HomeMy WebLinkAboutMorphey Construction/Eng/CO #2/13,724.10/Structure Replacement #15-09CITY OF CARMELrt-,l) TO: CONTRACT CHANGE ORDER NO.: 02 Morphey Construction DATE: 04/13/2017 1499 N. Sherman Dr. PROJECT NAME: Small Str. Replacement —15-09 Indianapolis, IN. 46201 CITY REQ. NO.: CITY PO NO.: 33414 CITY PO DATE: 1/6/2016 I. You are directed to make the following changes in this Contract: The following original items were increased/ decreased slightly and the following new items were added to the total contract. The reason for these changes were due to modifications to the new structure backfill material resulting in a credit and time and material work performed as extra due to scope changes. II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: Change order due to credit offered and scope changes. The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this' Change Order $_487 484.90 Contract Price will be increased/decreased by this Change Order $ 13,724.10 New Contract Price including this Change Order $_501.,209.00 Contract Time Prior to this Change Order 135 Days Completion Date Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order 135 Days Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. SCHEDULED ADJUSTMENT ITEM AMOUNT (+) OR (-) DAYS Structure Backfill, Type 5 -83.0 CYS. -$8300.00 Zero (0) Days Structure Backfill, Type 3 83.0 CYS. $5976.00 Zero (0) Days Time & Material Work 1.0 LS. $5400.00 Zero (0) Days Time & Material Work 1.0 LS. $10,648.10 Zero (0) Days II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: Change order due to credit offered and scope changes. The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this' Change Order $_487 484.90 Contract Price will be increased/decreased by this Change Order $ 13,724.10 New Contract Price including this Change Order $_501.,209.00 Contract Time Prior to this Change Order 135 Days Completion Date Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order 135 Days Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommenced -HWC. Engineering ENGINEER IS I N. Delaware Stl.. 800 Address 'The Above Changes Are. Actepte4: MomheY Construptim (ZONTPACTOIRI. 1499 N. Sherman Dx. Address JpdianpQli,s, IN. 46204 IN. 4:6210 city/Sutepp City/S.tate/Zip j, A B. 'Phone.. Phbne: Datd: Date. 4j - Approved-, CITY OF CARMEL PROJECT 15-09 CHANGE ORDER NO.2 SUPPLEMENTAL DESCRIPTION 1. Item #12 — Structure Backfill, Type V — Credit cost �,-a,300.O 0 This credit was offered to the contract by switching the material type and means/ method of installation for both Culvert #86 (Ralston Ave.) and Culvert #102 (Rolling Springs Drive). The proposed change was based on weather conditions and acceleration of the work item. The material change was approved by HWC Engineering from a structural analysis and allowable changes within accordance of the Indiana Department of Transportation specifications for this type of work. This was a 100% item change. 2. Item #47 — Structural Backfill, Type III — Supplemental cost $5,967.00 This item was added to replace Item #12. This was a change to granular material due to weather conditions at the time of placement, which helped accelerate the work. This work included material cost, and labor/ equipment cost to place In accordance with project specifications. This cost reduced the original bid item by 29%. 3. Item #48 — Time & Material Work — Rolling Springs Drive — Additional cost $5,400.00 This additional cost is for extra work at Culvert #102 (Rolling Springs Drive). After installation of the proposed articulated concrete mattress' in the creek flow line, it was determined that and additional tree would require removal in order for the ACM to be installed and function properly. The tree in question was over twelve (12) inches in diameter and it was determined that time and material work would offer the best cost for the City. The tree had been left in place during the original clearing work in an effort to not over remover existing urban forestry in the neighborhood. This is a 1.0% over run of the current contract price. 4. Item #49 — Time & Material Work — Ralston Avenue — Additional cost $10,648.10 This additional cost is for extra work at Culvert #86 (Ralston Avenue). After work was complete, during average rain events, a sizeable amount of water was trapped in front of 11520 Ralston Avenue beyond the original project limits. After additional investigation and minor survey work, the City Engineering department directed HWC and Morphey Construction to facilitate a solution to move the trapped water to the newly installed drainage structures within the project limits which was accomplished in accordance project specifications. This is a 2% over run of the current contract price. Total Increase to the current contract amount = $13,724.10 or 3% overall cost increase.