HomeMy WebLinkAboutRieth-Riley Construction Co., Inc/Eng/CO #2/36,031.35/Spring Mill Road ReconstructionPage 1 of 2
CITY OF CARMEL
TO: Lucas Clark CONTRACT CHANGE ORDER NO.: 2
Rieth-Riley Construction Co., Inc. DATE: 2/28/2017
Box 276
1751 W. Minnesaota Street PROJECT NAME: Spring Mill Road Reconstruction /
175
Indianapolis, IN _P_roi. #16 -ENG -52
CITY REQ. NO.:
CITY PO NO.:
CITY PO DATE:
I. You are directed to make the following changes in this Contract:
*Deletion and Removal of existing Septic Systems (2) located at the following properties:
12510 & 12530 Spring Mill Road, Carmel, IN 46032
*All work associated with installation of new laterals and grinder pump stations at the
aforementioned properties per the attached Change Proposal and Plans.
*This Change Order will create a new item, ITEM # 143V — Septic Replacement, which
will be paid as a LUMP SUM in the amount of $36,031.35.
II. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order:
*Change Proposal for Septic Replacement as submitted by Rieth=Riley Construction Co.,
Inc. (Proposal includes plans for new sanitary designed by Crossroads Engineers, PC)
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $ 8.591.757.98
Contract Price will be increased/deefease�d by this Change Order $ 36;03.1.35
New Contract Price including this Change Order $ .8,627.789.33
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
AR -1
Page 2 of 2
The Above Changes Are
Recommended
United Consulting
ENGINEER
1625 N. Post Road
Address
Indianapolis, IN 46219
City/State/Zip
By:
94A;&z .
Phone: 317.724.5582
Date: 2/28/2017
The Above Changes Are Approved:
Accepted:
Rieth-Riley
CONTRACTOR s Brai d, M
1751 W. Minnesota Street
Address Mary Bur ,
Indianapolis, IN 46206
Qt�/`i _ Lori Mfa n�Memb
Date: 3/2/17 _
Je y K man, ?.E --
City
. City Engineer
Date: �&// j�-
CONSTRUCTION CO.. INC.
100%Quality • 100% Employee Owned • Over 100 Years
February 22, 2017
Bret Smiley
United Consulting
Construction Manager
1625 N. Post Road
Indianapolis, IN 46219
RE: Spring Mill Road Improvements
City of Carmel Project No. 16 -ENG -27 & 16 -SW -07
Rieth-Riley Project No. 3200671
Dear Mr. Smiley,
SENT VIA ELECTRONIC MAIL ONLY:
Bret.Smiley@ucindy.com
Rieth-Riley Construction is proposing a contract adjustment in the amount of $36,031.35 to install new grinder pumps
and force main laterals at 12510 and 12530 Spring Mill Road.
This pricing includes
• Install 1 %" HDPE SDR11 lateral across Spring mill road with locate wire at desired depth.
• Excavate and tap existing force main sewer for lateral connections along with providing and installing lateral
assembly shut off valves per C.T.R.W.D. specifications
• Excavate and set new Zoller Grinder pump stations with control panels mounted at either the houts or grinder
tank location. 815 Shark model as approved by C.T.R.W.D..
• Provide electrical hook up from house to control panel. At time of bid it is uncertain where there is ample space
for new 30 double pole breaker in residence breaker panels. If panel does not have this capacity, additional
costs to make this connection may apply.
• Pump, crush and fill with granular fill existing septic tanks as needed per county health department
requirements.
• Restoration to disturbed area in home owners yard off right of way.
• Hydro excavation of exiting force main to determine depth.
A detailed breakdown of this pricing is attached on the following pages.
Please call with any questions.
Thanks
Lucas S. Clark
Project Manager
RIETH-RILEY CONSTRUCTION CO., INC.
cc: Eric McKinley
Mike Jaskela
P.D. Box 276.1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com
RIETH-RILEY CONSTRUCTION
EXTRA WORK AGREEMENT
LABOR 109.05 MY
FRINGES
TOTAL LABOR $172.40 (2)
FICA 7:¢ % x LINE (2) $12.93 (3)
EMPLOYEE
HOURS
WORKERS COMPENSATION 5.72'' % X LINE (2)
RATE
EMPLOYEE
Regular Overtime Doubletime TOTAL
RATE
EXTENSION
CARPENTER
0.00
$27.49
$0.00
CARPENTER FOREMAN
0.00
$28,;99
$0.00
COMBINATION
0.00
$29.01
$0.00
FINISHER
0.00
$25.'021
$0.00
FOREMAN
0.00
$34.15
$0.00
LABORER
0.00
$23:62
$0.00
MECHANIC
0.00
;$3$.15
$0.00
OPERATOR (103)0.00
X
$33'
$0.00
OPERATOR (841)
0.00.
$31x80
$0.00
OPERATOR OILER (103)
0.00
$30.51
$0.00
QA TECH
0.00
$23`.62
$0.00
SUPERINTENDENT/PROJECT MANAGER
4.00 4.00
$43:10
$172.40
TEAMSTER
0.00
$27.91
$0.00
FRINGES
TOTAL LABOR $172.40 (2)
FICA 7:¢ % x LINE (2) $12.93 (3)
EMPLOYEE
HOURS
WORKERS COMPENSATION 5.72'' % X LINE (2)
RATE
EXTENSION
CARPENTER
0.00
X
$1.8:20 =
$0.00
CARPENTER FOREMAN
0.00
X
$18:20 =
$0.00
COMBINATION
0.00
X
$14,91 =
$0.00
FINISHER
0.00
X
$13.96 =
$0.00
FOREMAN
0.00
X
:-.,$1T06 =
$0.00
LABORER
0.00
x
L,$13.96 =
$0.00
MECHANIC
0.00
X
$1.7:06 =
$0.00
OPERATOR (103)
0.00
X
;$17:06 =
$0.00
OPERATOR (841)
0.00
X.$19.5,1
_
$0.00
OPERATOR OILER (103)
0.00
X
$ 7.06 =
$0.00
QATECH
0.00
X
_ .',,;$13:96 =
$0.00
SUPERINTENDENT/PROJECT MANI
4.00
x 1
$1 0:951
$43.80
TEAMSTER 1
0.00 1
x 1
$14.91 =
$0.00
TOTAL FRINGES
$43.80 (4)
WORKERS COMPENSATION 5.72'' % X LINE (2)
$9.86 (5)
BODILY INJURY/ PROPERTY DAMAGE INSURANCE 5.80 % X LINE (2)
$10.00 (6)
STATE UNEMPLOYMENT ✓3.85: % X LINE (2)
$6.64 (7)
FEDERAL UNEMPLOYMENT 0.40'' % X LINE (2)
$0.69 (8)
TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3)
$0.00 (9)
TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9
$256.32 (10)
20 % x LINE (10)
$51.26(11)
GRAND TOTAL LABOR LINES (10) + (11)
$307.58 (12)
Page 1 of 2
MATERIAL 109.05 (b)(3)
MATERIALS PURCHASED
$0.00 (18)
MATERIALS MANUFACTURED
$0.00 (19)
TOTAL: LINE (18)+(19)
$0.00 (20)
12%xLINE (?0)
$0.00 (21)
GRAND TOTAL FOR MATERIALS: LINE (20) + (21)
$0.00 (22)
EQUIPMENT 109.05 (b)(4)
$0.00
Equipment# CONTRACTOR OWNED EQUIPMENT
FHWA HOURLY RATE
HOURS
EXTENSION
FUEL, LUBRICANTS AND TRANSPORTATION COSTS
$94:65
TOTAL LINES (23) + (24) + (25)
$0.00
12 % x LINE (26)
$60.60'
GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27)
$0.00
SUBCONTRACTORS 109.05 (b)(6)
$z2:i6
$0.00
$om
$0.00
$0.00
. _ ..:. $0.00
_ __�
$0.00
$o.00
$0.00
$b:00
$0.00
$0.00
Trucking - Striaght Time
$0.00
$0.00
Trucking - Over Time
�' _;„ $0.00 �. ' ,
_'.. ", -,
$0.00
Trucking - Double Time
... $0.00
TOTAL EQUIPMENT
$0.00 (23)
TOTALTRUCKING
$0.00 (24)
FUEL, LUBRICANTS AND TRANSPORTATION COSTS
$0.00 (25)
TOTAL LINES (23) + (24) + (25)
$0.00 (26)
12 % x LINE (26)
$0.00 (27)
GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27)
$0.00 (28)
SUBCONTRACTORS 109.05 (b)(6)
TOTAL SUBCONTRACT WEEK ENDING $32,900.00 (29)
10 % x LINE (30) $3,000.00 OR LESS $300.00 (31)
7 % x LINE (30) OVER $3,000.00 $2,093.00 (32)
GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $35,293.00 (33)
TOTAL OF WORK COMPLETED FOR THE WEEK
TOTAL LINES (12), (17), (22), (28) 8 (33) $35,600.58 (34)
€ % OF BOND RATE BASED UPON LINE (34) $391.61 (35)
10 % x LINE (35) $39.16 (36)
TOTAL EXTRA WORK LINES: (34) + (35) + (36) $36,031.35 (37)
Page 2 of 2
TPT'#e
UTILITY CONSTRUCTION
TPI Utility Construction LLC
478 North County Road 1100 East
Zionsville, IN 46077
ADDRESS
Reith Riley Construction
1751 West Minnesota Street
Indianapolis, IN 46206
Estimate 1026
Please detach top portion and return with your payment.
..........................................................................................................................................................................
PROJECT NAME
Springmill Road Grinder Pumps
DATE
ACTIVITY
CITY
RATE
AMOUNT
02/21/2017
Install 1 1/4" HDPE SDR 11 lateral across
2
1,200.00
2,400.00
Springmill road with locate wire @ desired
depth. Crucial depth information must be
supplied by engineer or prime contractor.
02/21/2017
Excavate and tap existing FM sewer for
2
2,000.00
4,000.00
lateral connections. Includes providing and
installing lateral assembly shut off per
CTRWD specifications.
02/21/2017
Excavate and set new Zoller Grinder pump
2
8,000.00
16,000.00
Stations w/ control panels mounted either on
house or @ grinder tank location. 815 Shark
model as approved by CTRWD
02/21/2017
Provide electrical hook up from house to
2
1,200.00
2,400.00
control panel location. At time of bid
uncertain whether there is ample space for
new 30 amp double pole breaker in breaker
box. If not additional cost to make correct for
connection may apply and shall be identified
to engineer.
02/21/2017
Pump, crush and fill with granular fill existing
2
1,500.00
3,000.00
septic tanks as needed per county health
department regulations.
02/21/2017
Restoration to disturbed area in homeowners
2
1,500.00
3,000.00
yards.... assumed no reason for restoration
inside of construction limits.
Accepted By
TOTAL $30,800.00
Accepted Date
BORE IT ..... DON'T RESTORE IT !!
THANK YOU.