Loading...
HomeMy WebLinkAboutPacket 17040007-11 VSHAMROCK SELF-STORAGE PRESENTED BY STEVEN D. HARDIN, ESQ. Request for BZA Approval Board of Zoning Appeals | May 22, 2017 TABLE OF CONTENTS SHAMROCK SELF-STORAGE Developer TABLE OF CONTENTS Greg OÔHerren, Owner George Geiger, Owner Shamrock Builders, Inc. Tab 1 9800 Westpoint Drive Findings of Fact (Ballot & Question Sheets) Suite 200 Indianapolis, IN 46256 Tab 2 Statement of Variance & Support Attorney: Steven D. Hardin, Esq. Tab 3 Rex Ramage, Land Use Planner Aerial Location Map Faegre Baker Daniels, LLP Tab 4 600 East 96th Street, Suite 600 Indianapolis, Indiana 46240 Existing Conditions telephone. 317.569.9600 fax. 317.569.4800 Tab 5 Development Plan Engineer: Adam DeHart, PS Tab 6 Keeler-Webb Associates Architecture 486 Gradle Drive Carmel, Indiana 46032 Tab 7 telephone. 317.574.0140 Explanation of Variance Requests Architect: Chuck Kotterman, AIA Architura 55 Monument Circle Suite 1212 Indianapolis, Indiana 46204 telephone. 317.348.1000 CARMEL ADVISORY BOARD OF ZONING APPEALS BALLOT SHEET: FINDINGS OF FACT, DEVELOPMENT STANDARDS VARIANCE Carmel, Indiana 17040007 V (Parking Lot Connection) Docket No.: ______________________________________________ Shamrock Builders, Inc. by Faegre Baker Daniels LLP Petitioner: ______________________________________________ 1. ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ 2. ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ 3. _________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ DATED THIS ________________ DAY OF ______________________________________, 20 ___________. ______________________________________________ Board Member Page 10 of 12 Filename: Development Standards Variance 2017 Revised 12/20/2016 CARMEL ADVISORY BOARD OF ZONING APPEALS FINDINGS OF FACT SHEET - DEVELOPMENT STANDARDS VARIANCE 17040007 V (Parking Lot Connection) Docket No.: _______________________________________________ Shamrock Builders, Inc. by Faegre Baker Daniels LLP Petitioner: _______________________________________________ 1. The approval of this variance will not be injurious to the public health, safety, morals and general welfare of the community because: Adequate connectivity is provided to the undeveloped parcel to the south. _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ 2. The use and value of the area adjacent to the property included in the variance will not be affected in a substantially adverse manner because: Adequate connectivity is provided to the undeveloped parcel to the south. _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ 3. The strict application of the terms of the Zoning Ordinance to the property will result in practical difficulties in the use of the property because: The proposed redevelopment project would not be able to be constructed. _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ DECISION It is therefore the decision of the Carmel Board of Zoning Appeals that Development Standards Variance Docket No. ___________________________ is granted, subject to any conditions stated in the minutes of this Board, which are incorporated herein by reference and made a part hereof. Adopted this _______________ day of __________________________________, 20 _______. _____________________________________________ _____________________________________________ CHAIRPERSON, Carmel Board of Zoning Appeals _____________________________________________ _____________________________________________ SECRETARY, Carmel Board of Zoning Appeals Conditions of the Board are listed on back; Petitioner or representative to sign. Page 11 of 12 Filename: Development Standards Variance 2017 Revised 12/20/2016 CARMEL ADVISORY BOARD OF ZONING APPEALS BALLOT SHEET: FINDINGS OF FACT, DEVELOPMENT STANDARDS VARIANCE Carmel, Indiana 17040008 V (Overhead Door) Docket No.: ______________________________________________ Shamrock Builders, Inc. by Faegre Baker Daniels LLP Petitioner: ______________________________________________ 1. ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ 2. ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ 3. _________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ DATED THIS ________________ DAY OF ______________________________________, 20 ___________. ______________________________________________ Board Member Page 10 of 12 Filename: Development Standards Variance 2017 Revised 12/20/2016 CARMEL ADVISORY BOARD OF ZONING APPEALS FINDINGS OF FACT SHEET - DEVELOPMENT STANDARDS VARIANCE 17040008 V (Overhead Door) Docket No.: _______________________________________________ Shamrock Builders, Inc. by Faegre Baker Daniels LLP Petitioner: _______________________________________________ 1. The approval of this variance will not be injurious to the public health, safety, morals and general welfare of the community because: This unique, high-end design is the first of its kind in Carmel. The glass-like entry _____________________________________________________________________________________ was thoughtfully designed to be recessed (approximately 16') from the front _____________________________________________________________________________________ columns on the east facade. _____________________________________________________________________________________ 2. The use and value of the area adjacent to the property included in the variance will not be affected in a substantially adverse manner because: This unique, high-end design is the first of its kind in Carmel. The glass-like entry _____________________________________________________________________________________ was thoughtfully designed to be recessed (approximately 16') from the front _____________________________________________________________________________________ columns on the east facade. _____________________________________________________________________________________ 3. The strict application of the terms of the Zoning Ordinance to the property will result in practical difficulties in the use of the property because: A key feature of the climate controlled primary building will be customers’ ability to _____________________________________________________________________________________ conveniently drive inside the building and unload/store their possessions while being _____________________________________________________________________________________ protected from the elements. _____________________________________________________________________________________ DECISION It is therefore the decision of the Carmel Board of Zoning Appeals that Development Standards Variance Docket No. ___________________________ is granted, subject to any conditions stated in the minutes of this Board, which are incorporated herein by reference and made a part hereof. Adopted this _______________ day of __________________________________, 20 _______. _____________________________________________ _____________________________________________ CHAIRPERSON, Carmel Board of Zoning Appeals _____________________________________________ _____________________________________________ SECRETARY, Carmel Board of Zoning Appeals Conditions of the Board are listed on back; Petitioner or representative to sign. Page 11 of 12 Filename: Development Standards Variance 2017 Revised 12/20/2016 CARMEL ADVISORY BOARD OF ZONING APPEALS BALLOT SHEET: FINDINGS OF FACT, DEVELOPMENT STANDARDS VARIANCE Carmel, Indiana 17040011 V (Building Height) Docket No.: ______________________________________________ Shamrock Builders, Inc. by Faegre Baker Daniels LLP Petitioner: ______________________________________________ 1. ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ 2. ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ 3. _________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ DATED THIS ________________ DAY OF ______________________________________, 20 ___________. ______________________________________________ Board Member Page 10 of 12 Filename: Development Standards Variance 2017 Revised 12/20/2016 CARMEL ADVISORY BOARD OF ZONING APPEALS FINDINGS OF FACT SHEET - DEVELOPMENT STANDARDS VARIANCE 17040011 V (Building Height) Docket No.: _______________________________________________ Shamrock Builders, Inc. by Faegre Baker Daniels LLP Petitioner: _______________________________________________ 1. The approval of this variance will not be injurious to the public health, safety, morals and general welfare of the community because: This $9 Million redevelopment project incorporates high quality architectural design _____________________________________________________________________________________ appropriate for the corridor. _____________________________________________________________________________________ _____________________________________________________________________________________ 2. The use and value of the area adjacent to the property included in the variance will not be affected in a substantially adverse manner because: This $9 Million redevelopment project incorporates high quality architectural design _____________________________________________________________________________________ appropriate for the corridor. _____________________________________________________________________________________ _____________________________________________________________________________________ 3. The strict application of the terms of the Zoning Ordinance to the property will result in practical difficulties in the use of the property because: The proposed redevelopment project would not be able to be constructed. _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ DECISION It is therefore the decision of the Carmel Board of Zoning Appeals that Development Standards Variance Docket No. ___________________________ is granted, subject to any conditions stated in the minutes of this Board, which are incorporated herein by reference and made a part hereof. Adopted this _______________ day of __________________________________, 20 _______. _____________________________________________ _____________________________________________ CHAIRPERSON, Carmel Board of Zoning Appeals _____________________________________________ _____________________________________________ SECRETARY, Carmel Board of Zoning Appeals Conditions of the Board are listed on back; Petitioner or representative to sign. Page 11 of 12 Filename: Development Standards Variance 2017 Revised 12/20/2016 CARMEL ADVISORY BOARD OF ZONING APPEALS BALLOT SHEET: FINDINGS OF FACT, DEVELOPMENT STANDARDS VARIANCE Carmel, Indiana 17040009 V (Facade Offsets) Docket No.: ______________________________________________ Shamrock Builders, Inc. by Faegre Baker Daniels LLP Petitioner: ______________________________________________ 1. ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ 2. ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ 3. _________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ DATED THIS ________________ DAY OF ______________________________________, 20 ___________. ______________________________________________ Board Member Page 10 of 12 Filename: Development Standards Variance 2017 Revised 12/20/2016 CARMEL ADVISORY BOARD OF ZONING APPEALS FINDINGS OF FACT SHEET - DEVELOPMENT STANDARDS VARIANCE 17040009 V (Facade Offsets) Docket No.: _______________________________________________ Shamrock Builders, Inc. by Faegre Baker Daniels LLP Petitioner: _______________________________________________ 1. The approval of this variance will not be injurious to the public health, safety, morals and general welfare of the community because: Facade offsets shall be provided on perimeter facades with decorative columns as _____________________________________________________________________________________ shown on the elevations. _____________________________________________________________________________________ _____________________________________________________________________________________ 2. The use and value of the area adjacent to the property included in the variance will not be affected in a substantially adverse manner because: Facade offsets shall be provided on perimeter facades with decorative columns as _____________________________________________________________________________________ shown on the elevations. _____________________________________________________________________________________ _____________________________________________________________________________________ 3. The strict application of the terms of the Zoning Ordinance to the property will result in practical difficulties in the use of the property because: The proposed redevelopment project would not be able to be constructed. _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ DECISION It is therefore the decision of the Carmel Board of Zoning Appeals that Development Standards Variance Docket No. ___________________________ is granted, subject to any conditions stated in the minutes of this Board, which are incorporated herein by reference and made a part hereof. Adopted this _______________ day of __________________________________, 20 _______. _____________________________________________ _____________________________________________ CHAIRPERSON, Carmel Board of Zoning Appeals _____________________________________________ _____________________________________________ SECRETARY, Carmel Board of Zoning Appeals Conditions of the Board are listed on back; Petitioner or representative to sign. Page 11 of 12 Filename: Development Standards Variance 2017 Revised 12/20/2016 CARMEL ADVISORY BOARD OF ZONING APPEALS BALLOT SHEET: FINDINGS OF FACT, DEVELOPMENT STANDARDS VARIANCE Carmel, Indiana 17040010 V (Building Materials) Docket No.: ______________________________________________ Shamrock Builders, Inc. by Faegre Baker Daniels LLP Petitioner: ______________________________________________ 1. ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ 2. ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ 3. _________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ DATED THIS ________________ DAY OF ______________________________________, 20 ___________. ______________________________________________ Board Member Page 10 of 12 Filename: Development Standards Variance 2017 Revised 12/20/2016 CARMEL ADVISORY BOARD OF ZONING APPEALS FINDINGS OF FACT SHEET - DEVELOPMENT STANDARDS VARIANCE 17040010 V (Building Materials) Docket No.: _______________________________________________ Shamrock Builders, Inc. by Faegre Baker Daniels LLP Petitioner: _______________________________________________ 1. The approval of this variance will not be injurious to the public health, safety, morals and general welfare of the community because: This $9 Million redevelopment project incorporates high quality architectural design _____________________________________________________________________________________ appropriate for the corridor. The facades seeking relief are interior to the site screened _____________________________________________________________________________________ from the public ROW. _____________________________________________________________________________________ 2. The use and value of the area adjacent to the property included in the variance will not be affected in a substantially adverse manner because: This $9 Million redevelopment project incorporates high quality architectural design _____________________________________________________________________________________ appropriate for the corridor. The facades seeking relief are interior to the site screened _____________________________________________________________________________________ from the public ROW. _____________________________________________________________________________________ 3. The strict application of the terms of the Zoning Ordinance to the property will result in practical difficulties in the use of the property because: The proposed redevelopment project would not be able to be constructed. _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ DECISION It is therefore the decision of the Carmel Board of Zoning Appeals that Development Standards Variance Docket No. ___________________________ is granted, subject to any conditions stated in the minutes of this Board, which are incorporated herein by reference and made a part hereof. Adopted this _______________ day of __________________________________, 20 _______. _____________________________________________ _____________________________________________ CHAIRPERSON, Carmel Board of Zoning Appeals _____________________________________________ _____________________________________________ SECRETARY, Carmel Board of Zoning Appeals Conditions of the Board are listed on back; Petitioner or representative to sign. Page 11 of 12 Filename: Development Standards Variance 2017 Revised 12/20/2016 STATEMENT OF VARIANCE & SUPPORT SHAMROCK SELF-STORAGE 1 {ŷğƒƩƚĭƉ .ǒźƌķĻƩƭͲ LƓĭ͵ Λͻ{ŷğƒƩƚĭƉͼΜ is the contract purchaser of the 2.6 +/- acres located at 9850 North Michigan Road (the Real Estate")(please see the Aerial Loca on Map at Tab 3) and respec ully requests BZA approval of certain variances of development standards to allow for the economic redevelopment of this site. The property is zoned I-1 (Industrial) and is within the U.S. Highway 421 - Michigan Road Corridor Overlay Zone. The property most recently was operated as a used car lot and a tree service business, and it now hosts a number of vacant buildings, gravel surface areas and discarded materials (please see the exis ng condi ons at Tab 4). The property is narrow and deep (approximately 200' x 600'), and the exis ng improvements have an assessed value of $48,900. Shamrock proposes to invest approximately $9,000,000 to acquire, develop and construct a new 3-story, drive-thru, climate-controlled, upscale self-storage facility, which will serve the needs of the local business community and nearby residents. The ŋ rst of its kind in /ğƩƒĻƌ ğƓķ IğƒźƌƷƚƓ /ƚǒƓƷǤͲ ğ ƉĻǤ ŅĻğƷǒƩĻ ƚŅ ƷŷĻ ĭƌźƒğƷĻ ĭƚƓƷƩƚƌƌĻķ ƦƩźƒğƩǤ ĬǒźƌķźƓŭ Ǟźƌƌ ĬĻ ĭǒƭƷƚƒĻƩƭ͸ ability to conveniently drive inside the building and unload/store their possessions while being protected from the elements. The property is bound by a gas sta on and fast food restaurant to the north, Michigan Road to the east, an undeveloped parcel and exis ng business to the south, and an undeveloped parcel to the west. As part of the development process, Shamrock respec ully requests the following variances from Chapter 23C: U.S. Highway 421 - Michigan Road Corridor Overlay Zone of the Carmel Zoning Ordinance: (1) Variance from Ch. 23C.11.C to allow relief from providing access to the parcel immediately north of the Real Estate. (2) Variance from Ch. 23C.14.02 to allow one (1) overhead door to face to the front of the building and be visible from the public ROW. (3) Variance from Ch. 23C.09.C to allow Building A to exceed the maximum building height and Buildings B, C, D, E, and F to be below the minimum building height. (4) Variance from Ch. 23C.09.D to allow relief from building facade o sets. (5) Variance from Ch. 23C.09.D and Ch. 23C.09.K.03 to allow for relief from the building materials and facade treatments on the non-perimeter building facades. A detailed explana on of each of the above variances can be found at Tab 7. The proposed Development Plan and Architecture may be found at Tabs 5 and 6, respec vely. If approved, then Shamrock plans to begin construc on later this year. Thank you for your considera on. 1 {ŷğƒƩƚĭƉ .ǒźƌķĻƩƭͲ ĭƚΏƚǞƓĻķ ĬǤ DƩĻŭ h͸IĻƩƩĻƓ ğƓķ DĻƚƩŭĻ DĻźŭĻƩͲ źƭ ĭĻƌĻĬƩğ ng its 50th anniversary in 2017 as a developer/builder of residen al, o ce and self-storage projects. Shamrock currently is building /ğƩƒĻƌ͸ƭ ƓĻǞĻƭƷ ƭĻƌŅΏƭƷƚƩğŭĻ ƦƩƚƆĻĭƷͲ ƚƓ ‘ĻƭƷ /ğƩƒĻƌ 5ƩźǝĻ ΛƆǒƭƷ ǞĻƭƷ ƚŅ /źƷǤ /ĻƓƷĻƩ 5ƩźǝĻΜͲ ğƓķ ƷŷğƷ ƦƩƚƆĻĭƷ received DP/ADLS approval in 2016 and is expected to be completed later this year. AERIAL LOCATION MAP SHAMROCK SELF-STORAGE U S 4 2 1 / M i c h i g a n R o a d 96th Street Real Estate EXISTING CONDITIONS SHAMROCK SELF-STORAGE 12 1 5 42 3 3 45 DEVELOPMENT PLAN SHAMROCK SELF-STORAGE A T E R L 2I N 0 E ' ' 3 .S 8E 2 E 1 A W S E E M R E E 15 L.F. NEW FENCE N A T S E M 1E 5'N 8 . 1 . 3 5T ' 1 5 . 5 ' ACK SETB ARD IDE Y 15' S F G DIN UIL B 2 1 q.ft. 00± s ,00 AL 2 2 TOT 2 Y NR 'SO A 0 Y M R 0 STO 1 - ' D M ING' ILD BU .25 A ft.884 sq.. = 00±.F.E 3,8F TAL5.6' TO1 X RY MASONRY SIGN 1.33'x12'x6' N 2 SO MA RY. TO - S 1 0 S 5R E W/60SQ.FT. OF SIGN AREA. SEE SIGN ' ' 7 T .25 U884 B . = F.F.E5 A 2 DETAIL ON ARCH DRAWING SHEETS.. T 0 C 5 I L ' .K I0 T ' 2' Y1 . 5 1 5 E . 2 A ' 8' 37. S OVERHEAD DOOR E 25 L.F. NEW FENCE M E N U ' 190 A 3 G S IN ILD BU T 0 B 4' DU 2G 1 RY ON 1 AS T' M I RY R STO .L7 - -.3 O O R1 E CE) D4FFI t. (O S sq.f 00±E V, 1,1 .q.ft. T5± s T,72 N 1 IT 23 LF RIN AN SE E OTP 1O AD FO 5 RO N GA HI RB IC 'M 8LG R LE R .25 A 884 6E. = L 1F.F. E Y T Cc.Y .A± A ,2.38 E AG 6 R & M STO R P Z 7 O 6 M Y . 5A 5 AN 3 I ± S'N RE 2 O . D s OVERHEAD DOOR S 8q N E S 6 . T E f R B 5 T t A B.Y' ' 6 . A C 7 6 F C K . F E K NG LDI UI B . E R . 2 L TA ME 0 =Y OR - ST 1 . 0 ' 8 t. 8sq.f 50± 2,3 AL 1 5OT T 4 ' . U2.25R 884 . = .F.E7 F 5 0 T . 0 I' 0' L19 I T Y 2 E 5 A . ' 50 . 2 S3 ' ER 4 M 5 . E 0 N ' ' T5 . 2 5 1 D5 . .3 0 R4 0 ' 0 . 2 B. G' DIN UIL 0. B 350 2 . ' q.ft. 80± s' ,50'0 AL 5 TOT Y NR 1 25 L.F. NEW FENCE0 SO A Y M R STO R 1 - . P2 .25 884 5. = ..F.E F ' 5 80 , P. 1 5. 301 T D.R EMEN EAS LINE TRIC ' ELEC 022010' CK SETBA ARD ' DE Y 24.0 5' SI 1 T EN SEM EA GE INA DRA 10' ' 5 . 9 11 T MEN EASE LINE TRIC ELEC 5 10' . 3 ' 205 L.F. NEW FENCE GATE CONTROLER ELECTRICAL TRANSFORMER ON 8'x8' PAD SEE DETAIL 24' LEFT HAND "AUTO GATE" - SHEET C5.2 BUCKEYE FENCE, PROVIDE MASONRY WALL, MATCH BUILDING BRICK ARCHITECTURE SHAMROCK SELF-STORAGE View From Michigan Road VARIANCE #1: PARKING LOT CONNECTION SHAMROCK SELF-STORAGE A T E R L 2I N 0 'E ' 3 .S 8E 2 E 1 A W S E E RM E 15 L.F. NEW FENCEE AN T S E M 1E 5'N 8 . 1 .3 T 5 ' 1 5 . 5 ' ACK RD SETB SIDE YA 15' F ING BUILD 2 1 q.ft. 0000± s TAL 2,2 2YTO ONR 'MAS 0 RY 0 - STO 1' G D'M ILDIN BU .4.25 A ± sq.ftE. = 88 3,800F.F. TOTAL15.6'X RYMASONRY SIGN 1.33'x12'x6' 2SON MA. TORY 1 - S 50 S R E W/60SQ.FT. OF SIGN AREA. SEE SIGN '' T 7 84.25 U.E. = 8 B 5 F.F A 2DETAIL ON ARCH DRAWING SHEETS. T. C 0 I5 L' .K I0 T ' Y2' .1 5 15 E . A2 ' 7.8' S3 OVERHEAD DOOR E 25 L.F. NEW FENCE M E N U 0' 19G A 3 S LDIN BUI T 0 B 4' D1U 2G RY 1 SON MA T I'ORY R .L.7 3 - ST O- R1 O)E D4FFICE Sq.ft. (O ,100± s E .V.ft., 1 TT725± sq N 1 IFNT 23, AN SEL E OTPRI 1OOADFO 5 N R HIGA R 'MIC B 8 LG LE R R A 884.25 6.F.E. = L E 1Y F T C Ac.Y .A,2.38± GE 6TORA & R MS Z P 7 O 6 M .Y 5A N 5 A 3±I S'N RE 2 O. D s OVERHEAD DOOR 8 S q S N E 6 .T E fR 5 B T t A B.Y'' 6 . A C 7 6 F C K . K FG E ILDIN BU . E R . 2 TAL =Y ME0 TOR 1 - S. 0 ' 8 . 8± sq.ft 2,350 5TAL 1 TO 4 ' . U2.25R = 884 F.F.E.7 5 0 T. 0 I' 190' L I T Y 2 E 5 A. ' 50 . 2 S 3' ER 4 M 5 E. 0 N' ' T5 . 52 1 D5 . .3 0 R4 0 0' .2 B. ING' UILD0. 3B5 20 . .ft.' 800± sq''0 AL 5,5 TOT NRY1 25 L.F. NEW FENCE0ASO RY M STOR 1 - . P2 4.25 5. = 88 .F.F.E ' 5 . 180 5. 301, P ENT D.R E EASEM TRIC LIN 020'10' ELEC 2 ETBACK YARD S.0' 5' SIDE 24 1 T SEMEN E EA AINAG 0' DR '1 5 . 9 1 T 1 SEMEN LINE EA LECTRIC 5 10' E . 3 ' 205 L.F. NEW FENCE GATE CONTROLER ELECTRICAL TRANSFORMER ON 8'x8' PAD SEE DETAIL 24' LEFT HAND "AUTO GATE" - SHEET C5.2 BUCKEYE FENCE, PROVIDE MASONRY WALL, MATCH BUILDING BRICK Ch. 23C.11.C: "Parking lots shall be designed to provide coordinated access to parking areas on adjoining tracts or parcels within the Overlay Zone." Request: To provide a stub for access to the south, but not to the north. Explanation: This use requires an enclosed, secure facility for the safety of its users and on-site inventory. Shamrock has worked with staff to agree on the proposed plan. VARIANCE #2: OVERHEAD DOOR SHAMROCK SELF-STORAGE Ch. 23C.14.02: "Loading berths and overhead doors shall face to the rear of all buildings. Should a loading berth be located adjacent to or visible from a public right-of-way, or established on the side of a building through any circumstance, it shall be screened per Commission approval." Request: To allow an overhead door to face to the front of the building and be visible from the public ROW. Explanation: This unique, high-end design is the first of its kind in Carmel. Access to the facility is provided through an overhead door, straight through the building with an exit on the opposite end for the ease of vehicular circulation (please see the floor plan and illustrative photos below). The entry design was thoughtfully designed to be recessed (approximately 16') from the front columns on the east facade. ASONRY SIGN 1.33'x12'x6' R . OF SIGN AREA. SEE SIGN 7 5 N ARCH DRAWING SHEETS. . 0 ' OVERHEAD DOOR 3 0 ' G R )E CE FFI E N B E L T & M I N . S E T B A C K Illustrative photo of proposed overhead doorSite plan showing recessed doorSite plan showing recessed doorIllustrative photo of proposed interior loading area VARIANCE #3: BUILDING HEIGHT SHAMROCK SELF-STORAGE Ch. 23C.09.C: "The maximum height shall be 46' thirty feet (30’); however, an additional eight feet (8’) shall be permitted to accommodate mechanical penthouses or other inner roof structures." (38' total maximum building height) Request: To allow Building A to exceed the total maximum building height by eight (8) feet with a total building height of forty-six feet (46') Explanation: The maximum building height permitted for this use in the underlying zoning district is sixty (60) feet. The first floor is also eight (8) feet taller than normal to accommodate vehicular entry for the "drive- thru" concept. Ch. 23C.09.C: "The minimum height for all buildings shall be twenty (20) feet either at 14' the roofline or at the top of the parapet wall." Request: To allow Buildings B, C, D, E, and F to be below the minimum building height by six feet (6') with a total building height of fourteen feet (14') Explanation: These buildings at the rear of the property are single-story. VARIANCE #4: FACADE OFFSETS SHAMROCK SELF-STORAGE Ch. 23C.09.D: "Buildings with continuous façades that are ninety (90) feet or greater in width, shall be designed with offsets (projecting or recessed) not less than eight (8) feet deep, and at intervals of not greater than sixty (60) feet." Request: To allow relief from the design of offsets on the west (rear) facade of Building A and the facades of Buildings B, C, D, E, and F. Facade offsets shall instead be provided with Brown Brick Cream Brick decorative columns as shown on the elevations. Explanation: Shamrock has worked with the staff to provide the decorative columns to satisfy the aesthetic intent of the standard. 41' +/- 4' +/- VARIANCE #5: BUILDING MATERIALS SHAMROCK SELF-STORAGE Ch. 23C.09.D: "All façades of buildings shall be of the same materials and similarly detailed." and Ch. 23C.09.K.3: "Warehouse facilities, including self-storage and mini- warehouse uses, shall have a high- quality façade treatment on all sides consistent with the following..." Request: To allow relief relief from these requirements on the interior- facing building facades to accommodate the inward-facing entry doors.