HomeMy WebLinkAbout0001.01 State ReleaseProject number
Release date
arE:eT. CONSTRUCTION DESIGN RELEASE
277161
12/05/00
e`<. "'tio State Form 41161 (R9/5-98)
:v
Construction type
YP
Occupancy classification
P Y
n Report Printed on: Decembers, 2000
"''\ /,
EXST
M, ADD
_,
Scope of release
lel6
Indiana . Department of,Fire,and Building' Services
FDN
STR
PLAN REVIEW DIVISION
Type of release
Office of the StateBuilding Commissioner
402 W. Washington. St., Room E245
Partial
Indianapolis, Indiana 46204 701621
Project name
To: Owner / Architect / Engineer
CARMEL ACE HARDWARE
HAROLD SARK & ASSOCIATES
Street address
HAROLD'SARK 00296
731 S RANGE LINE RD
9429:ARONSON DR
INDIANAPOLIS IN 46240
City
County
CARMEL
HAMILTON
The, plans specifications and,application submitted for the above referenced proiect have been reviewed for compliance with the applicable rules of
the FirePrevemon and BuildingSafety Commission. The ;project 'is released for constmctiomsubject to; but not necessarily limited to, the conditions. _
listed below: THIS IS NOT'A'BUILDING PERMIT. All required local permits' and licenses rnust be obtained prior to beginning constnichdn work
`- .._ - -
,All construction work�rnust,be in�•full compliance with all applicable State rules. Any changes in the released plans and/or specifcations must be filed
with and released by thisioffice before any work is altered_This release may be suspended or revoked if if is determined to be issued in.error, in
,violation ofany .rules of. the Commission orifitis based on incorrect or'insuffcient information. This release shall expire by limitation, and become null
and void; if the work, authorized is not commenced within�one (11 year from the above date.
CONDITIONS:
Notel:(A1A _&:Al B): In accordancewiththe affidavit sworn under penalties of perjury in the,app ical tion for construction design release the plans
and specifications filedin conjunction with this project shall'comply, with all of the applicable rules and laws of Fire Prevention and Building Safety
Commission: Providing false information' constitutes an act of perjury; which is a Class D felony punishable by a prison term and a fine up to
$10,000.
4GO615AI Architectural system remainsao be reviewed and released in accordance with 675 IAC 12-6-15.
4GO607AV A dimensioned floor plan shall be -submitted in accordance with 675 IAC 12-6-7(h)(3).
4GO603AG This release does not include electrical, mechanical, and plumbing work. Plans and specifications for
adding or remodeling these systemsshall be filed as a new project or as one or more partials before
commencing work in accordance with 675 IAC 12-6-3.
4130615A This is a partially submitted and released project: Subsequent submittals shall be accompanied by a
completed standard / partial form,(ACDR) and proper, fees in accordance ,vith 675 IAC 12-6-15(c).
8BO505A To maintain an unlimited area building, the building shall be provided with an approved. automatic
sprinkler system throughout, and.be:entirely surrounded and adjoined by public ways or yards not less
---than. 60,feet: in -width-in accordance with Section 505.2, IBC (675 IAC 13-2.3).
861866A Footings shall have a minimum depth as specified in Table 18-1-C in accordance with Section 1806.1,
IBC (675 IAC 13-2.3).
Please be advised that if an administrative review of this'. actiomis,desired, a written petition for reviews must be,filed at the above address with the
Fire Prevention and Building Safety Commission identifying`,the matter for which aseview is sought nolater than eighteen' (18) days from the above -
stated date; unless the eighteenth day falls on atSaturday, a,Sunday, alegal holiday,under State statute, or a day in which the Department of Fire
and Building Services is closed during normal business hours. in the latter. case; the filing deadline -will be the, funs working day thereafter. If you
choose to.petition, and thebefore-mentioned procedures are.followed,.your petition for review will`be granted, and an administrative proceeding will
be conducted by an administrative law judge ofthe Fire'Prevention.and Building:Safety Commission.. if a petition for review is noffiled, this Order will
be final, and you must comply with its requirements: '
A setof documents released by this office shall be maintained on the construction site until the structure is. occupied. Please -post acopy o�
this release on the construction jobsite to comply withAhe.requirement for posting -a placard (6751AC 12-6-19)
Attachments
Code review official
CRAYTON
(name,titleof local official,street,city,state and ZIP code
DEPT OF COMMUNITY DEVELOPMENT
ONE CIVIC SQUARE
CARMEL, IN 46032
277161
701621
rage vt