HomeMy WebLinkAboutMunicipal & Contractors Sealing Products/Eng/ CO #3/100,550/Carmel Linings Project 16-SW-08CITY OF CARMEL
TO: Municipal & Contractors Sealing Products
7740 Reinhold Drive
Cincinnati, OH 45237
CONTRACT CHANGE ORDER NO.: 03
DATE:
w?
PROJECT NAME: SW -16-08
CITY REQ. NO.:
CITY PO NO.: 34292
CITY PO DATE: 8/17/2016
I. You are directed to make the following changes in this Contract:
See attached supplemental description.
SCHEDULED ADJUSTMENT
ITEM AMOUNT H OR (-) DAYS
EW 01 Pipe Lining, 12" (Prestwick Lane) 400.0 LFT $51,250.00 *0 Days
EW 02 Pipe Lining, 21" (Prestwick Lane) 300.0 LFT $47,500.00 *0 Days
EW 03 Pond Pumping (Crooked Stick CC) 1.0 LS $1,800.00 *0 Days
*SEE SUPPLEMENTAL DESCRIPTION FOR APPLICATION OF TIME
II. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other:
Scope changes due to unforeseen conditions — see supplemental description attached.
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order
$ 604,692.61
Contract Price will be increased/decreased by this Change Order $ 100,550.00
New Contract Price including this Change Order $ 705,242.61
Contract Time Prior to this Change Order Completion Date 11/30/2016
Net increased/decreased resulting from this Change Order 17 Days
Current Contract Time including this Change Order Completion Date 1/18/2017
This Change Order is for full and- final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The- Above.Changes Are
Recommended
IMC.:Eneineering
ENGINEER
135 N. Pennsylvania St.. STE
2800
Address
Indianapolis, INI .46204
City/State/Zip
r,
�F• j #
Phone:SI-t -'i
Date: t Z 12d I}
The Above Changes Are
Accepted:
MCSP
CON'TRACT'OR
7740 Rcinhold'Dr.
Address
Cincinnati, OH *45237
City/State/Zip
By:
Date: �f`v
Approved:
dame Brainar r iNfavor
Nlary urke m'.
Lori 'atso , 4ember
Jere tman, Cited
A
CCtuastina S..Paul lei
Treasurer
Date:
EM
CITY OF CARMEL
PROJECT SW -16-08
CHANGE ORDER NO. 3
SUPPLEMENTAL DESCRIPTION
1. Item EW #01— Pipe Lining, 12" —Additional cost $51,250.00
This additional work based on video field measurements for Prestwick Lane (Crooked Stick —
Section 4). The added bid item is for 400 lineal feet CMP and includes pipe under Prestwick
Lane. This was 8% added cost to the current contract price.
2. Item EW #02 —Pipe Lining, 21" —Additional cost $47,500.00
3. This additional work based on video field measurements for Prestwick Lane (Crooked Stick—
Section 4). The added bid item is for 300 lineal feet CMP. This was 8% added cost to the
current contract price.
4. Item EW #03 —Pond Pumping (Crooked Stick GC) —Additional cost $1,800.00
This item is being added as a measure to lower the discharge pond for the 12" and 21" CMP
pipe being lined. The normal water line elevations need to be lowered in order to pull the
liner resin through the pipe for curing. This is less than .5% added to the current contract
price.
Total Increase to the current contract amount = $100,500.00 or 16.6% overall cost increase.
NOTE: Additional time calculation is based on the following:
Current contract price $604,629.61/ 105 calendar days
Say - $5,759.00 per day project cost
Current CO price $100,550.00/ 5,759 cost per day
Added days =17 calendar days
I have added the extra days beginning at 1/3/2017 due to the fact the current scope of work
was completed by the previous completion date. The new time is being added based on the
proposed schedule to complete the added scope of work.