DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
212 R4462865 25290 93293 1,890.00 WETLAND INSPECTION
VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201(Rev.1995)
Vendor# 00350562 ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
AMERICAN STRUCTURE POINT, INC IN SUM OF$ CITY.OF CARMEL
7260 SHADELAN D STATION An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
INDIANAPOLIS, IN 46256-3957
Payee
$1,890.00
ON ACCOUNT OF APPROPRIATION FOR Purchase Order#
Engineering
Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Boara Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
25290 93293 44-628.65 $1,890.00 1 hereby certify that the attached invoice(s),or 1/23/17 93293 Bray Homestead Wetland Mitigation $1,890.00
2200 Eircrrmbered 212 •2200 212
bill(s)is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Tuesday, February 21,2017
Kashman,Jeremy
Director
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
120
Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
P.O . 33b& I
o
O AMEHICAN American Structurepoint, Inc.
EA STRUCTUREPOINT p
Detailed Payment
106th Street.Beam Replacement
i
Description: Removal and replacement of the damaged beam on the 106th Street bridge over Keystone Parkway and repair of other
damaged beams.
Payment Number: 3 Prime Contractor: Rieth-Riley Construction Co., Inc.
Pay Period: 08/27/2016 to 12/01/2016 Payment Status: Approved
Awarded Project Amount: $308,396.65
Authorized Amount: $311,938.67
Line Number ••Item Unit Unit'Price QuanCu tityQutanP d' Previous d Tom Qu
antity Total Quantity. Current Payment Total Amount
Quantity Q ty o Date Placed . Amount Paid To Date
Section- 1 Default Section
0010 1 LSUM $2,000.000 1.00 0.00 1.00 1.00 1.00
$0.00 $2,000.00
CONSTRUCTION ENGINEERING
0020 2 MOS $1,600.000 5.00 0.00 2.00 2.00 2.00
$0.00 $3,200.00
FIELD OFFICE,A
0030 3 LSUM $15,419.830 1.00 0.00 1.00 1.00 1.00 $0.00 $15,419.83
MOBILIZATION AND DEMOBILIZATION
0040 4 LSUM $109,834.230 1.00 0.00 1.00 1.00 1.00 $0.00 $109,834.23
PRESENT STRUCTURE REMOVE,PORTIONS
0050 5 SYS $67.970 17.00 0.00 17.00 17.00 17.00 $0.00 $1,155.49 1
SIDEWALK,CONCRETE, REMOVE
0060 6 EACH $189.230 2.00 0.00 2.00 2.00 2.00
$0.00 $378.46
TEMPORARY EROSION AND SEDIMENT CONTROL,CURB INLET PROTECTION
0070 7 CYS $149.030 3.00 0.00 3.00 3.00 3.00 $0.00 $447.09
EXCAVATION,DRY
i
r
9
Detailed Payment: 106th Street Beam Replacement Page 1 of 5 12/02/2016 j
i
I
Awarded Current Paid .Previous Paid Total Quantity Total Quantity Current Payment Total Amount
Line Number Item. Unit Unit.Price
Quantity Quantity Quantity Paid.To Date Placed Amount Paid To Date
0080 8 CYS $108.580 4.00 4.00 0.00 4.00 4.00 $434.32 $434.32
AGGREGATE FOR END BENT BACKFILL
0090 9 SYS $127.270 17.00 25.30 4.00 29.30 29.30 $3,219.93 $3,729.01 j
CONCRETE SIDEWALK,4 IN.
0100 10 SYS $11.490 10.00 0.00 10.00 10.00 10.00 $0.00 $114.90
GEOTEXTILES
' I
0110 11 SYS $230.310 11.00 0.00 0.00 0.00 0.00 $0.00 $0.00
SODDING,NURSERY
i
0120 12 LBS $1.470 8,011.00 0.00 8,011.00 8,011.00 8,011.00 $0.00 $11,776.17
REINFORCING BARS, EPDXY COATED
I
0130 13 CYS $857.330 42.80 0.00 42.80 42.80 42.80 $0.00 $36,693.72
CONCRETE,C, SUPERSTRUCTURE
0140 14 CYS $742.090 11.40 0.00 11.40 11.40 11.40 $0.00 $8,459.83
CONCRETE, C,RAILING
0150 15 LFT $538.960 53.00 0.00 53.00 53.00 53.00 $0.00 $28,564.88
STRUCTURAL MEMBERS,CONCRETE I-BEAM, 11, 36 IN.X 12 IN.
0160 16 LSUM $1,800.000 1.00 1.00 0.00 1.00 1.00 $1,800.00 $1,800.00
SURFACE SEAL
0170 17 LSUM $13,980.000 1.00 1.00 0.00 1.00 1.00 $13,980.00 $13,980.00
MASONRY COATING
0180 18 SFT $2.940 574.00 0.00 574.00 574.00 574.00 $0.00 $1,687.56
CONCRETE IMPRINTING
0190 19 SFT $25.000 117.00 0.00 117.00 117.00 117.00 $0.00 $2,925.00
CONCRETE STAINING
0200 20 LSUM $2,381.570 1.00 0.00 1.00 1.00 1.00 $0.00 $2,381.57
STREET NAME SIGN,BRIDGE MOUNTED,DECORATIVE,REMOVE AND RESET
0210 21 LSUM $527.150 1.00 0.00 0.00 0.00 0.00 $0.00 $0.00
BRIDGE RAIL MOCK UP
0220 22 LSUM $213.910 1.00 1.00 0.00 1.00 1.00 $213.91 $213.91
FLAT-WORK MOCK UP
i
0230 23 LFT $77.280 61.00 61.00 0.00 61.00 61.00 $4,714.08 $4,714.08
ORNAMENTAL RAILING,REMOVE AND RESET
• i
Detailed Payment: 106th Street Beam Replacement Page 2 of 5 12/02/2016
i
i
Ativarded_ Current Paid Previous Paid Total uantity ,Total Current Pa
Line Number Item IJnrt .`• Uaut Price Quantity t3' yment `y'otal Amount:
Quanta
ty Quantity Quantity Paid To IDate PIaced r -Amount Paid To Date: s
0240 24 LSUM
$374.550 1.00 0.00 1.00 1.00 1.00 $0.00 $374.55
FORMLINER, SPECIALTY,CITY SEAL
0250 25 LSUM $749.140 1.00 0.00 1.00 1.00 1.00 $0.00 $749.14
FORMLINER,BRIDGE RAIL,REAR FACE
0260 26 LSUM $749.140 1.00 0.00 1.00 1.00 1.00 $0.00 $749.14
FORMLINER,BRIDGE RAIL,FRONT FACE j
0270 27 LSUM $7,150.000 1.00 0.00 1.00 1.00 1.00 $0.00 $7,150.00
FIBER WRAP, 106TH STREET
0280 28 LSUM $5,450.000 1.00 0.00 1.00 1.00 1.00 $0.00 $5,450.00
FIBER WRAP, 136TH STREET j
0290 29 EACH $130.000 4.00 0.00 4.00 4.00 4.00 $0.00 $520.00
DETOUR ROUTE MARKER ASSEMBLY
0300 30 EACH $160.000 22.00 7.00 22.00 29.00 29.00 $1,120.00 $4,640.00
CONSTRUCTION SIGN,A
0310 31 EACH $75.000 3.00 0.00 3.00 3.00 3.00 $0.00 $225.00
CONSTRUCTION SIGN,B
0320 32 DAY $15.000 120.00 6.00 120.00 126.00 126.00 $90.00 $1,890.00
FLASHING ARROW SIGN
0330 33 LSUM $9,124.780 1.00 0.00 1.00 1.00 1.00 $0.00 $9,124.78
MAINTAINING TRAFFIC, 106TH STREET
0340 34 LSUM $4,000.000_ 1.00 0.00 1.00 1.00 1.00 $0.00 $4,000.00
MAINTAINING TRAFFIC, 136TH STREET
0350 35 LFT $20.000 36.00 0.00 36.00 36.00 36.00 $0.00 $720.00
BARRICADE,III-A
0360 36 LFT $36.780 230.00 0.00 230.00 230.00 230.00 $0.00 $8,459.40
TEMPORARY TRAFFIC BARRIER,TYPE 2
0370 37 LFT $38.330 65.00 20.00 65.00 85.00 85.00 $766.60 $3,258.05
CONDUIT,PVC, 2 IN.
0380 38 EACH $3,358.000 1.00 0.00 1.00 1.00 1.00 $0.00 $3,358.00
LIGHT POLE AND LUMINAIRE, REMOVE AND RESET
0390 39 EACH $3,500.000 1.00 0.00 1.00 1.00 1.00 $0.00 $3,500.00
PORTABLE CHANGEABLE MESSAGE SIGN
I
Detailed Payment: 106th Street Beam Replacement Page 3 of 5 12/02/2016 i
I
1
f
Awarded Current Paid 'Previous Paid Total
Line Number Item Umt :,Unit Price Quantity TotahQuantity Current Payment, Total'Am
ount:
Quantity Quantity Quantity. Paid To Date Placed Amount Paid To Date
Section Totals: $26,338.84 $304,078.11
Total Payments: $26,338.84 $304,078.11
1
Time Charges
i
Charges Damages Days Days
Time Damages
Limit Original Authorized This This Completed Remaining . to.Date
Deadline Deadline Period Period to Date to.Date
Liquidated damages to be of a resonable amount agreed upon by Owner and
Contractor 09/01/2016 09/01/2016 N/A $0.00 N/A 1 Day $0.00
Total Damages: $0.00
Summary
Current Approved Work: $26,338.84 Approved Work To Date: $304,078.11
Stockpile Advancement: $0.00 Stockpile Advancement To Date: $0.00
Current Retainage: $0.00 Retainage To Date: $0.00
Current Retainage Released: $0.00 Retainage Released To Date: $0.00
Stockpile Recovery: $0.00 Stockpile Recovery To Date: $0.00
Current Liquidated Damages: $0.00 Liquidated Damages To Date: $0.00
Current Adjustment: $0.00 Adjustments To Date: $0.00
Current Taxes: $0.00 Taxes To Date: $0.00
Current Payment: $26,338.84 Payments To Date: $304,078.11
I
i
i
i
Detailed Payment: 106th Street Beam Replacement Page 4 of 5 12/02/2016
1
i
I
�ff
J d
Rieth-Riley, Inc. Date 1
i
erican Structurepoint, Inc. Date
City Ca el Date ±
i
i
i
i
f
0
1
Detailed Payment: 106th Street Beam Replacement Page 5 of 5 12/02/2016