Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
I400 - STAIR DEMOLITION PLANS.pdf
75CS5EXS75CS5EXS Project Number: Sheet Title: Issue Date: Sheet Number: Project:CARMEL, INDIANA 46032By: Architect: Architecture / Project Managment: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone)FERGUSON/REESE KITCHENSDrawn By Checked ByPrint Date Revisions: COPYRIGHT & OWNERSHIP OF DOCUMENTS 200 SOUTH RANGE LINE ROADSUITE 101/201INDIANA DESIGN CENTERI400 STAIR DEMOLITION PLANS Parcel 12 PEDCOR DESIGN GROUP, LLC 9/29/16 CONSTRUCTION DOCUMENTS THIS DOCUMENT IS AN INSTRUMENT OF SERVICE AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. © COPYRIGHT 2006, 2007, 2008, JAMES R. STUTZMAN, AIA, CARMEL. 9/30/16 STATE RELEASE SET 9/30/16 KEY PLAN SCALE: N.T.S. FIRST FLOOR N A.1 C EBA.5A A.2 D 8 8.1 10 11 9.1 9.9 10.9 10.85 9 A.1 C EBA.5A A.2 D 8 8.1 10 11 9.1 9.9 10.9 10.85 9 LINE OF SOFFIT LINE OF SOFFITLINE OF SOFFIT16' UNISTRUT 8' UNISTRUT8' UNISTRUT8' UNISTRUT8' UNISTRUT 8' UNISTRUT8' UNISTRUT10' UNISTRUT 10' UNISTRUT 4' UNISTRUT 4' UNISTRUT4' UNISTRUT6' UNISTRUT REMOVE AND REPAIR DRYWALL CEILING AND DEMISING WALL AS NEEDED TO INSTALL NEW STRUCTURAL BEAMS. REMOVE THE LIGHT FIXTURES, WIRING, AND UNISTRUT IN THE STRUCTURAL STEEL AND FLOOR OPENING AREAS. RERUN WIRING TO ANY LIGHTS TO REMAIN AS REQUIRED. A A A ABB NL BBBBB BBBBB V V REROUTE THE HVAC DUCTWORK IN THE STRUCTURAL STEEL AND FLOOR OPENING AREAS. RELOCATE FIRE SPRINKLER PIPES AND FIRE SPRINKLERS AS REQUIRED. UNIT 6 UNIT 4 UNIT 2 UNIT 1 UNIT 3 UNIT 5 UNIT 7 SCALE: 1/8" = 1'-0" 1 1ST FLOOR REFLECTED CEILING PLAN I400 SCALE: 1/8" = 1'-0" 2 1ST FLOOR HVAC PLAN I400 FERGUSON/ REESE N N