HomeMy WebLinkAboutMorphey Construction/Eng/400,623/Main Street Drainage – Guilford Road to 4th Ave SWMorphey Construction, Inc...
Engineering Department - 2017
Appropriation # 2016 Storm Water Bond Fund, P.O. #: 100177J;;p _
Contract Not To Exceed $400,623.00 U
AGREEMENT FOR PURCHASE OF GOODS AND SERVICES
THIS AGREEMENT FOR PURCHASE OF GOODS AND SERVICES ("Agreement") is hereby entered into by
and between the City of -Carmel, Indiana, acting by and through its Board of Public Works and Safety ("City"), and
Morphey Construction, Inc., an entity duly authorized to do business in the State of Indiana ("Vendor"):
TERMS AND CONDITIONS
1. ACKNOWLEDGMENT, ACCEPTANCE:
Vendor acknowledges that it has read and understands this Agreement, and agrees that its execution of
same constitutes its acceptance of all of the Agreement's terms and conditions.
2. PERFORMANCE:
City agrees to purchase the goods and/or services (the "Goods and Services") from Vendor using City
budget appropriation number 2016 Storm Water Bond Fund funds. Vendor agrees to provide the Goods and
Services and to otherwise perform the requirements of this Agreement by applying at all times the highest
technical and industry standards. Vendor will not perform any of the Services detailed in Exhibit A prior to
obtaining a written Notice to Proceed from the City. Upon receiving a Notice to Proceed, the Vender shall
perform only those Services specifically detailed in the Notice. If the Vender desires clarification of the scope
of any Notice to Proceed, the Vendor shall obtain such clarification from the City in writing, prior to
performing the service set forth in the Notice to Proceed. Any services performed without the City's prior
express written authorization will not be compensated.
3. PRICE AND PAYMENT TERMS:
3.1 Vendor estimates that the total. price for the Goods and Services to be provided to City hereunder
shall be no more than Four Hundred Thousand Six Hundred Twenty Three Dollars ($400,623.00)
(the "Estimate"). Vendor shall submit an invoice to City no more than once every thirty (30) days
detailing the Goods and Services provided to City within such time period. City shall pay Vendor for
such Goods and Services within thirty-five (35) days after the date of City's receipt of Vendor's
invoice detailing same, so long as and to the extent such Goods and Services are not disputed, are
in conformance with the specifications set forth in Exhibit A, are submitted on an invoice that
contains the information contained on attached Exhibit B, and Vendor has otherwise performed and
satisfied all the terms and conditions of this Agreement.
3.2 Vendor agrees not to provide any Goods and Services to City that would cause the total cost of the
Goods and Services provided by Vendor to City hereunder to exceed the Estimate, unless City has
previously agreed, in writing, to pay an amount in excess thereof.
4. WARRANTY:
Vendor expressly warrants that the Goods and Services covered by this Agreement will conform to those
certain specifications, descriptions and/or quotations regarding same as were provided to Vendor by City
and/or by Vendor to and accepted by City pursuant to or as part of that certain City of Carmel Engineering
Department Bid Proposal Package for "Main Street Drainage — Guilford Road to 4t" Ave SW, Project # 16 -
SW -72" received by the City of Carmel Board of Public Works and Safety on or about February 15, 2017, all
of which documents are incorporated herein by reference, and that the Goods and Services will be delivered
in a timely, good and workmanlike manner and free from defect. Vendor acknowledges that it knows of City's
intended use and expressly warrants that the Goods and Services provided to City pursuant .to this
Agreement have been selected by Vendor based upon City's stated use and are fit and sufficient for their
particular purpose.
[S:Wontrectgftof.Sv & Goads Svm\Engineefing\2017\Morphey Construction, 1— Goods and Servi—d=2/17/2017 10:26 AM]
Morphey Construction, Inc.
Engineering Department - 2017
Appropriation # 2016 Storm Water Bond Fund, P.O. #: 100177
Contract Not To Exceed $400,623.00
5. TIME AND PERFORMANCE:
This Agreement shall become effective as of the last date on which a party hereto executes same ("Effective
Date"), and both parties shall thereafter perform their obligations hereunder in a timely manner. Time is of the
essence of this Agreement.
6. DISCLOSURE AND WARNINGS:
If requested by City, Vendor shall promptly furnish to City, in such form and detail as City may direct, a list of
all chemicals, materials, substances and items used in or during the provision of the Goods and Services
provided hereunder, including the quantity, quality and concentration thereof and any other information
relating thereto. At the time of the delivery of the Goods and Services provided hereunder, Vendor agrees to
furnish to City sufficient written warning and notice (including appropriate labels on containers and packing)
of any hazardous material utilized in or that is a part of the Goods and Services.
7. LIENS:
Vendor shall not cause or permit the filing of any lien on any of City's property. In the event any such lien is
filed and Vendor fails to remove such lien within ten (10) days after the filing thereof, by payment or bonding,
City shall have the right to pay such lien or obtain such bond, all at Vendor's sole cost and expense.
8. DEFAULT:
In the event Vendor: (a) repudiates, breaches or defaults under any of the terms or conditions of this
Agreement, including Vendor's warranties; (b) fails to provide the Goods and Services as specified herein;
(c) fails to make progress so as to endanger timely and proper provision of the Goods and Services and does
not correct such failure or breach within five (5) business days (or such shorter period of time as is
commercially reasonable under the circumstances) after receipt of notice from City specifying such failure or
breach; or (d) becomes insolvent, is placed into receivership, makes a general assignment for the benefit of
creditors or dissolves, each such event constituting an event of default hereunder, City shall have the right to
(1) terminate all or any parts of this Agreement, without liability to Vendor; and (2) exercise all other rights
and remedies available to City at law and/or in equity.
9. INSURANCE AND INDEMNIFICATION:
Vendor shall procure and maintain in full force and effect during the term of this Agreement, with an insurer
licensed to do business in the State of Indiana, such insurance as is necessary for the protection of City and
Vendor from all claims for damages under any workers' compensation, occupational disease and/or
unemployment compensation act; for bodily injuries including, but not limited to, personal injury, sickness,
disease or death of or to any of Vendor's agents, officers, employees, contractors and subcontractors; and,
for any injury to or destruction of property, including, but not limited to, any loss of use resulting therefrom.
The coverage amounts shall be no less than those amounts set forth in attached Exhibit C. Vendor shall
cause its insurers to name City as an additional insured on all such insurance policies, shall promptly provide
City, upon request, with copies of all such policies, and shall provide that such insurance policies shall not be
canceled without thirty (30) days prior notice to City. Vendor shall indemnify and hold harmless City from and
against any and all liabilities, claims, demands or expenses (including, but not limited to, reasonable attorney
fees) for injury, death and/or damages to any person or property arising from or in connection with Vendor's
provision of Goods and Services pursuant to or under this Agreement or Vendor's use of City property.
Vendor further agrees to indemnify, defend and hold harmless City and its officers, officials, agents and
employees from all claims and suits of whatever type, including, but not limited to, all court costs, attorney
fees, and other expenses, caused by any act or omission of 'Vendor and/or of any of Vendor's agents,
officers, employees, contractors or subcontractors in the performance of this Agreement. These
indemnification obligations shall survive the termination of this Agreement.
[SAConuam\Prof.Svcs & Goads SvalEngincm g12017\Morpbey Constrodion, 1— Goods and Servitt d=2/17/2017 10:26 AM]
2
Morphey Construction, Inc.
Engineering Department - 2017
Appropriation # 2016 Storm Water Bond Fund, P.O. #: 100177
Contract Not To Exceed $400,623.00
10. GOVERNMENT COMPLIANCE:
Vendor agrees to comply with all federal, state and local laws, executive orders, rules, regulations and codes
which may be applicable to Vendor's performance of its obligations under this Agreement, and all relevant
provisions thereof are incorporated herein by this reference. Vendor agrees to indemnify and hold harmless
City from any loss, damage and/or liability resulting from any such violation of such laws, orders,rules,
regulations and codes. This indemnification obligation shall survive the termination of this Agreement.
11. NONDISCRIMINATION:.
Vendor represents and warrants that it and all of its officers, employees, agents, contractors and
subcontractors shall comply with all laws of the United States, the State of Indiana and City prohibiting
discrimination against any employee, applicant for employment or other person in the provision of any Goods
and Services provided by this Agreement with respect to their hire, tenure, terms, conditions and privileges of
employment and any other matter related to their employment or subcontracting, because of race, religion,
color, sex, handicap, national origin, ancestry, age, disabled veteran status and/or Vietnam era veteran
status.
12. E -VERIFY:
Pursuant to I.C. § 22-5-1.7 et seq., as the same may be amended from time to time, and as is incorporated
herein by this reference (the "Indiana E -Verify Law"), Vendor is required to enroll in and verify the work
eligibility status of its newly -hired employees using the E -Verify program, and to execute the Affidavit
attached herein as Exhibit D, affirming that it is enrolled and.participating in the E -verify program and does
not knowingly employ unauthorized aliens. In support of the Affidavit, Vendor shall provide the City with
documentation indicating that it has enrolled and is participating in the E -Verify program. Should
Vendor subcontract for the performance of any work under and pursuant to this Agreement, it shall fully
comply with the Indiana E -Verify Law as regards each such subcontractor. Should the Vendor or any
subcontractor violate the Indiana E -Verify law, the City may require a cure of such violation and thereafter, if
no timely cure is performed, terminate this Agreement in accordance with either the provisions hereof or
those set forth in the Indiana E -Verify Law. The requirements of this paragraph shall not apply should the E -
Verify program cease to exist.
13. NO IMPLIED WAIVER:
The failure of either party to require performance by the other of any provision of this Agreement shall not
affect the right of such party to require such performance at any time thereafter, nor shall the waiver by any
party of a breach of any provision of this Agreement constitute a waiver of any succeeding breach of the
same or any other provision hereof.
14. NON -ASSIGNMENT:
Vendor shall not assign or pledge this Agreement, whether as collateral for a loan or otherwise, and shall not
delegate its obligations under this Agreement without City's prior written consent.
15. RELATIONSHIP OF PARTIES:
The relationship of the parties hereto shall be. as provided for in this Agreement, and neither Vendor nor any
of its officers, employees, contractors, subcontractors and agents are employees of City. The contract price
set forth herein shall be the full and maximum compensation and monies required of City to be paid to
Vendor under or pursuant to this Agreement
[SXonnc&ftof.Svcs & Goods Svc Wnginming17017%Molphey Construction, Inc Goods and Smi—dm2/17/2017 10:26 AM]
Morphey Construction, Inc.
Engineering Department - 2017
Appropriation # 2016 Storm Water Bond Fund, P.O. #: 100177
Contract Not To Exceed $400,623.00
16. GOVERNING LAW; LAWSUITS:
This Agreement is to be construed in accordance with and governed by the laws of the State of Indiana,
except for its conflict of laws provisions. The parties agree that, in the event a lawsuit is filed hereunder, they
waive their right to a jury trial, agree to file any such lawsuit in an appropriate court in Hamilton County,
Indiana only, and agree that such court is the appropriate venue for and has jurisdiction over same.
17. SEVERABILITY:
If any term of this Agreement is invalid or unenforceable under any statute, regulation, ordinance, executive
order or other rule of law, such term shall be deemed reformed or deleted, but only to the extent necessary to
comply with same; and the remaining provisions of this Agreement shall remain in full force and effect.
18. NOTICE:.
Any notice provided for in this Agreement will be sufficient if it is in writing and is delivered by postage
prepaid U.S. certified mail, return receipt requested, to the party to be notified at the address specified
herein:
If to City: City of Carmel AND Douglas C. Haney,
One Civic Square Corporation Counsel
Carmel, Indiana 46032 Department of Law
One Civic Square
Carmel, Indiana 46032
If to Vendor: Morphey Construction, Inc.
1499 N. Sherman Drive
Indianapolis, IN 46201
ATTENTION: Steven P. Milbourne
Notwithstanding the above, notice of termination under paragraph 19 hereinbelow shall be effective if given
orally, as long as written notice is then provided as set forth hereinabove within five (5) business days from
the date of such oral notice.
19. TERMINATION:
19.1 Notwithstanding anything to the contrary contained in this Agreement, City may, upon notice to
Vendor, immediately terminate this Agreement for cause, in the event of a default hereunder by
Vendor and/or if sufficient funds are not appropriated or encumbered to pay for the Goods and
Services to be provided hereunder. In the event of such termination, Vendor shall be entitled to
receive only payment for the undisputed invoice amount representing conforming Goods and
Services delivered as of the date of termination, except that such payment amount shall not exceed
the Estimate amount in effect at the time of termination, unless the parties have previously agreed in
writing to a greater amount.
19.2 City may terminate this Agreement at any time upon thirty (30) days prior notice to Vendor. In the
event of such termination, Vendor shall be entitled to receive only payment for the undisputed
invoice amount of conforming Goods and Services delivered as of the date of termination, except
that such payment amount shall not exceed the Estimate amount in effect at the time of termination,
unless the parties have previously agreed in writing to a greater amount.
19.3 The City may terminate this Agreement pursuant to Paragraph 11 hereof, as appropriate.
jSXontmclsTrotSv & Goods S—TngineuingV017\M.,p6ey Conswctim Inc. Goods and Seav —dac:2117/2017 10:26 AM]
Morphey Construction, Inc.
Engineering Department - 2017
Appropriation # 2016 Storm Water Bond Fund, P.O. #: 100177
Contract Not To Exceed $400,623.00
20. REPRESENTATIONS AND WARRANTIES
The parties represent and warrant that they are authorized to enter into this Agreement and that the persons
executing this Agreement have the authority to bind the party which they represent.
21. ADDITIONAL GOODS AND SERVICES
Vendor understands and agrees that City may, from time to time, request Vendor to provide additional goods
and services to City. When City desires additional goods and services from Vendor, the City shall notify
Vendor of such additional goods and services desired, as well as the time frame in which same are to be
provided. Only after City has approved Vendor's time and cost estimate for the provision of such additional
goods and services, has encumbered sufficient monies to pay for same, and has authorized Vendor, in
writing, to provide such additional goods and services, shall such goods and services be provided by Vendor
to City. A copy of the City's authorization documents for the purchase of additional goods and services shall
be numbered and attached hereto in the order in which they are approved by City.
22. TERM
Unless otherwise terminated in accordance with the termination provisions set forth in Paragraph 19
hereinabove, this Agreement shall be in effect from the Effective Date through December 31, 2017 and shall,
on the first day of each January thereafter, automatically renew for a period of one (1) calendar year, unless
otherwise agreed by the parties hereto.
23. HEADINGS
All heading and sections of this Agreement are inserted for convenience only and do not form a part of this
Agreement nor limit, expand or otherwise alter the meaning of any provision hereof.
24. BINDING EFFECT
The parties, and their respective officers, officials, agents, partners, successors, assigns and legal
representatives, are bound to the other with respect to all of the covenants, terms, warranties and obligations
set forth in Agreement.
25. NO THIRD PARTY BENEFICIARIES
This Agreement gives no rights or benefits to anyone other than City and Vendor.
26. IRAN CERTIFICATION: Pursuant to I.C. § 5-22-16,5, the Vendor shall certify that, in signing this document,
it does not engage in investment activities within the Country of Iran.
27. ADVICE OF COUNSEL:
The parties warrant that they have read this Agreement and understand it, have had the opportunity to obtain
legal advice and assistance of counsel throughout the negotiation of this Agreement, and enter into same
freely, .voluntarily, and without any duress, undue influence or coercion.
28. IC 5-16-13.
The provisions of IC 5-16-13 are hereby incorporated into this Agreement by reference.
29. ENTIRE AGREEMENT:
This Agreement, together with any exhibits attached hereto or referenced herein, constitutes the entire
agreement between Vendor and City with respect to the subject matter hereof, and supersedes all prior oral
or written representations and agreements regarding same. Notwithstanding any other term or condition set
forth herein, but subject to paragraph 16 hereof, to the extent any term or condition contained in any exhibit
attached to this Agreement or in any document referenced herein conflicts with any term or condition
contained in this Agreement, the term or condition contained in this Agreement shall govern and prevail.
[&: ConttactsTrotS— @. Goods SvcaTngi mingt2017\Muphey Cow=diw, 1— Goods and Savic d=2/17/2017 10:26 AM]
.Morojey Construction, Inc.
'Evgindfting Department -.20-17
4pid''Priation #'2016'St6miWiter-Bond Fund, P.O. #. 100177
Contract Not. To Ex'eeed $400,62-1.00
This Agreement may only- be modified :by written amendment 6)(OoUted by,both plies 'hereto, or their
successo0in interest.
IN WITNESS -WHEREOF, the padjes hereto have M66b.and*-executed thls.Agreomeht asfollows:-
UITY-oF CARMEL, INDIANA
Py an'd.thrbugh its Board of Public
ftrkt and Safety
By:
,14nos Bfafnard, Presiding Officer
Mary
Date:
Lori S.
Date:
ATTEST:
CleTO-reqs tifier
DAte:
97
'6
MORPHEY CONSTRUCTION, INC.
By:
Authorized :Sign at6re
S—ro—C V60
P/"/l�-/�aJ2�rrPrinted Name
Tide
FID)TIM. 2- Z
Last, -Four of SSN if -Sole Proprietor:
Date'. 2 P-2 I-,,
a
f
} BIDDER'S ITEMIZED PROPOSAL
AND DECLARATIONS
City of Carmel
Instructions To Bidders:
This form shall be utilized by all Bidders. Except as otherwise specifically provided, all Parts shall
be fully and accurately filled in and completed and notarized.
Project: Main Street Drainage — Guilford Road to f Ave SW
Project # 16-S W- 72
Proposal For Construction of: . The reconstruction of the south side of Main Street, beginning
at Guilford Road and extending east to 4th Ave SW, including
patching various widths of the south edge of pavement,
installation of concrete curb and gutter, concrete drive
approaches, storm sewer systems, erosion control measures and
the grading of roadside drainage ditches. Various areas of the
north edge of pavement will also have concrete curb and gutter
installed along with E[MA patching.
Date: A l 5 ` ai Or/
To: City of Carmel, Indiana, Board of Public Works and Safety. . .
EXFi ll UT
Version 2016-08-31
INDIANA DEPARTMENT OF TRANSPORTATION PAGE: 1
SCHEDULE OF PAY ITEMS REVISED:
LETTING DATE:2/15/17
CONTRACT ID: PROJECT(S): Main St. Guilford to 4th Ave S
CONTRACTOR: Morphey Construction, Inc.
+------------------------------------------------------------------------------+
ILINEI ITEM I APPROX. I UNIT PRICE I BID AMOUNT
NO I DESCRIPTION I QUANTITY}----------------I---------------I
AND UNITS I DOLLARS I CTS I DOLLARS ICTS
+------------------------------------------------------------------------------+
I 11construction Engineerin I 1.000 I 10,000.00 I 10,000.00 I
I Ig ILS I I I I I
+------------------------------------------------------------------------------+
I 2IMob & Demob I 1.000 I 19,450.00 I 19,450.00 I
I I ILS I I I I I
+------------------------------------------------------------------------------+
I 31Maintaining Traffic I 1.000 I 34,999.62 I 34,999.62 I
I I ILS I I I I I
----------- =----------------------------- -----------------------------------------+
I 4JInlet REmove I 4.000 I 280.00 I 1,120.00 I
I I IEA I I I I I
+------------------------------------------------------------------------------+
I SIPipe REmove I 117.000 I 40.00 I 4,680.00 I
I I ILF I I I I I
+------------------------------------------------------------------------------+
I 61walk Remove I 69.000 I 15.00 I 1,035.00 I
I I ISY I I I I I
+------------------------------------------------------------------------------+
I 71Headwall Demolish I 3.000 I 280.00 I 840.00 I
I I IEA I I I I I
+------------------------------------------------------------------------------+
I I I I I. I I I
81common Excavation 396.000 I 60.00 I 23,760.00 I
I ICY
I I I I
+------------------------------------------------------------------------------+
I 91Mailbox Remove & REplac I 4.000 I 300.00 I 1,200.00 I
I Ie IEA I I I I I
+------------------------------------------------------------------------------+
I I I I I I I I
I 10ITemp Inlet Protection I 17.000 I 150.00 I 2,550.00 I
I I IEA I I I I I
+-------------------------------------------------------------------
I 11ITEmp Silt Fence I 520.000 I 1.55 I 806.00 I
I I ILF I I I I I
+------------------------------------------------------------------------------+
ISIT A
26-x'7
INDIANA DEPARTMENT OF TRANSPORTATION PAGE: 2
SCHEDULE OF PAY ITEMS REVISED:
LETTING DATE:2/15/17
CONTRACT ID: PROJECT(S): Main St. Guilford to 4th Ave S
CONTRACTOR: Morphey Construction, Inc.
+------------------------------------------------------------------------------+
ILINEI ITEM I APPROX. I UNIT PRICE I BID AMOUNT
NO I DESCRIPTION I QUANTITY}----------------I---------------I
AND UNITS I DOLLARS I CTS I DOLLARS ICTS I
+---------------------------------------------------------
I 12IStr BAckfill Type 1 1 33.000 I 40.00 I 1,320.00
I I ICY I I I I
+------------------------------------------------------------------------------+
I 13IHMA Surface 9.5mm I 68.000 I 160.00 I 10,880.00
I I ITN I I I I
+--------------------------------------------
I 14IConcrete Cap for STreet I 612.000 I 40.00 I 24,480.00
I I Cut REpair 5.5" ISY I I I I
+-------------------------
I 15IComp. Agg #53 I 449.000 I 40.00 I 17,960.00
I I ITN I I I I
+------------------------------------------------------------------------------+
I 16IGeogrid Type 1B (UND) I 612.000 I 3.00 I 1,836.00
I I ISY I I I I
+------------------------------------------------------------------------------
I 17ISidewalk Conc 4" I 69.000 I 90.00 I 6,210.00
I I ISY I I I I
+------------------------------------------------------------------------------+
I I I I I I I I
I 18ICurb & Gutter Concrete I 2,731.000 I 28.00 I 76,468.00
I I ILF I I I I
+------------------------------------------------------------------------------+
I 19IPCCP for App 6" I 188.000 I 95.00 I 17,860.00
I I ISY I I I I
+------------------------------------------------------------------------------+
I I I I I I I I
I 20ISubgrade Treatment Type 1 146.000 I 50.00 I 7,300.00
I I II ISY I I I I
+------------------------------------------------------------------------------+
I 21IMob & Demob for Seeding I 2.000 I 275.00 I 550.00
I I IEA I I I I
+------------------------------------------------------------------------------+
I 22ISeed Mix T I 132.000 I 1.21 I 159.72
I I ILIB I I I I
+-------------------------------------------------------
3 X-7
CONTRACT ID:
INDIANA DEPARTMENT OF TRANSPORTATION
PAGE: 3
SCHEDULE OF PAY ITEMS REVISED:
LETTING DATE:2/15/17
PROJECT(S): Main St. Guilford to 4th Ave S
CONTRACTOR: Morphey Construction, Inc.
+------------------------------------------------------------------------------
+
ILINEI ITEM I APPROX. I UNIT PRICE I BID AMOUNT
NO I DESCRIPTION I QUANTITY}----------------I---------------I
AND UNITS I DOLLARS I CTS I DOLLARS ICTS I
+------------------------------------------------------------------------------+
I 23ITemp Mulch I 2.500 I 392.00 I 980.00
I I ITN I I I I
+------------------------------------------------------------------------------+
I 24ITemp check dam riprap I 31.000 I 80.00 I 2,480.00
I I ITN I I I I
+------------------------------------------------------------------------------+
I 25ITemp Check Dam Filter S I 37.000 I 60.00 I 2,220.00 I
I Itone ITN I I I I I
+-------------------------
I 26IRiprap for Perm outlet I 45.000 I 100.00 I 4,500.00 I
I (protection ITN I I I I I
+----------=-------------------------------------------------------------------+
I 27IGeotextile fabric I 104.000 I 3.00 I 312.00
I I ISY I I
+----------------------------------------------------------
I 28IErosion Control Blanket I 1,524.000 I 9.00 I 13,716.00 I
I I ISY . I I I I I
+------------------------------------------------------------------------------
I 29ISEed Mix U I 42.000 I 10.23 I 429.66
I I ILB I I I I
+------------------------------------------------------------------------------+
I 30INursery Sod I 834.000 I' 18.00 I 15,012.00 I
I I ISY I I I I I
+------------------------------------------------------------------------------+
I 31IWater I 2.500 I 40.00 I 100.00 I
I I IKG I I I I I
+------------------------------------------------------------------------------+
I 32IPipe Type 4 Circular 6" I 2,268.000 I 14.00 I 31,752.00 I
I I ILF I I I I I
+------------------------------------------------------------------------------+
I 33IPipe Underdrain Outlet I 45.000 I 27.00 I 1,215.00 I
I 16111
ILF I I I I I
+------------------------------------------------------------------------------+
INDIANA DEPARTMENT OF TRANSPORTATION . PAGE: 4
SCHEDULE OF PAY ITEMS REVISED:
LETTING DATE:2/15/17
CONTRACT ID: PROJECT(S): Main St. Guilford to 4th Ave S
CONTRACTOR: Morphey Construction, Inc.
+-----------------
------------------------
-----------------------
ILINEI ITEM I APPROX. UNIT PRICE I BID AMOUNT
NO I DESCRIPTION I QUANTITY}----------------I---------------I
AND UNITS I DOLLARS I CTS I DOLLARS ICTS I
+------------------------------------------------------------------------------
I I I I
34IAgg for Underdrain I 193.000 I 40.00 I 7,720.00 I
I I ICY I J I I I
+-----------------------------------------------------------------
I 35IGeotextiles for Underdr I 1,763.000 I 3.00 I 5,289.00 I
I Iain ISY I I I I I
+------------------------------------------------------------------------------+
I 36ICore Existing Str for 6 I 6.000 I 650.00 I 3,900.00 I
I I" Underdrain IEA I I I I I
+---------------------------------------
I 37IAdjust Hydrant to Grade I 1.000 I 3,500.00 I 3,500.00 I
I I IEA I I I I I
+-------------------------------------7-------
I 38IAdjust Valve to Grade I 3.000 I 420.00 I 1,260.00 I
I I IEA I I I I I
+------------------------------------------------------------------------------+
I 39IAdjust Casting to Grade I 1.000 I 600.00 I 600.00
I I IEA I I I I
+------------------------------------------------------------------------------
I 40ICasting Furnish & Intal I 3.000 I 2,000.00 I 6,000.00 1
I 11 Type 13 IEA I I I I I
+------------------------------------------------------------------------------+
I 41IInlet Type E7 I 4.000 I 2,000.00 I 8,000.00 I
I I IEA I I I I I
+------------------------------------------------------------------------------+
I 42IInlet Type B15 I 2.000 I 2,500.00 I 5,000.00 I
I I IEA I I I I I
+------------------------------------------------------------------------------+
I 43IInlet Type B15 Modified I 1.000 I 2,900.00 I 2,900.00 I
I I IEA I I I I I
+------------------------------------------------------------------------------+
I 44IInlet Type M13 Modified I 1.000 I 2,900.00 I 2,900.00 I
I I IEA I I I I I
+------------------------------------------------------------------------------+
EXH UT -
!5-X-7
INDIANA DEPARTMENT OF TRANSPORTATION PAGE: 5
SCHEDULE OF PAY ITEMS REVISED:
LETTING DATE:2/15/17
CONTRACT ID: PROJECT(S): Main St. Guilford to 4th Ave S
CONTRACTOR: Morphey Construction, Inc.
+------------------------------------------------------------------------------
ILINEI ITEM 1 APPROX. I UNIT PRICE I BID AMOUNT
NO I DESCRIPTION I QUANTITY } ----------------I---------------1
AND UNITS I DOLLARS I CTS I DOLLARS ICTS I
+------------------------------------------------------------------------------+
I 451Pipe 10" HDPE 1 44.000 1 40.00 1 1,760.00 1
I 1 ILF I I I I I
+------------------------------------------------------------------------------+
I 461Pipe 12" HDPE 1 12.000 I 50.00 1 600.00 1
I I ILF I I I I
+------------------------------------------------------------------------------+
I 471Pipe 15" HDPE 1 6.000 1 60.00 1 360.00 1
I I ILF I I I I I
+--------------------------------------.----------------------------------------+
I 481Pipe 15" RCP 1 70.000 1 60.00 1 4,200.00 1
I I ILF I I I I I
+------------------------------------------------------------------------------+
I I I I I I I I
1 49115" Concrete PES 1 2.000 I 800.00 1 1,600.00 1
I I IEA I I I I I
+------------------------------------------------------------------------------+
1 50115" MES 1 1.000 1 800.00 1 800.00 1
IEA I I I I I
+------------------------------------------------------------------------------+
I 51IDetour Route Marker Ass 1 7.000 1 118.00 1 826.00 1
1 Iembley IEA I I I I I
+------------------------------------------------------------------------------+
I 521Construction Sign Type 1 10.000 1 120.00 1 1,200.00 1
1 IA IEA I I I I I
+------------------------------------------------------------------------------+
I 531Construction Sign Type 1 14.000 1 90.00 1 1,260.00 1
IB IEA I I I I I
+------------------------------------------------------------------------------+
I 541Construction Sign Type I 5.000 1 118.00 1 590.00 1
I IC IEA I I I I
+------------------------------------------------------------------------------+
I 551Road Closure Sign Assem 1 3.000 1 164.00 1 492.00 1
1 Iblies 1EA I I I I
+-----------------------------------------------------------------------------r,-+
V J7
INDIANA DEPARTMENT OF TRANSPORTATION PAGE: 6
SCHEDULE OF PAY ITEMS REVISED:
LETTING DATE:2/15/17
CONTRACT ID: PROJECT(S): Main St. Guilford to 4th Ave S
CONTRACTOR: Morphey Construction, Inc.
+------------------------------------------------------------------------------+
ILINEI ITEM I APPROX. I UNIT PRICE I BID AMOUNT
NO I DESCRIPTION I QUANTITY}----------------I---------------I
AND UNITS I DOLLARS I CTS I DOLLARS ICTS
+----------------------------------------------------------------------
I 56IBArricade III -B I 60.000 I 10.00 I 600.00
I I ILF I I I I
+------------------------------------------------------------------------------+
I I
I 57IClean Existing Pipe I 31.000 I 35.00 I 1,085.00
I I- ILF I I I I
+------------------------------------------------------------------------------+
1 l I I I I
+------------------------------------------------------------------------- -----+
I I I TOTAL I 400,623.00
I I I I I
+------------------------------------------------------------------------------+
5—xg MF
(�
EXHIBIT B
Invoice
Name of Company.
Address & Zip:
Telephone No.:
Fax No.:
Project Name:
Invoice No.
Purchase Order No:
Date:
Signature
Printed Name
Goods
Services
Person Providing
Goods/Services
Date
Goods/
Service
Provided
Goods/Services Provided
(Describe each good/service
separately and in detail)
Cost Per
Item
Hourly
Rate/
Hours
Worked
Total
GRAND TOTAL
Signature
Printed Name
EXHIBIT D
AFFIDAVIT
first being fli duly sworn, dego.ses-Afid'says that
'. ;m
he/she is faminar with and:'has, personal knowledge ofithe facts herein vand,-if called a.&A witness in this
matter; could =testify as fbllqw.s:
1. I am over eighteen (I8) -years -of age am c6mpqtdta to testify to the facts contained
-herein.
2. 1. am now:and a all times-..relevant-heFqinhave been employed b
rtrv,Ao .4ra(Alva (tfie I'Employpr,9)
_J
in the position of
3. 1 am familiar with the employment policies, practices, and procedures of the Employer and
have the authority to . action behalf of the Employer.
4. 'The Employer is enrolled and participates in the federal E -Verify -program and has
provided--documentation-of such-:enrollment-and—participation -to--the City -of Carmel;-
Indiana.
ity-of-Carmel,-
Indiana.
5. The tompiply does not knowingly employ any unauthorized aliens.
FURTHER AFFIANT SAYETH NOT.,
EXECUTED on fhe._9Lday of.
I certify under the penalties for -perjury under the laws of the UnitedStates of America and the, State of
Indiana thatthe foregoing.factual statements and se.preserwIitions ae tra.e..'and correct.
Minted:
Cv�� �� Carmel
INDIANA RETAIL TAX EXEMPT
CERTIFICATE NO. 003120155 002 0
Page 1 of 1
PURCHASE ORDER NUMBER
FEDERAL EXCISE TAX EXEMPT
100177
ONE CIVIC SQUARE
35-6000972
THIS NUMBER MUST APPEAR ON INVOICES, AIP
CARMEL, INDIANA 46032-2584
VOUCHER, DELIVERY MEMO, PACKING SUPS,
FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL - 1997
SHIPPING LABELS AND ANY CORRESPONDENCE
PURCHASE ORDER DATE
DATE REQUIRED
REQUISITION NO.
VENDOR NO.
DESCRIPTION
2/16/2017
00351732
Project 16-SW-72; Contract Date 03.01.17
MORPHEY CONSTRUCTION INC
City Engineering's Office
VENDOR.: 1499 N SHERMAN DRIVE
SHIP 1 Civic Square
TO Carmel, IN 46032-
INDIANAPOLIS, IN 46201--1515
Kate Lustig
PURCHASE ID
BLANKET
CONTRACT
PAYMENTTERMS
FREIGHT
12858
QUANTITY
UNIT OF MEASURE,
DESCRIPTION
UNIT PRICE EXTENSION
Department 2200 Fund: 0
Account 94-650.04
1 Each
Send Invoice To:
Jill Newport
CrossRoad Engineers, P.C.
3417 Sherman Drive
Beech Grove, IN 46107
G.O./Storm Water Bonds
PLEASE INVOICE IN DUPLICATE
2016 Storm Water Bond
Main Street Drainage - Guilford Road to 4th Ave SW. $400,623.00
Sub Total
$400,623.00
$400,623.00
DEPARTMENT I ACCOUNT PROJECT PROJECTACCOUNT AMOUNT
PAYMENT $400,623.00
SHIPPING INSTRUCTIONS ' AM VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. NUMBER IS MADE A
PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN.
'SHIP PREPAID. AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBUGATED BALANCE IN
'C.O.D. SHIPMENT CANNOT BE ACCEPTED. THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER.
'PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL
`THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945
AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO. ORDERED BY
Jeremy Kashman Douglas Haney
TITLE Director Corporation Counsel
CONTROL NO. 100177 CLERK -TREASURER