Loading...
HomeMy WebLinkAbout00_2017-03-30 - Sun King Distillery - CDs - Cover SheetSHEET INDEXPROJECT LOCATIONBUILDING LOCATIONwww.DELVdesign.comScaleDELV Design212 W 10th St, STE F125Indianapolis, IN 46202(317) 296-7400www.DELVdesign.comARCHITECTJPS CONSULTING ENGINEERS9365 COUNSELORS ROW, STE 116INDIANAPOLIS, IN 46240(317) 617-4270STRUCTURALHEAPY ENGINEERING3850 PRIORITY WAYSUITE #204INDIANAPOLIS, IN 46240(317) 571-8795MEP ENGINEERINGCIVIL & ENVIRONMENTAL CONSULTANTS530 E. OHIO STREET, SUITE GINDIANAPOLIS, IN 46204(317) 655-7778CIVIL ENGINEERINGF.A. WILHELM CONSTRUCTION.CO3914 PROSPECT ST.INDIANAPOLIS, IN 46203(317) 359-5411DESIGN BUILD CONTRACTOR3/30/2017 3:38:01 PMSun King at MidtownSun King SpiritsMIDTOWN, CARMELG001COVERSun King SpiritsCONSTRUCTION DOCUMENTS01 ARCHITECTUREA000 GENERAL NOTESA001 GENERAL ADA REQUIREMENTSA010 LIFE SAFETYA020 WALL TYPES AND ASSEMBLIESA110 DIMENSION PLANA120 ARCHITECTURAL PLANA130 REFLECTED CEILING PLANA140 ROOF PLANA150 ENLARGED PLANSA200 EXTERIOR ELEVATIONSA250 BUILDING SECTIONSA251 BUILDING SECTIONSA252 BUILDING SECTIONSA300 WALL SECTIONS - TYPICAL BAYA301 WALL SECTIONS - DISTILLERYA302 WALL SECTIONS - ENTRANCEA303 WALL SECTIONS - PATIOA320 EXTERIOR PLAN DETAILSA400 VERTICAL CIRCULATIONA401 VERTICAL CIRCULATIONA402 VERTICAL CIRCULATIONA500 OPENING / EQUIPMENT SCHEDULEA600 INTERIOR ELEVATIONSA601 INTERIOR ELEVATIONSA800 BAR DETAILSA801 INTERIOR DETAILSIF100 INTERIOR FINISH PLANSTRUCTURAL DRAWINGSS001GENERAL NOTES AND ABBREVIATIONSS110FOUNDATION PLANS120SECOND FLOOR FRAMING PLANS121SECOND FLOOR CONNECTION LOADSS130ROOF FRAMING PLANS131ROOF FRAMING CONNECTION LOADSS210SECTIONSS211SECTIONSS220SECTIONSS221SECTIONSS230SECTIONSS250FRAMING ELEVATIONSS251FRAMING ELEVATIONSS300TYPICAL FOUNDATION DETAILSS302CONCRETE PIER DETAILSS305TYPICAL SLAB ON GRADE REINFORCINGS310TYPICAL COMPOSITE SLAB REINFORCING DETAILSS501TYPICAL STEEL COLUMN DETAILSS502ANCHOR ROD LAYOUTSS505TYPICAL STEEL CONNECTION DETAILSS510TYPICAL FLOOR FRAMING DETAILSFIRE SUPPRESSIONFS000SYMBOLS, ABBREVIATIONS, INDEXFS100FIRE SUPPRESSION PLANSPLUMBING DRAWINGSP001SYMBOLS, ABBREVIATIONS & INDEXP101FOUNDATION PLUMBING PLANP102FIRST & SECOND FLOOR PLUMBING PLANP103PLUMBING ROOF PLANP400SOIL, WASTE & VENT DIAGRAMP500PLUMBING SCHEDULES AND DETAILSELECTRICAL DRAWINGSE001SYMBOLS, ABBREVIATIONS & INDEXE002SINGLE LINE DIAGRAM & PANEL SCHEDULESE003ELECTRICAL SCHEDULESE004ELECTRICAL DETAILSE201FIRST FLOOR LIGHTING PLANE202SECOND FLOOR LIGHTING PLANE301FIRST FLOOR POWER & SYSTEMS PLANE302SECOND FLOOR POWER & SYSTEMS PLANE303ROOF POWER PLANCIVIL DRAWINGSC200SITE PLANC300GRADING PLANC500SITE UTILITY PLANC800SITE UTILITY PLANC801SITE DETAILSC802SITE DETAILSC900STORMWATER POLLUTION PREVENTION PLANC901STORMWATER POLLUTION PREVENTION NOTESC902STORMWATER POLLUTION PREVENTION DETAILSMECHANICAL DRAWINGSM001SYMBOLS, ABBREVIATIONS & INDEXM101FIRST FLOOR MECHANICAL PLANM102SECOND FLOOR MECHANICAL PLANM103ROOF MECHANICAL PLANM501MECHANICAL DETAILSM701MECHANICAL SCHEDULESSITE AERIAL IS OUT OF DATE BUILDING SITE HAS BEEN REDEVELOPED SINCE THIS PHOSTO WAS TAKEN