HomeMy WebLinkAboutEngineering Response Letter 03-28-17
March 28, 2017
Alex Jordan
City of Carmel – Department of Engineering
One Civic Square
Carmel, IN 46032
RE: Heritage at Spring Mill, Sections 1 & 2
Docket No. 16120017 SP
Dear Alex,
Please find enclosed 1 set of revised Section 1 & 2 Final Plats, Construction Plans and O&M Manual for
Heritage at Spring Mill. The plans have been revised per your comment email dated March 22, 2017. I
have addressed each of your items individually with a numbering system consistent to your comment
email.
Please note the plans have been updated for the last coordination with United Consultants related to the
City of Carmel Spring Mill Road Improvement project. Carmel’s consultant has added in the majority of
the right-of-way improvements into their scope of work and the design/connection points have been
updated and noted in the plans.
1. Please revise the elevations for lot 10 on C1.1. It appears that the MFPG elevation was placed on top
of the pad elevation.
The text overlap has been corrected on C1.1 for Lot 10.
2. Please show how the wetland area will be graded once it is removed on C1.2.
Additional grading has been added to the wetland area on sheet C1.2.
3. Please replace the dandy bag detail on C8.1 with a completely below the grate inlet protection, such
as Flexstorm or a similar product.
The dandy bag inlet protection detail has been replaced with Flexstorm inlet protection on
sheet C8.1.
4. Please provide a detail for a “No Mow or Spray” sign to be placed around the pond at the edge of the
native plantings. This needs to be provide in the plans and the O&M.
Additional signage has been added for “Stormwater BMP Native Plantings Do Not Mow or
Spray” on sheets C1.1, C1.3 and detail sheet C8.1.
If you have any questions or require additional information, please feel free to contact me at your
convenience.
Sincerely,
Brandon T. Burke, P.E.
Senior Project Manager
Enclosure