HomeMy WebLinkAboutFoldoutGOALS, OBJECTIVES AND POLICIES
Goals are ultimate ends toward which action
meat and reduction of all types of pollution
sen ices unless the L opacity of the services can be
The Comprehensive Plan Update's objectives and
should be directed; they are general in nature. Ob-
The quality of Carmel/Clay Township's natural
increased at reasonable cost -for example, by
policies are divided into sections on general, resi-
jectives are more specific and immediate ends toward
environment should be protected from develop
widening a road or constructing additional class-
denial, commercial and industrial development,
whichprograms and actions should be directed.
nest that proceeds without regard for the natural
rooms for a school.
open space and recreation, community facilities and
Pe P tY
They are, whenever possible, stated in terms of at-
limitations of land.
;
services, and circulation.
tainable conditions. Policies are explicit statements
.r:� k
Policy 3 - Development patterns that result
The general development policies support devel-
of desired courses of action to guide the development
Goal 4 - Reduction of the ratio of public costs
from market forces should be permitted and
opment that makes the maximum and most efficient
process. They are not proposals for specific public
to revenue
encouraged where they are compatible with
use of existing public facilities, considers develop -
actions in specific individual situations but are in-
Public programs should be aimed at the most ef-
other policies.
ment as a result of the operation of market forces
tended to serve as "guides" in any of a large number
ficient use of public resources to attain public goals.
There is little value in attempting to implement
and encourages large-scale, well planned projects.
of situations.
Public dollars should be cautiously reserved for
policies that are in conflict with normal economic
These policies form a framework for the rational
General Development Goals
services and facilities for which the private sector
forces. Such policies tend to be expensive in terms
development of land within Carmel/Clay Township.
Goal 1 - A living environment of high quality
will not respond nor be expected to respond.
of time and effort unless they are based on some
important
• The objectives and policies for residential de -
and diversity
Goal 5 - A stable and united community
community need.
velopment are designed to protect neighbor -
hoods from the effects of spreading
The attractive and functional design of buildings
Development policy should be aimed at solidifying
'community'
Policy 4 -Large-scale developments should be
P
encouraged when they are well-planned and
nonresidential activities and disinvestments and
and areas can have positive economic and sy-
p p ,
chological as well as aesthetic effects. Good design
and strengthening the concepts of
gth g P
and *neighborhood.*
particularly when they include such amen -
encourage renewal in deteriorating
neighborhoods.
of residential, commercial, industrial areas and
open spaces can reduce cost while at the same
General Development Policies
ities as utilities, thoroughfares, public open
space and/or recreational facilities.
• The objectives and policies for commercial de-
,velopment
time increase the value of the communis• as a
Policy 1 - Develo est should be eneou ed
Pm rs$cation
Generally speaking, large-scale planned develop-
address quality, mix, scale and Io -
of development.
place to live/work/shop.
to first use developable, vacant land within
those areas that have already experienced
ments provide an emtronment superior to devel-
opments consisting of many individually built
• The objectives and policies for industrial de -
Goal 2 - A sound, balanced and diversified
levels of development and have the
facilities. The advantages of larscale Planned
� � P
velopment encourage/promote a diversified
economyintense
The result of economic development in Carmel/
streets and infrastructure necessary to sup-
port development.
developments exist because planning uses the
most w
workable patterns of activities and land use
economic base.
• The objectives and policies for open space and
Clay Township should be an economy that is
sound. This means that fluctuations in some ser
This policy and Polio _, which follows, will
and because the% can provide combinations of fa-
cilities that tend u1 reinforce and strengthen each
gt
recreation propose a balance among a variety
of locations and types of recreational facilities
tors of the national and regional economies do not
encourage development that makes maximum and
other.
and suggest development that is sensitive to
bring about severe dislocations involving high un-
most efficient use of existing public facilities and
services'
These four basic policies form a framework for
unique environmental areas and agricultural
areas.
employment rates or serious losses of incomes.
Principally, this means an economy that does not
Policy 2 - The level of development intensity
the rational development of land within Carmel/Clay
'township. Higher densities should be near main
• The objectives and policies for community fa -
cilities and services apply principally to those
depend too heavily on any one industry. The
economy must be balanced in two senses. First,
that should be encouraged should be based
on the level of existing/planned access/high-
thoroughfares and business centers; lower densities
public services relating substantially to physical
it must provide employment opportunities for
ways, the suitability of soil and topographic
should be in areas of poorer soils and poorest asses-
sibility. Throughout all of these areas, developers
improvement. They encourage high -service
level at low cost and multiple use of facilities
range of skills and preferences. Second, it must
provide a base for adequate public revenues-pri-
conditions and the availability of necessary
should be encouraged to produce varied and efficient
where appropriate and accessible.
manly through taxes. It must be diversified for
services.
designs at the largest scale
P,n ge possible. The use of site
• The objectives and policies for circulation deal
m a
most of the reasons cited above and particularly
m
This policy should be the principal guide to the
plan review is to be encouraged to ensure the quality
with providing safe and efficient access through
avoid the severe effects economic limitations.
level of development density throughout the area.
of development. This review will also ensure that
Carmel and Clay Township without disrupting
Three water utilities serve Carmel and Clay
Clearly, no level should bepermitted to exceed
development will be consistent with communis
.
existing developed areas.
Goal 3 - Protection of the natural environ-
that level which can be supported by available
objectives.
Clay Township is to ensure the efficient distribution
DEVELOPMENT PATTERNS
One of the simplest yet most important aspects
stages of neglect and minor deterioration. Those
single-family housing units in 1979 numbered 422,
of a Comprehensive Plan► is evaluating a community's
problems associated with building and neighbor -
,
,\i/
present development and how the community at-
hood conditions in the Carmel/Clay area are aes-
-SCHOOLS
. ,
tained that development. Existing development
thetic, cosmetic and maintenance -related. Most
-
conditions analyzed were building conditions and
problems are present in older plats, such as the
6.9 % 7.9 % 7.9 %
land use. Examination of local building conditions
Home Place area. Commercial -related problems ex-
,acs "rtil a 1
;
revealed limited areas in need of building improve-
ist mainly in older commercial strips with changing
.r:� k
P -d
ments, the type of improvements needed and the
market identities. However, these problems can be
0
. I W.T1.N
kinds of structures with the most prevalent problems.
remedied easily if proper measures are taken.
________
Four basic building classifications were used for
Existing land uses were identified in 1984 follow -
NOW WATERWORKS FACILITIES
evaluation. These included residential, commercial,
ing a parcel -by -parcel inventory. Carmel is primarily
-
industrial and "other' structures, like barns and farm-
a suburban/exurban residential community with
usually these are open for membership only to sub-
related buildings. In three of these four categories,
continuing development of commercial, industrial
0
90 percent or more of the structures were sound. In
and office sectors. Clearly, Carmel/Clay Township
- /
the "other" category, which consists of structures that
is becoming more diverse and is no longer strictly a_
SERVICE AREA
are not residential, commercial or industrial in nature,
bedroom community. A large percentage of land,
- -- _
only about 68 percent were sound (Figure 5). Based
approximately 67 percent, is still undeveloped, va-
Hamilton County and encompasses four Planning
310 acres are devoted to general recreational facili-
cant or agricultural in nature (Figure 6). Single-family
.....
Figure 5
residential uses comprise slightly more than 16 per-
percent (compared to less than 1 percent in 1968). issues present in Carmel/Clay Township. Consid-
EXISTING BUILDING CONDITIONS
cent of the areas land use, the second-largest per-
Three major patterns of residential growth were eration of land use and development patterns cannot
BY TYPE OF STRUCTURE,centage
of land devoted to one use. Commercial
noted from the land Use Inventory. These included exclude consideration of the supporting street sss-
Sound •/ goo/. 92%
116th Street, Main Street (131st Street), Carmel
Drive and Mohawk Drive (126th Street).
and industrial uses make up slightly more than 5
the'core. area, surrounding curvilinear development tem. The area is well served by north -south high -
of the City and Township that appear to be under-
There are several other significant thoroughfares
mel/Clay schools has enrollment over capacity. The
The largest portion of residential neighborhoods ways; however, there are a limited number of east -
served. Many areas could be served with small
in the City and Township that serve important traffic-
Figure 6
are newer, platted areas served by local recreational west streets that can adequately serve the traffic gen-
. I 68 D'o
carrying functions primarily oriented to shorter trips
within the Township. In Clay Township, these in -
EXISTING LAND USE
facilities, churches and other support facilities. Ar erated. A second major land -use issue is the potential
Source: Woolpert Consultants
on this inventory, only a small portion of the building
stock is in need of "major" immediate attention. Most
of these are farm -related buildings, many of which
are obsolete and unused.
Carmel/Clay "I ownship has a few areas in the early
cess to these subdivisions is limited mostly to two-
lane roads, which sometimes do not have the ca-
pacity to support the resulting volume of traffic. Key-
stone Avenue and Meridian Street help distribute
these loads; however, they also divide the Carmel
area into three distinct sections with the cental por-
tion being the most heavily developed and diversi-
f red area.
The remaining two-thirds of the community has
been residential since 1960. Growth in the eastern
one-third is much more rapid than in the western
one-third. The core area contains a large percentage
of existing housing units and primary retail/com-
mercial activities. Range Line Road north of 116th
Street is the major commercial corridor in the core
area. Within this corridor are 12 shopping plazas.
Land use analysis reveals a variety of development
for new and mixed-use developments. Mixed-use
developments are economical because facilities are
shared and building costs are reduced. Residential
development is a third area of concern. There is a
strong sense of neighborhood solidarity present in
Carmel. A fourth major issue is land -use conflicts.
Measures can be taken to lessen contrasts between
opposing land uses, such as landscaping or *screen-
ing.' In general, though, the existing land uses con-
form to the established zoning districts.
A comparison was made between existing land
use and the "proposed" land use for 1990 from The
Gwnprrhensrue Plan, Cannel and Clay Towns*, k-
diana, 1971. Although there are a few minor differ-
ences, growth and development have progressed in
a manner closely resembling the 1971 Plan.
DEVELOPMENT SUPPORTS ANALYSIS
I
1
I
' I
t I .
"��,
\ - -, ::t
I \ r '-I.
ii r
�...,.
? f
- -------- . "I .. , - I , . : . � . � I .11;i - ': I I
_ .
s
-M - EI CNI
�-
.
_ , ,.,,.J
nm-.
I _ -1!.
1 Op.. ?-.: _ <A.i _ - CLAY J ,1.01 1�
--------.
s�,I.
r.. --- 1- Ll�
---
(��.�,\\:: -1,.
f,_ J -
I
1
_•••'%�
LEGEND
PROBLEMS AND OPPORTUNITIES
Review of existing conditions and analysis of de-
velopment factors/issues and environmental con-
straints within Carmel/Clay Township have helped
determine: 1) where new population and develop-
ment have taken place and 2) where population and
development are likely to occur in the immediate
future. From this planning analysis and evaluation of
development potential, there has emerged a series
of problems and opportunities. This analysis is the
basis for the Concept Plan recommendations.
Supportive In of growth and development,
such as a new industrial park and numerous office
developments, appear to be occurring as the Carmel
vicinity becomes more of a service-oriented com-
munity. This economic evolution will require an im-
proved road system, affe5t the type and intensity of
new land uses and require additional community fa-
cilities such as utilities, parks and recreational facil-
ities to support the new population growth.
Presently, the Carmel/Clay Township community
has several special development opportunities, of
which the Meridian Corridor is unique and perhaps
the most important land development opportunity
within the area. The type of development taking
place along the Meridian Street Corridor is creating
a very positive image for the City and Township,
increasing the tax base and establishing the corridor's
identity as a special high-quality office -service dis-
trict. Development within this corridor is occurring
along the entire length of Meridian Street. Devel-
opments such as these have potential for overloading
the design capacities of road intersections and caus-
ing some bottlenecks and traffic problems at rush
hours. Development along those streets outside the
corridors that feed into Meridian Street, such as
103rd Street, 106th Street, 111th Street, Pennsyl-
vania Street, 116th Street and 131st Street, has been
moderate but is increasing. If improved, these streets
could provide convenient east/west access while at
the same time encouraging appropriate development
to move off of U.S. Route 31 (Meridian Street).
This, too, would create additional opportunities for
stepping down land uses from Meridian Street. With
the extension of sewers between Spring Mill Road
and Meridian Street, development is expected in
this corridor.
One of the most significant effects associated with
development in the Meridian Corridor is the poten-
tial for overloading traffic capacity on Main Street
east of Meridian Street. Because many of the struc-
tures located along Main Street west of Range Line
Road are built right up to the road, major acquisition,
relocation and demolition would be required to widen
this thoroughfare,
Introduction of significant amounts of commercial
development west of Meridian Street will require
additional developer -initiated improvements to
Spring Mill Road as well as traffic control improve-
ments along Meridian Street. Sewer and water im-
provements also would be required. One of the
effects of this development along the Meridian Street
Corridor will include a shift in traffic circulation from
a north -south traffic flow to a more east -west flow
to the western edge away from population concen-
trations. As a result, more cross cis/township and
easthvest traffic would exist. Competition also would
be created between the eastern and western portions
of the Township, and the downtown would have yet
another commercial district to compete with.
The interchange at 1-465 and Meridian Street is
a prime location for mixed-use development. A de-
velopment here will provide a strong image for the
Carmel/Clay Township area as a quality community.
High-quality development should be required to
maintain Carmers positive image. In addition to pos-
sible commercial development pressure, develop-
ment of the Timber Lane and Northridge Village
residential subdivisions, which are currently platted
but largely undeveloped, could be realized well
within the planning period. The interchange at U.S.
Route 421 (Michigan Road) and 1-465, particularly
north of 96th Street, is another area of significance.
It represents an opportunity for a development de-
pendent upon good highway access. The opportu-
nity to provide convenient commercial uses and
personal/ business services in this area to the resi-
dents of the Green Tree Country Club vicinity also
exists.
The Purdue University Agriculture Station known
as Lynmvood Farm occupies 323.6 acres of land in
the northeast central portion of the Township. It is
situated on land outside of the flood plain that has
soils suitable for devclopment. The development of
this area would require major street improvements,
particularly the improvement of north -south circu-
lation. The area also has potential to be adequately
served by extending existing utilities.
Property owned by American Aggregates in the
southeastern portion of the Township, beyond the
city limits, represents a major future development
opportunity in terms of reclamation and redevelop-
ment for residential lyses. This southeastern area
yields extensive groundwater and is the site of seven
future City well sites along the west side of River
Avenue north of 106th Street. Planned improve-
ments to 96th Street in this area, including a new
bridge crossing over the White River, should accom-
modate any future development.
With continued growth taking place and several
large planned developments proposed, pressure to
upgrade existing streets and highways necessary to
support the increased traffic will greatly increase.
Several major traffic issues and concerns have been
identified. Most importantly, a good roadway system
will be necessaryto support the type and intensity
of development that is becoming characteristic of
Carmel. Here is an examination of the four major
traffic issues and concerns identified in the Com-
prehensive Plan update:
1) Although a suitable major east/west thorough-
fare does not exist in Carmel/Clay Township, 116th
Street seems to be the most logical existing east/
west route for upgrading to primary thoroughfare
status. Current traffic volumes appear to be at or
over capacity. A more specific study should be con-
ducted to determine the future status of this street.
2) The extension of Carmel Drive west to U.S.
31 (Meridian Street) will help alleviate the over-
loading of east -west traffic in this vicinity. Here, op-
portunities for additional development, such as
Carmel Science and Technology Park, would also
increase traffic volumes and should be taken into
consideration. The accepted plans call for the ex-
tension of Carmel Drive westward from its current
terminus to U.S. 31 (Meridian Street). These plans
also provide for the future extension of 126th Street
from its current terminus at Range Line Road west-
ward to the Carmel Drive extension. The combi-
nation of these two road extensions would improve
east/west access through Carmel. One of the impli-
cations, however, is the possibility that traffic on
Guilford Road would increase in a north/south di-
rection. When this area was rezoned for manufac-
turing, a commitment was made to the residents of
the area that development would be planned to min-
imize additional through traffic on Guilford Road.
3) Opening Carmel Drive and 126th Street to
Meridian Street would relieve heavy traffic flow ex-
perienced by 3rd Avenue Southwest during shift
changes in the Gradic Drive/Carmel Drive industrial
area. By providing direct access from this industrial
area to Meridian Street, traffic volumes on Main
Street, Range Line Road and 116th Street would
be lessened, particularly during peak hours. How-
ever, consideration should be given to the potential
for truck traffic to feed onto Mohawk Drive (126th
Street) from Keystone Avenue to arrive at the in-
dustrial park. This is a residential area and is not
well-suited to industrial traffic.
4) Development in the vicinity of St. Vincent's
Hospital may strain the capacity of some of the
northern east/west thoroughfares, particularly Smo-
key Row Road/ 136th Street. The presence of the
hospital and the desirability of it being close to Me-
ridian Street and Keystone Avenue make the triangle
bordered by Range Line Road, 136th Street (Smo-
key Row Road) and Keystone Avenue appropriate
for higher density development.
COMPREHENSIVE PLAN PROCESS
Communities such as the City of Carmel and Clay
Township -like people -grow and change over
time. Therefore, the goals, objectives, policies and
programs guiding such communities also must
change. A program for community improvement and
development will accomplish its goals only if it is
kept current and workable. This program is usually
referred to as the "Comprehensive Plan.'
The City of Carmel and Clay Township have re-
established the continuous process of comprehensive
planning by authorizing an update of the 1971 Com-
prehensive Plan. An overview of the plan update is
provided in this Summary Poster.
The Summary Poster is designed to give a quick
narrative and illustrative overview of the 1985 Com -
prehensive Plan Update for the City of Carmel/Clay
Township. Written specifically for anyone interested
in the community's past, present and future devel-
opment, it can be an educational tool for citizens,
government officials and developers. The poster is
divided into a series of concise, easy -to -read sections:
comprehensive plan process, goals, objectives and
policies, population and economy, development pat-
terns, development supports, problems and oppor-
tunities, land use and housing plan, circulation plan,
downtown plan and plan achievement measures. For
complete text on each of these sections, refer to the
1985 Comprehensive Plan Update for Carmel/Clay
Township. Copies are available at Canters City Hall,
40 Fast Main St., Carmel, Indiana 46032.
Carmel City Hall
One of Many Churches Serving the Cannel Area
Since the 1971 Comprehensive Plan was pre- as well as other factors, are affecting, or will likely
pared, Carmel and Clay Township have experienced: affect, the future of Carmel and Clay Township, and
• More than a decade of demographic change to outline appropriate strategies for directing this
representing two census reporting periods; development.
• Changes in development practices, manage- The development of the Comprehensive Plan has
ment techniques and technology (solar access, been a four-vear combined effort involving city of -
satellite communication, "cluster" develop- ficials and staff, township trustees, builders and de-
ments, etc.); velopers, a private consulting firm and citizens of
• Changes in the utility systems and service areas; Carmel and Clay Township. Throughout the proc-
• Significant new development, especially resi- ess, more than 40 open meetings were held to hear
denial and commercial; public comment and discussion. In addition, 10 work
• Changing character of the downtown; sessons were held by the Comprehensive Plan Com-
o Concentrations of particular types of develop- mittee and the consultant. The Comprehensitr Plan
ment (i.e., the hospital and the office devel- Updaa, City of Carmd/C.lay Towwship was officially
opment cluster along Meridian Street) with the adopted on Sept. 30, 1985.
potential to affect the character of surrounding If the Comprehensive Plan is used intelligently
developed and undeveloped areas; and and often and is flexible enough to guide rather than
• Replacement, upgrading and normal aging of dictate decision-making, the Comprehensive Plan
public facilities and infrastructure. Update will be an important tool for communis
The Comprehensive Plan Update is intended to progress; if it is forgotten, it will someday be only.
consider in detail how the changes described above, an interesting historical document.
POPULATION AND ECONOMY
Since 1950, the population in Carmel and Clay The percentage of the population in Carmel/Clay Figure 3
Township has increased dramatically when compared Township and Hamilton County that moved from LABOR FORCE CHARACTERISTICS
with state and national trends (Figure 1). Clay a different county or state increased between 1970 1970-1980
Township experienced its greatest rate of growth and 1980. People moving to the area from within
between 1950 and 1960. Carmel, on the other hand, the state showed the largest increase. The majority
of the Carmel labor force depends on employment
Figure 1 opportunities in Indianapolis. In 1980, 73.6 percent
COMPARATIVE POPULATION of Carmers population worked outside the county
GROWTH SINCE 1970 or area of residence.
100.1
CARMEL CARMEL/
single-family housing units in 1979 numbered 422,
CLAY
1970 1980 1970
,
,\i/
375
PARK AND RECREATION FACILITES:
-SCHOOLS
. ,
76.4 %
PROFESSIONAL
-
Pu011� co.aa
1111111111w. ONARK Control
National State Count Carmel/
y Clay
6.9 % 7.9 % 7.9 %
i►(.'.
...
OPERATORS/
._.� Pura. Comm
,
6.3 /o
LABORERS
ities, public utilities and other community services
Iota
P -d
91 /d
d 6.7 % 11.5 %
/. i /
REPAIRMEN
. I W.T1.N
S PUBLIC SAFETY FACILITIES
--T--_-_----.•__________________
________
'�.•.'.
�l.NA1,
NOW WATERWORKS FACILITIES
volume and pressure to its customers.
�"�
--Zi;
= WASTEWATER FACILITIES
usually these are open for membership only to sub-
it
Education
Wastewater Treatment
• •• • ANTICIPATED CARMEL WATERWORKS
Carmel and Clay Township are served by three
- /
ti
Woodland, is located in Carmel and provides swim-
SERVICE AREA
attractions that has drawn many people to live in the
e
/`I ,
ming, sailing and fishing to residents of the Wood-
land Springs and Woodlands subdivisions. About
state 465. They are U.S. Route 31 (Meridian Street
Ave -
through Carmel), state Route 431 (Keystone Ave -
w ANTICIPATED CARMEL SEWER SERVICE AREA
Hamilton County and encompasses four Planning
310 acres are devoted to general recreational facili-
nue) and U.S. Route 421 (Michigan Road southwest
.....
.-INDIANAPOLIS WATER CO. DISTRIBUTION MAINS
ties, of which 207 acres are public school ground
facilities.
corner of Clay Township). Other important tho-
roughfares in the City and Township, in order of
garten programs were implemented in 1965 within
the public school system. Carmel also has a Catholic
Carmel's wastewater collection service area pres-
The need for recreational facilities is not as great
,...-5 PLANED E.P.A. SEWER SERVICE AREA
-_-� PLANNED MERIDIAN CORRIDOR SEWER
school and a Christian Academy. In addition, there
�.,
__
��,.,,,,,,I
116th Street, Main Street (131st Street), Carmel
Drive and Mohawk Drive (126th Street).
.....
SERVICE AREA
of the City and Township that appear to be under-
There are several other significant thoroughfares
mel/Clay schools has enrollment over capacity. The
...
served. Many areas could be served with small
in the City and Township that serve important traffic-
PROBLEMS AND OPPORTUNITIES
Review of existing conditions and analysis of de-
velopment factors/issues and environmental con-
straints within Carmel/Clay Township have helped
determine: 1) where new population and develop-
ment have taken place and 2) where population and
development are likely to occur in the immediate
future. From this planning analysis and evaluation of
development potential, there has emerged a series
of problems and opportunities. This analysis is the
basis for the Concept Plan recommendations.
Supportive In of growth and development,
such as a new industrial park and numerous office
developments, appear to be occurring as the Carmel
vicinity becomes more of a service-oriented com-
munity. This economic evolution will require an im-
proved road system, affe5t the type and intensity of
new land uses and require additional community fa-
cilities such as utilities, parks and recreational facil-
ities to support the new population growth.
Presently, the Carmel/Clay Township community
has several special development opportunities, of
which the Meridian Corridor is unique and perhaps
the most important land development opportunity
within the area. The type of development taking
place along the Meridian Street Corridor is creating
a very positive image for the City and Township,
increasing the tax base and establishing the corridor's
identity as a special high-quality office -service dis-
trict. Development within this corridor is occurring
along the entire length of Meridian Street. Devel-
opments such as these have potential for overloading
the design capacities of road intersections and caus-
ing some bottlenecks and traffic problems at rush
hours. Development along those streets outside the
corridors that feed into Meridian Street, such as
103rd Street, 106th Street, 111th Street, Pennsyl-
vania Street, 116th Street and 131st Street, has been
moderate but is increasing. If improved, these streets
could provide convenient east/west access while at
the same time encouraging appropriate development
to move off of U.S. Route 31 (Meridian Street).
This, too, would create additional opportunities for
stepping down land uses from Meridian Street. With
the extension of sewers between Spring Mill Road
and Meridian Street, development is expected in
this corridor.
One of the most significant effects associated with
development in the Meridian Corridor is the poten-
tial for overloading traffic capacity on Main Street
east of Meridian Street. Because many of the struc-
tures located along Main Street west of Range Line
Road are built right up to the road, major acquisition,
relocation and demolition would be required to widen
this thoroughfare,
Introduction of significant amounts of commercial
development west of Meridian Street will require
additional developer -initiated improvements to
Spring Mill Road as well as traffic control improve-
ments along Meridian Street. Sewer and water im-
provements also would be required. One of the
effects of this development along the Meridian Street
Corridor will include a shift in traffic circulation from
a north -south traffic flow to a more east -west flow
to the western edge away from population concen-
trations. As a result, more cross cis/township and
easthvest traffic would exist. Competition also would
be created between the eastern and western portions
of the Township, and the downtown would have yet
another commercial district to compete with.
The interchange at 1-465 and Meridian Street is
a prime location for mixed-use development. A de-
velopment here will provide a strong image for the
Carmel/Clay Township area as a quality community.
High-quality development should be required to
maintain Carmers positive image. In addition to pos-
sible commercial development pressure, develop-
ment of the Timber Lane and Northridge Village
residential subdivisions, which are currently platted
but largely undeveloped, could be realized well
within the planning period. The interchange at U.S.
Route 421 (Michigan Road) and 1-465, particularly
north of 96th Street, is another area of significance.
It represents an opportunity for a development de-
pendent upon good highway access. The opportu-
nity to provide convenient commercial uses and
personal/ business services in this area to the resi-
dents of the Green Tree Country Club vicinity also
exists.
The Purdue University Agriculture Station known
as Lynmvood Farm occupies 323.6 acres of land in
the northeast central portion of the Township. It is
situated on land outside of the flood plain that has
soils suitable for devclopment. The development of
this area would require major street improvements,
particularly the improvement of north -south circu-
lation. The area also has potential to be adequately
served by extending existing utilities.
Property owned by American Aggregates in the
southeastern portion of the Township, beyond the
city limits, represents a major future development
opportunity in terms of reclamation and redevelop-
ment for residential lyses. This southeastern area
yields extensive groundwater and is the site of seven
future City well sites along the west side of River
Avenue north of 106th Street. Planned improve-
ments to 96th Street in this area, including a new
bridge crossing over the White River, should accom-
modate any future development.
With continued growth taking place and several
large planned developments proposed, pressure to
upgrade existing streets and highways necessary to
support the increased traffic will greatly increase.
Several major traffic issues and concerns have been
identified. Most importantly, a good roadway system
will be necessaryto support the type and intensity
of development that is becoming characteristic of
Carmel. Here is an examination of the four major
traffic issues and concerns identified in the Com-
prehensive Plan update:
1) Although a suitable major east/west thorough-
fare does not exist in Carmel/Clay Township, 116th
Street seems to be the most logical existing east/
west route for upgrading to primary thoroughfare
status. Current traffic volumes appear to be at or
over capacity. A more specific study should be con-
ducted to determine the future status of this street.
2) The extension of Carmel Drive west to U.S.
31 (Meridian Street) will help alleviate the over-
loading of east -west traffic in this vicinity. Here, op-
portunities for additional development, such as
Carmel Science and Technology Park, would also
increase traffic volumes and should be taken into
consideration. The accepted plans call for the ex-
tension of Carmel Drive westward from its current
terminus to U.S. 31 (Meridian Street). These plans
also provide for the future extension of 126th Street
from its current terminus at Range Line Road west-
ward to the Carmel Drive extension. The combi-
nation of these two road extensions would improve
east/west access through Carmel. One of the impli-
cations, however, is the possibility that traffic on
Guilford Road would increase in a north/south di-
rection. When this area was rezoned for manufac-
turing, a commitment was made to the residents of
the area that development would be planned to min-
imize additional through traffic on Guilford Road.
3) Opening Carmel Drive and 126th Street to
Meridian Street would relieve heavy traffic flow ex-
perienced by 3rd Avenue Southwest during shift
changes in the Gradic Drive/Carmel Drive industrial
area. By providing direct access from this industrial
area to Meridian Street, traffic volumes on Main
Street, Range Line Road and 116th Street would
be lessened, particularly during peak hours. How-
ever, consideration should be given to the potential
for truck traffic to feed onto Mohawk Drive (126th
Street) from Keystone Avenue to arrive at the in-
dustrial park. This is a residential area and is not
well-suited to industrial traffic.
4) Development in the vicinity of St. Vincent's
Hospital may strain the capacity of some of the
northern east/west thoroughfares, particularly Smo-
key Row Road/ 136th Street. The presence of the
hospital and the desirability of it being close to Me-
ridian Street and Keystone Avenue make the triangle
bordered by Range Line Road, 136th Street (Smo-
key Row Road) and Keystone Avenue appropriate
for higher density development.
COMPREHENSIVE PLAN PROCESS
Communities such as the City of Carmel and Clay
Township -like people -grow and change over
time. Therefore, the goals, objectives, policies and
programs guiding such communities also must
change. A program for community improvement and
development will accomplish its goals only if it is
kept current and workable. This program is usually
referred to as the "Comprehensive Plan.'
The City of Carmel and Clay Township have re-
established the continuous process of comprehensive
planning by authorizing an update of the 1971 Com-
prehensive Plan. An overview of the plan update is
provided in this Summary Poster.
The Summary Poster is designed to give a quick
narrative and illustrative overview of the 1985 Com -
prehensive Plan Update for the City of Carmel/Clay
Township. Written specifically for anyone interested
in the community's past, present and future devel-
opment, it can be an educational tool for citizens,
government officials and developers. The poster is
divided into a series of concise, easy -to -read sections:
comprehensive plan process, goals, objectives and
policies, population and economy, development pat-
terns, development supports, problems and oppor-
tunities, land use and housing plan, circulation plan,
downtown plan and plan achievement measures. For
complete text on each of these sections, refer to the
1985 Comprehensive Plan Update for Carmel/Clay
Township. Copies are available at Canters City Hall,
40 Fast Main St., Carmel, Indiana 46032.
Carmel City Hall
One of Many Churches Serving the Cannel Area
Since the 1971 Comprehensive Plan was pre- as well as other factors, are affecting, or will likely
pared, Carmel and Clay Township have experienced: affect, the future of Carmel and Clay Township, and
• More than a decade of demographic change to outline appropriate strategies for directing this
representing two census reporting periods; development.
• Changes in development practices, manage- The development of the Comprehensive Plan has
ment techniques and technology (solar access, been a four-vear combined effort involving city of -
satellite communication, "cluster" develop- ficials and staff, township trustees, builders and de-
ments, etc.); velopers, a private consulting firm and citizens of
• Changes in the utility systems and service areas; Carmel and Clay Township. Throughout the proc-
• Significant new development, especially resi- ess, more than 40 open meetings were held to hear
denial and commercial; public comment and discussion. In addition, 10 work
• Changing character of the downtown; sessons were held by the Comprehensive Plan Com-
o Concentrations of particular types of develop- mittee and the consultant. The Comprehensitr Plan
ment (i.e., the hospital and the office devel- Updaa, City of Carmd/C.lay Towwship was officially
opment cluster along Meridian Street) with the adopted on Sept. 30, 1985.
potential to affect the character of surrounding If the Comprehensive Plan is used intelligently
developed and undeveloped areas; and and often and is flexible enough to guide rather than
• Replacement, upgrading and normal aging of dictate decision-making, the Comprehensive Plan
public facilities and infrastructure. Update will be an important tool for communis
The Comprehensive Plan Update is intended to progress; if it is forgotten, it will someday be only.
consider in detail how the changes described above, an interesting historical document.
POPULATION AND ECONOMY
Since 1950, the population in Carmel and Clay The percentage of the population in Carmel/Clay Figure 3
Township has increased dramatically when compared Township and Hamilton County that moved from LABOR FORCE CHARACTERISTICS
with state and national trends (Figure 1). Clay a different county or state increased between 1970 1970-1980
Township experienced its greatest rate of growth and 1980. People moving to the area from within
between 1950 and 1960. Carmel, on the other hand, the state showed the largest increase. The majority
of the Carmel labor force depends on employment
Figure 1 opportunities in Indianapolis. In 1980, 73.6 percent
COMPARATIVE POPULATION of Carmers population worked outside the county
GROWTH SINCE 1970 or area of residence.
100.1
CARMEL CARMEL/
single-family housing units in 1979 numbered 422,
CLAY
1970 1980 1970
1980
375
50.4%
77.4 % 80.2 % 69.6 %
76.4 %
PROFESSIONAL
population growth. Carmel/Clay Township is pro -
11.2 Dao
5.6 %
National State Count Carmel/
y Clay
The Carmel labor force increased by more than
240 percent during 1970-1980 (Figure 3). The labor
force of Clay Township also increased but not as
much as Carmel's. In 1980, managerial, professional
and specialty occupations, along with technical sales
and administrative support occupations, were held
by 80.2 and 76.4 percent of those people employed
' C I d CI T h' • I Ma
1n acme an ay owns 1p, respective y. n Source: 1980 Census of Population
ufacturing had the second-highest percentage of em-
ployment in Carmel in 1970 and 1980.
Source: 1980 Census of t'opulation COMPARATIVE POPULATION
TRENDS
experienced its highest growth rate between 1960
and 1970. After these large growth increases, Carmel 18 YEARS MEDIAN 65 YEARS
and Clay Township continued to grow but at slower 8L UNDER AGE & OVER
rates. The largest percentage increase occurred in 40.7% 26.6 Years 1 5.3
the 55-59 age group in Carmel/Clay Township from
1970 to 1980. The second highest increase in Car-
mefs population occurred in the 35-39 age group,
and its smallest percentage increase was in the 0-4 CARMEL
age group.
The slower rate of growth in the 14 and under mmississ
age group is the result of the declining birth rate and 1 40.7% 1264Yea,sr4.9%
the in -migration of more single, professional people,
married couples waiting longer to have children and
older couples whose children have already left home. CARMEL/CLAY TOWNSHIP
A summary of age composition for the City of Car-
mel/Clay Township is provided in Figure 2. O 1970 p 1980
Mobility and commuting are directly related to the Source: 1980 Census of Population
population characteristics of a community or area. 1970 Census of Population
Alnno the last _SII urate KerwA n 14711 ,inr1 14X11
cent, and a trend toward fewer people per household
developed. This trend shows that more of the pop-
ulation consists of the single, professional type or
married couples with only one or two children. The
percentage increase of housing units in Clay Town-
ship and Hamilton County was not as great as Car-
mers because most new homes were built in the
north and east parts of Carmel.
The downward trend in the national economy be-
tween 1980 and 1983 affected the housing market
Income levels and trends from decade to decade
reflect the economic vitality and prosperity of a com-
munity. Carmefs median family income and per cap-
ita income levels have been significantly above the
levels of the surrounding areas, while the percent of
the population below the poverty level has been less
than the surrounding areas. A good indicator of Car-
mel's strong domestic purchasing power is the dis-
tribution of households by family income. Because
the majority of Carmers households are in the mid-
dle- to upper-income brackets, retail sales and the
need for more service establishments should con-
tinue to increase. These are significant indicators of
Carmefs economic prosperity and future growth
potential.
Figure 4
RECENT CONSTRUCTION TRENDS
SIN(.I.F FAMILY DWFLLING UNITS
CARMEL CARMEL/
single-family housing units in 1979 numbered 422,
CLAY
1970 1980 1970
1980
375
MANAGERIAL/
77.4 % 80.2 % 69.6 %
76.4 %
PROFESSIONAL
population growth. Carmel/Clay Township is pro -
crease since 1974. However, the number of new
SERVICE
OCCUPATIONS
6.9 % 7.9 % 7.9 %
9.1%
OPERATORS/
5.0 /0 9.5 /0
6.4 % ` ,
,
6.3 /o
LABORERS
ities, public utilities and other community services
Iota
CRAFTSMEN/
91 /d
d 6.7 % 11.5 %
7.8 %
REPAIRMEN
iature golf complex and an outdoor community
need for a larger, more modern facility within the
TOTAL LABOR
2,514 8,525 7,616
15,521
FORCE
ness or residence. Development support factors
volume and pressure to its customers.
1n acme an ay owns 1p, respective y. n Source: 1980 Census of Population
ufacturing had the second-highest percentage of em-
ployment in Carmel in 1970 and 1980.
Source: 1980 Census of t'opulation COMPARATIVE POPULATION
TRENDS
experienced its highest growth rate between 1960
and 1970. After these large growth increases, Carmel 18 YEARS MEDIAN 65 YEARS
and Clay Township continued to grow but at slower 8L UNDER AGE & OVER
rates. The largest percentage increase occurred in 40.7% 26.6 Years 1 5.3
the 55-59 age group in Carmel/Clay Township from
1970 to 1980. The second highest increase in Car-
mefs population occurred in the 35-39 age group,
and its smallest percentage increase was in the 0-4 CARMEL
age group.
The slower rate of growth in the 14 and under mmississ
age group is the result of the declining birth rate and 1 40.7% 1264Yea,sr4.9%
the in -migration of more single, professional people,
married couples waiting longer to have children and
older couples whose children have already left home. CARMEL/CLAY TOWNSHIP
A summary of age composition for the City of Car-
mel/Clay Township is provided in Figure 2. O 1970 p 1980
Mobility and commuting are directly related to the Source: 1980 Census of Population
population characteristics of a community or area. 1970 Census of Population
Alnno the last _SII urate KerwA n 14711 ,inr1 14X11
cent, and a trend toward fewer people per household
developed. This trend shows that more of the pop-
ulation consists of the single, professional type or
married couples with only one or two children. The
percentage increase of housing units in Clay Town-
ship and Hamilton County was not as great as Car-
mers because most new homes were built in the
north and east parts of Carmel.
The downward trend in the national economy be-
tween 1980 and 1983 affected the housing market
Income levels and trends from decade to decade
reflect the economic vitality and prosperity of a com-
munity. Carmefs median family income and per cap-
ita income levels have been significantly above the
levels of the surrounding areas, while the percent of
the population below the poverty level has been less
than the surrounding areas. A good indicator of Car-
mel's strong domestic purchasing power is the dis-
tribution of households by family income. Because
the majority of Carmers households are in the mid-
dle- to upper-income brackets, retail sales and the
need for more service establishments should con-
tinue to increase. These are significant indicators of
Carmefs economic prosperity and future growth
potential.
Figure 4
RECENT CONSTRUCTION TRENDS
SIN(.I.F FAMILY DWFLLING UNITS
nationally as well as in Carmel. New construction of
536
single-family housing units in 1979 numbered 422,
a00
16 422
423
375
The Comprehensive Plan Update examined how
family housing units reached their peak in the early
various growth alternatives would influence future
318-
population growth. Carmel/Clay Township is pro -
crease since 1974. However, the number of new
327
single -family housing units once again is increasing
cent or to 48,752 residents by the year 2005. This
and has surpassed the level of activity exhibited in
was the alternative that best fit the patten of Carmel/
the 1970s.
Clay Township's growth.
ities, public utilities and other community services
Iota
nationally as well as in Carmel. New construction of
1973 74 75 76 77 78 79 80 81 82 83 84 85
single-family housing units in 1979 numbered 422,
Source: City of Carmel
decreased dramatically to 149 units in 1980 and
within the Township are served by individual on-
continued to decline through 1982 (Figure 4). Multi-
The Comprehensive Plan Update examined how
family housing units reached their peak in the early
various growth alternatives would influence future
1970s, and there has not been an appreciable in-
population growth. Carmel/Clay Township is pro -
crease since 1974. However, the number of new
jected to grow at an average annual rate of two per -
single -family housing units once again is increasing
cent or to 48,752 residents by the year 2005. This
and has surpassed the level of activity exhibited in
was the alternative that best fit the patten of Carmel/
the 1970s.
Clay Township's growth.
DEVELOPMENT CONSTRAINTS/CONDITIONS
r
D
I I
� ,--------• - ---- ------ ----- ----
J /--- 0 / 1f1 -
j� SUITABLE FO i J ` _
LOWER INTENSITY 1�1 MODERATE �� ����/// .
/ INTENSITY r
DEVELO NT g
/9 p ---- // O/ / I \ � d�
0 LOWER '�,lr .
o ��` / err o / A
PRIME AGRICULTURAL LAND 0 �� 0 J I k (� /� SUITABLE FOR
5 MODERATE ❑ f f � 1 ❑D / DEVELOPMENTMODERATE
D E
5 INTENSITY 9;q► 'If
"'� \ 000000 \ \ ❑ 1 ,�
S i 0 I J
; I71vL NIS]
111111111111111111M MMMMMMMMMMME 11111 MM -_ t URBAN CORE 'W > , 0
', -� �' HIGHER � INTENSITY `\\ `
SUrrABLE Ff]f - 0, j - - `'��::'I. O 1
;'I,N....e' % OWERINENSIT�`T- O I I ' LOWEQ.
`•••'�"""- DEVELOWNENT � ) I _ \`` n, �/ - !INTENSITY /
' ccj T-�
I . � - 0 - _
< o___aoo 000c�y l oma,- _ - - .. -'- ... -
�� o ooQ000 a000000 -i
// ( I � LEGEND
_ , r� '/ g: LOWER / I DEVELOPMENT INTENSITY
SUITABLE FOR - / - _ \_ Z INTENSITY `LOWER / r-,
LOWER INTENSITY _ (j �: / `�J EXISTING DEVELOPMENT AREA
DEVELOPMEN . ]].�..
\ _ / OMODERATE INENSITY/ {J- I �� O SUITABLE DEVELOPMENT 4PEA
G. DEVELOPMENT SUPPORTS
LOWER INTENSITY 0 1 I I RESOURCE
(' � .
^ N - 0 , EXTRACTION QQQ MAJOR MIGNMpYs BARRIERS
\ \� Q --� - 000 CROSS CITY TOWNSHIP CONNECTORS
`11
�` 0 ,� I
MISSING YAJ011 ROAD LINKAGE
� � LOWER / --.. ------
1.111. MISSING MINOR ROAD LINKAGE
HIGHER-' _ - - - - - - SANITARY SEWER SERVICE AREA
WTENSITY \ %� INTENSITY 1 / _ g ,_ �. - I ; = LIMITATIONS IN UNDEVELOPED AREAS
` 0 / 11 o - -, ; 1 - - FL000w.rs
_ 11�� STEEP SLOPES
�000 00000 0000000000 OC7000C=) 0 `,-�.,.,{/-I / : oO T -O - VV MAJOR TREE COVER
��iqz : �� --- �__. n - - -h- - � �Qp� jt5 BUILDING SITE LIMITATIONS
DEVELOPMENT SUPPORTS
The extent and quality of the public facilities and
Village and Village of Mt. Carmel area. Other areas
remaining 4 percent (39 acres).
by the Hamilton County Sheriffs Department. The
essential services the community provides are main-
within the Township are served by individual on-
The primary recreational facilities include five golf
Carmel Police Department is located on 1 st Avenue
stays of a healthy community and principal factors
site wells or small systems serving several residences.
courses, a racquet club with indoor and outdoor
N.W. An addition was constructed in 1980, which
that determine livability. The quality of the thor-
Total storage capacity, as of 1985, for the Carmel/
courts and other facilities, two small parks, a large
more than tripled the size of the facility. The Carmel
oughfare system, school system, recreational amen-
Clay Township service area is 1.5 million gallons,
ice-skating facility, a riding stable, tennis courts at
Police Department facility is currently meeting the
ities, public utilities and other community services
which is more than adequate to supply peak hourly
the high school and two junior high schools, a min-
department's needs; however, there will likely be a
can often tip the balance of individual and corporate
flow and fire -flow demands. The distribution System
iature golf complex and an outdoor community
need for a larger, more modern facility within the
decision making in selecting a community for busi-
is well gridded and capable of supplying sufficient
swimming pool. Many residential subdivisions offer
next five years or so.
ness or residence. Development support factors
volume and pressure to its customers.
open space and neighborhood swimming pools, but
considered in the planning process include:
usually these are open for membership only to sub-
Circulation
Education
Wastewater Treatment
division residents. One large water body, Lake
Carmel and Clay Township are served by three
The Carmel/Clay Schools are one of the major
Carmel and portions of Clay Township are part
Woodland, is located in Carmel and provides swim-
principal highways having interchanges with Inter -
attractions that has drawn many people to live in the
e
of the Southern Hamilton County Regional Waste-
water District, which was created to serve southern
ming, sailing and fishing to residents of the Wood-
land Springs and Woodlands subdivisions. About
state 465. They are U.S. Route 31 (Meridian Street
Ave -
through Carmel), state Route 431 (Keystone Ave -
area. The Township and City are served one
senior high school, two junior high schools and five
Hamilton County and encompasses four Planning
310 acres are devoted to general recreational facili-
nue) and U.S. Route 421 (Michigan Road southwest
elementary schools. Special education and kinder-
Areas. The City of Carmel coordinates planning for
the four areas.
ties, of which 207 acres are public school ground
facilities.
corner of Clay Township). Other important tho-
roughfares in the City and Township, in order of
garten programs were implemented in 1965 within
the public school system. Carmel also has a Catholic
Carmel's wastewater collection service area pres-
The need for recreational facilities is not as great
their magnitudes of traffic, include Range Line Road,
school and a Christian Academy. In addition, there
ently includes most of the land between Guilford
Road and state Route 431 (Keystone Avenue) north
as it might be because unserved areas also are the
least populous areas. Still, there are outlying areas
116th Street, Main Street (131st Street), Carmel
Drive and Mohawk Drive (126th Street).
are several nursery or cooperative pre-schools serving
Carmel/Clay Township. Presently, none of the Car-
of 116th Street to 136th Street; most of the land
of the City and Township that appear to be under-
There are several other significant thoroughfares
mel/Clay schools has enrollment over capacity. The
between state Route 431 and Gray Road south of
served. Many areas could be served with small
in the City and Township that serve important traffic-
school system, as of the spring of 1985, was operating
136th Street to 96th Street; several subdivisions just
east of Gray Road; and several subdivisions just north
neighborhood parks offering active recreation.
carrying functions primarily oriented to shorter trips
within the Township. In Clay Township, these in -
at 80 percent of its optimum enrollment capacity.
of 136th Street. The Planning Area for Carmefs
Public Safety
elude a number of roads following section lines on
Carmel Public Library
wastewater collection service extends well beyond
Public safety facilities in Carmel and Clay Town-
roughly one mile centers. Within the City of Carmel,
The Carmel Public Library is located at 515 E.
this service area and includes the entire eastern por-
ship include those needed for fire protection and
other significant thoroughfares include Guilford
Main St. The Library District coincides with the
tion of Clay Township to the White River. All of
police activities. The Carmel Fire Department, the
Road, Pennsylvania Street, Old Meridian Street and
boundaries of Clay Township and the Carmel -Clay
this land will eventually be serviced by the Carmel
Carmel Police Department and the Hamilton
Smokes, Row Road (136th Street).
School District. A major concern of the Board is
wastewater collection system. The Clay Township
County Sheriffs Department provide these services.
Past traffic studies performed for various individual
improvements in service to the western portion of
Regional Waste District encompasses most of the
The Carmel Fire Department provides fire pro-
development proposals suggest an approximate 2
the Township, the most distant service area from
remainder of the Township.
tection and emergency medical services to the City
percent annual growth rate in traffic volumes for the
the library.
of Carmel and all of Clay Township. Overall, the
Carmel area. It is expected that this rate will be
Parks and Recreation
departments four stations are well located and pro-
exceeded on roads serving the growing eastern and
Water Utility
Carmel/Clay Township has 1,05.5 acres of indoor
vide good coverage of the Township and City. There
central portions of Carmel and Clay Township. The
Three water utilities serve Carmel and Clay
and outdoor parks and recreational facilities, includ-
are presently no problems with access to and from
primary goal of the thoroughfare plan for Carmel/
Township. The municipal waterworks system of the
ing 20 acres of land reserved for the proposed Car-
individual fire stations. A new central fire station and
Clay Township is to ensure the efficient distribution
City of Carmel serves most of the built-up area within
mel -Clay Community Park. Public recreational
outdoor amphitheater are the first phase of the Car-
of traffic within the City and Township. Providing
the present corporate limits. The Indianapolis Water
facilities provide only 20 percent (213 acres) of the
mel Civic Square project located west of Range Line
right -of --ways for widening and for new road con-
oo-Company,
Company,a private utility, serves Clay Township
total recreational facility acreage in the City and
Road on Gracile Drive.
struction will be imperative if this goal is to be
and a portion of the City of Carmel. The Hamilton
Township. Private facilities account for 76 percent
The Carmel Police Department provides service
realized.
Western Utility Company serves the Hunters Creek
(783 acres), while quasi -public facilities make up the
to the City of Carmel, while the Township is served
EXISTING THOROUGHFARE CONDITIONS
CARMEL/CLAY TOWNSHIP
OFFICIAL LAND USE AND CIRCULATION PLAN
LEGEND
LOWER IlNTENSITY RESIDENTIAL-
ESTATE/LARGE LOT
MODERATE IlVTENSITY RESIDENTIAL -
SUBURBAN
HIGHER INTENSITY RESIDENTIAL -
URBAN / SCALE
BUSINESS
INDUSTRIAL
FORMAL OPEN SPACE
SPECIAL USE
TRANSITION AREA
LAND USE AND HOUSING PLAN
The Carmel land Use and Housing Plan is in-
tended to show the generalized land -use relationships
with regard to the City's and the Township's future
development pattern. The Plan also indicates the
general direction and magnitude of new urban growth
and development, where agricultural cultivation and
large lot, estate types of development should con-
tinue to prevail and where certain features of the
local landscape should be perserved or kept as open
space. The Plan also states the desirable future bal-
ance within the City and the Township between
non -urban activities and urban development and in-
dicates the direction in which Carmel should move
to arrive at such a functional relationship.
This Plan is intended as a guide to development
decision-making, to be used by the public as well
as the private sectors. It should be interpreted so
that the community can be flexible in responding to
unanticipated opportunities and/or to changing de-
velopment circumstances. The Plan recommends
that development first take place where existing sup-
port systems such as streets, water service, sewer
service, police protection, fire protection and schools
are present. This implies that existing vacant areas
with available supports and amenities be developed
first. (improvements may be necessary to avoid
overloading the existing support systems.)
General land -use categories have been estab-
lished. A description of these categories follows:
(a) Lower Intensity Residential —Estate/
Large Lot
Limited to open space and/or single-family
residential structures on parcels of land one
acre or more.
(b) Moderate Intensity Residential —
Suburban
Comprised largely of single-family homes on
moderately sized parcels of land. Some other
housing types, such as two-family units and
other cluster housing types, also are in this
category.
(c) Iligher Intensity Residential—Urban
Scale
Includes small lot, higher density
development.
(d) Commercial
Uses encompass retail, professional and busi-
ness services, personal services and
agribusiness.
(e) Industrial
Includes manufacturing, wholesale outlets and
warehouse and distribution outlets.
(f) Formal Open Space
Takes into account planned/proposed parks
and recreation, both passive and active in na-
ture. These ;rctn wcs include hiking and riding
trails, tennis, golf and swimming.
(g) Agriculture
Limited to those farms operating either as food
or animal producers.
(h) Special Uses
Accounts for uses that may require special
planning measures, such as St. Vincent's Hos-
pital and its immediate vicinity.
(i) Circulation Spine
Includes designated north/south (Meridian
Street, Keystone Avenue and Range Line
Road) and east/%vest road connectors (96th
Street, 116th Street, 131st Street between
Carmel Downto%vn Residential Area
DOWNTOWN PLAN
In most instances, the downtowns of today have
evolved from the original town settlement clusters
of yesterday. Carmel is no different. What began as
14 lots in 1837 quickly grew into a village that served
the area's local population.
This area in the vicinity of Range Line Road and
Main Street became the major hub of Carmel/Clay
Township as the area continued to grow, and new
businesses and industries were established.
In recent years as emphasis has shifted away from
downtown Carmel, the downtown's historic image
as the central focus and primary commercial activity
center has weakened and eroded. It is apparent from
the size and number of shopping centers in this
vicinity that a large amount of commercial compe-
tition is present. Carmel's Central Business District
(CBD) is not, nor should it be expected to be, ca-
pable of competing these levels of commercial e
activity. Rather, the Carmel CBD should build upon
its own unique characteristics to develop an atmos-
phere rethat is uniquely 'Carmel.'
1. Business Core Focus Area
Although the Downtown Plan covers a larger area
in terms of initial studies and evaluation, the design/
development emphasis of the Plan is in the vicinity
of the intersection of Main Street and Range Line
Road. This area is referred to on the accompanying
map as the Business Core Focus Area, and it is
within this area that the vestiges of the -original'
CBD are to be found.
The Comprehensive Plan Update recommends
that downtown Carmel evolve as an established, dis-
tinct commercial identity that
nco
t incorporates a com-
. rP
bination of various commercial uses attractive to
potential City/Township users. The Plan includes
recommendations for -public' streetscape, building
exterior improvements and parking improvements.
The thrust of the design concept is an environment
designed for people on foot.
2. Outlying Focus Areas
The outlying areas surrounding the central busi-
ness core have been identified as focus areas, and
recommendations have been made where appropri-
ate. Such improvements as landscaping, providing
unified information on signage, upgrading buildings
and curb and gutter treatments are recommended.
Carmel Downtown Park
Spring Mill Road and Gra-, Road, and 146th
Street) between these various uses that create
linkages throughout the City and Township.
0) Transition Areas
Refers to special areas where either the future
of development cannot presently be predicted
or where sensitive treatment will be required
between ne►w and existing land uses.
The Plan recommends that zoning requests con-
stantly be compared against the existing physical
conditions present in an area. Rezoning, when in-
dicated by changing land use patterns, helps to ac-
celerate the natural transition occurring and
encourages investment instead of disinvestment.
Areas experiencing changing market conditions that
would benefit from consideration of rezoning or a
special overlay zoning requirement include the
following:
• U.S. 421 (Michigan Road) area from 96th
Street to the Hamilton County line;
• Range Line Road north of the downtown;
• The Home Place area; and
• The existing I-1 zoned area along Range Line
Road and along Main Street.
A review of the Carmel Zoning and Subdivision
regulations indicates that adequate opportunity exists
for alternative types of housing developments. The
recommended [and Use Plan for Carmel/Clay
Township provides sufficient areas for consideration
of alternative housing types. In particular, many of
the Transition Areas provide an opportunity for en-
couraging mixed types of developments, including
cluster housing developments, as transitions between
higher commercial- and lower resident ial-intensit
development.
The area of greatest concern with respect to res-
idential deterioration is the Home Place area. The
Plan addresses the areas ability to provide alternative
housing types and starter homes for Carmel/Claw
Township's -next generation." Continued aggressix c
code enforcement is an important tool to maintain
property improvement in areas such as Home Place.
r
l
i�oo 9
° d - �.� o° o q n
� f °
r
Ir
waotrrruL cowfpcus amP ° p° GNEWER IEfC9 ML
�. t) FOCUS AREA
] o QOM
i — o �Jw_
° L
O OCD. a o°S p
o p t o 0o c o 0 c IC3 Z_
pa ❑° n(Co
I ' ❑ o°Qo 0coo
- o o❑On •n�� ocp
P O ° o
:� • Opo ao
(] ®uo` F� umvnowAl
I • RA
s• 9AgFi1
• ,
• AIEA Al
Foca Anu
iE Fo � -41?m Q O
0 (�
EXISTING PROPOSED
FREEWAY
EXPRESSWAY
PRIMARY
THOROUGHFARE
EXISTING PROPOSED
CIRCULATION PLAN
The recommended Circulation Plan for the City
of Carmel and Clay Township is based upon a num-
ber of factors, including:
• The lack of an east -west major thoroughfare
causes several east -west roads to serve varying
functions relative to the type of traffic they carry.
Despite its narrow, two-lane width, 116th
Street is the most heavily traveled east -west
route and serves as the only east -west route that
crosses the White River within the Township.
The extension of Carmel Drive from Range
Line Road to U.S. Route 31 is being empha-
sized both as a means to develop an industrial
park west of Gradle Drive and as a new east -
west route.
• Proposed office and commercial development
will cause further increases in traffic volumes
along U.S. Route 31 and other nearby roads.
• The development of currently vacant land will
contribute to increasing future traffic along Key-
stone .Avenue.
• Many roads lack sufficient pavement width to
accommodate existing and future levels of traffic
flow.
• Several offset intersections may be found in the
City and'1 ownship, most of which affect north -
south traffic flow.
• Many roads have reached or approached their
traffic -carrying capacity.
• There are areas where road linkages do not now
exist, but may be needed in the future.
• Other circulation problems include excessive
traffic in downtown area, poor condition of
many County roads, the need for service roads
in the vicinity of Meridian Street, peak -hour
congestion of Keystone Avenue, U.S. 31 and
U.S. 421 near 96th and 1-465, and the use of
"cul -de -loops' and excessively long cul-de-sacs
causing difficulty for firefighting equipment and
school bus maneuverability.
The presence of natural and man-made obstacles
in Carmel and Clay Township hinders traffic flow.
The White Ri%cr, which forms the eastern boundary
of Clay Township, effectively limits the potential for
new east -west road construction because of the need
for bridge crossings. A significant man-made obstacle
is U.S. 31 (Meridian Street). Because of the need
to limit the number of intersections along this high-
way and the extreme costliness of grade separations,
the potential for new east -west road construction in
the City and Township is limited.
Several planned or anticipated developments can
be expected to have significant impacts on the areas
circulation. Most of these are planned in the vicinity
of U.S. 31 (Meridian Street). The vicinity of Range
Line Road and 116th Street is another area that can
be expected to realize congestion as a result of in-
creased development.
Minimum design standards are useful not only for
regulating construction of new thoroughfares and
SECONDARY
THOROUGHFARE
_ _ _ _ _ _ COLLECTOR
STREET
O IlVTERSECTION
IMPROVEMENT
streets but also for evaluating existing conditions to
determine deficiencies and for programming im-
provements to existing thoroughfares and streets.
The design standards pertinent to this recommended
Circulation Plan for Carmel/Clay Township relate to
the minimum right-of-way width and street pavement
width for each functional class. These proposed
standards are outlined in Table 1.
The proposed network of freeways, expressways,
primary and secondary thoroughfares, collector
streets and local access streets have been designated
based upon their relationship to the existing thor-
oughfare and street network of the City, County,
State and U.S. highway system. The Circulation Plan
recommends the foregoing functional classification
of thoroughfares and streets and related design cri-
teria, in light of the expected increase in traffic vol-
umes that will be generated by population growth
Table 1
RECOMMENDED MINIMUM GEOMETRIC DESIGN STANDARDS FOR PUBLIC AND
PRIVATE THOROUGHFARES AIND STREETS
FUNCTIONAL
CLASSIFICATION
RIGHT-OF-WAY
WIDTH
(FEET)
BACK-TO-BACK ON -STREET
PAVEMENT WIDTH PARKING
(FEET)
Freeway
As required
As required None
Expressway
As required
As required None
Primary Thoroughfare
100
44 None
Secondary Thoroughfare
80
44 None
Collector Street
60
36 One Side
Local Access Street --
60
40 Both Sides
Commercial
30 None
Local Access Street --
50
Residential
30 Both Sides
Nouree: Woolpert Consultants
Commercial Project Entry Road
and land development during the next 20 years.
As well as the establishment of recommended
minimum right-of-way and pavement widths, im-
provements w ill be necessary to many intersections
along the thoroughfares in the City and Township.
In some cases, improvements to turning radii will
be necessary, however, the majority of the necessary
improvements will involve widening, improving
drainage and providing left turn and right turn lanes.
Synchronization of traffic signals will facilitate traffic
flow on the proposed primary and secondary thor-
oughfares and add to the capacity and safety of these
highways. The installation of additional traffic signals
will become necessary along primary thoroughfares
as land development occurs.
By means of subdivision requirements tied to the
classification of thoroughfares or through developer
incentives, sidewalks should also be provided. Land-
scaping requirements tied to the provision of side-
walks, such as street trees and/or landscaped earth
berms along the streetside planting strips, could be
a mechanism for ensuring that the proper relationship
is maintained between street and pedestrian ways.
PLAN ACHIEVEMENT MEASURES
Plan achievement measures are intended to be
used by City and Township officials and staff to keep
the Comprehensive Plan Update current. The plan
achievement measures are organized around Com-
munity goals and indicators.
Meridian Street Office Building
Community Goals
The basis for the Comprehensive Plan Update is
embodied in its goals, objectives and policies, which
were formulated to provide Carmel/Clay Township
development decision makers with a flexible frame-
work for considering development decisions antici-
pated within the various plan elements and the
planning issues and circumstances not anticipated
when the report was prepared.
If the Plan is to remain consistent with the goals,
objectives and policies from which it is comprised,
then it must represent current community -held at-
titudes regarding a variety of issues, including:
• Residential development (i.e., how to maintain
quality and encourage rene►val?);
• Commercial development (i.e., how to deter-
mine quality, mix, scale and location?);
• Industrial development (i.e., how and where to
promote and encourage growth?);
• Open Space and Recreation (i.e., how to
balance?);
• Community Facilities and Services, (i.e., where
to locate and at what cost?); and
• Circulation (i.e., how will thoroughfare devel-
opment disrupt established residential areas?).
Because of the growth in Carmel/Clay Township,
it is recommended that the goals, objectives and
policies be reviewed annually for their relevance to
development trends. The Plan Commission could
then propose changes to the Plan as necessary to
reflect modifications to the goals, objectives and pol-
icies consistent with changing community attitudes.
In fact, it may be necessary for the Plan Commission
at times to recommend changes to various plan ele-
ments where there may be significant divergence
between existing and modified goals, objectives and
Policies.
Indicators
Indicators are intended to provide the community
officials and staff with the basic units of information
necessary for evaluating the direction, timing and
extent of plan implementation. These are:
1. Building Permits — Information reported
includes class of use, type of improvement and
estimated value and date. This indicator is use
ful for keeping track of the rate of development
and type of development within Carmel/ Clav
Township.
2. Subdivision Plats — The system is presently
a manual system. Conversion to a computer
file would facilitate easier search of plats by
planning subarea, developer or housing type.
In addition to keeping records regarding indi-
vidual plats, it is recommended that plats be
tabulated by number of lots approved versus
number constructed for each plat and by sub-
area. Staff could then determine what impact
renewed development interest might have in
any single planning area relative to the number
of lots available for development without hav-
ing to go through subdivision approval.
3. Variances — There should be an annual re-
view relative to the types of variances being
requested, their locations and the outcomes of
the request. A summary report should be pre-
pared as an indicator of either development
pressure and/or the need to consider modifi-
cations to the zoning text and/or map.
4. Rezonings — Rezonings should be handled
like variances.
5. School Enrollments — School enrollment
figures should be obtained from the school de-
partment annually and recorded by planning
subarea as %•ell as by school subdistrict. This
information is useful for reconsidering growth
assumptions as a basis for forecasting future
population and population distribution within
the planning subareas.
6. Employment — Employment should be re-
corded annually within Carmel/Clay Town-
ship, preferably with regard to planning
subarea. Useful information can be obtained
simply by telephone or by canvassing new
businesses as identified by building permit rec-
ords to determine their anticipated employ-
ment. This will provide a suitable means of
gauging existing and potential employment
centers within Carmel/Clay Township and the
direction of employment as it relates to housing
needs, community facilities and services and
population forecasts.
7. Housing — It is recommended that Carmel/
Clay Township undertake a regular inspection
program of residential and nonresidential struc-
tures as away to monitor changes in condition
of City and Township structures and identify
disinvestment areas before such disinvestment
becomes significant.
8. Land Use Map — Land use changes within
Carmel/Clay Township should be recorded,
preferably on a quarterly basis. Building permit
records, plat records, rezoning information,
newspaper articles and informal discussions
with property owners over the course of regular
Department and/or Plan Commission business
should provide the basis for keeping the Land
Use Map current.
CONCLUSION
The rate of expansion of Carmel/Clay Township
now compares to the 1970s. New and different types
% appear to be occurring
of growth and development appe g
as the Carmel viciniry becomes more of a service-
oriented community. These changes will require ad-
ditional and/or improved circulation, affect the type
and intensity of new land uses demanded and require
additional utilities, parks, recreational and commu-
nity facilities to support the new population. The
Meridian Corridor and the 1-465 interchanges offer
the best development opportunities.
A large percent of land, approximately 67 percent,
is still undeveloped, vacant or agricultural in nature
in Carmel/Clay Township. To maintain quality of
development, Carmel/Clay Township must structure
and balance its future urban growth and development
in an orderly way through strong zoning regulations.
In the past, the City of Carmel and Clay Township
have maintained a strong commitment to the neigh-
borhoods and the community. This commitment,
along with the economic growth that Carmel has
experienced, assures that the quality of life will con-
tinue to improve. However, keeping planning current
and flexible is crucial to Carmel/Clay Township's
ability to guide and balance its development pros-
pects as conditions change, unforeseeable events oc-
cur, old problems are solved, new ones arrive and
new methods are found to sole them. Therefore,
it is recommended that the community update its
Comprehensive Plan every five years. In this ►wa%.
Carmel/Clay Township can ensure that the man
positive factors that make the area a highly desirable
place to live and conduct business today will continue
for future generations.