HomeMy WebLinkAboutE&B Paving/Eng/CO #11/885/Hawthorne Drive & Carey Road RAB #16-ENG-09CITY OF CARMEL
TO: CONTRACT CHANGE ORDER NO.: 11
E&B Paving, Inc. DATE: December 9, 2016
17042 Middletown Ave. PROJECT NAME: 136' St. & Carey RAB
Noblesville, IN 46060 CITY REQ. NO.: 16 -ENG -26
CITY PO NO.:
CITY PO DATE:
I. You are directed to make the following changes in this Contract:
Section Corner Monument line item added to the contract per the request of the
County Survey to install the monument on 1361 Street.
SCHEDULED ADJUSTMENT
ITEM AMOUNT (+) OR (-) DAYS
ER' Item #109 Section Corner Monument $885.00 1 Each $885.00 0 Days
H. The following referenced Documents fiu-ther describe the changes outlined in Paragraph I, and
are to be considered a part of this Change Order: R.F.P.: N/A W.D.C. No.: N/A
Other: Attached itemized change order document from E&B, Inc.
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order 1 $ 837,190.83
Contract Price will be increased/decreased by this Change Order $ 885.00
New Contract Price including this Change Order $_838.,075-83
Contract Time Prior to this Change Order 45 Days _ Open to Traffic
Net increased/decreased resulting from this Change Order 0 Days
Current Contract Time including this Change Order 45 Days Open to Traffic
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are
Recommended
American Structurepoint, Inc.
ENGINEER
7260 Shadeland Station
Address
Indianapolis, IN 46256
City/State/Zip
By: n
Phone: 317-547-5580
The Above Changes Are Approved:
Accepted:
E&B Paving, Inc. + 4—
CONTRACTOR es ard, Ma or
17042 Middletown Ave.
Address, Mary Burma, M�mb
Noblesville, IN 46060
City/State/Zip
B�
Phone: 317-773-4132 _
Lori"ff, Member
ATTEST:
JerJe& an, City Eng.
_
C . uley, lerl(-_
Treasurer
Date: /dI%1/6 Date: % 0'? -1 ' �� Date:
To: City of Carmel
One Civic Square
Carmel, IN 46032
Attn: John Cox
E B PAVING Inc
IVor•ld-Cluss Solutions cit a Locul Level"'
ADDITIONAL WORK AUTHORIZATION # 10
Phone: 317-285-9459
Fax:
Project: 136th-Carey-Hawthome RAB's
Location: Carey Rd and Hawthorne Dr
City: Carmel
Date: 12/11/2016
Job No: 02163505
The following quoted prices are for additional work that is not a part of our original contract scope of work.-
DESCRIPTION:
ork.
DESCRIPTION:
The following pricing is for the installation of a Section Comer Monument that was discovered at the intersection of 136th St and
Carey Rd. No previous pay item was listed for this work.
Description Quantity Unit Unit Price Extension
EWA Monument, Section Corner 1 LS $ 885.00 $ 885.00
Subtotal $ 885.00
10% of first $3,000.00
7% of remainder
TOTAL $ 885.00
ADDITIONAL CHARGE FOR THE ABOVE WORK IS: $ 885.00
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date:
Owner or Contractor Signature
(Authorized Representative)
We hereby agree to furnish labor and materials - complete in accordance'with-tho above specifications, at the above stated price.
E & B Paving, Inc., Authorized Signature Date: 12/01/16
Steve Broermann
THIS IS ADDITIONAL WORK AUTHORIZATION NO. 10
AN EQUAL OPPORTUNITY EMPLOYER
17042 Middletown Ave. • Noblesville, IN 46060
PHONE: 317.773.4132 • FAX- 317.773.4137
EB
Page I
o2163505C0'.1 136TH & CAREY MONUMENT 12/01/2016 18:31
Steven J. Broennann CHANGE ORDER #10 - SECTION MONUMENT
Activity Desc Quantity Unit Perm Constr Equip Sub -
Resource PCs Unit Cost Labor Material 1%1atVExp Ment Contract Total
JOB NOTES
Images/Docs Attached
..****-***Estimate created on: 12/01/2016 by User#: 39 - Steven J. Broermann
Source estimate used: H:\EB\EST\02JS163505
BID ITEM
= 1000
Description =
SECTION CORNER MONUMENT
Unit = LS
Takeoff Quan:
1.000 Engr Quan:
1.000
61506527
MONUMENT, SECT CORNER
Quan: 1.00 EAC Hrs/Shf :
10.00 Cal: 512 %N'C: IN5506
AMISC3
MISC 3 MAN CREW
2.00
CH Prod:
5.0000 US
Lab PCs: 3.00 Eqp PCs:
2.00
1RVINGREADYM - CLAS 1.00
2.00 CY
91.500
183
183
MISC CONCRETE CHAR 1.00
1.00 CY
1.500
2
2
AIR COMPRESSOR 175 1.00
2.00 HR
47.040
94
94
FOREMAN'S TRUCK 1.00
2.40 HR
18.440
44
44
combo man 1.00
2.20 MH
29.010
124
124
foreman 1.00
2.40 MH
35.650
169
169
operator 1.00
2.20 MH
33.650
143
143
S758.75
6.8000 MH/EACH
6.80 MH
[ 268.26 ]
436 185
138
759
5.0000 Un/Shift ' 0.2000 Shifts
2.0000 Ilr/Unit
435.92 184.50
138.33
758.75
> Item Totals: 1000 - SECTION CORNER MONUMENT
5758.75
6.8000 MH/LS
6.80 MH
[ 268.261
436 185
138
759
758.750
1 LS
435.92 184.50
138.33
758.75
EB 12/01/2016 18:33
02163505C0#1 136TH & CAREY MONUMENT Page: 1
Bid Summary Totals Report
Standard Markup Instructions
Selected Bond Table:
Previous Run
Summary: 12/01/2016 6:29 PM
Spread: 12/01/2016 6:29 PM
Summary run on Takeoff Quan and Adjusted to Bid Quan.
Cost Basis
Markup %
Markup
Labor:
268
20.00
54
Burden:
168
20.00
34
Perm Matl:
185
12.00
22
Const Mad:
0
12.00
0
Sub:
0
0.00
0
Eq. Op. Exp:
0
0.00
0
Co. Equip:
138
12.00
17
Rented Eq.:
0
12.00
0
PLANT MAT:
0
0.00
0
TRUCKING:
0
0.00
0
OVERHEAD:
0
0.00
0
Overrides:
0
0
Total:
759
16.59
126
Selected Bond Table:
Previous Run
Summary: 12/01/2016 6:29 PM
Spread: 12/01/2016 6:29 PM
Summary run on Takeoff Quan and Adjusted to Bid Quan.
Standard Spreads
Indirect Spread: Total less Sub
Markup Spread: Total less Sub
Addon/Bond Spread: Total less Sub
Totals as of Last Spread
Cost: Markup:
Total:
Direct: 759 126
885
Indirect: 0 0
0
Addons: 0 0
0
Bond: 0
0
SubTotal: 759 126
885
Pass Through: 0
0
Total: 759 126
885