Water with an exhibit that highlights the conflict locations. b. Vectren test holed several locations of potential conflicts and provided information to CRE for review. CRE revised the construction plans to eliminate most of the potential conflicts. Conflicts still exist with Str. 2, Str. 3, and Str. 29. Vectren has been notified of these conflicts and the Contractor shall coordinate with Vectren on these potential relocations. Prj. #16-02 – Emerson Road Storm Sewer Reconstruction Pre-Bid Meeting Minutes April 1, 2016 3 CRE has provided Vectren with an exhibit that highlights the conflict locations. c. CRE indicated that there is likely to be conflicts with water and gas services and these conflicts shall be evaluated on a case by case basis. The Contractor shall coordinate with Vectren and Carmel Water to relocate any conflicting service lines. d. CRE noted that there are Duke Energy conflicts with two light poles in the Emerson Rd. neighborhood, a utility pole at the NW corner of the parking lot at 210 3rd Ave. SW, and three service poles north of the building to be demolished. These conflicts are being coordinated between the City of Carmel and Duke Energy. i. The contractor shall contact Duke Energy at (800) 774-0246 to cancel the service to the building to be demolished. 3. All proposed work is within either areas of existing R/W or easements, or areas where proposed R/W is in place. Right of Entry forms will be required per TS 35. 4. It was indicated that asphalt street and path patching installation and testing work shall be per INDOT. Concrete testing will be performed by the inspection unit. 5. It was indicated that the Contractor shall perform all required sanitary sewer testing. City of Carmel Wastewater Utility shall be notified prior to testing, and shall be on site when performing the testing. 6. It was indicated that the Contractor shall review the special provisions or Technical Specifications carefully to gain a complete understanding of the requirements set forth by the contract documents as compliance will be required. 7. Construction Engineering will be provided by the City of Carmel for this project; therefore, no item was included in the Itemized Proposal within the Contract Documents. It was indicated to provide 48 hours advance notice for any Construction Engineering per TS 16. 8. It was indicated that any delay caused to the project due to a delay in the issuing of a notice to proceed will result in an extension of time to the project, but there will be no change in the accepted unit costs for each item. 9. Any further questions outside of the pre-bid meeting that are to be addressed within the minutes from the meeting shall be submitted by 9:00 a.m. on April 1, 2016. The pre-bid meeting minutes shall be completed and submitted to all plan holders by the end of the day on April 1, 2016. Any questions received outside of this timeframe shall be included as additional addendums. Clarification/Answers for Questions and Utility Discussions: 1. There were no questions asked at this time. Prj. #16-02 – Emerson Road Storm Sewer Reconstruction Pre-Bid Meeting Minutes April 1, 2016 4 This addendum, being Addendum 1, dated April 1, 2016, must be included in Part 4, Contract Documents and Addenda, sheet BID-6, with all bid submittals. If you should have any questions, feel free to give me a call at 317-780-1555 x 140. Sincerely, CrossRoad Engineers, P.C. William Hall, P.E. Project Engineer Cc: Mr. Jeremy Kashman, P.E., City of Carmel, City Engineer Mr. John Duffy, Carmel Utilities Mr. Steve Cook, Carmel Water Mr. Trent Newport, P.E., L.S., CrossRoad Engineers, P.C. Mr. Lance Stahley, CrossRoad Engineers, P.C. Attendees Plan Holders Co s t $ 7 5 Li s t c u r r e n t t h r o u g h 3 - 1 7 - 2 0 1 6 Se t # C o m p a n y C o n t a c t N a m e A d d r e s s E m a i l A d d r e s s F a x N u m b e r P h o n e N u m ber C h e c k # 1 Ci t y   o f   C a r m e l J e r e m y   K a s h m a n ‐ ‐ ‐ ‐ n / a 2 Ci t y   o f   C a r m e l J e r e m y   K a s h m a n ‐ ‐ ‐ ‐ n / a 3 CR E W i l l i e   H a l l ‐ wh a l l @ c r o s s r o a d e n g i n e e r s . c o m 317‐780‐6525 3 1 7 ‐ 7 8 0 ‐ 1 5 5 5 x 1 4 0 n / a 4 Ea g l e   V a l l e y C h u c k   N o r m a n 34 0 1   N .   R a c e w a y   R o a d ,   I n d i a n a p o l i s ,   I N   46 2 3 4 cn o r m a n @ e a g l e v a l l e y i n c . c o m 317‐291‐8786 3 1 7 ‐ 2 9 1 ‐ 8 1 0 4 1 0 4 6 3 5  C r i d e r   a n d   C r i d e r B i l l   L a n g 9 3 8 8   T u r n s t o n e   C o u r t ,   N o b l e s v i l l e ,   I N  4 6 0 6 0 bl a n g @ c r i d e r a n d c r i d e r . c o m 317‐334‐1158 3 1 7 ‐ 3 3 4 ‐ 0 7 5 8 2 2 5 8 6 Ya r d b e r r y T i m   Y a r b e r r y 9 9 4 0   S   1 0 0 0   W   ,   A n d e r s o n ,   I N   4 6 0 1 7 ty a r b @ a o l . c o m 765‐378‐0376 7 6 5 ‐ 3 7 8 ‐ 5 7 8 3 3 2 3 9 5 7 Ca l u m e t K e v i n   G r e e n 48 9 8   F i e l d s t o n e   D r i v e ,   W h i t e s t o w n ,   I N   46 0 7 5 kg r e e n @ c a l u m e t c i v i l . c o m 317‐769‐7424 3 1 7 ‐ 7 6 9 ‐ 1 9 0 0 2 0 1 6 1 7 8 iS q F t A l l e n   B l a i r 45 0 0   L a k e   F o r e s t   D r i v e ,   S t e   5 0 2 ,   C i n c i n n a t i ,   OH   4 5 2 4 2 in d i a n a p l a n r o o m @ i s q f t . c o m 866‐570‐8187 8 0 0 ‐ 3 6 4 ‐ 2 0 5 9 6 4 7 0 4 9 Mo r p h e y   C o n s t r u c t i o n S t e v e   M i l b u r n 14 9 9   N .   S h e r m a n   D r i v e ,   I n d i a n a p o l i s ,   I n   46 2 0 1 sm i l b u r n @ m o r p h e y c o n s t r u c t i o n . c om 317‐356‐9253 3 1 7 ‐ 3 5 6 ‐ 9 2 5 0 1 2 7 3 7 10 Re i t h   R i l e y S t u a r t   H u c k l e b e r r y 17 5 1   W .   M i n n e s o t a   S t r e e t ,   P O   B o x   2 7 6 ,   In d i a n a p o l i s ,   I N   4 6 2 0 6 sh u c k e l @ r i e t h - r i l e y . c o m 317‐631‐6423317‐634‐5561x2121414518 11 At l a s   E x c a v a t i n g M o l l y   L e h m a n 47 4 0   S w i s h e r   R o a d ,   W e s t   L a f a y e t t e ,   I N   47 9 0 6 mo l l y l @ a t l a s e x c a v a t i n g . c o m 765‐429‐6464 7 6 5 ‐ 4 2 9 ‐ 4 8 0 0 1 0 1 4 5 12 Mi l l e n n i u m   C o n t r a c t o r s ,   L L C A n d r e w   J .   C l o s s e r P . O .   B o x   1 3 0 3 ,   I n d i an a p o l i s ,   I N   4 6 2 0 6 ac l o s s e r @ m c o n t r a c t o r s . c o m ‐ 3 1 7 ‐ 7 8 0 ‐ 0 1 0 9 2 9 9 1 8 13 DI G ON L Y DI G ON L Y DI G ON L Y Ci t y o f C a r m e l - L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E W. MAIN ST. W. MAIN ST. S. R A N G E L I N E R D . EMERSON RD. EM E R S O N R D . CITY C E N T E R D R . S. G U I L D F O R D R D . PA R K L N . YO R K D R . E. 126TH ST. 4T H A V E . S W INDUSTRIAL DR. 3 R D A V E . S W . 2ND ST. SW 3R D A V E . S W SH E R M A N D R . CITY CENTER DR. 1ST ST. SW MO N O N T R A I L De v e l o p m e n t C o n s u l t a n t s Tr a n s p o r t a t i o n & DI R E C T O R Y P A T H : R: \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s FI L E N A M E : XX X M O T . d w g DA T E / U S E R : 4/ 1 / 2 0 1 6 8 : 3 2 A M / Lc o x EM E R S O N R O A D S T O R M S E W E R R E C O N S T R U C T I O N P R O J E C T NO R T H 203 MA I N T E N A N C E O F T R A F F I C P L A N 20 3 FRONT VIEW SIDE VIEW ACCEPTABLE CHANNELING DEVICES TYPICAL ROAD CLOSURE SIGN ASSEMBLY MAINTENANCE OF TRAFFIC NOTES : TYPE III BARRICADE WOOD SKID SUPPORTSFRONT VIEW Know what's below. before you dig.Call R 10+00 15+0011+00 12+00 13+00 14+00 50 + 0 0 30 + 0 0 40 + 0 0 EMERSON ROAD 16+00 17+00 18+00 19+ 0 0 EMERSON ROAD 3 R D A V E . S W S 300 CO N S T R U C T I O N D E T A I L S 30 0 NO R T H 800 EXISTING LEGEND De v e l o p m e n t C o n s u l t a n t s Tr a n s p o r t a t i o n & DI R E C T O R Y P A T H : R: \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s FI L E N A M E : 30 0 C O N S T R U C T I O N D E T A I L S . d w g DA T E / U S E R : 3/ 3 1 / 2 0 1 6 4 : 5 9 P M / Lc o x EM E R S O N R O A D S T O R M S E W E R R E C O N S T R U C T I O N P R O J E C T MA T C H L I N E S T A . 1 5 + 8 5 ( S E E B E L O W ) MA T C H L I N E S T A . 1 5 + 8 5 ( S E E A B O V E ) KEYMAP NO SCALE SHEET 300SHEET 300 MATCHLINE STA. 19+50 (SEE SHEET 301) GENERAL NOTES TBM#1 TBM#2 BENCHMARK INFORMATION Know what's below. before you dig.Call R PROPOSED LEGEND S 12 + 0 0 40+00 43+3241+00 42+00 43+00 E M E R S O N R O A D YORK DR. 16 + 0 0 50+00 51+00 52+00 53+00PARK LN. 20+00 21+00 22+00 23 + 0 0 EMERSON ROAD 301 CO N S T R U C T I O N D E T A I L S 30 1 NORTH De v e l o p m e n t C o n s u l t a n t s Tr a n s p o r t a t i o n & DI R E C T O R Y P A T H : R: \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s FI L E N A M E : 30 0 C O N S T R U C T I O N D E T A I L S . d w g DA T E / U S E R : 3/ 3 1 / 2 0 1 6 4 : 5 9 P M / Lc o x EM E R S O N R O A D S T O R M S E W E R R E C O N S T R U C T I O N P R O J E C T KEYMAP NO SCALE SH E E T 3 0 1 SH E E T 3 0 1 SH E E T 3 0 1 MA T C H L I N E S T A . 1 9 + 5 0 ( S E E S H E E T 3 0 0 ) E M E R S O N R O A D BENCHMARK INFORMATION Know what's below. before you dig.Call R 800 EXISTING LEGEND GENERAL NOTESPROPOSED LEGEND S S S S www.ContechES.com® www.ContechES.com® www.ContechES.com® OUTLET INLET 302 CO N S T R U C T I O N D E T A I L S 30 2 NO R T H De v e l o p m e n t C o n s u l t a n t s Tr a n s p o r t a t i o n & DI R E C T O R Y P A T H : R: \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s FI L E N A M E : 30 0 C O N S T R U C T I O N D E T A I L S . d w g DA T E / U S E R : 3/ 3 1 / 2 0 1 6 4 : 5 9 P M / Lc o x EM E R S O N R O A D S T O R M S E W E R R E C O N S T R U C T I O N P R O J E C T KEYMAP NO SCALE GENERAL NOTES 800 EXISTING LEGEND BENCHMARK INFORMATION Know what's below. before you dig.Call R SHEET 302 PROPOSED LEGEND MATCHLINE (THIS SHEET) MATCHLINE (THIS SHEET) LINE - STM 'A' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 820 825 830 835 840 845 850 820 825 830 835 840 845 850 10+00 11+00 12+00 13+00 14+00 14+75 83 9 . 1 9 83 9 . 1 8 83 8 . 8 6 83 8 . 9 9 83 8 . 9 0 83 8 . 8 8 83 8 . 7 1 83 8 . 3 3 83 8 . 4 8 83 8 . 2 3 83 7 . 9 6 83 7 . 8 3 83 7 . 8 6 83 7 . 4 4 83 7 . 1 7 83 7 . 3 5 83 7 . 1 0 83 6 . 9 1 83 7 . 0 3 83 7 . 0 0 ∅ ∅∅ LINE - STM 'A' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 820 825 830 835 840 845 850 820 825 830 835 840 845 850 15+00 16+00 17+00 17+75 83 7 . 0 0 83 6 . 8 8 83 7 . 1 0 83 6 . 8 7 83 6 . 8 4 83 6 . 8 6 83 7 . 0 4 83 7 . 1 0 83 7 . 2 6 83 7 . 2 8 83 7 . 0 5 83 7 . 3 6 83 7 . 4 0 ∅∅∅∅ LINE - STM 'E' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 820 825 830 835 840 845 850 820 825 830 835 840 845 850 5+00 6+00 6+25 83 8 . 3 7 83 8 . 9 2 83 8 . 8 4 83 8 . 6 3 83 8 . 4 6 ∅ ∅∅ ∅ ∅ 10+00 EMERSON ROAD 10+00 11+00 12+00 13+00 14+00 15+00 EMERSON ROAD 15+00 16+00 17+00 5+00 6+ 1 0 6+ 0 0 400 ST O R M S E W E R PL A N & P R O F I L E S 40 0 De v e l o p m e n t C o n s u l t a n t s Tr a n s p o r t a t i o n & DI R E C T O R Y P A T H : R: \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s FI L E N A M E : XX X S T M P L A N & P R O F I L E S . d w g DA T E / U S E R : 3/ 3 0 / 2 0 1 6 7 : 0 7 P M / Mk a l b e r g EM E R S O N R O A D S T O R M S E W E R R E C O N S T R U C T I O N P R O J E C T MA T C H L I N E S T A . 1 4 + 7 5 ( S E E B E L O W ) MA T C H L I N E S T A . 1 4 + 7 5 ( S E E A B O V E ) MATCHLINE STA. 17+75 (SEE SHEET 401 ) GENERAL NOTES Know what's below. before you dig.Call R LINE - STM 'A' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 815 820 825 830 835 840 845 815 820 825 830 835 840 845 18+00 19+00 20+00 83 7 . 4 0 83 7 . 6 1 83 7 . 5 2 83 7 . 5 0 83 7 . 7 9 83 7 . 8 5 83 7 . 9 6 ∅ ∅ LINE - STM 'B' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 820 825 830 835 840 845 850 820 825 830 835 840 845 850 20+00 21+00 22+00 23+00 23+25 83 7 . 0 0 83 8 . 4 2 83 9 . 1 1 83 9 . 5 5 83 9 . 5 6 83 9 . 6 7 83 9 . 8 1 84 0 . 2 7 84 0 . 6 3 84 0 . 6 4 84 0 . 8 0 84 1 . 1 6 ∅ ∅ S 19+26 18+00 19+00 19+26 20+00 22+9321+00 22+00 401 ST O R M S E W E R PL A N & P R O F I L E S 40 1 De v e l o p m e n t C o n s u l t a n t s Tr a n s p o r t a t i o n & DI R E C T O R Y P A T H : R: \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s FI L E N A M E : XX X S T M P L A N & P R O F I L E S . d w g DA T E / U S E R : 3/ 3 0 / 2 0 1 6 7 : 0 7 P M / Mk a l b e r g EM E R S O N R O A D S T O R M S E W E R R E C O N S T R U C T I O N P R O J E C T MA T C H L I N E S T A . 1 7 + 7 5 ( S E E S H E E T 4 0 0 ) KEYMAP NO SCALE Know what's below. before you dig.Call R GENERAL NOTES LINE - STM 'C' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 820 825 830 835 840 845 850 820 825 830 835 840 845 850 30+00 31+00 32+00 33+00 33+25 83 6 . 9 5 83 6 . 1 6 83 6 . 3 8 83 6 . 6 9 83 6 . 7 3 83 6 . 9 3 83 7 . 1 5 83 7 . 3 2 83 7 . 2 3 83 7 . 4 2 83 7 . 6 1 83 7 . 5 6 ∅ ∅ ∅∅∅ LINE - STM 'D' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 815 820 825 830 835 840 845 815 820 825 830 835 840 845 40+00 41+00 42+00 43+00 43+50 83 6 . 9 9 83 7 . 0 0 83 8 . 2 6 83 8 . 6 2 83 8 . 8 1 83 9 . 2 5 83 8 . 6 8 83 8 . 3 7 83 8 . 1 8 83 8 . 0 1 83 7 . 3 4 83 7 . 7 2 ∅ ∅ ∅ ∅∅ ∅ ∅ 30+00 32+7931+00 32+00 40+00 42+88 41+00 42+00 402 ST O R M S E W E R PL A N & P R O F I L E S 40 2 De v e l o p m e n t C o n s u l t a n t s Tr a n s p o r t a t i o n & DI R E C T O R Y P A T H : R: \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s FI L E N A M E : XX X S T M P L A N & P R O F I L E S . d w g DA T E / U S E R : 3/ 3 0 / 2 0 1 6 7 : 0 7 P M / Mk a l b e r g EM E R S O N R O A D S T O R M S E W E R R E C O N S T R U C T I O N P R O J E C T Know what's below. before you dig.Call R GENERAL NOTES LINE - STM 'G' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 815 820 825 830 835 840 845 815 820 825 830 835 840 845 70+00 70+75 83 8 . 9 0 83 7 . 9 4 ∅ ∅ ∅ ∅ LINE - STM 'J' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 825 830 835 840 845 850 855 825 830 835 840 845 850 855 100+00 100+75 84 0 . 9 0 84 1 . 1 1 ∅ ∅ ∅ ∅ LINE - STM 'I' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 820 825 830 835 840 845 850 820 825 830 835 840 845 850 90+00 90+75 83 9 . 5 3 83 9 . 6 9 ∅ ∅ ∅ LINE - STM 'H' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 815 820 825 830 835 840 845 815 820 825 830 835 840 845 80+00 80+75 83 7 . 2 4 83 7 . 8 7 ∅ ∅ LINE - STM 'L' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 815 820 825 830 835 840 845 815 820 825 830 835 840 845 120+00 120+75 83 7 . 3 1 83 6 . 8 1 ∅ ∅ ∅ ∅ LINE - STM 'M' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 820 825 830 835 840 845 850 820 825 830 835 840 845 850 130+00 130+75 83 5 . 7 8 83 6 . 1 9 ∅ ∅ E M E R S O N R O A D 70+00 70+45 EMERSON ROAD 80+00 80+47 90+00 90+32 100+00 100+32 130+00 130+47 120+00 120+35 403 ST O R M S E W E R PL A N & P R O F I L E S 40 3 De v e l o p m e n t C o n s u l t a n t s Tr a n s p o r t a t i o n & DI R E C T O R Y P A T H : R: \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s FI L E N A M E : XX X S T M P L A N & P R O F I L E S . d w g DA T E / U S E R : 3/ 3 0 / 2 0 1 6 7 : 0 7 P M / Mk a l b e r g EM E R S O N R O A D S T O R M S E W E R R E C O N S T R U C T I O N P R O J E C T Know what's below. before you dig.Call R GENERAL NOTES LINE - STM 'Q' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 820 825 830 835 840 845 850 820 825 830 835 840 845 850 170+00 170+75 83 6 . 5 7 83 6 . 5 0 ∅ ∅ ∅ LINE - STM 'O' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 820 825 830 835 840 845 850 820 825 830 835 840 845 850 150+00 150+75 83 7 . 0 7 83 7 . 1 5 ∅ ∅ ∅ LINE - STM 'P' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 815 820 825 830 835 840 845 815 820 825 830 835 840 845 160+00 160+75 83 6 . 8 6 83 6 . 4 4 ∅ ∅ ∅ LINE - STM 'N' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 820 825 830 835 840 845 850 820 825 830 835 840 845 850 140+00 140+75 83 6 . 3 2 83 6 . 5 6 ∅ ∅ ∅ E M E R S O N R O A D 160+00 160+35 170+00 170+38150+00 150+33140+00 140+32 LINE - STM 'S' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 820 825 830 835 840 845 850 820 825 830 835 840 845 850 190+00 190+75 83 7 . 0 3 83 7 . 0 2 ∅ LINE - STM 'R' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 820 825 830 835 840 845 850 820 825 830 835 840 845 850 180+00 180+75 83 7 . 0 3 ∅ 190+00 190+40180+11 180+00 S 210+08 210+00 LINE - STM 'U' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 820 825 830 835 840 845 850 820 825 830 835 840 845 850 210+00 210+75 83 6 . 8 1 ∅ www.ContechES.co m®www.ContechE S . c o m OUTL E T INLE T 220+09 220+00 LINE - STM 'V' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 820 825 830 835 840 845 850 820 825 830 835 840 845 850 220+00 220+75 83 4 . 9 2 ∅ 404 ST O R M S E W E R PL A N & P R O F I L E S 40 4 De v e l o p m e n t C o n s u l t a n t s Tr a n s p o r t a t i o n & DI R E C T O R Y P A T H : R: \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s FI L E N A M E : XX X S T M P L A N & P R O F I L E S . d w g DA T E / U S E R : 3/ 3 0 / 2 0 1 6 7 : 0 7 P M / Mk a l b e r g EM E R S O N R O A D S T O R M S E W E R R E C O N S T R U C T I O N P R O J E C T Know what's below. before you dig.Call R GENERAL NOTES LINE - STM 'T' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 815 820 825 830 835 840 845 815 820 825 830 835 840 845 200+00 201+00 202+00 203+00 203+50 83 7 . 6 7 83 7 . 6 7 83 7 . 3 3 83 7 . 1 9 83 6 . 8 1 83 6 . 5 6 83 6 . 1 2 83 6 . 0 2 83 5 . 7 5 83 5 . 6 0 83 5 . 5 5 83 5 . 0 5 83 4 . 3 2 83 4 . 0 3 83 3 . 1 7 ∅ ∅ ∅∅ ∅ ∅ S www.ContechES.com ® www.ContechES. c o m ® www.ContechES.com ® OUTLET INLET 20 0 + 0 0 201+00 202+00 203+ 0 0 230 + 0 0 LINE - STM 'W' HORZ. SCALE: 1"=20 VERT. SCALE: 1"=5 810 815 820 825 830 835 840 810 815 820 825 830 835 840 230+00 231+00 232+00 233+00 233+75 83 4 . 0 6 83 3 . 5 9 83 3 . 0 0 83 2 . 6 3 83 2 . 3 4 83 0 . 8 7 83 0 . 8 7 83 0 . 1 7 83 0 . 3 7 83 0 . 4 7 83 1 . 4 0 83 1 . 8 6 83 1 . 1 0 83 0 . 0 7 83 0 . 0 0 ∅ ∅ 230+00 233+74231+00 232+00 233+00 405 ST O R M S E W E R PL A N & P R O F I L E S 40 5 De v e l o p m e n t C o n s u l t a n t s Tr a n s p o r t a t i o n & DI R E C T O R Y P A T H : R: \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s FI L E N A M E : XX X S T M P L A N & P R O F I L E S . d w g DA T E / U S E R : 3/ 3 0 / 2 0 1 6 7 : 0 7 P M / Mk a l b e r g EM E R S O N R O A D S T O R M S E W E R R E C O N S T R U C T I O N P R O J E C T Know what's below. before you dig.Call R GENERAL NOTES STORM SEWER STRUCTURE TABLE STR. DATA STORM SEWER STRUCTURE TABLE STR. DATA STORM SEWER STRUCTURE TABLE STR. DATA STORM SEWER STRUCTURE TABLE STR. DATA STORM SEWER STRUCTURE TABLE STR. DATA STORM SEWER STRUCTURE TABLE STR. DATA STORM SEWER STRUCTURE TABLE STR. DATA STORM SEWER STRUCTURE TABLE STR. DATA STORM SEWER STRUCTURE TABLE PIPES STR. DATA SANITARY SEWER STRUCTURE TABLE STR. DATA 600 ST R U C T U R E D A T A T A B L E 60 0 De v e l o p m e n t C o n s u l t a n t s Tr a n s p o r t a t i o n & DI R E C T O R Y P A T H : R: \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s FI L E N A M E : XX X S T M P L A N & P R O F I L E S . d w g DA T E / U S E R : 3/ 3 0 / 2 0 1 6 7 : 0 7 P M / Mk a l b e r g EM E R S O N R O A D S T O R M S E W E R R E C O N S T R U C T I O N P R O J E C T Know what's below. before you dig.Call R 300300 N O R T H EXISTING LEGEND D I R E C T O R Y P A T H : R : \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s F I L E N A M E : 3 0 0 C O N S T R U C T I O N D E T A I L S . d w g D A T E / U S E R : 3 / 1 6 / 2 0 1 6 7 : 1 2 P M / E c a r s o n MATCHLINE STA. 15+85 (SEE BELOW) M A T C H L I N E S T A . 1 5 + 8 5 ( S E E A B O V E ) KE Y M A P SH E E T 3 0 0 SH E E T 3 0 0 MA T C H L I N E S T A . 1 9 + 5 0 ( S E E S H E E T 3 0 1 ) GENERAL NOTES BE N C H M A R K I N F O R M A T I O N Kn o w w h a t ' s R PROPOSED LEGEND Lo c a t i o n 1 4" W a t e r M a i n Co v e r = 3 3 " TO P W a t e r M a i n = 8 3 6 . 0 3 IN V W a t e r M a i n = 8 3 5 . 7 0 ST M T O P @ W a t e r C r o s s i n g = 8 3 5 . 3 6 ST M I N V @ W a t e r C r o s s i n g = 8 3 3 . 8 6 Se p a r a t i o n = 0 . 3 4 ' No a n t i c i p a t e d v e r t i c a l c o n f l i c t . Po t e n t i a l h o r i z o n t a l c o n f l i c t . Lo c a t i o n 2 4" W a t e r M a i n ( a s s u m e d ) Co v e r = 5 0 " TO P W a t e r M a i n = 8 3 3 . 4 6 IN V W a t e r M a i n = 8 3 3 . 1 3 ( a s s u m e d ) ST M T O P @ W a t e r C r o s s i n g = 8 3 0 . 2 4 ST M I N V @ W a t e r C r o s s i n g = 8 2 8 . 7 4 Se p a r a t i o n = 2 . 8 9 ' No a n t i c i p a t e d v e r t i c a l c o n f l i c t . Lo c a t i o n 3 4" W a t e r M a i n ( a s s u m e d ) Co v e r = 5 0 " TO P W a t e r M a i n = 8 3 3 . 4 5 IN V W a t e r M a i n = 8 3 3 . 1 2 ( a s s u m e d ) ST M T O P @ W a t e r C r o s s i n g = 8 3 1 . 0 4 ST M I N V @ W a t e r C r o s s i n g = 8 2 9 . 5 4 Se p a r a t i o n = 2 . 0 8 ' No a n t i c i p a t e d v e r t i c a l c o n f l i c t . Po t e n t i a l H o r i z o n t a l C o n f l i c t Lo c a t i o n 4 4" W a t e r M a i n ( a s s u m e d ) Co v e r = 5 4 " ( a s s u m e d ) TO P W a t e r M a i n = 8 3 2 . 0 6 ( a s s u m e d ) IN V W a t e r M a i n = 8 3 1 . 7 3 ( a s s u m e d ) No t e s t h o l e w a s p e r f o r m e d b e c a u s e it w a s i n d i c a t e d t h a t t h e w a t e r m a i n lo c a t e d i n d r i v e l a n e . Po t e n t i a l h o r i z o n t a l a n d v e r t i c a l co n f l i c t s . Location 5 4" W a t e r M a i n ( a s s u m e d ) Cover = 5 0 " TOP W a t e r M a i n = 8 3 1 . 5 5 INV W a t e r M a i n = 8 3 1 . 2 2 ( a s s u m e d ) STM B O P @ W a t e r C r o s s i n g = 8 3 2 . 4 7 STM I N V @ W a t e r C r o s s i n g = 8 3 2 . 6 9 Separation = 0 . 9 2 ' ( a s s u m e d ) No v e r t i c a l c o n f l i c t a n t i c i p a t e d . Potential H o r i z o n t a l C o n f l i c t Lo c a t i o n 6 6" W a t e r M a i n ( a s s u m e d ) Co v e r = 5 4 " ( a s s u m e d ) TO P W a t e r M a i n = 8 3 1 . 4 8 ( a s s u m e d ) IN V W a t e r M a i n = 8 3 0 . 9 8 ( a s s u m e d ) ST M B O P @ W a t e r C r o s s i n g = 8 3 1 . 8 5 ST M I N V @ W a t e r C r o s s i n g = 8 3 2 . 1 0 Se p a r a t i o n = 0 . 3 7 ' No t e s t h o l e w a s p e r f o r m e d b e c a u s e wa t e r m a i n l o c a t e d i n d r i v e l a n e . Po t e n t i a l v e r t i c a l c o n f l i c t . Lo c a t i o n 7 4" W a t e r M a i n Co v e r = 6 4 " TO P W a t e r M a i n = 8 3 1 . 4 5 IN V W a t e r M a i n = 8 3 1 . 1 2 No a n t i c i p a t e d v e r t i c a l c o n f l i c t . Po t e n t i a l H o r i z o n t a l c o n f l i c t Lo c a t i o n 8 4" W a t e r M a i n Co v e r = 6 3 " TO P W a t e r M a i n = 8 3 1 . 7 0 IN V W a t e r M a i n = 8 3 1 . 3 7 No a n t i c i p a t e d v e r t i c a l c o n f l i c t . Po t e n t i a l H o r i z o n t a l c o n f l i c t Lo c a t i o n 9 4" W a t e r M a i n ( a s s u m e d ) Co v e r = 5 4 " ( a s s u m e d ) TO P W a t e r M a i n = 8 3 2 . 4 9 ( a s s u m e d ) IN V W a t e r M a i n = 8 3 2 . 1 6 ( a s s u m e d ) Te s t h o l e p e r f o r m e d a t t h i s l o c a t i o n , bu t n o w a t e r m a i n w a s f o u n d . Po t e n t i a l v e r t i c a l a n d h o r i z o n t a l co n f l i c t . 301301NORTH D I R E C T O R Y P A T H : R : \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s F I L E N A M E : 3 0 0 C O N S T R U C T I O N D E T A I L S . d w g D A T E / U S E R : 3 / 1 6 / 2 0 1 6 7 : 1 2 P M / E c a r s o n KEYMAPSHEET 301 SHEET 301 M A T C H L I N E S T A . 1 9 + 5 0 ( S E E S H E E T 3 0 0 ) EMERSON ROAD BENCHMARK INFORMATION Kn o w w h a t ' s R EXISTING LEGENDGENERAL NOTES PROPOSED LEGEND Lo c a t i o n 2 4" W a t e r M a i n ( a s s u m e d ) Co v e r = 5 0 " TO P W a t e r M a i n = 8 3 3 . 4 6 IN V W a t e r M a i n = 8 3 3 . 1 3 ( a s s u m e d ) ST M T O P @ W a t e r C r o s s i n g = 8 3 0 . 2 4 ST M I N V @ W a t e r C r o s s i n g = 8 2 8 . 7 4 Se p a r a t i o n = 2 . 8 9 ' No a n t i c i p a t e d v e r t i c a l c o n f l i c t . Lo c a t i o n 3 4" W a t e r M a i n ( a s s u m e d ) Co v e r = 5 0 " TO P W a t e r M a i n = 8 3 3 . 4 5 IN V W a t e r M a i n = 8 3 3 . 1 2 ( a s s u m e d ) ST M T O P @ W a t e r C r o s s i n g = 8 3 1 . 0 4 ST M I N V @ W a t e r C r o s s i n g = 8 2 9 . 5 4 Se p a r a t i o n = 2 . 0 8 ' No a n t i c i p a t e d v e r t i c a l c o n f l i c t . Po t e n t i a l h o r i z o n t a l c o n f l i c t . Lo c a t i o n 1 1 6" W a t e r M a i n Co v e r = 5 5 " TO P W a t e r M a i n = 8 3 5 . 4 8 IN V W a t e r M a i n = 8 3 4 . 9 8 No a n t i c i p a t e d v e r t i c a l c o n f l i c t . Po t e n t i a l H o r i z o n t a l C o n f l i c t Lo c a t i o n 1 2 6" W a t e r M a i n Co v e r = 4 8 " TO P W a t e r M a i n = 8 3 6 . 9 0 IN V W a t e r M a i n = 8 3 6 . 4 0 No a n t i c i p a t e d v e r t i c a l c o n f l i c t . Po t e n t i a l H o r i z o n t a l c o n f l i c t Lo c a t i o n 1 4 6" W a t e r M a i n Co v e r = 4 9 " TO P W a t e r M a i n = 8 3 3 . 2 8 IN V W a t e r M a i n = 8 3 2 . 7 8 No a n t i c i p a t e d v e r t i c a l c o n f l i c t . Po t e n t i a l h o r i z o n t a l c o n f l i c t . Lo c a t i o n 1 3 6" W a t e r M a i n Co v e r = 5 5 " TO P W a t e r M a i n = 8 3 2 . 4 7 IN V W a t e r M a i n = 8 3 1 . 9 7 No a n t i c i p a t e d v e r t i c a l c o n f l i c t . Po t e n t i a l h o r i z o n t a l c o n f l i c t . Lo c a t i o n 5 4" W a t e r M a i n ( a s s u m e d ) Co v e r = 5 0 " TO P W a t e r M a i n = 8 3 1 . 5 5 IN V W a t e r M a i n = 8 3 1 . 2 2 ( a s s u m e d ) ST M B O P @ W a t e r C r o s s i n g = 8 3 2 . 4 7 ST M I N V @ W a t e r C r o s s i n g = 8 3 2 . 6 9 Se p a r a t i o n = 0 . 9 2 ' ( a s s u m e d ) No v e r t i c a l c o n f l i c t a n t i c i p a t e d . Po t e n t i a l H o r i z o n t a l c o n f l i c t Lo c a t i o n 6 6" W a t e r M a i n ( a s s u m e d ) Co v e r = 5 4 " ( a s s u m e d ) TO P W a t e r M a i n = 8 3 1 . 4 8 ( a s s u m e d ) IN V W a t e r M a i n = 8 3 0 . 9 8 ( a s s u m e d ) ST M B O P @ W a t e r C r o s s i n g = 8 3 1 . 8 5 ST M I N V @ W a t e r C r o s s i n g = 8 3 2 . 1 0 Se p a r a t i o n = 0 . 3 7 ' No t e s t h o l e w a s p e r f o r m e d b e c a u s e wa t e r m a i n l o c a t e d i n d r i v e l a n e . Po t e n t i a l v e r t i c a l c o n f l i c t s e x i s t s . Lo c a t i o n 1 0 No v e r t i c a l o r ho r i z o n t a l c o n f l i c t s du e t o p l a n re v i s i o n s p r i o r t o su b m i t t a l . 300300 N O R T H EXISTING LEGEND D I R E C T O R Y P A T H : R : \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s F I L E N A M E : 3 0 0 C O N S T R U C T I O N D E T A I L S . d w g D A T E / U S E R : 3 / 1 6 / 2 0 1 6 7 : 1 2 P M / E c a r s o n MATCHLINE STA. 15+85 (SEE BELOW) M A T C H L I N E S T A . 1 5 + 8 5 ( S E E A B O V E ) KE Y M A P SH E E T 3 0 0 SH E E T 3 0 0 MA T C H L I N E S T A . 1 9 + 5 0 ( S E E S H E E T 3 0 1 ) GENERAL NOTES BE N C H M A R K I N F O R M A T I O N Kn o w w h a t ' s R PROPOSED LEGEND Lo c a t i o n 1 4" S t e e l G a s M a i n Co v e r = 3 6 " ( a s s u m e d ) TO P G a s M a i n = 8 3 5 . 6 5 ( a s s u m e d ) IN V G a s M a i n = 8 3 5 . 3 2 ( a s s u m e d ) ST M T O P @ G a s C r o s s i n g = 8 3 5 . 3 4 ST M I N V @ G a s C r o s s i n g = 8 3 3 . 8 4 Se p a r a t i o n = 0 . 0 0 ' Po t e n t i a l H o r i z o n t a l c o n f l i c t V er t i c a l c o n f l i c t e x i s t s . Lo c a t i o n 2 4" S t e e l G a s M a i n Co v e r = 3 6 " ( a s s u m e d ) TO P G a s M a i n = 8 3 4 . 6 2 ( a s s u m e d ) IN V G a s M a i n = 8 3 4 . 2 9 ( a s s u m e d ) ST M T O P @ G a s C r o s s i n g = 8 3 0 . 2 4 ST M I N V @ G a s C r o s s i n g = 8 2 8 . 7 4 Se p a r a t i o n = 4 . 0 5 ' No a n t i c i p a t e d h o r i z o n t a l o r ve r t i c a l c o n f l i c t . Lo c a t i o n 3 4" S t e e l G a s M a i n Co v e r = 4 1 " TO P G a s M a i n = 8 3 4 . 1 7 IN V G a s M a i n = 8 3 3 . 8 4 ST M T O P @ G a s C r o s s i n g = 8 3 1 . 1 8 ST M I N V @ G a s C r o s s i n g = 8 2 9 . 6 8 Se p a r a t i o n = 2 . 6 6 ' No a n t i c i p a t e d h o r i z o n t a l o r ve r t i c a l c o n f l i c t . Location 6 2" P E G a s M a i n Cover = 2 6 " TOP G a s M a i n = 8 3 3 . 9 5 INV G a s M a i n = 8 3 3 . 7 8 STM T O P @ G a s C r o s s i n g = 8 3 3 . 9 4 STM I N V @ G a s C r o s s i n g = 8 3 2 . 7 1 Separation = 0 . 0 0 ' Potential h o r i z o n t a l c o n f l i c t . V ertical c o n f l i c t e x i s t s . 301301NORTH D I R E C T O R Y P A T H : R : \ A c t i v e \ C a r m e l \ L I T T L E C O O L C R E E K - E M E R S O N D R D R A I N A G E S T U D Y \ C A D \ P l a n s F I L E N A M E : 3 0 0 C O N S T R U C T I O N D E T A I L S . d w g D A T E / U S E R : 3 / 1 6 / 2 0 1 6 7 : 1 2 P M / E c a r s o n KEYMAPSHEET 301 SHEET 301 M A T C H L I N E S T A . 1 9 + 5 0 ( S E E S H E E T 3 0 0 ) EMERSON ROAD BENCHMARK INFORMATION Kn o w w h a t ' s R EXISTING LEGENDGENERAL NOTES PROPOSED LEGEND Lo c a t i o n 2 4" S t e e l G a s M a i n Co v e r = 3 6 " ( a s s u m e d ) TO P G a s M a i n = 8 3 4 . 6 2 ( a s s u m e d ) IN V G a s M a i n = 8 3 4 . 2 9 ( a s s u m e d ) ST M T O P @ G a s C r o s s i n g = 8 3 0 . 2 4 ST M I N V @ G a s C r o s s i n g = 8 2 8 . 7 4 Se p a r a t i o n = 4 . 0 5 ' No a n t i c i p a t e d h o r i z o n t a l o r ve r t i c a l c o n f l i c t . Lo c a t i o n 3 4" S t e e l G a s M a i n Co v e r = 4 1 " TO P G a s M a i n = 8 3 4 . 1 7 IN V G a s M a i n = 8 3 3 . 8 4 ST M T O P @ G a s C r o s s i n g = 8 3 1 . 1 8 ST M I N V @ G a s C r o s s i n g = 8 2 9 . 6 8 Se p a r a t i o n = 2 . 6 6 ' No a n t i c i p a t e d h o r i z o n t a l o r ve r t i c a l c o n f l i c t . Lo c a t i o n 6 2" P E G a s M a i n Co v e r = 2 6 " TO P G a s M a i n = 8 3 3 . 9 5 IN V G a s M a i n = 8 3 3 . 7 8 ST M T O P @ G a s C r o s s i n g = 8 3 3 . 9 4 ST M I N V @ G a s C r o s s i n g = 8 3 2 . 7 1 Se p a r a t i o n = 0 . 0 0 ' Po t e n t i a l H o r i z o n t a l c o n f l i c t . V er t i c a l C o n f l i c t E x i s t s . Lo c a t i o n 4 4" S t e e l G a s M a i n Co v e r = 2 8 " TO P G a s M a i n = 8 3 7 . 3 7 IN V G a s M a i n = 8 3 7 . 0 4 ST M T O P @ G a s C r o s s i n g = 8 3 6 . 0 2 ST M I N V @ G a s C r o s s i n g = 8 3 4 . 7 9 Se p a r a t i o n = 1 . 0 2 ' No a n t i c i p a t e d v e r t i c a l c o n f l i c t . Po t e n t i a l H o r i z o n t a l c o n f l i c t . Lo c a t i o n 5 4" S t e e l G a s M a i n Co v e r = 2 4 " TO P G a s M a i n = 8 3 9 . 1 7 IN V G a s M a i n = 8 3 8 . 8 4 ST M T O P @ G a s C r o s s i n g = 8 3 7 . 7 9 ST M I N V @ G a s C r o s s i n g = 8 3 6 . 5 6 Se p a r a t i o n = 1 . 0 5 ' No a n t i c i p a t e d v e r t i c a l c o n f l i c t . Po t e n t i a l H o r i z o n t a l c o n f l i c t . ITB-2 1.5. The Unit Cost Schedule included as “Part 3” in Section 5.3.1 hereof is to be completed for the Project Bid. The construction completion time is shown in Technical Specification paragraph TS 2 and is as follows: Project Start Date: Start Date:  Anticipated Notice to Proceed – On or before April 20, 2016 May 4, 2016 Final Project Completion Date: Completion Date: 90 days from the Notice to Proceed. 2. DEFINITIONS The following definitions shall apply to these Instructions To Bidders (ITB): 2.1. Bidder - Any person or entity who submits a Bid. 2.2. Bid - A written proposal submitted by a Bidder as part of the form prescribed herein offering to perform and complete the Work and to fulfill all other requirements of the Contract Documents for one or more specified prices. 2.3. Bid Documents - All Documents and completed forms required to be submitted by a Bidder with and as integral parts of a Bid Submission, whether or not included as sample forms assembled in the Project Manual of which these Instructions To Bidders are a part. Such Bid Documents are listed and more fully described in ITB Section 5.3 hereof. 2.4. Bid Date - The date when Bids are to be received, opened and publicly read aloud as established by the Notice To Bidders as may be modified by Addenda. 2.5. Bid Submission - All Documents presented by a Bidder for receipt and opening on the Bid Date. 2.6. Contract Documents - The Agreement and any exhibits thereto (sometimes referred to as “Contract”), Addenda (which pertain to the Contract Documents), Instructions to Bidders, Advertisement, Notice to Bidders, Contractor’s Bid (including Documentation accompanying the Bid and any post-Bid Documentation submitted prior to the Notice of Award), Notice to Proceed, the Bonds, the Standard General Conditions, the Additional Requirements Section, any supplemental conditions, the Specifications and the Drawings as the same are more specifically identified in the Agreement. 2.7. ENGINEER - The City of Carmel, acting by and through its Board of Public Works and Safety. 2.8. OWNER - The City of Carmel acting by and through its Board of Public Works and Safety and the Department of Engineering. TS-1 TECHNICAL SPECIFICATIONS TS 1 GOVERNING DOCUMENTS The applicable sections of the following documents shall apply except as modified elsewhere herein: 1) Indiana Department of Transportation (INDOT) Standard Drawings and Standard Specifications – 2014. 2) INDOT Supplemental Specifications 3) City of Carmel - Standards for Construction of Required Improvements Unless otherwise specified within the Contract Documents, whenever any specification, standard, reference material, manual or other similar document is incorporated by reference into any of the contract documents, it shall be deemed to be the latest edition of said item including any and all supplemental addendum, which was in effect on the date of the bid opening for this project. TS 2 COMPLETION DATES AND LIQUIDATED DAMAGES Final Project Completion: Ninety (90) calendar days from the issuance of the Notice to Proceed. It is anticipated that the Notice to Proceed for the project will be issued on, or before, April 20, 2016 May 4, 2016. Construction and or material ordering can begin immediately after the Notice to Proceed has been issued. All road closures must meet the requirements of TS 15. Liquidated damages of $1000.00 per calendar day will be charged for failure to complete all Project 16-02 contract work within the contract time. Additional liquidated damages of $1000.00 per calendar day will be charged for failure to complete any Project 16-02 road closures within the road closure times indicated in the Contract Documents. TS 3 PROJECT PHASING The CONTRACTOR shall complete work in accordance with the following Phasing Plan, and as indicated in the Project 16-02 Contract Documents: PHASE I: Installation of all work associated with the connection to the Monon Sewer, underground detention system, outlet structure (Str. #55), stubs into the underground detention system, and the diversion structure (Str. #53A and 53B) and all work associated with the existing building demolition including building demolition sidewalk, steps, railings, walls, foundations, as. DURATION = 20 days TS-11 damaged. If any of these structures are damaged, the CONTRACTOR shall be required to repair them at his own expense. Yard tile encountered and affected by the scope of work specified within the Contract Documents shall be given a positive outlet. Any tile damaged by the CONTRACTOR's operations shall be replaced by the CONTRACTOR at his own expense. TS 14 RIGHT-OF-WAY CLEARING Clearing Right-of-Way shall be in accordance with the requirements of Section 201. Cavities formed by the removal of shrubs, trees and/or stumps and located outside of proposed pavement areas shall be backfilled and compacted with approved material. Such compaction shall comply with Section 211.04. The top six (6) inches of the backfilled area shall be topsoil in accordance with TS 23. The cost of tree and stump removal, landscape and fence removal, and all other removals required to install the proposed improvements, and any other items within the right-of- way that are not paid for in other pay items, or as directed by the ENGINEER, will not be paid for directly, but shall be included in the lump sum price for Clearing Right-of-Way. The cost of all existing street pavement removal, asphalt driveway and parking lot removal, concrete drive removal, and gravel drive removal will not be paid for directly, but shall be included in the cost of other items. The cost of all required pipe removal, storm and sanitary, and all storm structures necessary for the installation of the proposed improvements and as indicated on the plan, or at the direction of the ENGINEER, will not be paid for directly, but shall be included in the cost of other items. The cost of all required pavement removal, casting removal and concrete barrel/section removal required for the capping and filling of structures and pipes as indicated on the plans, or at the direction of the ENGINEER, will not be paid for directly, but shall be included in the cost of other items. All landscaping features, blocks, bricks, decorative stones, bird baths, statues, decorations, potted plants, etc. are to be salvaged per the homeowner’s direction in order to be reset by the homeowner. The CONTRACTOR shall coordinate with the homeowner on which items are to be salvaged prior to removal of the landscaped areas. TS 15 MAINTAINING TRAFFIC Maintenance of traffic shall be the sole responsibility of the CONTRACTOR. Access and traffic to all businesses, residences, for all postal deliveries and all emergency traffic such as police, fire, medical, etc. within the project limits, shall be maintained at all times. Unless otherwise directed, or permitted, the work specified shall be arranged and prosecuted in accordance with all applicable provisions of Sections 104.04, 107, 801 and as set out in INDOT Standard Specifications. TS-12 The names and telephone numbers of the CONTRACTOR'S superintendent and one other responsible employee shall be furnished at the pre-construction conference. These employees shall be on call and available at nights, weekends, or during other non- working periods to repair or replace all traffic control devices, which may become damaged or inoperative. In the event the CONTRACTOR desires not to perform traffic maintenance in accordance with the sequence of operations as called for within the Contract Documents, CONTRACTOR shall submit his alternate plan in writing to the ENGINEER and obtain acceptance at least 1 week prior to the commencement of any construction activities. There will be two road closures required for this project. One of the road closures will be a full closure on 3rd / 4th Avenue SW from Industrial Drive to 2nd Street SW, which will be Phase II of the project (refer to TS-3 Project Phasing) for the sanitary sewer relocation and a portion of the storm sewer installation. The other will be a road closure to thru- traffic on Emerson Road from Sherman Drive to 4th Ave. SW, on York Drive and on Park Lane, which will be Phase III of the project. There will also be a temporary closure to the Monon Trail for this project. This closure will be Phase I of the project (refer to the TS-3 Project Phasing) for the storm sewer installation and connection to the Monon Storm Sewer. Coordination shall be completed with the OWNER and ENGINEER prior to any disturbance to the Monon Trail to determine if any detours, construction signage, or temporary trail pavement will be necessary. The cost of all work associated with advance notification signage, construction and detour signage, and any temporary pavement or other maintenance of traffic measures necessary to maintain access to the Monon Trail throughout the entirety of the project will not be paid for directly, but shall be included in the lump sum cost of Maintenance of Traffic. There will also be a temporary Monon Trail bypass installed to maintain Monon Trail connectivity during Phase I of the project (refer to the TS-3 Project phasing) for the storm sewer installation and connection to the Monon Sewer. This work shall include placing and maintaining temporary barrels, barricades, advance notification signage, or other maintenance of traffic measures necessary to maintain access to the Monon Trail through the entirety of the project. The cost for this work will not be paid for directly, but shall be included in the lump sum cost of Maintenance of Traffic. The required street closures for the project shall in accordance with the Construction Plans and Project 16-02 Contract Documents. The CONTRACTOR shall post an advance closure construction sign that notifies the traveling public of a road closure and the duration of the closure at least 14 days in advance of the road closure, unless otherwise approved by the ENGINEER. The advance closure construction sign legend shall generally state that the named road or street will be closed on or after a specific date for a number of days. The signs shall be placed as shown on the plans of as directed by the ENGINEER. The required temporary Monon Trail closure bypass for the project shall be in accordance with the Construction Plans and Project 16-02 Contract Documents. The CONTRACTOR shall post an advance closure notification construction sign that notifies the public of the Monon Trail closure and the duration of the closure at least 14 days in TS-13 advance of the Monon Trail closure bypass, unless otherwise approved by the ENGINEER. The allowable duration of road closures and trail closures for this project are as follows: PHASE I: - Monon Trail Closure Bypass – 5 days PHASE II: - 3rd / 4th Avenue SW Closure - 20 days PHASE III: - Emerson Road Closure - 50 days - Park Lane Closure - 50 days - York Drive - 50 days Should the CONTRACTOR propose an additional street closure, he shall submit a written request to the ENGINEER for review and acceptance at least 2 weeks prior to the planned closure. The ENGINEER will give written notification of the acceptance or denial of any maintenance of traffic proposals and, if approved, will inform the City of Carmel, which will give notice to all public agencies and businesses within the project area. The failure to accept the request, as long as the decision is reasonable, shall not entitle the CONTRACTOR to an extension in contract time or to an increase in contract price. Open trenches, if permitted by the ENGINEER, shall be spanned per current OSHA requirements and with the concurrence of the ENGINEER. Any trenching areas adjacent to a sidewalk shall be barricaded. The CONTRACTOR shall be prepared to have all construction signs erected for the project as specified by the ENGINEER. All temporary traffic control devices including but not limited to advance warning signs, flagger stations, channelizing devices, temporary stone and steel plates to maintain access, etc. shall include all labor, equipment, materials, adjustments, etc. necessary for the maintenance of traffic as called for within the Contract Documents, or as permitted by the ENGINEER shall be included in the lump sum price for ‘Maintenance of Traffic’, as set out in the itemized proposal. The advance closure construction signs shall be in accordance with Section 801 of the INDOT Standard Specifications and shall be included in the cost for Maintenance of Traffic. CONTRACTOR is to utilize the typical MOT layout as specified in the plans when work operations warrant closing one lane. Flagging operations shall be provided by the CONTRACTOR per the MUTCD for one lane traffic. Materials required for operations shall be removed from the roadway by the CONTRACTOR at the end of each day of operations. The CONTRACTOR shall maintain vehicular movement and establish an acceptable bridge to span all open cuts for street crossings by using temporary stone, steel plates, or a method approved by the ENGINEER. CONTRACTOR must establish acceptable vehicular bridging prior to beginning work on the opposite lane. If temporary TS-14 backfill is used to bridge street cut gaps, the material must be removed and the applicable material shall be placed per the City of Carmel Standard Drawing 10-20 “Street Cut Repair Detail” as shown on the plans. CONTRACTOR is to coordinate with the ENGINEER and the City of Carmel for schedules of other projects under construction at the same time, specifically project “16- SW-12 – Carmel View Drainage Improvements”, for any MOT concerns and coordination, including but not limited to proposed detour overlaps, detour routes under construction, determining alternate detour routes or MOT setup. CONTRACTOR shall submit a written request to the ENGINEER for review and acceptance for any detour route or MOT revisions. The ENGINEER will give written notification of the acceptance or denial of any maintenance of traffic proposals, and if approved, will inform the City of Carmel, which will give notice to all public agencies and businesses within the project area. The failure to accept the request, as long as the decision is reasonable, shall not entitle the CONTRACTOR to an extension in contract time or to an increase in contract price. TS 16 CONSTRUCTION ENGINEERING This work shall include all construction layout work for the project. Construction Engineering for the project will be provided by the City of Carmel. The CONTRACTOR shall provide a minimum of 48 hours of advance notice when Construction Engineering is required. It shall be the responsibility of the CONTRACTOR to complete the verification of the elevations and measurements of all points where new construction is to match existing conditions prior to the commencement of any construction activities. This work will not be paid for directly, but shall be included in the cost of other items. TS 17 UNDISTRIBUTED ITEMS Quantities of undistributed items needed in addition to those shown on the itemized proposal and approved by the ENGINEER will be paid for at the contract unit price for the quantity used on the project. There shall be no adjustment in the contract unit price if quantities are less than those shown on the itemized proposal and the item can be deleted entirely without impact to the contract amount. All work involving undistributed items shall be performed only at the direction of the ENGINEER. TS 18 OPEN BURNING OF NATURAL GROWTH Open burning of natural growth is not permitted on this contract. TS 19 STREET CLEANING The CONTRACTOR shall provide effective dust control throughout the project. Vacuum sweepers shall be used for all street cleanings. Vacuum sweeping shall be performed prior to the pre-final meeting as directed by the ENGINEER. TS-21 All existing concrete manholes/inlets shall be core drilled as specified by the ENGINEER. All breaking into manhole/inlet, pipe, concrete, etc. required for construction of the sewer shall be included in the cost of other items. TS 38 PAYMENT FOR DRIVES When the existing drive is concrete or asphalt, the existing drive shall be sawed at the proposed locations or at locations as directed by the ENGINEER. No direct payment shall be made for the saw cutting or removal of any type of drive, but the cost thereof shall be included in the cost of other items. TS 40 HMA SURFACE, 9.5mm, 1.5” This work shall consist of the work necessary to replace street cut areas that were excavated to install the proposed storm improvements and the installation of the temporary Monon Trail bypass. The replacement materials will match back into the existing grades as shown on the plans or as directed by the ENGINEER. The costs for material, delivery, placement, compaction, labor, equipment, and any necessary incidentals with HMA surface installation for street cut and asphalt drive repair shall be included in the unit cost for HMA Surface, 9.5mm, 1.5”, Storm Sewer or HMA Surface, 9.5 mm, 1.5”, Sanitary Sewer per ton of material. The removal and disposal of existing pavement will not be paid for directly; rather, shall be included in the cost of other items. An asphalt tack coat shall be applied between each course of HMA material or as directed by the ENGINEER. Asphalt tack coat shall also be applied in areas of asphalt street cut repair and driveway patching repair where HMA Surface is installed on a concrete slab. Prevailing Specifications: INDOT 401, 402 Additions: The HMA surface course shall not be placed until all new pavement areas within the project limits, including mainline, approaches and areas of incidental construction, have been completed and are ready, in the opinion of the ENGINEER, for the HMA surface course. TS 41 HMA INTERMEDIATE, 19.0mm, 2.5” This work shall consist of the work necessary to replace the parking lot cut areas that were excavated to install the proposed storm improvements through the Indiana Bell Telephone Company’s parking lot (Parcel #16-09-25-04-05-001.000). The costs for material, delivery, placement, compaction, labor, equipment, and any necessary incidentals with HMA intermediate installation for parking lot cut repair shall be included in the unit cost for HMA Intermediate, 19.0mm, 2.5”, Storm Sewer per ton of material. The removal and disposal of existing pavement will not be paid for directly; rather, shall be included in the cost of other items. TS-24 The costs for concrete, excavations, removal of material, labor, equipment, backfill material, joint placement, any bed course material used for leveling, preparation of a compacted subgrade, and any necessary incidentals with concrete curb installation shall be included in the cost of ‘Curb Removal and Replacement’. When unsuitable material prevents achieving the desired compaction, these areas shall be excavated and replaced with Compacted Aggregate Base, No. 53 to the desired compaction at the direction of the ENGINEER. The costs for excavation, material, placement, and compaction shall be included in the pay item Compacted Aggregate Base, No. 53. TS 48 REMOVE AND RESET FENCE The removal and resetting of fence as shown in the plans or as directed by the ENGINEER will be paid for under the “Remove and Reset Fence” item. The CONTRACTOR shall be responsible for maintaining and storing all fence items that are removed from their respective places during construction. Any sign, post, hardware, etc. damaged after the fence has been removed shall be replaced and paid for by the CONTRACTOR before being reset at the end of the project. TS 49 COMPACTED AGGREGATE FOR DRIVEWAYS This work shall consist of the work necessary to replace gravel drive approaches that were excavated to install the proposed storm improvements. The replacement materials will match back into the existing grades as shown on the plans or as directed by the ENGINEER. The costs for material, delivery, placement, and compaction of the compacted aggregate for gravel drives shall be paid for with the item Compacted Aggregate for Driveways per ton of material. The removal and disposal of existing gravel drive material shall not be paid for directly; rather, shall be included in the cost of other items. TS 50 COMPACTED AGGREGATE, NO. 53 STONE This work shall consist of the work necessary to install compacted base material for the replacement of the concrete drive approaches that were excavated to install the proposed storm improvements, compacted base material for the replacement of the parking lot cut that were excavated to install the proposed storm improvements through the Indiana Bell Telephone Company’s parking lot (Parcel #16-09-25-04-05-001.000) and the temporary Monon Trail bypass. The costs for material, delivery, placement, and compaction of the compacted aggregate for the replacement of concrete drives and parking lot and shall be paid for with the item Compacted Aggregate for Driveways per ton of material. The removal and disposal of existing concrete drives and parking lot material shall not be paid for directly; rather, shall be included in the cost of other items. BID-4 PART 3 CONTRACT ITEMS AND UNIT PRICES [This Part to be used only for Bidding on Unit Price Contracts for the Contract Items shown] Base Bid Itemized Proposal (16-02) Emerson Road Storm Sewer Reconstruction STORM SEWER Item # Item Quantity Unit Unit Cost Total Cost 1 Mobilization / Demobilization, Storm Sewer 1 LS 2 Maintenance of Traffic, Storm Sewer 1 LS 3 Clearing Right of Way, Storm Sewer 1 LS 4 Curb Removal and Replacement, Storm Sewer 250 LFT 5 Sidewalk Remove and Replace, Storm Sewer 35 SYS 6 Curb Ramp Remove and Replace, Storm Sewer 21 SYS 7 Sign, Remove and Reset 4 EA 8 Fence, Remove and Reset 72 LFT 9 Remove and Reset, 3" Caliper Tree (437 Emerson Rd.) 1 EA 10 PCCP for Drive Patching - 6" 170 SYS 11 Concrete Cap for Street Cut Repair - 12", Storm Sewer 320 SYS 12 Flowable Fill for Street Cut Repair, Storm Sewer 325 CYS 13 HMA Surface, 9.5 mm, 1.5", Storm Sewer 50 TON 14 HMA Intermediate, 19.0 mm, 2.5", Storm Sewer 10 TON 15 Compacted Aggregate, No. 53 Stone 147 TON 16 Compacted Aggregate for Driveways 20 TON 17 8" PVC 26 LFT 18 12" RCP 939 LFT 19 15" RCP 414 LFT 20 24" RCP 221 LFT 21 30" RCP 523 LFT 22 36" RCP 607 LFT BID-5 23 Inlet, Type 'J'/'M' 14 EA 24 Inlet, Type 'E' 2 EA 25 Inlet, Type 'B'/'C' 2 EA 26 Manhole, Type 'C' 16 EA 27 Manhole, Type 'J' 11 EA 28 Manhole, Type 'K' 4 EA 29 Manhole, Type 'K', Doghouse 1 EA 30 Stormwater Quality Unit 1 EA 31 Underground Detention System 1 LS 32 Mechanically Core Existing Structure, Storm 2 EA 33 Structure Backfill for Storm Sewer 3544 CYS 34 Topsoil (undistributed) 762 CYS 35 Mulched Seeding, Storm Sewer 4571 SYS 36 EC Measures 1 LS 37 Flowable Fill for Existing Storm Sewer 40 CYS 38 Cap Existing Pipe, Storm Sewer 14 EA 39 36" Red Valve CheckMate Slip-In Tideflex Inline Check Valve 1 EA 40 Existing Building Demolition 1 LS Storm Sewer Subtotal SANITARY SEWER 41 Mobilization / Demobilization, Sanitary Sewer 1 LS 42 Maintenance of Traffic, Sanitary Sewer 1 LS 43 Clearing Right of Way, Sanitary Sewer 1 LS 44 Curb Removal and Replacement, Sanitary Sewer 80 LFT 45 Sidewalk Remove and Replace, Sanitary Sewer 4 SYS 46 Curb Ramp Remove and Replace, Sanitary Sewer 14 SYS 47 Concrete Cap for Street Cut Repair - 12", Sanitary Sewer 350 SYS 48 Flowable Fill for Street Cut Repair, Sanitary Sewer 752 CYS BID-6 49 HMA Surface, 9.5 mm, 1.5", Sanitary Sewer 30 TON 50 Sanitary Manhole, Type 1 1 EA 51 Sanitary Manhole, Doghouse 1 EA 52 15" SDR 26 Sanitary Sewer (12' - 14', including backfill) 419 LFT 53 Mechanically Core Existing Structure, Sanitary 1 EA 54 Cap Existing Pipe 1 EA Sanitary Sewer Subtotal Total Itemized Proposal E-VERIFY PROGRAM Pursuant to Indiana Code 22-5-1.7-11, the Vendor is required to enroll in and verify the work eligibility status of all newly hired employees through the E-Verify program. The Vendor is not required to verify the work eligibility status of all newly hired employees through the E-Verify program if the E-Verify program no longer exists. The individual person(s) executing this Agreement, being first duly sworn, depose(s), state(s) and affirms the following: 1. The Vendor does not knowingly employ an unauthorized alien. 2. The Vendor, prior to entering into this Agreement, has enrolled and is participating in the E-Verify program. The Vendor shall provide documentation to the administrator of the Hamilton County Community Development Block Grant Program and the City that the Vendor has enrolled and is participating in the E-Verify program. Vendor: __________________ Written Signature: Printed Name: Title: Important - Notary Signature and Seal Required in the Space Below STATE OF _____________________ SS: COUNTY OF ____________________ Subscribed and sworn to before me this ______ day of _____________________, 20 ___. My commission expires: _________ (Signed)____________________________ Printed:_____________________________ Residing in ___________________ County, State of______________________