HomeMy WebLinkAboutCrossRoad Engineers, P.C./Eng/Adl Serv #24/379,700/Guilford Road/Carmel Drive, Guilford Road/City Center Drive, Carmel Drive/City Center Drive Roundabouts – Construction InspectionCrossRoad Engineers, P.0
Engineering Department- 2017
Appropr'iatio'n # General Obligation Bonds Fund; P.O. # 100343 e
Contract Not To Exceed $379,700.00
ADDITIONAL SERVICES AMENDMENT.TO
AGREEMENT FOR PROFESSIONAL SERVICES
THIS AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES ('Agreement') entered into
by and between the City of Carmel and CrossRoad Engineers, P.C. (the "Professional''), as City Contract dated
March 16, 2016 shall amend the terms of the Agreement by adding the additional services- to be provided by
Professional consistent with:the Scope of Work attached hereto and incorporated herein as Exhibit "A". The terms
and conditions of the Agreement shall not otherwise.be affected by this Additional Services Amendment and shall
remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows:
CITY OF CARMEL, INDIANA
by and through its Board of Public
Works and Safety
'James Brainard; Presiding Officer
Date:
Mary Ann: rke, Vber
Date: 7
Lori S.atsonber
Date: /1 / a 7
"i,Cinm..�ItilS,.: A; Q,..J. S,a'£n,:"„ruugl`n17Cmuoxl Ge ,ert, As,\ el.tdx; V1'J1117 tR:SY.1.�t1
CrossRoad Engineers, P.C.
VV a 't e -z" k(Jtf i C__
Printed Name
Title 2
F.1D/TIN:
Last Four of SSN if Sole Proprietor:
Date:
April 4, 2017
Mr. Jeremy Kashman, City Engineer
City of Carmel
One Civic Square
Carmel, IN 46032
Re: Project No. 16 -ENG -23, Roundabout at Guilford Road and Carmel Drive
Project No. 16 -ENG -24, Roundabout at Guilford Road and City Center Drive
Project No. 16 -ENG -25, Roundabout at Carmel Drive and City Center Drive
Fee Proposal for Construction Inspection Services
Dear Jeremy:
We are submitting a fee proposal to provide full-time construction inspection services for the above
projects. These projects have been bid and will be sequentially built under one construction contract.
The first project is scheduled to start construction May 1, 2017 and the last project is scheduled to be
substantially completed October 3, 2017. Final completion of all three is scheduled for October 17, 2017.
Below is a listing of individuals we expect to be using on this project:
Trent E. Newport
Lance Stahley
Curtis Holcom, Justen Hochstetler
To Be Named
To Be Named
Director
Resident Project Representative
Project Inspectors
Assistant Project Inspectors
CADD Technicians (As Builts)
During the major construction duration (estimated 9 weeks for 16 -ENG -25, 7 weeks for 16 -ENG -24, and 7
weeks for 16 -ENG -23), we have budgeted 8 hours per week for the Director, 24 hours per week for the
Resident Project Representative, 50 hours per week for the Project Inspector, and 50 hours per week for
the Assistant Project Inspector. For 2 weeks prior to major construction beginning on each project, we
have budgeted 2 hours per week for the Director and 10 hours per week for the Resident Project
Representative for utility coordination. For 2 weeks after substantial completion, we have budgeted 8
hours per week for the Director, 16 hours per week for the Resident Project Representative, and 24 hours
per week for the Project Inspector for construction punch list items. All of this work will be performed on
an hourly basis in accordance with the attached schedule of hourly rates. These budgeted hours, with the
corresponding billing rates, yield the estimated costs per project.as shown on the attached spreadsheets.
To assist with the on-site material testing, we will utilize the services of Earth Exploration, Inc. Attached
are.proposals for their anticipated services.
If you should have any questions or need any further information, please do not hesitate to call me or
Trent Newport.
Sincerely,
'EXHIBIT •
3417 Sherman Drive 0 Beech Grove, Indiana 46107 ■ Tel 317.780.1555 E Fax 317.780.6525
Roundabout Construction at Guilford Road and Carmel Drive
Project No. 16 -ENG -23
Estimated Costs for Construction Inspection
ACTIVITY3
70 miles/wk
x 9 weeks
ASST PROD
'
The proposed fee for these estimated hours is as follows:
140 miles/wk
DIR
1E5 PROI REP
PROJ INSP��
OADDTECH
„..
�.�
Billing Rate
Total Hours
Direct Labor Costs
INSP
$150.00
Utility Coord before Const 2 wks
4
20
0
0
0
Major Const Duration
7 wks
56
168
350
350
0
After Major Const
2 wks
8
32
48
0
0
Complete Final Record*
4 wks
8
40
40
0
8
TOTAL HOURS
76
260
438
350
8
* Includes "As -Built' information
70 miles/wk
x 9 weeks
$327.60
The proposed fee for these estimated hours is as follows:
140 miles/wk
x 2 weeks
DIRECT LABOR COSTS --
Res. Proj. Rep. (Major)
350 miles/wk
x 7 weeks
Personnel Class
Billing Rate
Total Hours
Direct Labor Costs
Director
$150.00
76
$11,400.00
Resident Proj. Rep.
$115.00
260
$29,900.00
Project Inspector
$95.00
438
$41,610.00
Asst. Proj. Inspector
$75.00
350
$26,250.00
CADD Technician
$85.00
8
$680.00
TOTAL DIRECT LABOR COSTS
$109,840.00
DIRECT NON - LABOR COSTS --
MILEAGE
Direct Non -Labor Costs
Budgeted mileage rate is
$0.52 /mile
Director
70 miles/wk
x 9 weeks
$327.60
Res. Proj. Rep. (Util. Coord.)
140 miles/wk
x 2 weeks
$145.60
Res. Proj. Rep. (Major)
350 miles/wk
x 7 weeks
$1,274.00
Proj. Inspector (Major)
350 miles/wk
x 7 weeks
$1,274.00
Asst. Proj. Inspector (Major)
350 miles/wk
x 7 weeks
$1,274.00
Res. Proj. Rep. (After Major)
70 miles/wk
x 2 weeks
$72.80
Proj. Inspector (After Major)
140 miles/wk
x 2 weeks
$145.60
ON-SITE MATERIALS TESTING
See attached on-site material testing proposal from Earth Exploration.
$3,675.00
TOTAL DIRECT NON -LABOR COSTS $8,188.60
TOTAL ESTIMATED COSTS $118,028.60
USE $118,100.00
"EXHIBIT
--,A
26�
CONSTRUCTION SERVICES AND MATERIALS TESTING COST ESTIMATE
CARMEL ROUNDABOUTS
16 -ENG -23 to 25
CARMEL, INDIANA
EEI PROPOSAL NO. P1-17-253
"B HIBIT J "
Overtime/After hours work not included in Estimated Cost
All Time is considered portal to portal ly'
FIELD TESTING AND OBSERVATION SERVICES
16 -ENG -23 Guilford Rd. and Carmel Dr.
Subarade Testing
Engineering Technician
10 hours
$35.00 / hr
$350.00
Backfill and Subbase Testing
Engineering Technician
20 hours
35.00 / hr
$700.00
Concrete Testing
Engineering Technician
24 hours
35.00 /hr
$840.00
Subtotal
$1,890.00
EQUIPMENT AND TRANSPORTATION
Dynamic Cone Penetrometer
1 days
$30.00 /day
$30.00
Lightweiaht Deflectometer
4 days
$200.00 /day
$800.00
Transportation
14 trips
20.00 /trip
$280.00
Subtotal
$1,110.00
ENGINEERING AND ADMINISTRATION
Construction Services Manager
5 hrs
$100.00 / hr
$500.00
Secretarial
5 hrs
35.00 / hr
175.00
Subtotal
$675.00
Estimated Total Cost
$3,675.00
"B HIBIT J "
Overtime/After hours work not included in Estimated Cost
All Time is considered portal to portal ly'
Roundabout Construction at Guilford Road and City Center Drive
Project No. 16 -ENG -24
Estimated Costs for Construction Inspection
y
ACTI\%ITY''
$0.52 /mile
3 jSs �v,
A OJ
RES
Director
The proposed fee for these estimated hours is as follows:
x 9 weeks
IR
PROD REP PROD
INSP
CADD
INSP.
TECH
Utility Coord before Const
2 wks
4
20
0
0
0
Major Const Duration
7 wks
56
168
350
350
0
After Major Const
2 wks
8
32
48
0
0
Complete Final Record*
4wks
8
40
40
0
8
TOTAL HOURS
76
260
438
350
8
* Includes "As -Built' information
$0.52 /mile
Director
The proposed fee for these estimated hours is as follows:
x 9 weeks
Res. Proj. Rep. (Util. Coord.)
DIRECT LABOR COSTS --
x 2 weeks
Res. Proj. Rep. (Major)
350 miles/wk
Personnel Class
Billing Rate
Total Hours
Direct Labor Costs
Director
$150.00
76
$11,400.00
Resident Proj. Rep.
$115.00
260
$29,900.00
Project Inspector
$95.00
438
$41,610.00
Asst. Proi. Inspector
$75.00
350
$26,250.00
CADD Technician
$85.00
8
$680.00
TOTAL DIRECT LABOR COSTS
$109,840.00
DIRECT NON - LABOR COSTS --
MILEAGE
-
MILEAGE
Budgeted mileage rate is
$0.52 /mile
Director
70 miles/wk
x 9 weeks
Res. Proj. Rep. (Util. Coord.)
140 miles/wk
x 2 weeks
Res. Proj. Rep. (Major)
350 miles/wk
x 7 weeks
Proj. Inspector (Major)
350 miles/wk
x 7 weeks
Asst. Proj. Inspector (Major)
350 miles/wk
x 7 weeks
Res. Proj. Rep. (After Major)
70 miles/wk
x 2 weeks
Proj. Inspector (After Major)
140 miles/wk
x 2 weeks
ON-SITE MATERIALS TESTING
See attached on-site material
testing proposal from Earth Exploration.
TOTAL DIRECT NON -LABOR COSTS
TOTAL ESTIMATED COSTS
USE
Direct Non -Labor Costs
$327.60
$145.60
$1,274.00
$1,274.00
$1,274.00
$72.80
$145.60
$3,495.00
$8,008.60
$117,848.60
$117,900.00
"EXHIBIT/A
Lf 0_�7
CONSTRUCTION SERVICES AND MATERIALS TESTING COST ESTIMATE
CARMEL ROUNDABOUTS
16 -ENG -23 to 25
CARMEL, INDIANA
EEI PROPOSAL NO. P1-17-253
Overtime/After hours work not included in Estimated Cost
All Time is considered portal to portal
"EXHIBIT A •
FIELD TESTING AND OBSERVATION SERVICES
16 -ENG -24 Guilford Rd. and City
Center Dr.
Subarade Testina
Engineering Technician
10 hours
$35.00 / hr
$350.00
Backfill and Subbase Testing
Engineering Technician
20 hours
35.00 / hr
$700.00
Concrete Testing
Engineering Technician
20 hours
35.00 /hr
$700.00
Subtotal
$1,750.00
EQUIPMENT AND TRANSPORTATION
Dynamic Cone Penetrometer
1 days
$30.00 /day
$30.00
Lightweight Deflectometer
4 days
$200.00 /day
$800.00
Transportation
12 trips
20.00 /trip
$240.00
Subtotal
$1,070.00
ENGINEERING AND ADMINISTRATION
Construction Services Manaaer
5 hrs
$100.00 / hr
$500.00
Secretarial
5 hrs
35.00 / hr
175.00
Subtotal
$675.00
Estimated Total Cost
$3,495.00
Overtime/After hours work not included in Estimated Cost
All Time is considered portal to portal
"EXHIBIT A •
Roundabout Construction at Carmel Drive and City Center Drive
Project No. 16 -ENG -25
Estimated Costs for Construction Inspection
ACTIUItY
DIR `RES PROJ 'PROJ'INSP
SST PR
A QJ
Director
The proposed fee for these estimated hours is as follows:
x 9 weeks
Res. Proj. Rep. (Util. Coord.)
REP
INSP
CAUD TECH=
Utility Coord before Const 2 wks
4
20
0
0
0
Major Const Duration 9 wks
72
216
450
450
0
After Major Const 2 wks
8
32
48
0
0
Complete Final Record* 4 wks
8
44
40
0
8
TOTAL HOURS
92
312
538
450
8
* Includes "As -Built' information
$0.52 /mile
Director
The proposed fee for these estimated hours is as follows:
x 9 weeks
Res. Proj. Rep. (Util. Coord.)
DIRECT LABOR COSTS --
x 2 weeks
Res. Proj. Rep. (Major)
350 miles/wk
Personnel Class
Billing Rate
Total Hours
Direct Labor Costs
Director
$150.00
92
$13,800.00
Resident Proj. Rep.
$115.00
312
$35,880.00
Project Inspector
$95.00
538
$51,110.00
Asst. Proj. Inspector
$75.00
450
$33,750.00
CADD Technician
$85.00
8
$680,00
TOTAL DIRECT LABOR COSTS
$135,220.00
DIRECT NON - LABOR COSTS --
MILEAGE
Budgeted mileage rate is
$0.52 /mile
Director
70 miles/wk
x 9 weeks
Res. Proj. Rep. (Util. Coord.)
140 miles/wk
x 2 weeks
Res. Proj. Rep. (Major)
350 miles/wk
x 7 weeks
Proj. Inspector (Major)
350 miles/wk
x 7 weeks
Asst. Proj. Inspector (Major)
350 miles/wk
x 7 weeks
-Res. Proj. Rep. (After Major)
70 miles/wk
x 2 weeks
Proj. Inspector (After Major)
140 miles/wk
x 2 weeks
ON-SITE MATERIALS TESTING
See attached on-site material
testing proposal from Earth Exploration.
TOTAL DIRECT NON -LABOR COSTS
TOTAL ESTIMATED COSTS
USE
Direct Non -Labor Costs
$327.60
$145.60
$1,274.00
$1,274.00
$1,274.00
$72.80
$145.60
$3,905.00
$8,418.60
$143,638.60
$143,700.00
"EXHIBIT
a
CONSTRUCTION SERVICES AND MATERIALS TESTING COST ESTIMATE
CARMEL ROUNDABOUTS
16 -ENG -23 to 25
CARMEL, INDIANA
EEI PROPOSAL NO. P1-17-253
FIELD TESTING AND OBSERVATION SERVICES
16 -ENG -25 Carmel Dr. and City Center Dr.
Subgrade Testing
Engineering Technician 12 hours $35.00 / hr
Backfill and Subbase Testin4
Engineering Technician 20 hours 35.00 / hr
Concrete Testing
Engineering Technician 20 hours 35.00 /hr
Subtotal
Strength Specimens
Beams
Dynamic Cone Penetrometer
Lightweight Deflectometer
Transportation
Construction Services Manager
Secretarial
LABORATORY TESTING SERVICES
$420.00
$700.00
$700.00
$1,820.00
4 beams $35.00 / ea $140.00
Subtotal $140.00
EQUIPMENT AND TRANSPORTATION
1 days
$30.00 /day
5 days
$200.00 /day
12 trips
20.00 /trip
Subtotal
ENGINEERING AND ADMINISTRATION
5 hrs
$100.00 / hr
5 hrs
35.00 / hr
Subtotal
Estimated Total Cost
Overtime/After hours work not included in Estimated Cost
All Time is considered portal to portal
$30.00
$1,000.00
$240.00
$1,270.00
$500.00
175.00
$675.00
$3,905.00
naHIBIT A
7&-rY
HOURLY BILLING RATES
PERSONNEL CLASSIFICATION HOURLY RATE
DESIGN
Director
$ 150.00
Senior Project Manager
130.00
Project Manager
115.00
Project Engineer
100.00
Assistant Project Engineer
85.00
CADD Manager
100.00
CADD Technician
85.00
Assistant CADD Technician
70.00
R/W Manager
95.00
R/W Buyer
150.00
INSPECTION
Director $ 150.00
Resident Project Representative 115.00
Asst Resident Project Representative 105.00
Project Inspector 95.00
Assistant Project Inspector 75.00
SURVEY
Survey Manager
$ 120.00
Assistant Survey Manager
85.00
Survey Crew —1 Man
105.00
Crew Chief
85.00
Field Man
65.00
Researcher
80.00
Survey Technician
85.00
MISCELLANEOUS
Mileage (per mile) $ 0.52
Other Direct Costs at cost +15%
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, Indiana 46107
Rates Effective through December, 2017
"EXHIBIT
1910S
CONSTRUCTION MONITORING UNIT RATE FEE SCHEDULE
ITEM
DESCRIPTION
UNIT PRICE
C-1
Personnel for Consultation, Monitoring or Report Writing Including Travel Time
A.
Construction monitoring manager, per hour
$100.00
B.
Special testing and observations (e.g., proof -roll, structural steel and masonry observations)
60.00
C.
Soils engineer, P.E., per hour
100.00
D.
Senior project engineer, P.E., per hour
115.00
E
Principal engineer, P.E., per hour
175.00
F.
Special consulting, per hour
175.00
C-2
Engineering
Technician for Performing Field Testing, Sampling or Monitoring Including Travel Time
A.
Regular time, (4 hour minimum), per hour
35.00
B.
Overtime - over 8 hours per day, after 5:00 p.m. and Saturday, per hour
45.50
C.
Sundays and holidays, per hour
52.50
(Technician certified by American Concrete Institute, INDOT and Troxler Electronic Laboratories)
C-3
Senior
Engineering Technician for Performing Field Testing, Sampling or Monitoring Including Travel Time
A.
Regular time, (4 hour minimum), per hour
35.00
B.
Overtime - over 8 hours per day, after 5:00 p.m. and Saturday, per hour
45.50
C.
Sundays and holidays, per hour
52.50
(Technician certified by American Concrete Institute, INDOT and Troxler Electronic Laboratories)
C-4
Secretarial, per hour
35.00
C-5
SolgAggregate Testing
A.
Standard Proctor (ASTM D 698), per each
125.00
B.
Modified Proctor (ASTM D 1557), per each
150.00
C.
Verification of Proctor results (1 point), per each
65.00
D.
Sieve analysis with decantation (coarse aggregate), per each
135.00
E.
Special sample preparation, per hour
65.00
C-6
Concrete Testing
A.
Compressive strength testing of 6" X 12" concrete cylinders, per each
10.00
B.
Compressive strength testing of 2" X 2" cubes, per each
10.00
C.
Compressive strength testing of 3" X 3" grout prisms, per each
15.00
D.
Flexural strength testing of 6" X 6" X 20" concrete beams, per each
35.00
C-7
Asphalt Testing
A.
Unit weight of asphaltic concrete cores, per each
35.00
B.
Asphalt extraction and gradation, per each
185.00
C.
Asphalt Marshall stability, flow and density (3 points per test), per test
350.00
D.
Certified Bituminous Technician (sampling and testing at batch plant), per hour
65.00
C-8
Fireproofing Testing
A.
Density (Dry -back and Dimensions) ASTM E605, per test
30.00
B.
Adhesion/Cohesion (ASTM E736), per test
30.00
C-9
Special Equipment
A.
Nuclear moisture -density gauge, per site visit
55.00
B.
Concrete/asphalt coring machine, per site visit
120.00
C.
Diamond core bit wear, per inch diameter/per inch depth
2.50
D.
Torque wrench (600 ft -Ib), per site visit
50.00
E.
Dynamic cone penetrometer, per site visit
30.00
C-10
Reimbursable Expenses
A.
Overnight living expenses, per person per day
100.00
B.
Per diem, per person per day
35.00
C.
Mileage for all personnel (company or private vehicle), per mile
0.50
D.
Transportation, long distance telephone calls, shipping, facsimile transmissions
or items not ordinarily provided by EEI
Cost + 10%
E.
Up to 4 copies of all reports are normally provided. All copies in excess of 4, per 8W X 11" sheet
0.10
C-11
General
A.
All work must be authorized by a purchase order or letter of authorization.
B.
Unit prices will remain in effect for 60 days from date of quotation.
C.
Invoices submitted for payment are due within 30 days of the invoice date unless another
payment schedule has been agreed upon prior to commencing the work.
D.
Invoices will be submitted once a month for services provided during that month.
E.
A service charge of IY2% per month (18% per year) will be added to all past due accounts.
"EXHIBIT )4
One
City of Carmel
INDIANA RETAIL TAX EXEMPT
CERTIFICATE NO. 003120155 002 0
Page:1 of 1
PURCHASE ORDER NUMBER
JL
FEDERAL EXCISE TAX EXEMPT
100348
ONE CIVIC SQUARE
35-6000972
THIS NUMBER MUSTAPPEAR ON INVOICES, AIP
CARMEL, INDIANA 46032-2584
VOUCHER, DELIVERY MEMO, PACKING SUPS,
FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR
CITY OF CARMEL -1997
SHIPPING LABELS AND ANY CORRESPONDENCE
PURCHASE ORDER DATE
DATE REQUIRED-
REQUISITION NO.
VENDOR NO.
DESCRIPTION
4/10/2017
068025
Projects 16 -ENG -23,16 -ENG -24,16 -ENG -25; Contract Date
03.16.16
CROSSROAD ENGINEERS, PC
City Engineering's Office
VENDOR. 3417 S SHERMAN DR .
SHIP 1 Civic Square
TO Carmel, IN 46032 -
BEECH GROVE, IN 46107 -
Kate Lustig
PURCHASEID
BLANKET
CONTRACT
PAYMENTTERMS
FREIGHT
14412
QUANTITY
UNIT OF MEASURE
DESCRIPTION
UNIT PRICE EXTENSION
Department: 2200 . Fund.0
Account: 94-650.04
1 Each
Send Invoice To;
General Obligation Bond
ASA 24 - Guilford Rd/Carmel Dr, Guilford Rd/City Center,
Carmel Dr/City Ctr - Inspection
'y
$379,700.00 $379,700.00
Sub Total $379,700.00
Jill Newport A
CrossRoad Engineers, P.C.
3417 Sherman Drive
b `q
Beech Grove, IN 46107 ".
G.O./Storm Water Bonds "
PLEASE INVOICE IN DUPLICATE
DEPARTMENT ACCOUNT PROJECT PROJECTACCOUNT AMOUNT
PAYMENT $379,700.00
SHIPPING INSTRUCTIONS ' AIP VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. NUMBER IS MADE A
PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN
'SHIP PREPAID. AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBLIGATED BALANCE IN
'C.O.D. SHIPMENT CANNOT BE ACCEPTED. THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER.
'PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL
'THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945��
AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO. ORDERED BY
Jeremy Kashman
TITLE Director
CONTROL NO. 100348 CLERK -TREASURER -
Douglas Haney
Corporation Counsel