HomeMy WebLinkAboutE& B Paving/Eng/ CO #7/2,476.87/136th & Carey RABCITY OF CARMEL
TO: CONTRACT CHANGE ORDER NO.: 7
E&B Paving, Inc. DATE: October 27, 2016
17042 Middletown Ave. PROJECT NAME:_ _ 136`h St. & Carey RAB
Noblesville, IN 46060 CITY REQ. NO.: 16 -ENG -26
CITY PO NO.:
CITY PO DATE:
I. You are directed to make the following changes in this Contract:
Chemical Modifier Adjustment item added to the contract for an additional
lime kiln dust required for IB subgrade treatment item.
SCHEDULED ADJUSTMENT
ITEM AMOUNT+) OR (-) DAYS
EW Item #107 Chemical Modifier Adjustment 2783 Sys OD $0.89 = $2,476.87 0 Days
II. The following referenced Documents further describe the changes outlined in Paragraph I, and
are to be considered a part of this Change Order: R.F.P.: N/A I W.D.C. No.: N/A
Other: Attached itemized change order documents from E&B, Inc., Specialties, and
Altwitzig.
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $ 827 647.32
Contract Price will be increased/decreased by this Change Order $ 2,476.87
New Contract Price including this Change Order $_830.124.19
Contract Time Prior to this Change Order 45 Days _ Open to Traffic
Net increased/decreased resulting from this Change Order 0 Days
Current Contract Time including this Change Order 45 Days Open to Traffic
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are
Recommended
American Structurepoint, Inc.
ENGINEER
7260 Shadeland Station
Address
Indianapolis, IN 46256
City/State/Zip
By:
Au'&d 4
Phone: 317-547-5580
Date: 711K
The Above Changes Are
Accepted:
E&B Paving, Inc.
CONTRACTOR
17042 Middletown Ave.
Address
Noblesville, IN 46060
City/S to/Zi
By:
Phone: 317-773-4132
Date: l0 --?/ —l6
Approved:
J e Klhm E g.
h istine auley, CleW
Treasurer
Date:
To: City of Carmel
One Civic Square
Carmel, IN 46032
Attn: John Cox
E&B PAVING.onc
World -Class Solutions at a Local Levels"
ADDITIONAL WORK AUTHORIZATION # 5
Phone:
Fax:
317-285-9459
Project: 136th -Carey -Hawthorne RAB's
Location: 136th St and Carey Road
City: Carmel
Date: 10/25/2016
Job No: 02163505.
The following quoted prices are for additional work that is not a part of our original contract scope of work:
DESCRIPTION:
The following pricing is for additional lime needed to meet the requirements of the soil samples that were obtained and tested for
the stabilization of the road at 136th St and Carey Rd. Per the attached description, this amount is for the additional material.
Description Quantity Unit Unit Price Extension
EWA Additional Kiln Dust for Subgrade Treatment 1 B 2783 Sys $ 0.81 $ 2,254.23
Subtotal $ 2,254.23
10% of first $3,000.00 $ 225.42
7% of remainder
TOTAL $ 2,479.65
Additional Cost for Lime $ 0.89 *per sys
* this cost will be added to the original contract price for Subgrade Treatement
ADDITIONAL CHARGE FOR THE ABOVE WORK IS: $ 2,479.65
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. §d,476.97 Cale•19yd $
Date: Owner or Contractor Signature
90C-
(Authorized Representative)
We hereby agree to furnish labor and materials - complete in accords with the ecifications, at the above stated price.
E S B Paving, Inc., Authorized Signature Date: 10/25/16
THIS IS ADDITIONAL WORK AUTHORIZATION NO. 5
AN EQUAL OPPORTUNITY EMPLOYER
17042 Middletown Ave. • Noblesville, IN 46060
PHONE: 317.773.4132 • FAx: 317.773.4137
www.ebpaving.com
10/25/2016 IMI Mail - 136th & Carey Road Additional Material Cost Subgrade Treatement
�/ Il I CT,
l kaitt.c-HaaRS-", Ei -V'C� Steven Broermann <steve.broermann@ebpaving.com>
Group of Co111pa tics
136th & Carey Road Additional Material Cost Subgrade Treatement
1 message
Brad Schneider <brad. schneider@s pecialtiescom pany.com> Tue, Oct 25, 2016 at 10:59 AM
To: Steve Broermann <steve.broermann@ebpaving.com>
Cc: Susie Wood <susie.wood@specialtiescorhpany.com>, Andy -Eller <andy.eller@specialtiescompany.com>
Steve,
INDOT spec requires us to bid 5% kiln dust. Additional material is to be paid for by change order.
In this case, the testing required 7% kiln dust. So an addition 2%.
Per testing, the maximum natural dry weight is 108 lbs/cft.
Using that number, that application rate at 14" depth and 7% will be 79.4 lbs/syd.
2% of that 7% would equate to 22.7 lbs / syd.
Attached is our quote for $71.00/ton. 22.7 lbs/syd cost = $0.81/syd additional material cost.
Please let me know if you have any questions.
Thank you,
Brad
Brad Schneider, LS
Vice -President
Specialties Company, LLC
9350 E. 30th Street
Indianapolis, IN 46229
P: 317-594-0291
F: 317-594-0271
M: 317-502-6246
brad.schneider@specialtiescompany.com
Website: www.specialtiescompany.com
Twitter. @SpecialtiesCo
$ EClALMi
Cam a
Uc
Specialties Company LKD quote Carmel IN 10.25.2016 (1).pdf
140K
https://mail.google.com/mail/u/0/?ui=2&ik=d30e59b3O2&view=pt&search=inbox&th=l57fc5b24el630fe&siml=157fc5b24el630fe 1/1
13 West 2"`i Street - Maysville, KY 41056 — 606-564-5008 FAX -606-564-5012
October 25, 2016
Mr. Brad Schneider
Specialties Company, LLC
9350 East 30`h Street
Indianapolis, 1N. 46229
Dear Brad,
Omni Materials is pleased to provide the following quote for the supply of lime kiln dust
for your project in Carmel, IN. We quote as follows:
Materials
Material
Freight
Fuel
Total/Ton
Price/Ton
Rate/Ton
Surcharge
Black River
$42.00
$29.00
0%
$71.00
Lime Kiln Dust
• Payment Terms Net 30 Days
• Prices do not include tax if applicable. Customer is responsible
for sales tax until a sales tax exemption certificate is provided
prior to material delivery
• Fuel surcharges are subject to change
• Samples and specifications can be provided upon request
• 25 ton freight minimum
• Product is subject to availability
• Freight rates may increase or decrease depending on trucking
availability
Mr. Brad Schneider
Specialties Company, LLC
October 25, 2016
Page 2
By accepting this quote, you acknowledge (a) that you are solely responsible for the
application and use of the product, (b) that such application and use of the product is
based solely on your judgment and knowledge of the product, and (c) that no
representations or warranties of any kind whatsoever have been made to you concerning
the application and/or use of the product.
Please let us know if additional information is required. We can be reached as follows:
Office
606-564-5008
Office FAX
606-564-5012
Kevin Ireland- Mobile
812-304-0110
E-mail
kevin.ireland@omnimaterialsiilc.com
Sincerely,
�^ I1 1rfr�9
Kevin Ireland
CC. April Fisher
KW I/th
Alt & Witzig Engineering, Inc.
4105 West 99t1i Street • Carmel, Indiana 46032
(317) 875-7000 e Fax (317) 876-3705
Tested For:
Mr. Joe Hile, PE
Specialties Company, LLC
9350 East 3e Street
Indianapolis, IN 46229
Project:
136th Street & Carey Rd. Intersection Improvements
Carmel, IN
Hamilton County
Date: 10-04-16
Our Project No.: TZ 16133 -LTR
Executive Summary
Per your request, Alt & Witzig Engineering has performed a soil -chemical modification study on
the soil types obtained from the above referenced project to be utilized at subgrade elevation per
project specifications. The chemical modifiers utilized in the testing procedures are listed below:
• Cement — Lehigh Cement Company — Mitchell, IN
• Lime Kiln Dust — Carmeuse Lime & Stone Buffington, IN
Subgrade Treatment Recommendation —14" Chemical Soil Modification
Chemical Recommended: 7% LKD
Sample
Sample -
Spread
Optimum
As Received
Identification
Classification
Rate
Moisture
Moisture
Lb/,yd^2
Content %
Contents %
Sample #1
A-6 12 CLAY
74.2
20.3%
19.5%
Sample #2
i A-7-6 23 SILTY CLAY
74.2
24.1%
24.5%
Offices: Subsurface Investigation: and Foundation Engineering
Cincinnati, Ohio a Dayton, Ohio Construction Materials Testing and Inspection
Indianapolis a Evansville e Ft. Wayne 9 Lafayette 9 South Bend a Terre Haute, Indiana Environmental Services
136th Street & Carey Rd. Intersection Improvements — Carmel, IN
Specialties Company LLC
October 4, 2016
Page 2
Sample Collection
Two (2) soil samples were collected and delivered to our laboratory by a Specialties Company
LLC representative. It should be noted that Alt & Witzig Engineering, Inc was not present during
the sample collection process. The samples were collected from the intersection of 136th Street &
Carey Rd. The samples were not identified with reference to a "specific location (Line, station,
offset, etc.) and only identified as Sample #1 and Sample #2. According to the contractor, the
samples collected are representative of the soils to be utilized at the new design subgrade
elevation for this project.
Laboratory Testing
By request of the contractor, laboratory testing was performed in accordance with 1NDOT's most
recent publication of their "Design Procedures for Soil Modification or Stabilization" and ISS
215.
Sample #1
Eades & Grim pH testing indicated a minimum of 5.5 percent LKD to reach saturation (pH =
12.4) for the moderately to highly plastic A-6 Clay soils represented by Sample #1. Soluble
sulfate contents were below 1,000 ppm and Loss on Ignition (LOI) was not necessary based upon
visual examination. Moisture density relationships and unconfined compressive strength testing
was performed in accordance with INDOT guidelines using 5% & 6% LKD by dry unit weight,
as well as, 4% & 5% Cement by dry unit weight.
Sample #2
Eades & Grim pH testing indicated a minimum of 6.5 percent LKD to reach saturation (pH =
12.4) for the highly plastic A-7-6 Silty Clay soils represented by Sample #2. Soluble sulfate
contents were below 1,000 ppm and Loss on Ignition (LOI) was not necessary based upon visual
examination. Moisture density relationships and unconfined compressive strength testing was
performed in accordance with INDOT guidelines using 6% & 7% LKD by dry unit weight, as
well as, 5% & 6% Cement by dry unit weight.
136' Street & Carey Rd. Intersection Improvements — Carmel, IN
Specialties Company LLC
October 4, 2016
Page 2
Subgrade Treatment Recommendations
The moderately to highly plastic A-6 Clay soils represented by Sample #1 met the required
strength gains with the use of 6% LKD.
The highly plastic A-7-6 Silty Clay soils represented by Sample #2 met the required strength
gains with the use of 7% LKD.
Therefore, we recommend 7% LKD by dry unit weight be used for subgrade treatment of
areas represented by these soils collected for this project. We recommend a normalized
spread rate of 74.2 pounds per square yard for the entire project.
Double treatment may be necessary to aid in the acceptance of DCP results in the field.
Applying 34% LKD, allowing the soil chemical mixture to mellow for 24 HR, and then
applying the final 34% LKD.
14" Chemical Soil Modification — 7% LKD
Sample
Sample
Spread
Optimum
As Received
Identification.
-Classification"
Rate
Moisture.-
Moisture
:- Lb/Yd 2
Content %o
Contents %
Sample #1
A-6 12 CLAY
74.2
20.3%
19.5%
Sample #2
A-7-6 23 SILTY CLAY
74.2
24.1%
24.5%
Alternative Subgrade Treatment Recommendations
The moderately to highly plastic A-6 Clay soils represented by Sample #1 also met the required
strength gains with the use of 5% Cement.
The highly plastic A-7-6 Silty Clay soils represented by Sample #2 also met the required strength
gains with the use of 6% Cement.
Therefore, 6% Cement by dry unit weight may be considered for subgrade treatment of areas
represented by these soils collected for this project.
14" Chemical Soil Modification — 6% Cement
Sample ,
Sample
Spread
Optimum
As Received
Identification "
Classification
Rate ,
Moisture
Moisture
'Lb/yd^2 ' '
Content '%
Contents
Sample #1
A-6 12 CLAY
63.6
19.1%
19.5%
Sam le #2
A-7-6(23)SILTY CLAY
63.6
22.8%
24.5%
136th Street & Carey Rd. Intersection Improvements — Carmel, IN
Specialties Company LLC
October 4, 2016
Page 2
Closing Statement
Chemically treated soils must be at or above the optimum moisture content as determined by the
soil -chemical mixture. Site specific conditions, including anticipated weather during treatment,
stability of foundation soils, and in-situ moisture contents must be considered prior to subgrade
treatment. Site conditions that would adversely affect the chemical treatment should be brought
to the immediate attention of the project manager.
Approved chemicals to be incorporated in the field for stabilization or modification of the
subgrade shall be accomplished as per project specifications. The contractor shall account and
correct for all losses and equipment efficiencies that occur in the field to assure that the proper
chemical percentage is achieved. Please find a copy of our test results enclosed with this letter.
Sincerely,
HA
�p\SiE9
Z : a`Nob
Joshua W. Tinkle, E.I.T. s .�ao -337
David C. Harness, P.E.
Project: 136th St. & Carey Rd. Intersection Imp. A&W File #: TZ 16133 Sheet 1 of 2
Manager. D. Harness Client: Specialties Company LLC Project Description:
Soil Modification Study
Location: Carmel, IN Route 136th St. & Carey Rd.
Hamilton County INDOT Contract #:
, , , , , , , ,Specimen ID Specimen
Pill
Strength Specimen Data
Minimum M.C. @
ID Description
P
time of Compaction
LL PL PI Fines
DD (pcf) W% I %Comp.J PSI JPSIGaln
(%)
Sample #1
Cement -Soil Mixture - 4%
Cement 1
101.0
18.8
95.5
111
79
18.6
Sample #1
Cement -Soil Mixture - 4%
Cement ................................................
100.5
18.8
95.0
110
78
Sample #1
Cement -Soil Mixture - 5%
Cement 3 ........................
........................
99.9
19.2
95.5
146
114
19.1
Sample #1
Cement -Soil Mixture - 5%
Cement 4 ..
99.4
19.2
95.0.
144
112
Sample #1
Lime -Soil Mixture - 5%
Lime 1 .................................................
99.4
20.0
96.0
76
44
19.7
Sample #I 1
Lime -Soil Mixture - 5%
Lime 298.9
2.............
98.9
20.0
20.0
95.5
95.5
75
75
43
43
Sample #1
Lime -Soil Mixture - 6%
Lime 3,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,, ,,,,,,,,,,,,
98.2
20.5
95.6
92
60
20.3
Sample #1
Lime -Soil Mixture - 6%
Lime 4 ....................................................
97.7
20.5
95.1
91
59
Sami3le #1
A-6 (12) CLAY
Natural
102.5
17.5
95.0
33
17.5
35 20 - 15 � 81.6
Sample #1
Natural ....................................................
102.0
17.5
94.5
31
Sample #2
Cement -Soil Mixture - 5%
Cement 1 ..
...................... ............
95.2
22.4
96.7
107
73
22.2
Sample #2
Cement -Soil Mixture - 5%
Cement 2
94.7
22.4
96.2
105
71
Sample #2
Cement -Soil Mixture - 6%
Cement 3 ....................................
94.0
23.0
96.3
141
107
22.8
Sample #2
Cement -Soil Mixture - 6%
Cement 493.5
....................................................
23.0
95.8
139
105
Sample #2
Lime -Soil Mixture - 6%
Lime 1 ....................................................
92.6
23.6
95.8
68
34
23.5
Sample #2
Lime -Soil Mixture - 6%
Lime 2 ....................................................
92.1
23.6
95.3
67
33
Sample #2
Lime -Soil Mixture - 7%
Lime 3 ....................................................
91.5
24.1
95.5
86
52
24.1
Sample #2
Lime -Soil Mixture - 7%
Lime 4
91.0
24.1
95.0
84
50
Sample #2
A-7-6 (23) SILTY CLAY
Natural1..
96.9
21.2
96.0
34
21
43 21 22 � 95.5
AWAlt & Witzig Engineering, Inc.
4105 West 99th St.
Carmel, IN 46032
Soil/Chemical Modification Study
Telephone: 317-875-7000
Fax:
Project: 136th St. & Carey Rd. Intersection Imp.
A&W File #: TZ 16133
Sheet 2 of 2
........ Specimen ID Specimen
Pill ID Description
Strength Specimen Data
Minimum M.C. @
time of Compaction
LL PL PI Fines
DD (pcf) w% % Comp. PSI PSI Gain
N
Sample #2
Natural 2.
...................................................
96.4
21.2
95.6
33
Alt & Witzig Engineering, Inc.
i 4105 West 99th St.
- Carmel, IN 46032
Telephone: 317-875-7000
Fax:
Soil/Chemical Modification Study
135
130
■■■■■■■■■■■■■■WI
Description a .� .
■■■■■■■■■■■■■\V\■►
■■■■■■■■■■■■■LIMLMethod Method
■■■■■■■■■■■■■■■■■M
■■■■■■■■■■■■■■■■\\■tel.TEST RESULTS
Maximum Dry Density 105.8 PCF
Optimum Water Content 18.6 %
ATTERBERG LIMITS
iw
LL PL PI
■■■■■■■■■■■■■■■■r�■■\\\\;
■■■■■■■■■■■■■■■■■■■■La■\\
More,
Curves of 100% Saturation
or Specific Gravity Equal to:
2.80
2.70
2.60
85
A
75111111111111111111111111111111111111111111111�1
0 5 10 15 20 25 30 35 40 45
WATER CONTENT, %
Alt & Witzig Engineering, Inc. MOISTURE -DENSITY RELATIONSHIP
4105 West 99th St. Project Name: 136th St. & Carey Rd. Intersection Imp.
Carmel, IN 46032
Telephone: 317-875-7000 Location: Hamilton County
Fax: A&W File #: TZ 16133 INDOT contract #:
135
130
■■■■■■■■■■■E■N\
■■■■■■■■■■■■V♦m�. Source of Material
Description of Material Cement -Soil Mixture - 5%
■■■■■■■■■■■■■►\\■;
' ■■■■■■■■■■■■■L113 Method .. Method
■■■■■■■■■■■■■■\\\=,
■■■■■■■■■■■■■■ERM
■■■■■■■■■■■■■■■IMI
■■■■■■■■■■■■■■■LM
M -M --- l
110
U
CL
w 105
0
0
Alt & Witzig Engineering, Inc.
4105 West 99th St.
Carmel, IN 46032
Telephone: 317-875-7000
Fax:
TEST RESULTS
Maximum Dry Density 104.6 PCF
Optimum Water Content 19.1 %
ATTERBERG LIMITS
LL PL PI
Curves of 100% Saturation
for Specific Gravity Equal to:
2.80
2.70
2.60
20 25 30 35 40 45
WATER CONTENT, %
MOISTURE -DENSITY RELATIONSHIP
Project Name: 136th St. & Carey Rd. Intersection Imp.
Location: Hamilton County
A&W File #: TZ 16133 INDOT Contract M
t
A&W File#: TZ 16133
..
M.
MOISTURE-DENSITY
Alt • Witzig Engineering, Inc.
Project Name: 136th St. & Carey Rd. Intersection Imp.
.•
4105 West 99th St.
IN- 46032
7
rCarmel,
Telephon..
135
130
IM
1111111MUNWEN\■■■■\\\\. - . . - .
■■■■■■■■■■■■EN
■■■■■■■■■■■■E■ Description
Test MetWod
110
Alt & Witzig Engineering, Inc.
4105 West 99th St.
Carmel, IN 46032
Telephone: 317-875-7000
Fax:
Sample #1 Natural 1
A-6 (12) CLAY
AASHTO T99 Method A
TEST RESULTS
Maximum Dry Density 108.0 PCF
Optimum Water Content 17.5 %
ATTERBERG LIMITS
LL PL PI
35 20 15
Curves of 100% Saturation
for Specific Gravity Equal to:
2.80
2.70
2.60
20 25 30 35 40 45
WATER CONTENT, %
MOISTURE -DENSITY RELATIONSHIP
Project Name: 136th St. & Carey Rd. Intersection Imp.
Location: Hamilton County
A&W File #: TZ 16133 INDaT Contract #:
I- mea
M.
............................................
........................................■.....
.............................................
mom
mom
Alt Engineedng, Inc.
..
_ .., 32
Telephone:
AM File#: TZ 16133
..
■OMEN■■■■1\\
■■■■■■■■����■
■■■■i■■■\1i\►
■■■■■■■■■■E
MEMO■■■■l1\\■t
■■■■■■■■■EMM
■■■■■■■■■l►\\\\
■■■■■■■■■■\\Mil
■■■■■■■■■■i■1\\
■■■■■■■■■■■RN
■■■■■■■■■■■EME
■■■■■■■■■■■■M\��-
■■■■l■■■■■■■\\\iMEMEMMMEMEMMUMl
■■■■■■■■■■■■■RV
■■■■■■■■■■■■■E■LI\
■■■■■■■■■■■il■\\1�
■■■■■■■■■■■■■■NI■MMOMEMEMEMEMEME\
• • • ..
■■■■■■■■■■■■■■■■■MMMMMMMMMMMMMMMMMU
■�
■■■■■■■■■■■■■■■■■■■�
■■■■■■■■■■■■■■■■■MN
■■■■■■■■■■■■■■■■■UM
■■■■■i■■■■■■■iii■ii\��,
■■■iii■■■■■■■■■l■■■■■■\\\\►
■■■■■■■■l■■■■■■l■■■Eli:
\■\\\\\
■■■■■■■iii■■■■■■■■■■■■■■■■■■■■■�\\.
■iii■■■■■■■■■illi)■■■■■■■■■■■■■■■■ll\\►
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N\\..
■■■■■■■■■■■■■■■■ilii■ll■■■■■■■■■■■■l■iii■■■\�
■■■Alt
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�
MOISTURE-DENSITY RELATIONSHIP
& Witzig Engineering, Inc.
Project Name: 136th St. & Carey Rd. Intersection Imp.
4105 - 99th St.
46032
r-Carmel,-
A&W File#: TZ 16133
..
'
■■■■■■■■■■■■■■■■■■■■
Now \
■■■■■■■■■■■■■■■■■■■■
MEN \\\
.
■■■■■■■■■■■■■■■■■■■■■I■■■i�■■\\
.....................................
........................................
........................................:
........................................■.....
.............................................
.............................................
. ,
.,.
Project
,& ..
.., 32
Telephone:
AM File#: TZ 16133
..
off
.........................C■■■.■...
....................................
....................................
.....................................
.
......................................
......................................
....................................■....
.........................................:
........................................■....
.............................................
.............................................
.............................................
4105 -st ..Engineering,
Carmel, IN 46032
Telephone: 317-875-7000
..
135
130
Alt & Witzig Engineering, Inc.
4105 West 99th St.
Carmel, IN 46032
Telephone: 317-875-7000
Fax:
20 25 30 35 40 45
WATER CONTENT, %
MOISTURE -DENSITY RELATIONSHIP
Project Name: 136th St. & Carey Rd. Intersection Imp.
Location: Hamilton County
A&W File #: TZ 16133 INDOT Contract M
125
■■■■■■■■■■■l■MI
■■■■■■■■■■■■■ES - . Material Sample #2 Natural 1
■■■■■■■■■■■■■■■�
■■■■eee■■■■■■■■�
■■■■■■■■■■■■■■■�
Description of Material
.
.�■■■■■■■■■■■■■■■1
• LAY
■■■e■■e■■■■■■.P.\ Method .. ..
■■■■■ee■e■■■■WINK
■■■■■■■■■■■■■■■1
■■■■■■■■■■■■■■■N
■■■■■■■■■■■■■■■1
::::::e:::::EENNON
ENEENNNEEN� Heil TEST RESULTS
■■■■■■■■■■■■■■■■■■M
■■■■■■■■■■■■■■■■■ERS Dry Density , , . PCF
■■■■■■■■■■■■■■■■■■NINNik00. Optimum Water Content 21.0 %
CL
ATTERBERG LIMITS
z
105
LL PL P1
43 21 22
■■■■■■■■■■■■■■■■■■■►.V■�■■\\
■■■■■■■■■■■■■■■■■■I■■■ill\\\�Curves of 100% Saturation
■■■■■■■■■■■■■■■■■I■■■■■\\\\\for specific
■■■■■■■■■■■■■■■■r'■■■■■■■\�►1\\\
■■■■■■■■■■■■■■■■r■■■■■■■\i\\\.2.80
.
■■■■■■■■■■■■■■■■■■■■■■■■■■■\\\
2.70
2.60
Alt & Witzig Engineering, Inc.
4105 West 99th St.
Carmel, IN 46032
Telephone: 317-875-7000
Fax:
20 25 30 35 40 45
WATER CONTENT, %
MOISTURE -DENSITY RELATIONSHIP
Project Name: 136th St. & Carey Rd. Intersection Imp.
Location: Hamilton County
A&W File #: TZ 16133 INDOT Contract M
.
■■■■■■■■■■■■■■■�
■■■■eee■■■■■■■■�
■■■■■■■■■■■■■■■�
.
.�■■■■■■■■■■■■■■■1
■■■■■■■■■■■■■■■�
■■■■■■■■■■■■■■■�
■■■■■■■■■■■■0001
■■■■■■■■■■■■■■■N
■■■■■■■■■■■■■■■1
■■■■■■■■■■■■■■■N
■■■■■■■■■■■■■■■1
Alt & Witzig Engineering, Inc.
4105 West 99th St.
Carmel, IN 46032
Telephone: 317-875-7000
Fax:
20 25 30 35 40 45
WATER CONTENT, %
MOISTURE -DENSITY RELATIONSHIP
Project Name: 136th St. & Carey Rd. Intersection Imp.
Location: Hamilton County
A&W File #: TZ 16133 INDOT Contract M
Sheet 1 of 1
Sample ID
Textural
Classification
Passing
#10
Passing
#40
Passing
#200
Gravel
/o
Sand
/o
Silt
/o
Clay
/o
Colloid
/o
LL
PL
PI
LOI
/o
Ca/Mg
/o
Soluble
Sulfates
ppm
As Receive
Moisture
pH
Sample #1
A-6 (12) CLAY
98.3
94.4
81.6
1.7
16.7
49.8
31.8
30.8
35
20
15
NT
NT
0
19.5
7.5
Sample #2
A-7-6 (23) SILTY CLAY
99.9
98.9
95.5
0.1
4.4
50.8
44.6
43
21
22
NT
NT
20
24.5
7.8
4iV
Alt & Witzig Engineering, Inc.
4105 West 99th St.
Carmel, IN 46032
Telephone: 317-875-7000
Fax:
NOTE: NT = Not Tested
Chemical Modification Summary
Project Name: 136th St. & Carey Rd. Intersection Imp.
Location: Carmel, IN - Hamilton County
y
A&ifi1 File #: TZ 16133
1 irIDOT Contract #:
Fractions normalized to 100% passing
the 2mm (#10) sieve
S110,
'•. : � do
80 : ...............................
clay'... ;
70 ...............::::...............::............
oti
C560 :.....................................................
-`
GS50........... ............. ........... ..........
00 ,Oct
oo ��j►
o
s
o
C,O
:...sandy....................................40..silty... :0
.
clay clay
^o
3J
30 .
silty blay
,sandy clay -loam Ctay Ibam loam. o
20
C
10................................`.:.;...............n............. .....�.
.. to rt1..':..
sand :'sandy Ioarh'-.. : silty loam''•. silt
a 'oo LOO
10 o 00
110, o `Po 'Po �o
PERCENT SAND & GRAVEL (>0.075mm)
M
Sample ID
AASHTO Classification
Sand & Gravel %
Silt %
Clay %
• Sample #1
A-6 12 CLAY
18.4
49.8
31.8
M Sample #2
A-7-6 23 SILTY CLAY
4.5
50.8
44.6
00
0
it
Alt & Witzig Engineering, Inc. AASHTO Textural Classification Chart
4105 West 99th St. Project Name: 136th St & Carey Rd. Intersection Imp.
i;Carmel, IN 46032
Telephone: 317-875-7000 Location: Carmel, IN - Hamilton County
2 Fax: DES M INDOT Contract M
J
60
50
P
L
40
a-
-s
s
T
I
C
T 30
A-6
Y
1
20
D A -7-
E
X
10
A-4 A-5
0
0 20 40 60 80 100
LIQUID LIMIT
Specimen Identification
LL
PL
PI
Fines
Classification (AASHTO M-145)
•
Sample #1 0.00
35
20
15
82
A-6 (12) CLAY
M
Sample #2 0.00
43
21
22
95
A-7-6 (23) SILTY CLAY
Alt & Witzig Engineering, Inc.
4105 West 99th St.
Carmel, IN 46032
Telephone: 317-875-7000
Fax:
ATTERBERG LIMITS (AASHTO T-89 & T-90)
Project Name: 136th St. & Carey Rd. Intersection Imp.
Location: Carmel, IN - Hamilton County
DES #:
INDOT Contract #:
14
13.5
13
a 2.5
TZ -16133 136th St. & Carey Rd. Int. Imp.
Carmel, IN Hamilton County
10/04/2016
h� - - - - - - - � - y` � ..ww w - � - - � � �
12
11.5
11
0 1 2 3 4
5 6 7 8 9 10
% Buffington LKD
100% Buffington LKD
pH = 13.27
- s -Sample #1
—s—Sample #2